Upload
up680794
View
27
Download
2
Embed Size (px)
DESCRIPTION
CT5ANIGP
Citation preview
Callum East (UP680794)
CT5ANIGP - AFX Project - Production DiaryThroughout the 12 weeks (and beyond) allotted for our project, I did various tasks with varying degrees of complexity and success.Due to some scheduling issues and displeasure with our initial project, our first 6 weeks were disrupted and mainly went unused.Following this predicament, I began working on character designs as the newly appointed designer.
For Week 6, I begun creating mood boards for our Elk and Female Lead, and began to draft some initial ideas.For Week 7, I began refining these ideas further, creating more sketches and detailed images of our characters.For Week 8, and following on to Week 12, I experimented with both digital and traditional tests, creating frame drafts, digital boils and other effects that could be used for our Final Piece
Lastly, during the final weeks before our deadline, I assisted animation by animating 3 different scenes along with digitally enhancing them and compositing them into film.