72
AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework Buttressing Implementation of the First 10-Year Plan—“The Africa We Want”

AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

  • Upload
    others

  • View
    24

  • Download
    2

Embed Size (px)

Citation preview

Page 1: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

AFRICAN UNION AGENDA 2063

Capacity Development Plan Framework Buttressing Implementation of the First 10-Year Plan—“The Africa We Want”

Page 2: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

This Report is a product of the African Capacity Building Foundation (ACBF). The findings, interpretations, and conclusions

expressed in this volume do not necessarily reflect the views of the ACBF Executive Board or Board of Governors.

ACBF does not guarantee the precision of the data included in this work. The boundaries, colors, and other information shown on

any map in this work do not imply any judgment on the part of the Foundation concerning the legal status of any territory or the

endorsement or acceptance of such boundaries.

The user is allowed to reproduce, distribute and publicly perform this publication without explicit permission, provided that the

content is accompanied by an acknowledgement that the African Capacity Building Foundation (ACBF) is the source. No part of this

publication can be used for commercial purposes or adapted/translated/modified without the prior permission of ACBF.

© 2016 The African Capacity Building Foundation

2, Fairbairn Drive, Mt Pleasant, Harare, Zimbabwe

Produced by the Knowledge, Monitoring & Evaluation Department

The African Capacity Building Foundation

First printing February 2016

All rights reserved

For additional information on other knowledge products as well as project and program operations of the African Capacity Building

Foundation, please visit our website at the following address: http://www.acbf-pact.org

ISBN: 978-1-77937-064-8

EAN:9781779370648

Page 3: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

iii

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

CONTENTS

ACKNOWLEDGMENTS vi

LIST OF ABBREVIATIONS AND ACRONYMS vii

OVERVIEW 1

Background 1Key recommendations and observations 1

General points of emphasis 1Refine and pursue the critical technical skill agenda for “The Africa We Want” 2Fund the capacity development investments required in the first 10-year plan 3Capacity development for Agenda 2063: A long-term, special focus 3Structure of this document 4

CHAPTER 1 BUILDING ON CAPACITY REQUIREMENTS FOR THE NEW AFRICAN VISION 5

Summary of major points of emphasis from the capacity needs assessment 5Conceptual approach and methodology in preparing the CDP framework 5

CHAPTER 2 KEY PROPOSALS FOR CAPACITY DEVELOPMENT PRIORITIES 8

Proposal 1: Progressively build a capacity development ecosystem 8Proposal 2: Promote an African mind-set change and African ownership transformation capacity 9Proposal 3: Develop and promote transformative leadership capacity at all levels of leadership 10Proposal 4: Undertake institutional transformation, including reforming and retrofitting, to make

institutions more Agenda 2063 compliant 10Proposal 5: Prioritize the capacity development requirements for the first 10-year plan 11

Dimension 1: Recasting the African mind-set to a concept of African ownership 11Dimension 2: Identifying initial continental “flagship projects,” key development goals of

member states, and special development activities and initiatives 11Dimension 3: Scenario building/risk management and anticipating exigencies of the future 12

Proposal 6: Transfer shared responsibility to youth and women as central capacity pillars for Agenda 2063 13

Page 4: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

iv

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Proposal 7: Use a targeted multistakeholder approach 13Proposal 8: Prioritize capacity for communicating and creating awareness of Agenda 2063 14Proposal 9: Expand capacity by mobilizing and engaging with stakeholders 14Proposal 10: Strengthen partnership development and management 14Proposal 11: Engender ownership by countries and a broad spectrum of Africans 15Proposal 12: Unconditionally emphasize self-financing: “Solving the solvable — Africa financing itself” 15Proposal 13: Enhance capacity for implementation and for monitoring and evaluation 16Proposal 14: Strengthen the implementation capacity of key institutions 16Proposal 15: Anchor to the Capacity Development Strategic Framework 16Proposal 16: Recognize and accept what constitutes the multifaceted importance of a CDP 17

CHAPTER 3 PROPOSED CONTINENTAL CAPACITY DEVELOPMENT PLAN 18

CHAPTER 4 PROPOSED REGIONAL CAPACITY DEVELOPMENT PLAN 27

CHAPTER 5 PROPOSED NATIONAL CAPACITY DEVELOPMENT PLAN 33

CHAPTER 6 PROPOSED CAPACITY DEVELOPMENT PLAN FOR THREE STAKEHOLDER GROUPS 39

Developing the multistakeholder CDP templates 39

CHAPTER 7 INDICATIVE CAPACITIES REQUIRED FOR FLAGSHIP PROGRAMS OF THE FIRST 10‑YEAR IMPLEMENTATION PLAN 46

CHAPTER 8 GAPS IN AFRICA’S CRITICAL TECHNICAL SKILL AREAS: SAMPLE ANALYSIS 57

Engineers 57Medical doctors and specialists 58Researchers and STEM specialists 58Three other critical skill areas 59

NOTES 61

Page 5: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

v

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

REFERENCES 62

Boxes

1 Some urgent recommendations, particularly for enabling capacity 31.1 Points of emphasis from Capacity Requirements for the New African Vision 6

Figures

2.1 Capacity development ecosystem for Agenda 2063 92.2 The three strategic dimensions to be achieved under Agenda 2063 122.3 Two sets of capacity outcomes 148.1 Mining specialists and engineers 598.2 Geologists 608.3 Quantity surveyors 60

Tables

3.1 Continental start-up capacity interventions 194.1 Regional start-up capacity interventions 285.1 National start-up capacity interventions 346.1 Start-up capacity interventions for youth 406.2 Start-up capacity interventions for women 426.3 Start-up capacity interventions for academia and think tanks 447.1 Indicative capacities required for flagship programs of the first 10-year plan 47

Page 6: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

vi

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

ACKNOWLEDGMENTS

The Executive Secretary of the African Ca-pacity Building Foundation (ACBF) and the Chairperson of the African Union Commis-sion (AUC) are thankful to the institutions and individuals for putting together this im-portant capacity development plan. These include the leadership of the regional eco-nomic communities, the African Union (AU) Deputy Chairperson, AUC Commissioners, leadership of the AU specialized institutions, leadership of the AU organs, focal persons of the Office of the AUC Chairperson, the AUC Strategic Planning Department and the

Agenda 2063 Technical Team, representatives from various stakeholder groups, and other development institutions working closely with the AU, such as the African Develop-ment Bank and the United Nations Economic Commission for Africa.

The ACBF and the AUC also extend their appreciation to the team from Capacity and Development Services, which prepared the plan on the basis of the Capacity Needs As-sessment and the Africa’s Critical Technical Skills reports.

Page 7: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

vii

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

LIST OF ABBREVIATIONS AND ACRONYMS

ACBF African Capacity Build-ing Foundation

AfDB African Development Bank

AMDC African Mineral Devel-opment Center

APRM African Peer Review Mechanism

AU African UnionAUC African Union

CommissionCD Capacity developmentCDP Capacity development

planCDSF Capacity Development

Strategic FrameworkCSO Civil society

organizationCTS Critical Technical SkillsDRM Domestic resource

mobilizationECA United Nations Econom-

ic Commission for Africa

HSGOC Heads of State and Government Orientation Committee

M&E Monitoring and evaluation

NEPAD New Partnership for Africa’s Development

PAP Pan-African ParliamentREC Regional economic

communitySTEM Science, technology,

engineering, and mathematics

TOR Terms of referenceTVET Technical and vocational

education and trainingUNDP United Nations Develop-

ment Program

Unless otherwise indicated, all dollar amounts are U.S. dollars.

Page 8: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes
Page 9: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

1

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

OVERVIEW

Background

Pursuing the vision of “an integrated, pros-perous and peaceful Africa, driven by its own citizens and representing a dynamic force in the global arena,” the Heads of State and Government at the June 2012 African Union (AU) Summit mandated that the Chairperson of the African Union Commission (AUC), in collaboration with several key institutions, develop an indigenous strategic framework for the continent’s transformation over the next 50 years. This framework was to be an-chored in inclusive growth and sustainable development.

During the AU Golden Jubilee Summit, Member States pledged to commit themselves to the continent’s development and techno-logical transformation through a continental strategic framework, Agenda 2063, and to national development plans through a peo-ple-driven process. Furthering decisions of the AU Executive Council, the AUC formu-lated goals, targets, and strategies to realize Agenda 2063.

The AUC decided to assess the capacities required for implementing Agenda 2063 at the continental and regional levels (and sub-sequently at the national level) and worked closely with the African Capacity Building Foundation (ACBF), which led the exercise conducted by the Capacity Team in 2015. Three documents from this review were this capacity development plan (CDP) framework document; Capacity Requirements for the New African Vision: Agenda 2063 — “The Af-rica We Want;” and African Critical Technical

Skills: Key Capacity Dimensions Needed for the First 10 Years of Agenda 2063. The pre-liminary findings and recommendations from the capacity needs assessment were presented to the June 2015 Heads of State and Gov-ernment Summit. The Summit emphasized the capacity dimensions for Agenda 2063, including:

• Critical, technical, and sector-specific skills and training.

• The importance of developing mechanisms to enhance the role of youth and women as central capacity pillars.

• Mind-set transformation, including setting up multistakeholder groups.

This CDP document proposes multilevel and multistakeholder CDPs that identify an initial set of foundational capacity-strengthening ac-tivities for the First 10-Year Implementation Plan (first 10-year plan) of Agenda 2063.

Key recommendations and observations

General points of emphasis

Capacity development (CD) is crucial for the first 10-year plan and for Agenda 2063 over-all. It needs large financial resources beyond the capacity of any single organization (or groups of them) if interventions are man-aged centrally at the continental and regional levels. Thus the CD approach embodied in this document is based on subsidiarity and

Page 10: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

2

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

decentralization — hence the need for the mul-tilevel, multistakeholder approaches.

CD is essentially about pursuing three key goals: enhance skills of individuals and groups; enhance or improve enabling envi-ronments to get things done; and design or improve systems, processes, institutional structures, and modes of operation to achieve better outcomes and effectiveness.

Key stakeholder groups (Box 1) and indi-viduals are encouraged to mobilize and seek funding for CD at their levels. It is estimated that 80 percent of the needed CD interven-tions could be carried out by these groups and individuals, while 20 percent may be placed under the responsibility of continental and regional institutions.

In light of this split, the AU’s biggest role now is to go out forcefully to expand awareness, build commitment, negotiate buy-in, promote an African sense of confidence toward the future, and spin the wheels of a positive move-ment toward a greater Africa. This involves creating a sense of excitement for Africans at all levels (from the grassroots upwards) about owning and pursuing their aspirations in dif-ferent but complementary ways.

Considering other strategic dimensions of the larger “capacity picture” for Africa, the fol-lowing needs are also important:

• Build capacity inventories at various levels.

• Design and gather new data on various ca-pacity categories.

• Emphasize capacity retention and utilization.

• Map out intra-African mobility and mi gra tion of critical technically skilled professionals (including issues of demand and supply and opportunities and challenges).

• Potentially consider policy protocols on the brain-drain circulation of Africans within Africa.

Refine and pursue the critical technical skill agenda for “The Africa We Want”

A bold critical technical skill (CTS) agenda must be launched within this first year of im-plementation of the first 10-year plan. Such an agenda should prioritize:

• Dramatic increases in African CTS profes-sionals and specialists in key areas such as engineering, mining, physics, geology, irrigation, dams, and geographic informa-tion systems. From the sample analysis in Chapter 8, as well as more elaborate projections that are being established, the numbers required will generally be seven to ten times that of present levels. These required numbers ideally will be achieved by the end of the first 10-year plan (2023).

• Unprecedented emphasis on producing large numbers of technicians who have been trained in technical and vocational education and training (TVET).

• A huge emphasis and orientation toward boosting science, technology, engineering, and mathematics (STEM) education and training.

• A significant expansion of African research and the generation of contextualized knowledge and data to underpin Africa’s new narrative.

The CD imperatives related to the above re-quire attention to:

• New policy packages at the national level to orient and incentivize.

• Capacity-retention policies.

Page 11: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

3

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

• Strategic negotiations with academia and the private sector.

• Data on existing pools of CTS specialists and TVET and STEM workers.

• Dialogue with CTS professional associa-tions in Africa and the diaspora.

• Targets set and monitored for the produc-tion of CTS.

Fund the capacity development investments required in the first 10-year plan

To raise the considerable investment capital required, it is proposed that vision-driven negotiations be initiated at once, involving national governments, the private sector, and academia. Leaders of CTS professional asso-ciations should also be brought in. The private

sector should be encouraged and empowered to design and implement win-win solutions for African CTS education.

The start-up seed funding for the CD priorities identified for the multilevel and multistake-holder CDPs in this document amounts to $28,610,000. It is proposed that almost all these activities be undertaken within the next two years. To calculate the complete cost, one would add the large amount of funds required to finance education and training imperatives, including those focusing on CTS, TVET, and STEM.

Capacity development for Agenda 2063: A long-term, special focus

It is vital that the AU system be supported in a sustained way by specialized entities work-ing on capacity issues. In this spirit, it would be useful to consider and institutionalize the

Box 1 Some urgent recommendations, particularly for enabling capacity

AUC/AU and institutions Lead responsibility

Set up a central implementation entity at the AUC and focal teams within continental and regional institutions

AUC (Chairperson’s Office)

Lead and drive the mind-set transformation agenda AUC, with support from the New Partnership for Africa’s Development (NEPAD) and the regional economic communities (RECs)

Sustain the Agenda 2063 vision through urgent identification and promotion of “champion roles” involving current and former Heads of State and top private sector leadership

AU/AUC/NEPAD

Rationalize the institutional architecture and roles of institutions to make them Agenda 2063-compliant

AU/AUC/institutions and RECs

Create and train small and focused domestic resource mobilization (DRM) “brigade units” in key institutions

All concerned continental, regional, and national institutions

Member States

Set up Agenda 2063 focal points Key ministries concerned

Domesticate, national-contextualize, and build awareness of the first 10-year plan’s activities

Key stakeholder groups and individualsa

Take responsibility for identifying, proposing, and putting in place their respective interface mechanisms/representatives/structures engaging in the activities and dialogue for Agenda 2063

Stakeholder groups, working with AU institutions and RECs

a. Includes youth, women, the diaspora, African celebrities, traditional leaders, faith-based organizations, the private sector, civil society organi-

zations (CSOs), and academia and think tanks.

Source: ACBF Capacity Team.

Page 12: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

4

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

support of entities such as the African Capac-ity Building Foundation (ACBF). The ACBF will work closely with the NEPAD Agency and institutional entities in the United Nations Economic Commission for Africa (ECA), as well as with the African Development Bank (AfDB). It may also be helpful to integrate expertise on capacity issues within the im-plementation entity and focal teams under the AUC.

Structure of this document

The rest of this document is divided into eight chapters. Chapter 1 shows how this document builds on the findings and recommenda-tions of Capacity Requirements for the New

African Vision: Agenda 2063 — “The Africa We Want.” The particularly important Chapter 2 presents key proposals from the Capacity Team to guide priorities and planning.

Chapters 3, 4, and 5 outline three multilevel CDPs, at the continental, regional, and na-tional levels, and Chapter 6, in a similar vein, presents three sample CDPs for academia, youth, and women.

Chapter 7 gives indicative capacities required for the flagship programs of the first 10-year plan. Chapter 8 finishes with a sample analy-sis of projections in a few CTS areas (a topic more fully explored in African Critical Tech-nical Skills).

Page 13: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

5

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

1BUILDING ON CAPACITY REQUIREMENTS FOR THE

NEW AFRICAN VISION

In formulating the foundational areas for ca-pacity building expressed in this document, the Capacity Team drew on the findings and recommendations that emerged from the ca-pacity needs assessment. This assessment is documented in Capacity Requirements for the New African Vision: Agenda 2063 — “The Africa We Want,” which this chapter briefly summarizes.

In assessing the capacities required for achiev-ing Agenda 2063, the Team “unpacked” Africa’s transformative vision and analyzed the question: “Capacity for what?” It found that the fundamental broad capacities fall into three key strategic dimensions, which capture the essence of Africa’s Agenda 2063 vision:

• Dimension 1: recasting the African mind-set to a concept of African ownership.

• Dimension 2: identifying initial continental “flagship projects,” key development goals of member states, and special development activities and initiatives.

• Dimension 3: scenario building/risk man-agement and anticipating exigencies of the future.

The capacity review exercise produced major findings in broad capacity categories and made recommendations, all reflecting the multifaceted nature of capacity-enhancing priorities for succeeding in Agenda 2063.

Summary of major points of emphasis from the capacity needs assessment

Box 1.1 highlights the key messages taken from Capacity Requirements for the New African Vision. They were used as building blocks for the key proposals (chapter 2) and the CDPs (chapters 3–6).

Conceptual approach and methodology in preparing the CDP framework

Given the multidimensional nature and long-term vision of Agenda 2063, it is important that an equally innovative “CD” approach be developed that goes beyond the classic approach to CDPs. Hence the Capacity Team here proposes CDP templates that go beyond the production of one “umbrella” CDP. In-stead, the templates develop multilevel and multistakeholder CDPs to enhance the plan-ning of initial CD efforts.

The conceptual and methodological approach is based on the following:

A multilevel approach. The Team developed initial CDPs at the continental, regional, and national levels.

A multistakeholder approach. This recognizes the need for CDPs that address the CD needs of key stakeholder groups (see box 1).

Page 14: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

6

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Rolling, planning, updating, and expanding. During the first 10-year plan, the first CDP could aim for a timeframe of three years, with an adjusted set of CDPs for the last four of the first 10 years (until 2023).

Sources of funding — human, financial, and technological. One of the advantages of a multistakeholder approach is the potential for increasing the sources of funding on the basis of a decentralized, multilevel ap-proach. Moreover, this approach seeks to

“responsibilize” various levels of organiza-tions (continental, regional, and national) and stakeholder groups to commit them-selves to continuously re-identifying funding sources. It also enables a closer linking of CD requirements with actual Agenda 2063 activities.

Foundational and critical-path analysis. The Team first identified fundamental items — soft skills, composite capacities, and mind-set transformation. All these key issues

Box 1.1 Points of emphasis from Capacity Requirements for the New African Vision

Africa has diverse capacities at various levels that will help it firmly engage in implementing the First 10-Year Implementation Plan (the first 10-year plan) and Agenda 2063, but for it to be more effective some key capac-ities need urgent attention:

• Transformative and change abilities (including transformative leadership and change readiness).

• Improved capacities of institutions and organizations — continental, regional, and national — involving the restructuring and refocusing of work systems and a review of mandates.

• Investments in massive training and education for critical, technical, and sector-specific skills, including in STEM.

• An urgent revamping of the content of African education at all levels, so that educated Africans (including children and youth) are imbued with African values and visionary optimism and can find or create substan-tive employment.

• A move toward a Pan-African “New African” agenda through an African ideological grounding for those on the continent and in the diaspora,

• The start of a progressive transfer to youth and women of key responsibilities for leading parts of Agenda 2063 within the first two years of the first 10-year plan.

• The ability of the continent to commit and mobilize its own funding for the first 10-year plan and Agenda 2063. This will be the litmus test of “capacity.”

• An increase in soft skills, which are indispensable for each person to make things happen.

• Crucially and urgently, dimension 1 (recasting the African mind-set to a concept of African ownership) would then guide Africa’s development paradigm based on African values.

Page 15: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

7

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

are critical game-changers and drivers of transformation, acting together as in a com-plex ecosystem. They are key elements of transformative capacity and need to be in

place from the outset, at the core of imple-mentation. Transformative development is framed in the long term as an essential out-come of Agenda 2063.

Page 16: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

8

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

2KEY PROPOSALS FOR CAPACITY

DEVELOPMENT PRIORITIES

Based on substantive and conceptual analy-sis, this chapter presents 16 key proposals for prioritizing and developing interventions for the first 10-year plan and subsequently laying the foundations for the later implementation phases of Agenda 2063.

Proposal 1: Progressively build a capacity development ecosystem

The starting point in implementing Agenda 2063 is with several critical game-changers and drivers of transformation, acting together in an ecosystem as foundational elements of transformative capacity.

The ecosystem has four layers (figure 2.1): the individual level (red), the change agents (white), the context environment (dark blue), and the enabling environment (light blue). The CD eco-system works from the inner circle outwards.

At the center (the red circle) is the “new Afri-can.” In the broad context of Agenda 2063, she or he, whether an elected leader or an individ-ual citizen, should be deeply “conscientized,” Pan-Africanist, and results-driven. He or she must be fully self-aware, with a strong African identity, and must have gone through training, learning by doing, and formal and informal/indigenous education as adapted to the practical exigencies of Africa in the 21st century — the new Africa. Some form of ideology that guides and directs effort, knowledge, skills, and institutions is necessary to bring about trans-formation in Africa at the individual level.

“Ideology” in this context refers to a visionary theory of self-confidence, with bold belief in and pursuit of a great destiny, anchored in the African body system and the drive to own and manage African resources and progress.

The individual connects closely with the change agents (white). They are knowledgeable stakeholder groups and individuals — skilled, committed, highly motivated, and high-performing — and can start now. These change agents should be totally transformed into new kinds of Africans who can inspire and mobilize others for action.

Following this process of reframing the New Af-rican, the next tier of the ecosystem (dark blue) is the context within which stakeholder groups and individuals apply themselves, via institu-tions, resources, transformative leadership, and hard and soft skills. Individuals function more effectively within institutions that provide a strong foundation. Access to resources — or the lack of it — affects individuals’ ability to function and hence their productivity. Without a well-structured and functioning institutional setting, therefore, individuals are only individ-uals. Effective institutions serve as the crucible within which individuals and other resources interact to generate desired outcomes, and it is in these institutions that individuals, their skills, and their collective knowledge come together.

The final layer (light blue) is the enabling environment that promotes productivity, val-ue-chain thinking, results orientation, and a transformative agenda. The first 10-year plan

Page 17: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

9

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

should be solidly anchored in an African set of values that motivate and guide stakehold-er groups and individuals. It should also be anchored in a political economy and a social system that is founded on a clear, motivating, and single-purpose ideological paradigm with-in which people and institutions will function.

CD is not a one-time event. The ecosystem con-cept underscores this, going beyond traditional capacity “building.” The essential outcome is transformation generated and sustained over time and from within. Transformation of this kind goes beyond performing tasks.

Proposal 2: Promote an African mind-set change and African ownership transformation capacity1

The results of the capacity needs assessment showed that the continent has to make a

fundamental mind-set shift. A deeper para-digm, ideology, and existential identity are needed for Agenda 2063 to materialize. This will not happen just because it is desired. It will require the purposeful construction, nur-turing, and harnessing of key change drivers. These areas, especially the often-neglected “soft” and transformative capacities, have to be developed, after which they will constitute a new foundation for Africa to believe in its capacity to be a great continent, bringing and managing prosperity and peace to its people.

In particular, the “average” African’s self-confidence and positive mind-set that urgent change is necessary and possible are perhaps the most critical success factors for realizing the vision. These two areas present a challenge to Africans to take charge of their destiny and to believe and pursue the quest for development and prosperity. For this to happen, and for Africa to really “rise,” there

Figure 2.1 Capacity development ecosystem for Agenda 2063

Individual level

African values

Ideas

Mind-setIdeology

SocializationSelf-con�dence

Professionalism

Enterprising and industrious

Performance Value chains

People’s movement

Knowledge

DemandNew culture

Pride of purpose Performance

Hard skills

Resources

Lead

ersh

ip

Institu

tion

s

Source: Adapted by ACBF Capacity Team from UNDG Primer (UNDP 2009).

Page 18: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

10

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

needs to be a collective mind-set shift leading to a focus on a new and positive narrative, a capacity to dream of a different and better reality, and a capability to turn the dream into reality, starting today. Without these critical ingredients, detractors and negativity will sap essential energies. Creating the highly effec-tive “New African” requires that urgent action be taken to promote new belief, confidence, mind-set transformation, and commitment to build a new Africa.

In prioritizing the foundational CD needs for the first 10-year plan it is crucial to stress, on the one hand, CD for African mind-set and ownership transformation, including change readiness, and, on the other, human capacity (hard and soft skills), as well as other funda-mental and systemic capacities that need to be tackled starting now.

The existential imperative for change and transformation to ensure buy-in, broad-based acceptance, and a movement for transforma-tion in turn requires radical and visionary leadership. Another critical success factor is an engaged and committed citizenry with confidence in that leadership.

In addition, there must be a support mecha-nism for the transformation, while change agents must be encouraged to innovate, take risks, and explore nontraditional ideas. An-other prerequisite is robust transformative institutional architecture, with values- oriented institutions.

Proposal 3: Develop and promote transformative leadership capacity at all levels of leadership

The new Agenda 2063 individual stakehold-er groups need leadership at all levels that is visionary, recognizes and nurtures talent, creates space for individual expression, and

motivates and brings out the best in people. Engaging and participatory leadership are critical for high-performing individuals who thrive in environments that engender recogni-tion and reward excellence and achievement. Without such leadership, the continent will continue to lose its best- educated and skilled professionals to competing, more motivating environments.

Proposal 4: Undertake institutional transformation, including reforming and retrofitting, to make institutions more Agenda 2063 compliant

Agenda 2063 needs institutions that are fit-for-purpose — institutions with mandates aligned to the seven aspirations:

• A prosperous Africa based on inclusive growth and sustainable development.

• An integrated continent, politically united and based on the ideals of Pan-Africanism.

• An Africa of good governance, respect for human rights, justice, and the rule of law.

• A peaceful and secure Africa.

• An Africa with values, ethics, and a strong cultural identity.

• An Africa whose development is peo-ple-driven, relying especially on the potential offered by its youth and women.

• An Africa as a strong and influential global player and partner.

Delivering on Agenda 2063, start-ing with the first 10-year plan, requires fit-for-purpose institutions that provide the operational environment that encompasses

Page 19: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

11

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

a coherent set of policies, structures, and or-ganizations. These institutions also provide physical infrastructure and systems (including technology, procedures, and work processes) conducive to motivated and high-performing individuals. Effective institutions also cre-ate opportunities and build up the potential of individuals to expand their capabilities. Well-developed institutions — supported by skilled individuals, structures, and systems for applying knowledge, alongside clear account-ability mechanisms — enhance performance, allowing arrangements for implementation to be stronger and more efficient, adaptable, and resilient.

Some CD elements will be centered on the institutions and organizations with man-dates to lead the Agenda 2063 processes by reengineering systems and work processes; harmonizing mandates and functions; struc-turally configuring existing institutional architecture; and enhancing institutional capacities at the continental, regional, and na-tional levels and among stakeholder groups.

Africa needs an existential ideology to gal-vanize Africans into action and to sustain the transformation. This ideology is equiva-lent to the “total liberation of Africa,” a war cry of the 1960s that galvanized Africans and sympathizers everywhere into a unity of purpose: the eradication of all forms of colo-nialism. The Organization of African Unity was itself established with this mandate. The policies and actions of governments of independents states were aligned with it, and institutions and structures — including laws, power relations, and social norms governing civic engagement — were enact-ed in pursuit of the liberation struggles. A similar enabling environment to stimulate collective capacity will be essential to create the urgency, impetus, policies, and broad-based citizen action for implementing Agenda 2063.

Proposal 5: Prioritize the capacity development requirements for the first 10-year plan

Starting with the first 10 years, the Capac-ity Team addressed the question: What are the kinds of capacities necessary to achieve Agenda 2063? In addressing it, the Team un-dertook a substantive analysis of the purpose, content, and activities of the Agenda, which led the Team to “unpack” it into three strate-gic dimensions (figure 2.2).

This approach enables us to understand the elements of work that need be accomplished to achieve the outputs and outcomes in this bold vision. This unpacking therefore provides a first strategic response to the question: Capacity for what?

Dimension 1: Recasting the African mind-set to a concept of African ownership

A very important dimension of Agenda 2063, and a departure from previous development frameworks, is the emphasis on the need for Africa to master its own destiny through efforts and processes driven and managed by its own citizens. Achieving this dimension will be essential in paving the way for the two other dimensions to succeed, in a way that portrays Africa’s own development paradigm. Thus, accompanying the CD dimension is a call for social, economic, and political rejuvenation — a call for action to reenergize the African citizenry and rekindle the spirit of working together toward collective prosperity and a common destiny in a united and strong Africa.

Dimension 2: Identifying initial continental “flagship projects,” key development goals of member states, and special development activities and initiatives

This dimension requires skills in the areas of programming as well as activity planning and

Page 20: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

12

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

execution. It also requires “hard” technical or specialist subject knowledge and skill sets that are critical for implementing flagship projects and other programs of the 10-year plan. This dimension is not new, as it has been included in other continental frameworks such as the Lagos Action Plan, the African Economic Treaty, and, most importantly, the 1963 Organization of African Unity Summit Resolution (which laid the foundation for the continent’s development). Fulfilling Agenda 2063 will require capacity enhancement and revamping of resources, institutional capaci-ty, and systems and work processes. Critical skills are also required in engineering, energy, mining, financial management, science and technology, and information and communica-tions technology (ICT).

Dimension 3: Scenario building/risk management and anticipating exigencies of the future

This dimension raises the need for adaptable knowledge systems and structures to man-age risks and to build resilience. Member States should be able to anticipate society’s growing needs and future challenges and develop appropriate interventions to deal with them. This dimension requires strate-gic, forward-planning and scenario-building capacities for the 21st century and beyond. It also requires Africa to show the willingness and ability to explore new opportunities, set its own agenda, and experiment with viable alternative approaches to addressing emerg-ing issues and challenges.

Figure 2.2 The three strategic dimensions to be achieved under Agenda 2063

Dimension 1Recasting the

African mindset toa concept of

African ownership

Dimension 3Scenario building/

risk management andanticipating future exigencies

Dimension 2Identifying initial

continental “�agshipprojects,” key development

goals of memberstates, and special

development activitiesand initiatives

Source: ACBF Capacity Team.

Page 21: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

13

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Capacities for the three dimensions must act together in symbiotic equilibrium for mutual coexistence and reinforcement. Further, all the actors and actions (entities or subsystems) in the ecosystem (see figure 2.1) have to work in a synchronized fashion, operate toward a common purpose, and be governed by com-mon rules and processes. This will create the necessary momentum for transforming the continent and fulfilling Agenda 2063’s aspirations.

Proposal 6: Transfer shared responsibility to youth and women as central capacity pillars for Agenda 2063

Agenda 2063 is about the future. Those who will live in that future must be given ample op-portunity to shape the Africa they want. One of the seven aspirations (an Africa whose devel-opment is people-driven, relying especially on the potential offered by its youth and women) specifically focuses on the two groups. Their role must therefore be center stage, and the implementation of the first 10-year plan must begin from the premise that it will integrate and mainstream programs led by, and focusing on, them. Deliberate and urgent steps should be taken to transfer responsibility for driving and planning aspects of Agenda 2063 to the many capable and committed young men and women, and to women of all ages.

Proposal 7: Use a targeted multistakeholder approach

CD’s effectiveness will be a core measure in assessing the formulation, benchmarking, implementation, and evaluation of programs and projects in the first 10-year plan. As-sessment also covers investments, including institutional arrangements, systems and pro-cesses, knowledge and skills access/transfer

and augmentation, and the measurement of CD outcomes in the transformation. There-fore, CD targets should be set for each goal and priority area.

A central CD principle would be that all Agenda 2063 investments and activities must aim to achieve two sets of capacity outcomes (figure 2.3), with activities and indicators de-signed to achieve the following:

• Systemic, composite capacities that con-tribute to the broad goals by ensuring that systems thinking and critical-path approaches are adopted, and by generating knowledge, innovation, and learning for other development interventions.

• Critical technical and functional capacities specific to the priority areas of the first 10-year plan and essential for program/project implementation (in necessary skills, sys-tems, processes, and institutional structures).

The approach provides a basis for a decentralized, disaggregated, multilevel, mul-tistakeholder process, increasing the diversity of funding sources for targeted CD interven-tions by stakeholder groups and individuals. Their involvement eliminates the challenge of having to identify and manage funds for one umbrella CD plan. Rather, stakeholders will identify their needs and mobilize and commit resources to address them within a common framework.

Further, this approach also enables a closer linking of CD requirements to the Agenda 2063 activities pursued (by organizations at various levels and stakeholders). Stakeholders will thus take responsibility for developing specific capacity for their projects and areas of operation, while helping improve system-lev-el capacity outcomes — creating stability and building resilience through investments for innovation and continuous improvement.

Page 22: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

14

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Proposal 8: Prioritize capacity for communicating and creating awareness of Agenda 2063

A prerequisite for effective implementation of Agenda 2063 is awareness across sectors and an essential understanding of its essence at various levels. Within the first few years, con-crete steps must be taken to adopt and adapt the agenda to national contexts and to ensure collective commitment. Sharing information, creating awareness of goals, communicating the need for Africa’s transformation, and effectively communicating processes and out-comes in an ongoing and structured manner is critical. The capacity for these has to be strengthened across the continent.

Proposal 9: Expand capacity by mobilizing and engaging with stakeholders

Agenda 2063 calls on all Africans — businesses, religious communities, ordinary citizens,

women’s and youth leaders, and policymakers at all levels — to act in concert to overcome the challenges facing Africa. It is therefore necessary to mobilize stakeholders (public, nonpublic, and nonstate) as integral parts of mechanisms for delivering development ser-vices and the results chain at the continental, regional, and national levels. Capacity for the coordination and supporting activities of stakeholders, in particular the private sector and CSOs, is critical and must be strengthened. Mechanisms will be put in place to facilitate continual engagement among stakeholders to make Agenda 2063 a truly participatory trans-formative agenda.

Proposal 10: Strengthen partnership development and management

A primary mechanism for imple-menting Agenda 2063 will comprise crosscutting and multilevel (particularly African) partnerships, collaboration, and networking, requiring a broad range of

Figure 2.3 Two sets of capacity outcomes

Support forholistic capacitydevelopmentprocesses

ImpactOutcomesProjectoutput

Projectimpact

Projectoutcome

Projectoutput

Project results

Development results

Systemiccapacity

Implementationcapacity

Inputs

Inputs

Project-relatedcapacity building

Otherinterventions

Source: ACBF Capacity Team.

Page 23: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

15

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

actors to participate in, amplify efforts toward, and add value to the continen-tal development effort. A robust African partnership framework is necessary at the continental, regional, and national levels to promote ownership, facilitate ongoing learning, ensure engagement in implement-ing actions, and document and provide case evidence. Formalized partnership arrange-ments will be useful with organizations expected to play key roles.

Partners should be identified on the basis of their potential value addition to imple-mentation, that is, bringing intellectual capital (including institutional knowledge, expertise, and know-how); human, mate-rial, institutional, and technical assets; and financial resources that can be leveraged to advance progress toward targets. Such part-nerships and collaborative efforts will be key in pooling resources and knowledge assets into collective action and taking advantage of opportunities in the region to advance the continental transformation. These include as-sets from nonstate actors in particular. Efforts should be made to mobilize CSOs, the pri-vate sector, and policy think tanks for mutual benefit.

Intraregional cooperation and partnerships will also be important for discovering in-novations, promoting continental learning, and finding practical solutions. Particular emphasis will be placed on exploring ways to unlock and put to use existing African expertise. In addition, capacities should be strengthened to facilitate South-South Cooperation to build social and economic capital. Its modalities present new op-portunities and development solutions, including financing, knowledge-sharing, capacity substitution or augmentation, ac-cess to markets, transfer of technology and innovation, and engagement with the do-mestic private sector.

Proposal 11: Engender ownership by countries and a broad spectrum of Africans

One of the major challenges for Agenda 2063 is that implementation will depend on Member States; they have the ultimate responsibility for making it happen. A critical factor for success is therefore the urgency and extent to which Member States take ownership of the Agenda through national policies, integrating projects and other interventions consistently into plans, and mainstreaming priorities in fiscal budgets. Member States also need to build human, institutional, and operational capacity as part of domesticating Agenda 2063.

To support domestication and strengthen capacities, the AU will assist Member States in preparing “National Agenda 2063” documents. These will internalize the aspirations and integrate the key elements of programs and projects into national plans. Their preparation will engender greater ownership and commitment by Member States. Such documents will capture the spirit and provisions of Agenda 2063 documents, including parts of the first 10-year plan and a summary reflection of the countries’ own priorities (based on their development plans or vision documents). In a pilot, a few countries will be assisted in preparing these documents. As part of the pilot, domestication tool kits also will be prepared and training sessions organized for other countries. The Agenda 2063 CDP will also be domesticated.

Proposal 12: Unconditionally emphasize self-financing: “Solving the solvable — Africa financing itself”

Africa cannot and should not expect donors to fund Agenda 2063. External funding of any kind always comes with subtle conditions that

Page 24: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

16

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

can be intrusive and disruptive and has creat-ed a dependency syndrome that is now hard to escape. Continued reliance on external funding will undermine ownership and lead to a loss of control of the Agenda. Another critical success factor is therefore how much the continent’s leaders can commit to and mo-bilize Africa’s own funding for Agenda 2063. The AU and Member States must urgently use its own resources, internally generated or otherwise, to find new ways of financing. Several options are under discussion and once selected must be introduced without delay. Mechanisms will also be developed for tap-ping into resources from the global South.

Proposal 13: Enhance capacity for implementation and for monitoring and evaluation

Agenda 2063 emphasizes invest-ment in capacities for monitoring and evaluation (M&E) to promote an evaluative culture that goes beyond compliance with processes and funding requirements. Con-crete implementation modalities and M&E capacity requirements should be factored into all Agenda 2063 project interventions, with plans for upgrading skills, managing information, strengthening collection of socioeconomic data, and developing systems for reporting results. Interventions should aim to improve procedures, set up accountability mechanisms, and create functional mech-anisms that facilitate access to and use of information for decisions.

An evaluative culture suggests use of M&E as a basis for learning to promote better perfor-mance, integrally linking M&E with knowledge management. For this purpose, Agenda 2063’s M&E framework will serve as a foundation for strengthening the capacity of Member States’ governments and their institutions to help them learn from their implementation experience and

improve their performance, drawing on evi-dence on the ground.

Proposal 14: Strengthen the implementation capacity of key institutions

CD priorities should include institutional development and mechanisms for delivering development services across the continent, as well as making the continent’s institutions — AUC, RECs, NEPAD Agency, African Peer Review Mechanism (APRM), Pan-African Parliament (PAP), and so on — operationally more effective and efficient.2 Continental and regional programs need to be linked to na-tional actions, each providing feedback to the other, which is why mechanisms to facilitate interaction will be important.

Proposal 15: Anchor to the Capacity Development Strategic Framework

The AU/NEPAD Capacity Development Strategic Framework (CDSF), endorsed by the AU Assembly in 2010, provides a good foundation for prioritizing CD in Africa. The CDSF represents a crucial paradigm shift in the approach to CD, emphasizing the imperative to capitalize on African resource-fulness and seeking to address capacity challenges through innovative and transfor-mative processes. The CDSF is a common approach to CD, ensuring continuity and synergy between regional and nation-al initiatives. Based on priorities defined by African stakeholders, the CDSF is found-ed on six “cornerstones:” transformative leadership; citizen empowerment; utilizing African potential, skills, and resources; pursuing knowledge and evidence-based innovation; developing the capacity of ca-pacity developers; and integrating planning and implementation for results.3

Page 25: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

17

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

The cornerstones address capacities among systems and individuals, and this Capacity Development Plan Framework builds on and operationalizes them. The aim is both to de-velop the capacity of actors (organizations and individuals) who can bring about transforma-tion and to meet Agenda 2063’s aspirations.

Proposal 16: Recognize and accept what constitutes the multifaceted importance of a CDP

When one reads the initial CD interventions suggested in the following chapters, one should bear in mind that CD includes:

• Training people and developing skills.

• Improving enablers, optimizers, and ca-pacity enhancers.

• Implementing enabling processes, in-stitutional structures, and managerial systems, including decentralization and responsibilization.

• Mobilizing and building commitment at all levels to succeed in a strategic and vision-ary agenda.

• Identifying and promoting soft skills.

With the above 16 proposals in mind, the Capacity Team presents some initial CD interventions, using a broad range of entry points.

Page 26: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

18

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

3PROPOSED CONTINENTAL

CAPACITY DEVELOPMENT PLAN

This first CDP matrix (table 3.1) proposes continental start-up capacity interventions. The areas of intervention will not remain static and will need to be periodically updated within the first 10 years when new priorities emerge. Further, these areas are only indica-tive of some of the foundational interventions required. The outcomes of the interventions

will be the basis for identifying, updating, or expanding further interventions.

The table has six key issue areas (first row), plus the timeline, indicative costs, and pro-posed key supporting organizations. The areas of broad capacity gaps and needs derive from the capacity needs assessment.

Page 27: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

19

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLANTa

ble

3.1

Co

nti

nen

tal s

tart

-up

cap

acit

y in

terv

enti

on

s

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts (

$)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

1C

ore

impl

emen

tatio

n ar

rang

emen

t/m

echa

nism

Nee

d to

est

ablis

h ro

bust

impl

emen

tatio

n en

tity/

foca

l tea

ms

Urg

ently

cre

ate

and

prov

ide

expe

rt ca

paci

ty tr

aini

ng to

the

Age

nda

2063

impl

emen

tatio

n en

tity/

foca

l tea

ms s

et u

p un

der

the A

UC

and

oth

er le

vels

/in

stitu

tions

as a

ppro

pria

te

Urg

ent

Dev

elop

and

impl

emen

t a

know

n an

d pu

blic

ized

fo

cal e

ntity

with

A

gend

a 20

63 e

mai

l and

co

mm

unic

atio

n sy

stem

sC

larit

y in

resp

onsi

bilit

y fo

r mov

ing

the A

gend

a fo

rwar

dR

esou

rces

and

syst

ems

prec

edin

g an

d fo

llow

ing

the

impl

emen

tatio

n

Cos

t of e

quip

men

t, IT

, ad

min

istra

tive,

and

co

mm

unic

atio

n se

rvic

es

($10

0,00

0)C

osts

rela

ted

to

deve

lopm

ent/f

orm

ulat

ion

of th

e TO

R, i

nclu

ding

th

e en

tity’

s man

date

and

ro

les (

$50,

000)

Cos

t of r

esul

ts-b

ased

im

plem

enta

tion

train

ing

wor

ksho

ps (t

rave

l and

lo

gist

ics)

($15

0,00

0)

$300

,000

AU

CA

CB

FEC

AA

fDB

2A

gend

a to

tra

nsfo

rm

Afr

ican

min

d-se

t

Urg

ently

put

in p

lace

ne

w in

itiat

ives

to

desi

gn, p

rom

ote,

and

ac

hiev

e a

min

d-se

t tra

nsfo

rmat

ion

wel

l id

eolo

gize

d an

d pr

omot

ed a

t all

leve

ls

Qui

ckly

dev

elop

and

agr

ee o

n an

Afr

ican

exi

sten

tial i

deol

ogy,

a

stra

tegi

c va

lue

syst

em, a

nd a

co

ncep

t of P

an-A

fric

anis

m th

at

trans

cend

s cul

ture

s, tra

ditio

ns,

and

phys

ical

bou

ndar

ies

Org

aniz

e a

serie

s of m

ind-

set

trans

form

atio

n pi

lot s

emin

ars

acro

ss th

e co

ntin

ent i

nvol

ving

ke

y st

akeh

olde

rsU

se p

opul

ar c

ultu

re to

co

nsci

entiz

e ci

tizen

s

Urg

ent

Ideo

logi

cal g

roun

ding

on

Pan-

Afr

ican

solid

arity

, co

nfide

nce,

and

self-

awar

enes

s and

ow

ners

hip

of it

s ow

n A

fric

an

deve

lopm

ent a

gend

aA

fric

a to

mas

ter i

ts o

wn

dest

iny

thro

ugh

the

effo

rts a

nd p

roce

sses

dr

iven

and

man

aged

by

its o

wn

citiz

ens

Cre

ate

a m

ovem

ent f

or

com

mun

icat

ing

and

publ

iciz

ing

Age

nda

2063

Min

d-se

t tra

nsfo

rmat

ion

expe

rt-te

am o

rient

atio

ns

($20

0,00

0)C

onsu

ltativ

e pr

oces

s ac

ross

the

cont

inen

t on

dev

elop

ing

Afr

ican

ex

iste

ntia

l ide

olog

y an

d st

rate

gic

valu

e sy

stem

s ($

900,

000)

Cos

ts re

late

d to

or

gani

zing

the

min

d-se

t se

min

ars (

Afr

ica

min

d-se

t pr

opag

anda

pac

kage

s —

trans

port,

logi

stic

s, an

d fin

anci

al re

sour

ces)

($

400,

000)

$1,5

00,0

00A

UC

with

su

ppor

t of

NEP

AD

AC

BF

ECA

AfD

BU

ND

P A

fric

a B

urea

u

3Su

stai

ning

the

Age

nda

2063

vi

sion

Put i

n pl

ace

mec

hani

sms t

hat

can

help

ens

ure

the

sust

aina

bilit

y of

“Th

e A

fric

a W

e W

ant”

vi

sion

, par

ticul

arly

am

ong

Afr

ica’

s po

litic

al le

ader

ship

an

d th

e le

ader

s of k

ey

inst

itutio

ns

Iden

tify

and

build

a sm

all

team

of c

ham

pion

cur

rent

and

fo

rmer

Hea

ds o

f Sta

te fo

r “Th

e A

fric

a W

e W

ant”

vis

ion

Con

side

r rev

isin

g/ex

pand

ing

the

role

of t

he N

EPA

D

HG

SOC

to se

rve

as a

form

al

Hea

ds o

f Sta

te A

ssem

bly

for

stim

ulat

ing

and

guid

ing

the

visi

on

Urg

ent

Hig

h-le

vel A

gend

a 20

63

cham

pion

sA

civ

il so

ciet

y an

d yo

uth-

led

mov

emen

t of

peop

le th

at p

rom

otes

and

sa

fegu

ards

the

visi

onA

stro

ng a

nd su

stai

ned

Age

nda

2063

team

Team

com

posi

tion,

se

nsiti

zing

mis

sion

s, ro

undt

able

/hig

h-le

vel

mee

tings

, tra

vel a

nd

logi

stic

al c

osts

, and

som

e ho

nora

rium

cos

ts fo

r fo

rmer

Hea

ds o

f Sta

te

($1,

000,

000)

$1,0

00,0

00A

UC

with

su

ppor

t of

NEP

AD

ECA (c

ontin

ued)

Page 28: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

20

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts (

$)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

4In

stitu

tiona

l ca

paci

tyR

atio

naliz

atio

n of

the

curr

ent c

ontin

enta

l in

stitu

tiona

l ar

chite

ctur

e

Ref

orm

inst

itutio

ns to

mak

e th

em A

gend

a 20

63 c

ompl

iant

Bui

ld c

apac

ity th

roug

h th

e es

tabl

ishm

ent o

f an

AU

in

ter-i

nstit

utio

nal t

ask

forc

e,

with

one

or t

wo

key

pers

ons

from

eac

h or

gani

zatio

n (A

UC

, NEP

AD

, APR

M, P

AP,

R

ECs a

nd so

me

orga

ns) t

o m

ake

reco

mm

enda

tions

for

ratio

naliz

ing

Form

ulat

e a

guid

ed w

ork

prog

ram

Trai

n ex

perts

in th

e ra

tiona

lizat

ion

Urg

ent

(firs

t ye

ar)

Trai

n ke

y in

divi

dual

s fr

om e

ach

inst

itutio

n on

ratio

naliz

atio

n fo

r A

gend

a 20

63Es

tabl

ish

a re

alis

tic

inst

itutio

nal r

efor

m

agen

da to

mak

e th

e co

ntin

enta

l ins

titut

ion

mor

e fit

for p

urpo

se fo

r A

gend

a 20

63

Proc

urem

ent o

f a

cons

ulta

nt (d

evel

opm

ent

of T

OR

for t

his t

ask

forc

e) ($

200,

000)

Expe

rt-su

ppor

ted

wor

k se

ssio

ns ($

100,

000)

$300

,000

AU

C w

ith

supp

ort o

f N

EPA

D

ECA

AC

BF

AfD

B

Set u

p an

inst

itutio

nal r

efor

m

polic

y gr

oup

to b

uild

an

impl

emen

tatio

n fr

amew

ork

for

Age

nda

2063

Firs

t 6

mon

ths

Dis

tingu

ish

role

s and

re

spon

sibi

litie

s of e

ach

orga

niza

tion

at th

e co

ntin

enta

l lev

el

Expe

nses

for t

he

inst

itutio

nal r

efor

m

polic

y gr

oup

($20

0,00

0)

$200

,000

AU

C w

ith

supp

ort o

f N

EPA

D

TBD

Impl

emen

tatio

n pr

oces

ses a

nd re

sults

-dr

iven

app

roac

hes

Cre

ate

and

train

spec

ial

impl

emen

tatio

n br

igad

e un

its a

s par

t of c

ontin

enta

l in

stitu

tions

Firs

t 6

mon

ths

Prod

uce

an

impl

emen

tatio

n m

anua

l ta

ilore

d to

eac

h in

stitu

tion

Plac

e re

new

ed fo

cus

on im

plem

enta

tion

for

resu

lts

Dev

elop

men

t of t

he T

OR

of

brig

ade

units

(rol

es

and

func

tions

) ($7

0,00

0)O

pera

tiona

l gui

delin

e pr

oduc

tion,

a c

oord

inat

ed

track

ing

syst

em, a

nd

train

ing

wor

ksho

ps o

n im

plem

enta

tion

proc

esse

s ($

50,0

00)

$120

,000

NEP

AD

A

genc

y an

d PA

P

TBD

Gov

erna

nce

and

enfo

rcem

ent

capa

citie

s

Inst

itute

and

org

aniz

e a

runn

ing

syst

em o

f gov

erna

nce

of A

U p

roce

ss w

orks

hops

th

at p

rece

de e

very

stat

utor

y pl

anne

d m

eetin

g.Id

entif

y bo

ttlen

ecks

and

en

hanc

e re

sults

-driv

en

gove

rnan

ce a

ppro

ache

s

Firs

t yea

rB

ette

r foc

us a

nd d

rive

for r

esul

ts a

nd th

e im

plem

enta

tion

of

deci

sion

sR

educ

e co

sts f

rom

fo

cusi

ng o

n th

e pr

oces

ses

of m

eetin

gs

Hig

h-le

vel e

xper

t co

nsul

tant

s to

unde

rtake

th

e ch

ange

in th

e go

vern

ance

syst

ems

($50

,000

)C

ondu

ct tr

aini

ng

wor

ksho

ps fo

r sta

ff to

ca

rry

out t

he n

ew sy

stem

(tr

avel

and

logi

stic

al

cost

s) ($

200,

000)

$250

,000

AU

(with

su

ppor

t fro

m

PAP

and

APR

M)

TBD

Nee

d to

stre

ngth

en

the A

U a

nd re

trofit

th

e AU

Org

ans f

or

Age

nda

2063

Stre

ngth

en th

e co

nsul

tativ

e ca

paci

ty a

nd re

vam

p th

e st

rate

gic

focu

s of t

he ro

le

and

wor

k of

the

key

orga

ns,

built

aro

und

thei

r lea

ders

hip

path

way

tow

ard

“The

Afr

ica

We

Wan

t”

Firs

t yea

rV

isio

nary

and

tra

nsfo

rmat

ive

lead

ersh

ip

thro

ugh

the

wor

k of

th

e or

gans

tow

ard

“The

A

fric

a W

e W

ant”

Con

tent

des

ign,

co

nsul

tativ

e pr

oces

ses,

prep

arat

ion

of p

ropo

sals

, an

d fa

cilit

atio

n of

im

plem

enta

tion

($40

0,00

0)

$400

,000

AU

(with

su

ppor

t fro

m

PAP

and

APR

M)

Tab

le 3

.1 C

on

tin

enta

l sta

rt-u

p c

apac

ity

inte

rven

tio

ns

(con

tinue

d)

Page 29: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

21

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts (

$)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

5H

uman

cap

acity

(h

ard

and

soft

skill

s)

Insu

ffici

ent s

taff

with

th

e rig

ht sk

ills i

n th

e in

stitu

tions

Ana

lyze

cur

rent

skill

sets

and

im

porta

nt sk

ills r

equi

red

for

Age

nda

2063

Und

erta

ke a

cap

acity

-ena

blin

g re

desi

gn o

f fun

ctio

nsEm

bark

on

a re

crui

tmen

t driv

e,

hirin

g pe

ople

with

skill

s at

mul

tiple

leve

ls

Firs

t yea

rQ

ualifi

ed P

an-A

fric

anis

ts

who

hav

e un

derg

one

rigor

ous i

nduc

tion

and

cons

cien

tizat

ion

train

ing

prog

ram

s

Ana

lysi

s of n

ew sk

ill se

t ($

50,0

00)

Trai

ning

pac

kage

and

tra

inin

g pr

ogra

ms

($15

0,00

0)

$200

,000

AU

CTB

D

Skill

s ret

entio

n an

d ut

iliza

tion

syst

emW

ork

on a

ppro

ache

s for

en

gagi

ng a

nd u

sing

the

serv

ices

of t

he A

fric

an

dias

pora

with

rele

vant

te

chni

cal s

kills

Firs

t 2

year

sC

reat

e sh

ort-t

erm

sk

ills t

rans

fer f

or th

e A

fric

an d

iasp

ora

to w

ork

tem

pora

rily

in A

fric

aSk

ills-

base

d ne

twor

k of

th

e di

aspo

ra tr

ansf

errin

g sk

ills t

o A

fric

a

Expe

rt co

nsul

tant

to

unde

rtake

the

desi

gn

and

train

ing

wor

ksho

ps

on im

plem

entin

g ne

w

appr

oach

es($

100,

000)

Cos

ts re

late

d to

setti

ng u

p th

e ne

twor

k(1

50,0

00)

$250

,000

AU

CC

ontin

enta

l in

stitu

tions

Gre

ater

app

licat

ion

of

the

soft

skill

s in

the

cont

inen

tal i

nstit

utio

ns

Form

ulat

e an

d im

plem

ent a

so

ft sk

ills n

ew tr

aini

ng a

gend

a.

This

cou

ld in

volv

e w

orks

hops

an

d se

min

ars f

or le

ader

s and

m

anag

ers a

t the

con

tinen

tal

leve

l

Firs

t 2

year

sC

ompr

ehen

sive

indi

cativ

e lis

ts o

f sof

t ski

llsA

focu

s on

soft

skill

s dur

ing

revi

ew,

asse

ssm

ent,

eval

uatio

n,

and

hum

an re

sour

ce

train

ing

Trai

ning

on

the

appl

icat

ion

of so

ft sk

ills

($15

0,00

0)

$150

,000

AU

CA

ll co

ntin

enta

l in

stitu

tions

6Sy

stem

s and

w

ork

proc

esse

sFo

cus o

n re

sults

-bas

ed

man

agem

ent

Set u

p an

exp

ert t

eam

to

unde

rtake

a si

gnifi

cant

ov

erha

ul a

nd st

ream

line,

with

gr

eate

r dec

entra

lizat

ion

of

resp

onsi

bilit

ies,

the

wor

king

sy

stem

s and

pro

cess

es o

f co

ntin

enta

l ins

titut

ions

Firs

t yea

rA

syst

em o

f cle

arly

de

fined

mea

sure

s of

perf

orm

ance

and

succ

ess

Purp

ose-

driv

en

cont

inen

tal i

nstit

utio

ns

Proc

ess a

nd e

stab

lish

perf

orm

ance

man

agem

ent

syst

ems (

$100

,000

)W

orks

hops

on

rele

vanc

e, e

ffici

ency

, or

gani

zatio

nal

effe

ctiv

enes

s, , a

nd fi

t for

pu

rpos

e ($

100,

000)

$200

,000

AU

CTB

D

M&

E, w

ith a

focu

s on

effe

ctiv

e an

d ef

ficie

nt in

stitu

tiona

l pr

oced

ures

, ca

pabi

litie

s, an

d in

tern

al sy

stem

s

Cre

ate

a ta

sk fo

rce

in e

ach

cont

inen

tal i

nstit

utio

n to

as

sess

exi

stin

g da

ta re

sour

ces

and

iden

tify

data

gap

s with

re

spec

t to

the

indi

cato

rs

for t

rack

ing

Age

nda

2063

pr

ogre

ss (b

asel

ine,

impa

ct, a

nd

impl

emen

tatio

n ou

tcom

es)

Firs

t 2

year

sA

pro

cess

of

impl

emen

tatio

n of

re

sults

-bas

ed M

&E

tool

s in

con

tinen

tal i

nstit

utio

ns

Inst

itutio

naliz

e M

&E

syst

em w

ith p

erfo

rman

ce-

repo

rt m

echa

nism

s in

plac

e, in

clud

ing

the

train

ing

of in

divi

dual

s in

resu

lts-b

ased

M&

E ($

100,

000)

$100

,000

AU

CTB

D

Effe

ctiv

e an

d ef

ficie

nt p

roce

dure

s, ca

pabi

litie

s, an

d in

tern

al sy

stem

s

Und

erta

ke a

cap

acity

-en

hanc

ing

reen

gine

erin

g of

sy

stem

s and

pro

cedu

res

Firs

t yea

rU

pgra

de sy

stem

s and

w

ork

proc

esse

sEx

pert

revi

ew o

f the

cu

rren

t sys

tem

with

a

view

to u

pgra

ding

it

($15

0,00

0)

$150

,000

AU

CA

CB

FEC

A (con

tinue

d)

Page 30: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

22

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts (

$)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

7K

now

ledg

e an

d ac

cess

to

info

rmat

ion

Exch

ange

and

shar

e in

form

atio

n, in

tern

ally

an

d ex

tern

ally

Iden

tify

and

prov

ide

lear

ning

re

sour

ces a

nd c

arry

out

ta

rget

ed tr

aini

ng fo

r key

co

ntin

enta

l ins

titut

ions

to

chan

ge th

e cu

lture

of w

orki

ng

in si

los

Firs

t yea

rB

uild

kno

wle

dge

and

info

rmat

ion

man

agem

ent

syst

ems i

n ea

ch

orga

niza

tion

that

will

be

com

e its

org

aniz

atio

nal

cultu

re

Initi

al o

utso

urci

ng

and

man

agem

ent c

osts

($

50,0

00)

Trai

ning

cos

ts($

200,

000)

$250

,000

AU

CA

CB

FEC

A

Mec

hani

sms i

n pl

ace

for o

rgan

izat

ions

to

be

“lea

rnin

g or

gani

zatio

ns”

for

Age

nda

2063

Rat

iona

lize

all t

he d

atab

ase

and

know

ledg

e sy

stem

s in

cont

inen

tal i

nstit

utio

ns w

ith

the

aim

of i

nstit

utin

g a

cultu

re

of le

arni

ng a

t ind

ivid

ual a

nd

orga

niza

tiona

l lev

els

Firs

t yea

rD

atab

ase,

stru

ctur

ed

docu

men

tatio

n, a

nd

know

ledg

e sy

stem

Expe

rt co

nsul

tant

to

unde

rtake

ratio

naliz

atio

n ($

200,

000)

$200

,000

AU

CA

CB

FEC

A

8C

hang

e an

d tra

nsfo

rmat

ive

capa

citie

s

Tran

sfor

mat

iona

l cu

lture

Top

lead

ersh

ip

and

man

agem

ent

optim

ism

, and

top

man

agem

ent

owne

rshi

p of

dec

isio

n-m

akin

g

Und

erta

ke a

con

tinen

t-wid

e se

ries o

f tra

inin

g, e

xper

ts’

advi

ce, a

nd re

com

men

datio

ns

on tr

ansf

orm

ativ

e cu

lture

and

ga

me-

chan

ging

lead

ersh

ipPr

oduc

e a

year

ly p

ublic

atio

n ra

nkin

g th

e hi

gher

-leve

l tra

nsfo

rmat

ive

and

acco

unta

ble

lead

ersh

ip o

n th

e co

ntin

ent

Firs

t yea

rA

rene

wed

Afr

ica

with

an

inte

rnal

ized

and

de

term

ined

spiri

t of

trans

form

atio

nal c

ultu

reA

n A

fric

an le

ader

ship

th

at e

mbr

aces

Afr

ican

va

lue

syst

ems o

f uni

ty,

sacr

ifice

, and

the

inte

rest

of

the

com

mon

goo

dA

n A

fric

an le

ader

ship

th

at is

com

petit

ive

at a

ll le

vels

and

at a

ll tim

es

Expe

rts’ r

emun

erat

ion

($50

0,00

0)R

esea

rch

and

publ

icat

ion

cost

s ($5

00,0

00)

$100

,000

AU

CA

U a

genc

ies

All

stak

ehol

ders

Spiri

t of P

an-

Afr

ican

ism

Fast

-trac

k pe

ople

-to-p

eopl

e in

tegr

atio

n pr

oces

ses

(cou

ntrie

s do

not p

rodu

ce

inte

grat

ion;

peo

ple

do)

Pan-

Afr

ican

ist e

xper

ts to

pr

oduc

e an

d de

velo

p an

in

duct

ion

stra

tegy

for t

he st

aff

in c

ontin

enta

l org

aniz

atio

ns

and

carr

y ou

t tra

inin

g to

in

culc

ate

a Pa

n-A

fric

an sp

irit

Firs

t yea

rPe

ople

mot

ivat

ed to

war

d a

shar

ed in

spira

tiona

l vi

sion

Prod

uctio

n of

an

indu

ctio

n st

rate

gy o

n Pa

n-A

fric

anis

m

Org

aniz

e an

d co

nduc

t a

serie

s of w

orks

hops

on

Pan

-Afr

ican

ism

($

450,

000)

Pan-

Afr

ican

ist e

xper

ts’

rem

uner

atio

n ($

50,0

00)

$500

,000

AU

CTB

D

Cha

nge

read

ines

s at

titud

esD

evel

op a

pla

tform

to

enco

urag

e an

d re

war

d cr

eativ

ity, i

nnov

atio

n, a

nd

entre

pren

eurs

hip

Firs

t yea

rA

cul

ture

of s

elf-

driv

en

chan

geR

enew

ed a

nd

trans

form

ed a

ppro

ach

to w

ork,

pro

gram

s, an

d pr

ojec

ts

Set u

p th

e pl

atfo

rm w

ith a

re

war

d fu

nd ($

450,

000)

$450

,000

AU

CTB

D

Tab

le 3

.1 C

on

tin

enta

l sta

rt-u

p c

apac

ity

inte

rven

tio

ns

(con

tinue

d)

Page 31: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

23

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts (

$)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

9C

ompo

site

ca

paci

ties

Stra

tegi

c pl

anni

ngFa

cilit

atio

n an

d co

ordi

natio

nPr

ogra

m d

evel

opm

ent

Man

agem

ent a

nd

finan

cing

kno

wle

dge

Ris

k m

anag

emen

t

Des

ign

and

inst

itute

a

Com

posi

te C

apac

ities

R

efre

sher

Tra

inin

g Sc

hem

e th

at ta

ckle

s the

key

are

as o

f op

erat

iona

lizat

ion;

pro

gram

m

anag

emen

t; an

d fa

cilit

atio

n,

coor

dina

tion,

and

stra

tegi

c/vi

sion

ary

plan

ning

Firs

t yea

rR

elev

ant A

fric

an

inst

itutio

ns p

rovi

ding

co

ntin

uous

relia

ble,

ef

ficie

nt, a

nd e

ffect

ive

serv

ices

to it

s ow

n ci

tizen

an

d to

the

wor

ldA

cro

p of

lead

ers i

n A

fric

an in

stitu

tions

with

fo

rwar

d-lo

okin

g vi

sion

/th

inki

ng a

nd p

lann

ing

to

deliv

er o

n A

gend

a 20

63

and

beyo

nd

Expe

rts to

dev

elop

cle

ar

TOR

on

coor

dina

tion

and

faci

litat

ion

($50

,000

)Ex

perts

to d

evel

op

capa

citie

s to

mat

ch th

e TO

R, t

o ge

t the

righ

t pe

ople

with

the

right

m

ind-

sets

, and

to fr

ame

an a

gend

a fo

r com

posi

te-

skill

s mas

tery

and

ap

plic

atio

n pf

the

task

($

50,0

00)

$100

,000

AU

CTa

rget

ed

indi

vidu

als

and

inst

itutio

ns

acro

ss a

ll se

ctor

s

10Fi

nanc

e an

d re

sour

ces

DR

MC

reat

e an

d tra

in a

smal

l and

fo

cuse

d D

RM

brig

ade

unit

as p

art o

f the

par

tner

ship

and

re

sour

ce-m

obili

zatio

n se

ctio

n of

eac

h co

ntin

enta

l ins

titut

ion

Bui

ld c

apac

ities

that

hel

p A

fric

a tra

nsiti

on fr

om th

e pa

rado

x of

bei

ng a

reso

urce

-ric

h co

ntin

ent w

ith a

hig

h nu

mbe

r of p

oor i

ndiv

idua

ls

Firs

t yea

rD

evel

op a

con

tinen

tal

DR

M fr

amew

ork

The

cont

inen

t enj

oyin

g its

reso

urce

sJo

int D

RM

secr

etar

iat

with

AfD

B fo

r Age

nda

2063

Cap

acity

bui

ldin

g th

roug

h tra

inin

g w

orks

hops

($25

0,00

0)

$250

,000

AU

CA

fDB

AC

BF

11A

ntic

ipat

ive

read

ing

of

the

futu

re

and

scen

ario

bu

ildin

g

Con

duct

futu

re

anal

ysis

and

scen

ario

pl

anni

ngIn

volv

e no

nsta

te

acto

rs to

con

tribu

te to

pr

oces

ses o

f sce

nario

pl

anni

ngIn

clud

e yo

uth

and

wom

en

Bui

ld c

apac

ity th

roug

h tra

inin

g an

d w

orks

hops

on

futu

re

anal

ysis

and

scen

ario

pla

nnin

g

Firs

t 6

mon

ths

Afr

ican

forw

ard-

look

ing

lead

ers/

indi

vidu

als

envi

sion

ing,

ana

lyzi

ng,

and

plan

ning

the

futu

re o

f th

e co

ntin

ent

Dev

elop

and

del

iver

the

cont

ent o

f gro

up-tr

aini

ng

sess

ions

($20

0,00

0)

$200

,000

NEP

AD

A

genc

yTB

D (con

tinue

d)

Page 32: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

24

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts (

$)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

Prop

osed

CD

P ap

proa

ches

to a

ddre

ss o

ther

cap

acity

nee

ds

12N

eed

to e

nhan

ce

som

e cr

itica

l um

brel

la

capa

citie

s for

A

fric

a as

a

cont

inen

t

Cap

acity

for e

nsur

ing

and

prot

ectin

g co

ntin

enta

l sec

urity

Cre

ate

and

oper

atio

naliz

e an

AU

Con

tinen

tal S

ecur

ity

Wat

chdo

g In

stitu

tion

to

iden

tify

and

act o

n ex

istin

g an

d fu

ture

secu

rity

thre

ats

The

cont

inen

t’s a

bilit

y to

pr

ojec

t pow

er a

nd a

utho

rity

Firs

t 2

year

sA

Con

tinen

tal

Inte

llige

nce A

genc

y (C

IA) t

o id

entif

y cu

rren

t an

d fu

ture

secu

rity

thre

ats

Cos

ts re

late

d to

setti

ng u

p th

e ag

ency

($60

0,00

0)$6

00,0

00A

U P

eace

an

d Se

curit

y C

ounc

il

AC

BF

ECA

13Im

prov

e ca

paci

ty

for a

chie

ving

an

d en

surin

g tru

e ow

ners

hip

of A

fric

an

natu

ral r

esou

rces

and

fu

nds

Dev

elop

a ti

me-

boun

d st

rate

gy

for A

fric

a’s m

anag

emen

t of i

ts

reso

urce

s and

fund

sQ

uick

ly se

t up

and

oper

atio

naliz

e an

Afr

ican

M

iner

al D

evel

opm

ent C

ente

r (A

MD

C)

Iden

tify

and

cons

olid

ate

enfo

rcem

ent m

echa

nism

s, in

clud

ing

train

ing,

co

mm

unic

atio

n, a

nd

cont

inuo

us fa

mili

ariz

ing,

Firs

t yea

rO

wne

rshi

p of

our

age

nda

Gre

ater

ava

ilabi

lity

and

the

mor

e tim

ely

use

of

Afr

ica’

s res

ourc

es fo

r our

pr

iorit

ies

Dev

elop

stra

tegy

($

50,0

00)

Cos

ts re

late

d to

setti

ng

up a

n op

erat

ing

AM

DC

($

250,

000)

Res

ourc

es fo

r exp

erts

to

con

duct

a st

udy

and

to d

esig

n en

forc

emen

t m

echa

nism

s and

trai

ning

($

150,

000)

$450

,000

AU

CTB

D

14C

apac

ity fo

r ach

ievi

ng

mon

itorin

g of

A

fric

a’s r

esou

rces

via

ou

ter s

pace

sate

llite

te

chno

logy

Con

stitu

te, o

rient

, and

trai

n an

Afr

ican

hig

h-le

vel t

eam

to

neg

otia

te u

rgen

tly n

eede

d sp

ace

for p

ositi

onin

g A

fric

a’s

own

mon

itorin

g sa

telli

teId

entif

y an

d or

ient

a te

am o

f A

fric

an e

xper

ts o

n sa

telli

te

tech

nolo

gy to

ens

ure

sust

aine

d at

tent

ion

and

subs

tant

ive

info

rmat

ion

Firs

t yea

rA

fric

a us

ing

its o

wn

spac

e sa

telli

te te

chno

logy

to

col

lect

and

ana

lyze

in

form

atio

n on

its

reso

urce

s

Expe

nses

for c

onst

itutin

g an

d tra

inin

g th

e hi

gh-

leve

l tea

m ($

100,

000)

Iden

tifica

tion

and

orie

ntat

ion

of th

e ex

pert

team

($20

0,00

0)

$300

,000

AO

STI

TBD

Tab

le 3

.1 C

on

tin

enta

l sta

rt-u

p c

apac

ity

inte

rven

tio

ns

(con

tinue

d)

Page 33: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

25

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts (

$)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

15C

apac

ity fo

r sa

fegu

ardi

ng

and

usin

g its

ow

n re

sour

ces

for i

nitia

tives

, de

velo

pmen

t ac

tiviti

es, a

nd it

s in

terg

over

nmen

tal

inst

itutio

ns

Dev

elop

an

inte

rnal

Afr

ican

pr

otoc

ol th

at id

entifi

es a

nd

limits

the

kind

s of f

undi

ng

that

Afr

ican

cou

ntrie

s and

in

stitu

tions

shou

ld so

licit

from

ou

tsid

e th

e co

ntin

ent

Iden

tify

and

resp

onsi

biliz

e an

in

stitu

tion

that

will

lead

the

wor

k on

illic

it fin

anci

al fl

ows

from

the

cont

inen

tD

evel

op a

nd n

egot

iate

a

prot

ocol

with

Afr

ica’

s priv

ate

sect

or le

ader

s for

gre

ater

su

ppor

t fro

m p

rivat

e se

ctor

re

sour

ces t

o he

lp th

e co

ntin

ent

esca

pe a

id o

verd

epen

denc

y

Firs

t yea

rA

ltern

ate

fund

ing

mod

els

for t

he c

ontin

ent

Self-

sust

aini

ng c

ontin

ent

Dev

elop

an

inte

rnal

pr

otoc

ol ($

50,0

00)

Iden

tify

and

resp

onsi

biliz

e In

stitu

tions

($

250,

000)

Dev

elop

and

neg

otia

te a

pr

ivat

e se

ctor

pro

toco

l ($

100,

000)

$400

,000

NEP

AD

with

su

ppor

t of

AU

C

REC

s

16C

apac

ity fo

r ful

l ow

ners

hip

and

man

agem

ent o

f its

cu

rren

cy a

rran

gem

ents

to

serv

e Afr

ica’

s in

tere

sts

Des

ign

a st

rate

gic

proc

ess f

or

Mem

ber S

tate

s to

enha

nce

owne

rshi

p of

thei

r ow

n cu

rren

cy. C

ould

be

linke

d to

th

e w

ork

of th

e Afr

ican

Cen

tral

Ban

kLe

ader

ship

of t

he A

fric

an

Mon

etar

y Fu

nd to

pre

pare

the

prop

osal

and

the

proc

ess f

or

an o

vera

ll A

fric

an c

ontin

enta

l st

rate

gic

appr

oach

to c

urre

ncy

owne

rshi

p an

d m

anag

emen

t

Firs

t yea

rM

embe

r Sta

tes’

sove

reig

nty

and

use

of

thei

r ow

n cu

rren

cy fo

r an

d ac

cord

ing

to th

eir

own

agen

da a

nd th

e co

ntin

ent’s

Dev

elop

men

t and

ne

gotia

tion

of a

st

rate

gic

plan

that

seek

s to

asc

erta

in A

fric

a’s

owne

rshi

p of

its o

wn

curr

ency

($12

0,00

0)

$120

,000

AU

C w

ith

the

supp

ort

of N

EPA

D

Age

ncy

REC

s

17C

apac

ity to

ens

ure

and

cont

inuo

usly

un

derta

ke, w

ith o

ne

voic

e, st

rate

gic

and

tact

ical

neg

otia

tions

vi

s-à-

vis g

loba

l act

ors

Mai

nstre

am a

Com

mon

Afr

ica

Posi

tion

in a

ll pa

rtner

ship

en

gage

men

ts w

ithin

co

ntin

enta

l ins

titut

ions

Firs

t 2

year

sA

fric

a ne

gotia

ting

on

equa

l foo

ting

(win

-win

) w

ith in

tern

atio

nal

partn

ers

TBD

TBD

AU

C w

ith

supp

ort o

f th

e N

EPA

D

Age

ncy

and

PAP

REC

s (con

tinue

d)

Page 34: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

26

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts (

$)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

18C

apac

ity o

f Afr

ica

to

gene

rate

, pre

serv

e,

and

utili

ze it

s ow

n da

ta

Des

igna

te o

ne o

f tw

o in

stitu

tions

in A

fric

a to

m

anag

e an

d pr

omot

e st

rate

gic

appr

oach

es fo

rA

fric

a’s d

ata

revo

lutio

n an

d ow

ners

hip

Bui

ld c

apac

ity in

Afr

ican

da

ta u

se, p

rodu

ctio

n, a

nd

mai

nten

ance

and

bui

ld

capa

city

in a

kno

wle

dge

man

agem

ent s

yste

m

Firs

t 6

mon

ths

Cre

ate

an o

nlin

e kn

owle

dge

porta

l to

be a

stor

ehou

se fo

r pu

blic

atio

ns, d

iscu

ssio

ns,

know

ledg

e sh

arin

g, a

nd

best

-pra

ctic

e in

form

atio

n

Iden

tifica

tion

of

inst

itutio

ns to

man

age

and

prom

ote

appr

oach

es

for d

ata

revo

lutio

n($

200,

000)

Trai

ning

on

Afr

ican

da

ta p

rodu

ctio

n, u

se

and

mai

nten

ance

, and

kn

owle

dge

man

agem

ent

syst

em ($

300,

000)

$500

,000

AU

C w

ith

the

supp

ort

of E

CA

and

A

fDB

TBD

19St

rate

gy to

eng

age

the

Afr

ican

dia

spor

aA

scer

tain

num

ber o

f Afr

ican

s in

the

dias

pora

, the

ir sk

ills

and

expe

rtise

, and

reso

urce

s at

thei

r dis

posa

l and

det

erm

ine

how

thes

e ca

n be

use

d fo

r A

gend

a 20

63D

evel

op a

nd im

plem

ent

mec

hani

sms t

o ta

p in

to th

e A

fric

an d

iasp

ora

as a

pot

entia

l as

set t

o tra

nsfe

r bes

t pra

ctic

es

from

the

deve

lope

d w

orld

, in

clud

ing

shor

t-ter

m sk

ills

trans

fer t

hrou

gh te

mpo

rary

w

ork

on p

roje

cts

Firs

t yea

rA

stra

tegy

to e

ngag

e th

e di

aspo

ra in

im

plem

enta

tion,

not

ju

st a

dvoc

acy.

Incl

udes

ha

ving

a d

atab

ase

of th

eir

skill

s

Map

ping

the

num

ber o

f pe

ople

in th

e Afr

ican

di

aspo

ra a

nd th

eir

reso

urce

s ($1

50,0

00)

Cos

ts re

late

d to

de

velo

ping

the

stra

tegy

an

d da

taba

se ($

100,

000)

$250

,000

AU

CR

ECs

Mem

ber

Stat

esPr

ivat

e se

ctor

Civ

il so

ciet

yA

cade

mic

in

stitu

tions

Indi

cativ

e se

ed a

mou

nt re

quire

d fo

r sta

rt-up

CD

inte

rven

tions

in th

is C

DP

$9,7

90,0

00

Not

e: T

BD =

to b

e de

term

ined

.

Tab

le 3

.1 C

on

tin

enta

l sta

rt-u

p c

apac

ity

inte

rven

tio

ns

(con

tinue

d)

Page 35: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

27

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

4PROPOSED REGIONAL CAPACITY

DEVELOPMENT PLAN

The second CDP matrix (table 4.1) has indic-ative examples of regional interventions. Like the continental interventions, they are not static and will need to be periodically updat-ed within the first 10 years as new priorities emerge. The interventions should be promot-ed by RECs and other regional institutions. The outcomes of the interventions will be the

basis for identifying, updating, or expanding further interventions.

The table has six key issue areas (first row), plus the timeline, indicative costs, and pro-posed key supporting organizations. The areas of broad capacity gaps and needs derive from the capacity needs assessment.

Page 36: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

28

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Tab

le 4

.1 R

egio

nal

sta

rt-u

p c

apac

ity

inte

rven

tio

ns

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

Lea

d re

spon

sibi

lity

Prop

osed

key

su

ppor

ting

orga

niza

tions

1M

ind-

set

trans

form

atio

nN

eed

to p

ut in

pla

ce

new

initi

ativ

es to

de

sign

, pro

mot

e, a

nd

achi

eve

min

d-se

t tra

nsfo

rmat

ion

in th

e ea

rly y

ears

of A

gend

a 20

63

Org

aniz

e an

d de

velo

p an

ag

enda

Con

stitu

te b

rain

stor

min

g te

ams,

incl

udin

g yo

uth,

ac

adem

ia, a

nd th

ough

t lea

ders

Org

aniz

e pi

lot s

emin

ars a

cros

s re

gion

s

Urg

ent

Incr

ease

ow

ners

hip

of

Afr

ican

Age

nda

2063

Self-

awar

enes

s ide

olog

y an

d ch

ange

and

tra

nsfo

rmat

ion

read

ines

s

Reg

iona

l con

sulta

tive

proc

esse

s on

fine-

tuni

ng

acro

ss th

e re

gion

s($

300,

000)

Dev

elop

men

t of

publ

icat

ions

and

IT-

enab

led

com

mun

icat

ions

($15

0,00

0)

$450

,000

REC

sA

UC

Mem

ber

Stat

esA

CB

FO

ther

regi

onal

or

gani

zatio

ns

2U

nsyn

chro

nize

d ge

ogra

phic

co

vera

ge o

f the

R

ECs

Con

side

r hav

ing

five

REC

s ins

tead

of e

ight

, ea

ch re

pres

entin

g an

A

U re

gion

Ren

ame

REC

s to

refle

ct th

e re

gion

al fo

cus o

f the

ir ro

les

and

resp

onsi

bilit

ies i

n ov

eral

l or

gani

c AU

inst

itutio

nal

arch

itect

ure

Urg

ent

REC

s as r

espo

nsiv

e in

stitu

tions

, with

the

aim

of

cut

ting

the

num

ber o

f R

ECs

Cos

ts re

late

d to

re

stru

ctur

ing/

rena

min

g th

e R

ECs

($25

5,00

0)

$255

,000

REC

sM

embe

r St

ates

NEP

AD

AC

BF

ECA

AU

C

3R

ECs n

ot tr

uly

an in

tegr

ated

pa

rt of

the A

U

stru

ctur

e

Inte

grat

ing

REC

s int

o th

e AU

Stru

ctur

eC

reat

e an

exp

ert-s

uppo

rted

task

team

to c

onsu

lt an

d de

sign

th

e in

clus

ion

of th

e R

ECs a

s an

orga

nic

part

of th

e AU

Rei

nfor

ce e

xcha

nge

amon

g R

ECs a

nd A

U o

ffici

als t

o pr

ovid

e a

usef

ul b

asis

for

build

ing

com

mon

ality

and

for

enha

ncin

g co

ordi

natio

n on

the

deci

sion

s tak

en

Firs

t yea

rR

ECs a

s an

orga

nic

part

of th

e AU

, ser

ving

as

com

mis

sion

s of t

he A

U a

t th

e re

gion

al le

vel

Task

team

-rel

ated

cos

ts($

70,0

00)

$70,

000

REC

sTB

D

Page 37: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

29

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

Lea

d re

spon

sibi

lity

Prop

osed

key

su

ppor

ting

orga

niza

tions

4O

rgan

izat

iona

l ca

paci

tySt

ream

linin

g/re

arra

ngem

ent o

f R

ECs f

or A

gend

a 20

63

Esta

blis

h an

Age

nda

2063

task

fo

rce

to a

lign

the

inst

itutio

nal

refo

rms f

or A

gend

a 20

63.

This

revi

ew sh

ould

con

side

r st

ream

linin

g ea

ch R

EC to

war

d th

e as

pira

tions

of A

gend

a 20

63

Firs

t yea

rTr

ain

key

indi

vidu

als

from

eac

h R

EC in

ra

tiona

lizat

ion

for

Age

nda

2063

Dev

elop

and

del

inea

te

a re

alis

tic in

stitu

tiona

l re

form

age

nda

to m

ake

the

regi

onal

inst

itutio

ns

mor

e fit

for p

urpo

se

Supp

ort f

or th

e w

ork

of

the

task

forc

e ($

100,

000)

$100

,000

REC

sTB

D

Man

agem

ent a

nd

Ope

ratio

n ca

paci

ties

Stre

ngth

en in

tern

al

man

agem

ent a

nd

acco

unta

bilit

y ar

rang

emen

tsA

ssig

n fu

nctio

nal r

oles

and

in

stitu

tiona

l res

pons

ibili

ties f

or

the

desi

gn a

nd c

oord

inat

ion

of

M&

E, c

ontin

enta

l pro

gram

s, re

sults

man

agem

ent,

qual

ity

assu

ranc

e, a

nd re

late

d is

sues

Dev

elop

and

impl

emen

t rul

es,

valu

es, n

orm

s, an

d st

anda

rds t

o go

vern

wor

k sy

stem

s

Firs

t yea

rB

ette

r fun

ctio

ning

/bet

ter

coor

dina

tion

of R

ECs

Dev

elop

self-

regu

lato

ry

man

ual

Lear

ning

and

kno

wle

dge

sem

inar

s to

train

on

impl

emen

tatio

n pr

oces

ses

($15

0,00

0)Ex

pert

cons

ulta

nt o

n pr

ojec

t man

agem

ent

($50

,000

)

$200

,000

REC

sN

EPA

DA

CB

FEC

AO

ther

co

ntin

enta

l or

gani

zatio

ns

5St

affin

g st

reng

thLi

mite

d va

ried

skill

ed

pers

onne

l in

the

regi

onal

inst

itutio

ns

Mob

ilize

Afr

ican

fina

ncia

l re

sour

ces t

o re

crui

t and

trai

n ne

w p

erso

nnel

Dev

elop

pro

files

for s

taffi

ng

func

tions

, pos

ition

s, an

d le

vels

al

igne

d di

rect

ly w

ith A

gend

a 20

63

Firs

t 2

year

sD

evel

op a

n im

prov

ed

recr

uitm

ent s

trate

gyA

naly

sis a

nd p

ropo

sals

on

the

new

skill

set

($15

0,00

0)D

evel

opm

ent o

f a

stra

tegy

and

trai

ning

for

it ($

100,

000)

$250

,000

REC

sTB

D

Effe

ct th

e so

ft sk

ills

in th

e re

gion

al

inst

itutio

ns

Dev

elop

trai

ning

wor

ksho

ps

and

sem

inar

s on

soft

skill

s at

the

regi

onal

leve

l

Firs

t yea

rC

ompr

ehen

sive

indi

cativ

e lis

ts o

f sof

t ski

llsFo

cus o

n so

ft sk

ills

durin

g hu

man

reso

urce

tra

inin

g, re

view

, as

sess

men

t, an

d ev

alua

tion

Expe

rt co

nsul

tant

to

unde

rtake

the

revi

ew

($15

0,00

0)A

pplic

atio

n of

soft

skill

s thr

ough

trai

ning

w

orks

hops

($35

0,00

0)

$500

,000

REC

sN

EPA

DA

CB

FEC

A (con

tinue

d)

Page 38: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

30

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

Lea

d re

spon

sibi

lity

Prop

osed

key

su

ppor

ting

orga

niza

tions

6Sy

stem

s and

w

ork

proc

esse

sFo

cus o

n re

sults

-bas

ed

man

agem

ent

Und

erta

ke a

cap

acity

re

engi

neer

ing

of w

ork

syst

ems

and

proc

esse

s

Firs

t yea

rB

ette

r im

plem

enta

tion

and

achi

evem

ent o

f pr

ogra

ms

Mor

e ef

fect

ive

wor

k sy

stem

s

Kno

wle

dge

and

lear

ning

ro

undt

able

trai

ning

cos

ts

($15

0,00

0)

$150

,000

REC

sTB

D

Effe

ctiv

e an

d ef

ficie

nt

inst

itutio

nal i

nter

nal

syst

ems,

proc

edur

es,

and

capa

bilit

ies

Und

erta

ke a

cap

acity

en

hanc

ing

reen

gine

erin

g of

sy

stem

s and

pro

cedu

res

Firs

t yea

rU

pgra

de sy

stem

s and

w

ork

proc

esse

s tow

ard

Age

nda

2063

at t

he

regi

onal

leve

l

Expe

rt’s r

evie

w o

f the

cu

rren

t sys

tem

with

a

view

of u

pgra

ding

it

($25

0,00

0)

$250

,000

REC

sN

EPA

DA

CB

FEC

A

Nee

d fo

r M&

E sy

stem

Rep

eat M

&E

train

ing

focu

sed

on tr

acki

ng A

gend

a 20

63

impl

emen

tatio

n

Firs

t 2

year

sA

pro

cess

of

impl

emen

tatio

n of

resu

lt-ba

sed

M&

E to

ols a

t re

gion

al in

stitu

tions

Inst

itutio

naliz

e th

e M

&E

syst

em w

ith th

e pe

rfor

man

ce re

ports

m

echa

nism

s in

plac

e

Trai

ning

of i

ndiv

idua

ls

in re

sult-

base

d M

&E

($20

0,00

0)

$200

,000

REC

sN

EPA

DA

CB

FEC

A

7C

apac

ity g

aps

in k

now

ledg

e an

d in

form

atio

n sh

arin

g sy

stem

s

Incr

ease

/sus

tain

in

form

atio

n ex

chan

ge

betw

een

REC

s and

A

U

Kno

wle

dge

and

info

rmat

ion

syst

ems w

ith n

ew tr

aini

ng

syst

ems f

ocus

ed o

n “T

he

Afr

ica

We

Wan

t”

Urg

ent

Bui

ld k

now

ledg

e an

d in

form

atio

n m

anag

emen

t sy

stem

s in

each

or

gani

zatio

n th

at w

ill

beco

me

its o

rgan

izat

iona

l cu

lture

Out

sour

cing

and

m

anag

emen

t rel

ated

cos

ts

($15

0,00

0)

$150

,000

REC

sN

EPA

DA

CB

FEC

AA

fDB

UN

DP

Reg

iona

l B

urea

u

8Tr

ansf

orm

ativ

e an

d ga

me

chan

ging

le

ader

ship

Ensu

re tr

ansf

orm

ativ

e an

d ac

coun

tabl

e le

ader

ship

Trai

n 4–

5 ex

perts

at e

ach

REC

on

tran

sfor

mat

ive

and

gam

e-ch

angi

ng le

ader

ship

Orie

nt p

erso

nnel

of r

egio

nal

inst

itutio

ns to

be

first

and

fo

rem

ost P

an-A

fric

anis

ts

at h

eart

thro

ugh

rigor

ous

indu

ctio

n, c

onsc

ient

izat

ion,

an

d tra

inin

g pr

ogra

ms o

n va

lues

, nor

ms,

and

inte

grity

Urg

ent

Tran

sfor

m re

gion

al

com

mun

ities

, lea

ding

to

mor

e in

tegr

ated

regi

ons

Kno

wle

dge

and

lear

ning

ro

undt

able

trai

ning

se

ssio

ns ($

400,

000)

$400

,000

REC

sN

EPA

DA

CB

FEC

AA

CB

F

Tab

le 4

.1 R

egio

nal

sta

rt-u

p c

apac

ity

inte

rven

tio

ns

(con

tinue

d)

Page 39: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

31

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

Lea

d re

spon

sibi

lity

Prop

osed

key

su

ppor

ting

orga

niza

tions

9In

effe

ctiv

e fa

cilit

atio

n an

d co

ordi

natio

n of

pr

ogra

ms a

nd

proj

ects

Nee

d fo

r an

enha

nced

fa

cilit

atio

n an

d co

ordi

natio

n of

pr

ogra

ms t

o de

liver

on

man

date

s

Und

erta

ke a

cap

acity

bui

ldin

g ac

tivity

thro

ugh

ratio

naliz

ing

coor

dina

tion

syst

ems t

o de

liver

pr

ojec

ts a

nd p

rogr

ams

Firs

t yea

rW

ell-f

unct

ioni

ng

inst

itutio

ns d

eliv

erin

g go

od se

rvic

es o

n pr

ojec

ts

and

prog

ram

s

Sem

inar

trai

ning

($20

0,00

0)$2

00,0

00R

ECs

NEP

AD

AC

BF

ECA

10R

esou

rces

an

d fin

anci

al

man

agem

ent

syst

ems

Reg

iona

l fina

nce

sour

cing

and

DR

M

mec

hani

sms

At t

he le

vel o

f eac

h re

gion

al

inst

itutio

n, c

reat

e an

d tra

in a

DR

M b

rigad

e un

it (4

–5 p

eopl

e) a

s par

t of t

he

partn

ersh

ips a

nd re

sour

ces

mob

iliza

tion

sect

ion

Firs

t yea

rR

egio

nal fi

nanc

ial

auto

nom

yIn

tern

al in

stitu

tiona

l tra

inin

g w

orks

hops

on

DR

M ($

200,

000)

$200

,000

REC

NEP

AD

AC

BF

ECA

11A

ntic

ipat

ive

read

ing

of

the

futu

re

and

scen

ario

bu

ildin

g

Con

duct

futu

re

anal

ysis

and

scen

ario

pl

anni

ng

Und

erta

ke c

apac

ity b

uild

ing

thro

ugh

train

ing

and

wor

ksho

ps o

n de

velo

pmen

t, fu

ture

ana

lysi

s, an

d sc

enar

io

plan

ning

Firs

t yea

rD

evel

op m

echa

nism

s fo

r fut

ure

anal

ysis

and

sc

enar

io p

lann

ing

Expe

rt te

ams t

o de

velo

p th

e co

nten

t and

supp

ort

rollo

ut ($

200,

000)

$200

,000

REC

NEP

AD

AC

BF

ECA

Prop

osed

CD

inte

rven

tions

to a

ddre

ss o

ther

cap

acity

nee

ds

12A

ppro

ach

to

harn

ess t

he

capa

citie

s of t

he

Afr

ican

dia

spor

a

App

roac

hes f

or

enga

ging

and

usi

ng

the

serv

ices

of t

he

Afr

ican

dia

spor

a w

ith

rele

vant

tech

nica

l sk

ills

Des

ign

appr

oach

es a

nd tr

ain

on sc

hem

es a

nd m

echa

nism

s to

mob

ilize

the A

fric

an d

iasp

ora

as a

pot

entia

l ass

et, i

nclu

ding

sh

ort-t

erm

skill

s tra

nsfe

r th

roug

h te

mpo

rary

wor

k on

pr

ojec

ts

Firs

t 6

mon

ths

Avai

labi

lity

of a

larg

er

capa

city

pla

tform

for u

se

in A

fric

a

Dev

elop

men

t and

im

plem

enta

tion

of th

e st

rate

gy ($

255,

000)

$255

,000

REC

sN

EPA

DA

CB

FEC

AA

fDB

Afr

ica

UN

DP

Reg

iona

l B

urea

u

13Yo

uth

and

wom

enIn

clus

ion

of y

outh

an

d w

omen

in

empl

oym

ent a

t the

re

gion

al le

vel

Cre

ate,

exp

and,

and

in

stitu

tiona

lize

volu

ntee

r and

in

tern

ship

sche

mes

targ

eted

at

yout

h an

d w

omen

to in

crea

se

thei

r inv

olve

men

t in

regi

onal

in

stitu

tions

Urg

ent

Yout

h an

d w

omen

be

com

ing

the

truly

ce

ntra

l pill

ars

A k

ey in

stitu

tiona

lized

pr

oces

s of a

recr

uitm

ent

stra

tegy

that

focu

ses o

n yo

uth

and

wom

en

Dev

elop

men

t and

in

stitu

tion a

lizat

ion

($20

0,00

0)

$200

,000

REC

sN

EPA

DA

CB

FEC

A (con

tinue

d)

Page 40: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

32

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

Lea

d re

spon

sibi

lity

Prop

osed

key

su

ppor

ting

orga

niza

tions

14Te

chno

logy

an

d in

nova

tion

capa

city

Enha

nced

inno

vatio

n an

d ch

ange

-driv

en

abili

ties

Stre

amlin

e an

d es

tabl

ish

cent

ers o

f exc

elle

nce

and

inno

vatio

n hu

bs a

t the

regi

onal

le

vel.

This

will

invo

lve

the

inst

alla

tion

and

enha

ncem

ent

of IT

net

wor

ks a

t the

regi

onal

le

vel

Firs

t 2

year

sC

reat

e en

ablin

g en

viro

nmen

ts a

nd

spac

e fo

r tec

hnol

ogy

and

inno

vatio

n to

war

d A

gend

a 20

63

Cos

ts re

late

d to

the

esta

blis

hmen

t of c

ente

rs

and

the

inst

alla

tion

and

enha

ncem

ent o

f IT

netw

orks

($40

0,00

0)

$400

,000

REC

sPr

ivat

e se

ctor

Civ

il So

ciet

yA

cade

mia

15Li

nkag

e lo

ops

from

the

cont

inen

tal t

o th

e re

gion

al

and

the

natio

nal

leve

ls

Stre

ngth

enin

g fe

edba

ck a

nd

repo

rting

mec

hani

sms

at a

ll le

vels

. Thi

s will

in

volv

e m

onito

ring

and

regu

lariz

ing

the

linka

ge p

roce

ss.

Dev

elop

impl

emen

tatio

n-re

porti

ng m

echa

nism

s tha

t en

sure

that

Mem

ber S

tate

s are

ac

coun

tabl

e to

them

selv

es a

s a

colle

ctiv

e in

impl

emen

ting

Ass

embl

y de

cisi

ons.

This

will

cr

eate

bot

tom

-up

and

top-

dow

n lin

kage

s.

Firs

t 6

mon

ths

Esta

blis

h a

func

tioni

ng

feed

back

syst

em th

at

trans

cend

s all

exis

ting

leve

ls. T

his w

ill

invo

lve

mon

itorin

g an

d re

gula

rizin

g th

e lin

kage

pr

oces

s.

Cos

ts re

late

d to

th

e de

velo

pmen

t of

info

rmat

ion

and

know

ledg

e m

anag

emen

t sy

stem

s ($3

50,0

00)

$350

,000

REC

sM

embe

r St

ates

AU

C

Indi

cativ

e se

ed a

mou

nt re

quire

d fo

r sta

rt-up

CD

inte

rven

tions

in th

is C

DP

$4,7

80,0

00

Not

e: T

BD =

to b

e de

term

ined

.

Tab

le 4

.1 R

egio

nal

sta

rt-u

p c

apac

ity

inte

rven

tio

ns

(con

tinue

d)

Page 41: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

33

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

5PROPOSED NATIONAL CAPACITY

DEVELOPMENT PLAN

The national CDP matrix (table 5.1) pres-ents a template that can be contextualized to individual countries. Although the for-mal capacity needs assessment for Agenda 2063 is yet to be undertaken at the national level, some generic and start-up capacity needs must be addressed, for which the table gives some indicative, foundational, and capacity-enhancing interventions (subject

to revision when the national needs assess-ments are completed). These interventions are to be carried out by Member States, stakeholder groups, and institutions at the national level.

The table has six key issue areas (first row), plus the timeline, indicative costs, and pro-posed key supporting organizations.

Page 42: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

34

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Tab

le 5

.1 N

atio

nal

sta

rt-u

p c

apac

ity

inte

rven

tio

ns

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

and

inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

(ave

rage

es

timat

e pe

r co

untr

y)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

1M

ind-

set

trans

form

atio

nN

eed

to p

ut in

pla

ce

new

initi

ativ

es to

de

sign

, pro

mot

e,

and

achi

eve

a w

ell

ideo

logi

zed

and

prom

oted

min

d-se

t tra

nsfo

rmat

ion

agen

da

Incu

lcat

e Afr

ican

val

ue

syst

ems t

hrou

ghou

t the

po

pula

tion,

incl

udin

g in

sc

hool

s, fa

mili

es, a

nd

wor

kpla

ces

Dev

elop

an

outre

ach

prog

ram

(c

ount

ry-s

peci

fic) f

or A

gend

a 20

63, t

o re

ach

all s

egm

ents

of

soci

ety

Firs

t yea

rA

com

mon

ideo

logi

cal

grou

ndin

g an

d a

colle

ctiv

e m

ovem

ent f

or

“The

Afr

ica

We

Wan

t”Se

lf-co

nfide

nce,

self-

awar

enes

s, ow

ners

hip

of

reso

urce

s, an

d re

writ

ing

our n

arra

tives

Dev

elop

pub

licat

ion

and

IT c

omm

unic

atio

n at

the

natio

nal l

evel

($10

0,00

0)C

onsu

ltativ

e pr

oces

ses

to in

culc

ate

the

com

mon

id

eolo

gica

l gro

undi

ng

and

colle

ctiv

e m

ovem

ent

($10

0,00

0)

$200

,000

Mem

ber

Stat

esA

cade

mia

CSO

sPr

ivat

e se

ctor

2Im

plem

enta

tion

foca

l poi

ntN

eed

for a

n es

tabl

ishm

ent o

f an

Age

nda

2063

foca

l po

int a

t the

Mem

ber

Stat

e le

vel

Cre

ate

and

train

spec

ial

impl

emen

tatio

n br

igad

e un

its

as p

art o

f nat

iona

l ins

titut

ions

Urg

ent

Mor

e ef

ficie

nt n

atio

nal

inst

itutio

ns d

eliv

erin

g pr

ogra

ms a

nd p

roje

cts

fast

er

Kno

wle

dge

and

lear

ning

ro

undt

able

trai

ning

on

impl

emen

tatio

n pr

oces

ses

($30

0,00

0)

$300

,000

Mem

ber

Stat

esR

ECs

3In

stitu

tiona

l st

reng

thR

estru

ctur

ing

natio

nal

inst

itutio

nsQ

uick

ly e

ngag

e in

the

rest

ruct

urin

g/re

desi

gnin

g of

the

set-u

p of

nat

iona

l in

stitu

tions

aim

ing

tow

ard

Age

nda

2063

, with

the

aim

to

esta

blis

h in

stitu

tions

that

are

fit

for p

urpo

se fo

r Age

nda

2063

Urg

ent

Ref

orm

nat

iona

l in

stitu

tions

that

are

mor

e fit

for p

urpo

se

Proc

ure

a co

nsul

tant

($

250,

000)

$250

,000

Mem

ber

Stat

esA

CB

F

4H

uman

cap

acity

CTS

Dev

elop

, with

exp

erts

’ tra

inin

g su

ppor

t, sy

stem

s for

trac

king

an

d m

appi

ng o

f the

cur

rent

nu

mbe

rs o

f CTS

spec

ialis

ts

and

prod

uce

num

bers

in

vario

us C

TS e

duca

tion

area

s an

d in

STE

M

Firs

t yea

rA

poo

l of C

TS sp

ecia

lists

th

at c

an b

e ca

lled

upon

to

und

erta

ke a

nd d

eliv

er

on n

atio

nal (

as w

ell a

s re

gion

al a

nd c

ontin

enta

l) pr

ojec

ts a

nd p

rogr

ams

Expe

rts’ s

ervi

ce fe

es,

incl

udin

g tra

inin

g fe

es

($25

0,00

0)

$250

,000

Mem

bers

St

ates

REC

sPr

ivat

e se

ctor

Aca

dem

ia

Gre

ater

app

licat

ion

of th

e so

ft sk

ills i

n na

tiona

l ins

titut

ions

Elab

orat

e an

d im

plem

ent,

with

ex

pert

supp

ort,

the

soft

skill

s tra

inin

g ag

enda

Firs

t yea

rFo

cus o

n so

ft sk

ills

durin

g hu

man

reso

urce

tra

inin

g, re

view

, as

sess

men

t, an

d ev

alua

tion

Stud

y on

the

new

skill

set

($20

0,00

0)Tr

aini

ng a

nd th

e de

velo

pmen

t of a

stra

tegy

($35

0,00

0)

$550

,000

Mem

ber

Stat

esC

ivil

soci

ety

Page 43: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

35

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

and

inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

(ave

rage

es

timat

e pe

r co

untr

y)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

5Sy

stem

s and

w

ork

proc

esse

sEf

fect

ive

and

effic

ient

in

stitu

tiona

l int

erna

l sy

stem

s, pr

oced

ures

, an

d ca

pabi

litie

s

Esta

blis

h an

d do

cum

ent

guid

elin

es o

n bu

reau

crat

ic/

non-

bure

aucr

atic

wor

k pr

oces

ses,

proc

edur

es, a

nd

rela

ted

supp

ortin

g fu

nctio

ns

such

as M

&E,

repo

rting

, bu

dget

ing,

pro

cure

men

t, re

crui

tmen

t, w

ork

plan

ning

, cl

ient

man

agem

ent,

polic

y de

velo

pmen

t, pe

rfor

man

ce/

qual

ity m

anag

emen

t, re

sults

m

anag

emen

t, de

cisi

on-m

akin

g,

finan

cial

and

hum

an re

sour

ce

man

agem

ent,

and

coor

dina

tion

and

rela

tions

hips

with

oth

er

entit

ies

Firs

t yea

rA

syst

em o

f cle

arly

de

fined

mea

sure

s of

perf

orm

ance

and

succ

ess

Proc

ess a

nd e

stab

lish

perf

orm

ance

man

agem

ent

syst

ems (

$250

,000

)Tr

aini

ng a

nd lo

gist

ical

co

sts (

$250

,000

)

$500

,000

Mem

ber

Stat

esR

ECs

6In

form

atio

n an

d ac

cess

to

know

ledg

e

Mec

hani

sms i

n pl

ace

for o

rgan

izat

ions

to b

e kn

owle

dge

driv

en fo

r A

gend

a 20

63

Bui

ld a

stro

ng sk

ills a

nd

know

ledg

e ba

se fo

r the

im

plem

enta

tion

of A

gend

a 20

63

Firs

t yea

rSt

reng

then

syst

ems

and

stru

ctur

es fo

r th

e ge

nera

tion

of th

e kn

owle

dge

and

expe

rtise

Esta

blis

h kn

owle

dge

and

info

rmat

ion

man

agem

ent

syst

ems i

n ea

ch

orga

niza

tion,

whi

ch w

ill

beco

me

its o

rgan

izat

iona

l cu

lture

($30

0,00

0)

$300

,000

Mem

ber

Stat

esR

ECs

Priv

ate

sect

orA

cade

mia

7C

hang

e an

d tra

nsfo

rmat

ive

capa

citie

s

Tran

sfor

mat

iona

l cu

lture

Top

lead

ersh

ip

and

man

agem

ent

optim

ism

, and

top

man

agem

ent

owne

rshi

p of

dec

isio

n-m

akin

g

Und

erta

ke n

atio

nal t

rain

ing

cour

ses,

with

exp

erts

’ adv

ice

and

reco

mm

enda

tions

, on

trans

form

ativ

e cu

lture

and

ga

me-

chan

ging

lead

ersh

ip

Firs

t yea

rN

atio

nal c

itize

ns

with

inte

rnal

ized

and

de

term

ined

spiri

t of

trans

form

atio

nal c

ultu

re

Wor

ksho

ps o

n tra

nsfo

rmat

ive

and

acco

unta

ble

lead

ersh

ip

($35

5,00

0)

$355

,000

Mem

ber

Stat

esR

ECs

Civ

il so

ciet

y

Cha

nge

read

ines

s at

titud

es a

t the

na

tiona

l lev

el

Dev

elop

a p

latfo

rm to

en

cour

age

and

rew

ard

crea

tivity

and

inno

vatio

n

Urg

ent

Ren

ew a

nd tr

ansf

orm

th

e ap

proa

ch to

wor

k,

prog

ram

s,, a

nd p

roje

cts

Trai

ning

/wor

ksho

p-re

late

d co

sts (

$250

,000

)Pr

oduc

tion

of tr

aini

ng

mat

eria

ls ($

70,0

00)

$320

,000

Mem

ber

Stat

esC

ivil

soci

ety

Aca

dem

ia

Tran

sfor

mat

iona

l cu

lture

at t

he n

atio

nal

leve

l

Iden

tify

inst

itutio

nal c

ultu

res

that

hav

e to

be

trans

form

ed a

t th

e na

tiona

l lev

el a

nd c

ondu

ct

man

ager

s’ tra

inin

g

Urg

ent

Trai

n a

coho

rt of

m

anag

ers a

t the

nat

iona

l le

vel i

n tra

nsfo

rmat

iona

l cu

lture

Trai

ning

cos

ts ($

350,

000)

$350

,000

Mem

ber

Stat

esC

ivil

soci

ety

Aca

dem

ia

(con

tinue

d)

Page 44: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

36

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

and

inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

(ave

rage

es

timat

e pe

r co

untr

y)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

8C

ompo

site

ca

paci

ties

Stra

tegi

c pl

anni

ngFa

cilit

atio

n,

coor

dina

tion,

and

pr

ogra

m m

anag

emen

t

Des

ign

and

inst

itute

a

com

posi

te c

apac

ities

refr

eshe

r tra

inin

g sc

hem

e ta

cklin

g th

e ke

y ar

eas o

f stra

tegi

c/vi

sion

ary

plan

ning

, fac

ilita

tion,

and

co

ordi

natio

nPr

ogra

m m

anag

emen

t and

op

erat

iona

lizat

ion

Firs

t 2

year

sR

elev

ant n

atio

nal

inst

itutio

ns p

rovi

ding

co

ntin

uous

relia

ble,

ef

ficie

nt, a

nd e

ffect

ive

serv

ices

to it

s ow

n ci

tizen

s

Dev

elop

stra

tegi

c th

inki

ng p

rogr

ams

($60

,000

)G

ive

train

ing

to

indi

vidu

als i

n M

embe

r St

ates

($30

0,00

0)

$360

,000

Mem

ber

Stat

esC

ivil

soci

ety

Aca

dem

ia

9La

ck o

f dat

a on

A

fric

an d

iasp

ora

App

roac

hes f

or

enga

ging

and

usi

ng

the

serv

ices

of t

he

natio

nal d

iasp

ora

with

re

leva

nt a

nd te

chni

cal

skill

s

Dev

elop

a sk

ills d

atab

ase

for

the

natio

nals

in th

e di

aspo

ra

and

use

it fo

r rel

evan

t pro

ject

s.

Firs

t yea

rPr

ovid

e an

d m

aint

ain

a da

taba

se o

f nat

iona

ls o

ut

of th

e co

untry

Cos

ts re

late

d to

the

deve

lopm

ent o

f the

st

rate

gy ($

65,0

00)

Impl

emen

tatio

n co

sts

($25

0,00

0)

$315

,000

Mem

ber

Stat

esC

ivil

soci

ety

Aca

dem

ia

10Ed

ucat

ion

syst

em n

ot

appr

opria

te

Tran

sfor

m e

duca

tion

for A

fric

ans i

n th

e co

ntex

t of A

gend

a 20

63

Mak

e ed

ucat

ion

rele

vant

to

the

natio

nal a

nd c

ontin

enta

l co

ntex

t, in

clud

ing

Afr

ican

va

lues

, foc

usin

g on

the

skill

ar

ea o

f tra

inin

g ba

sed

on

the

need

s and

em

ploy

men

t op

portu

nitie

s in

the

coun

tryD

evel

op a

mec

hani

sm to

fo

rmul

ate

and

artic

ulat

e th

e co

nten

t of P

an-A

fric

an

curr

icul

a in

uni

vers

ities

Cre

ate

a m

echa

nism

to c

aptu

re

know

ledg

e of

the

olde

r ge

nera

tion

on P

an-A

fric

anis

mSt

reng

then

voc

atio

nal,

grad

uate

, pos

tgra

duat

e, a

nd o

n-th

e-jo

b tra

inin

gEs

tabl

ish

and

stre

ngth

en

plat

form

s for

trip

artit

e so

cial

di

alog

ue b

etw

een

labo

r uni

ons,

empl

oyer

bod

ies,

and

yout

h or

gani

zatio

ns

Firs

t yea

rEd

ucat

ion

syst

em m

ore

appr

opria

te to

Afr

ica

Dev

elop

new

cur

ricul

a an

d ha

rmon

ize

it w

ith th

e ne

eds o

f Age

nda

2063

Dev

elop

a g

ener

atio

nal

map

ping

to c

aptu

re

the

olde

r gen

erat

ion’

s kn

owle

dge

of P

an-

Afr

ican

ism

and

tran

smit

it to

the

new

gen

erat

ion

Cos

ts re

late

d to

de

velo

pmen

t of c

urric

ula

($10

0,00

0)D

evel

opm

ent o

f a

gene

ratio

nal m

appi

ng($

65,0

00)

$165

,000

Mem

ber

Stat

esC

ivil

soci

ety

Aca

dem

iaR

ECs

Tab

le 5

.1 N

atio

nal

sta

rt-u

p c

apac

ity

inte

rven

tio

ns

(con

tinue

d)

Page 45: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

37

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

and

inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

(ave

rage

es

timat

e pe

r co

untr

y)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

11Im

plem

ent

Age

nda

2063

at

the

natio

nal

leve

l

Rol

e of

the

priv

ate

sect

orG

over

nanc

e an

d m

anag

emen

t of

Age

nda

2063

im

plem

enta

tion

at

natio

nal l

evel

s

Bui

ld c

apac

ity v

ia a

wor

king

pa

ct in

volv

ing

acad

emia

, th

e pr

ivat

e se

ctor

(ind

ustry

), an

d th

e pu

blic

sect

or. T

his

enga

gem

ent o

f sta

keho

lder

s en

able

s act

ors t

o co

ntrib

ute

to

and

influ

ence

dec

isio

nsSt

reng

then

resu

lts-tr

acki

ng

and

repo

rting

syst

ems a

nd

mec

hani

sms,

incl

udin

g th

e de

velo

pmen

t and

ado

ptio

n of

a

com

mon

form

at fo

r rep

ortin

g on

Age

nda

2063

acr

oss t

he

cont

inen

t

Firs

t yea

rA

stro

ng p

ublic

–priv

ate

partn

ersh

ip fo

r Age

nda

2063

Follo

w u

p on

im

plem

enta

tion

of

Age

nda

2063

pro

gram

s at

the

natio

nal l

evel

Esta

blis

h m

echa

nism

s fo

r pro

mot

ing

the

impl

emen

tatio

n of

A

gend

a 20

63

Cos

ts re

late

d to

setti

ng u

p m

echa

nism

s ($7

5,00

0)Fo

llow

-up

cost

s ($

50,0

00)

$125

,000

Mem

ber

Stat

esC

ivil

soci

ety

Aca

dem

iaPu

blic

in

stitu

tions

Priv

ate

sect

or

12C

apac

ity

rete

ntio

n an

d ca

paci

ty

utili

zatio

n

Abs

ence

of s

kills

re

tent

ion

and

utili

zatio

n po

licy

Des

ign

and

impl

emen

t (w

ith

train

ing)

a c

onsu

ltativ

e pr

oces

s th

at c

an e

nd in

the

prep

arat

ion

or st

reng

then

ing

of a

pol

icy

pack

age

addr

essi

ng th

e is

sue

Enha

nce

capa

city

rete

ntio

n th

roug

h in

tern

atio

nal

agre

emen

tsD

evel

op m

echa

nism

s to

inte

grat

e an

d in

corp

orat

e sk

ills

with

in a

cou

ntry

Firs

t yea

rD

evel

op sk

ills r

eten

tion

and

a ut

iliza

tion

mec

hani

sm in

eac

h co

untry

Cos

ts re

late

d to

the

deve

lopm

ent o

f m

echa

nism

s and

ag

reem

ents

($25

0,00

0)

$250

,000

Mem

ber

Stat

esC

ivil

Soci

ety

Aca

dem

iaPr

ivat

e se

ctor

Publ

ic se

ctor

13Sp

irit o

f Pan

-A

fric

anis

mC

apac

ity b

uild

ing

thro

ugh

train

ing

on

Afr

ican

val

ues,

unity

, an

d sp

irit

Bui

ld c

apac

ity th

roug

h tra

inin

g on

Pan

-Afr

ican

ism

Dev

elop

uni

ty a

nd sp

irit

indu

ctio

n st

rate

gy fo

r key

na

tiona

l pro

gram

man

ager

s an

d di

rect

ors t

o se

nsiti

ze

furth

er o

n Pa

n-A

fric

anis

m

Urg

ent

Ideo

logi

ze A

fric

ans o

n an

Afr

ican

Val

ue S

yste

m

and

a co

ncep

tion

of

Pan-

Afr

ican

ism

that

tra

nsce

nds c

ultu

res,

tradi

tions

, and

phy

sica

l bo

unda

ries

Pan-

Afr

ican

ist e

xper

ts

to c

ondu

ct tr

aini

ng

wor

ksho

ps ($

200,

000)

$200

,000

Mem

ber

Stat

esR

ECs

AU

CC

ivil

soci

ety

Priv

ate

sect

or

(con

tinue

d)

Page 46: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

38

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

and

inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

(ave

rage

es

timat

e pe

r co

untr

y)L

ead

resp

onsi

bilit

y

Prop

osed

key

su

ppor

ting

orga

niza

tions

14N

onin

clus

ion

of y

outh

and

w

omen

Incl

usio

n of

you

th

and

wom

en in

de

velo

pmen

t pr

oces

ses a

nd

lead

ersh

ip p

ositi

on

Esta

blis

h, th

roug

h tra

inin

g,

natio

nal p

roce

sses

to in

crea

se

the

role

of y

outh

and

wom

en

as c

entra

l pill

ars f

or A

gend

a 20

63

Urg

ent

Yout

h an

d w

omen

ch

ampi

onin

g th

eir

coun

tries

’ dev

elop

men

t ag

enda

s in

line

with

the

cont

inen

t dev

elop

men

t vi

sion

, “Th

e Afr

ica

We

Wan

t”

Cos

ts re

late

d to

the

esta

blis

hmen

t pro

cess

es

and

adop

tion

of n

atio

nal

polic

ies (

$300

,000

)

$300

,000

Mem

ber

Stat

esR

ECs

AU

CPu

blic

sect

orC

ivil

soci

ety

Priv

ate

sect

or

15D

RM

Dev

elop

an

inte

grat

ed D

RM

pl

an th

at ta

ckle

s illi

cit fi

nanc

ial

flow

s and

cov

ers t

he O

basa

njo

initi

ativ

e an

d pr

ivat

e se

ctor

/in

divi

dual

initi

ativ

esM

atch

cer

tain

reso

urce

stre

ams

with

key

Age

nda

2063

pro

ject

s

Urg

ent

Dev

elop

a N

atio

nal D

RM

an

d a

natio

nal s

trate

gy to

fig

ht c

apita

l out

flow

s

Dev

elop

the

stra

tegy

and

th

e pl

an ($

150,

000)

Trai

ning

wor

ksho

ps

($20

0,00

0)

$350

,000

Mem

ber

Stat

esA

UC

REC

sA

fDB

Indi

cativ

e se

ed a

mou

nt re

quire

d fo

r sta

rt-up

CD

inte

rven

tions

in th

is C

DP

$5,4

40,0

00

Tab

le 5

.1 N

atio

nal

sta

rt-u

p c

apac

ity

inte

rven

tio

ns

(con

tinue

d)

Page 47: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

39

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

6PROPOSED CAPACITY

DEVELOPMENT PLAN FOR THREE STAKEHOLDER GROUPS

Developing the multistakeholder CDP templates

This chapter presents three templates of stakeholder CDPs for youth, women, and ac-ademia, with indicative interventions. As with the earlier tables, the areas of intervention are not static and will need to be periodical-ly updated, expanded, and contextualized in line with the work of each stakeholder group

(private sector, CSOs, and so on). The out-comes of the interventions will be the basis for identifying, updating, or expanding fur-ther interventions.

The tables have six key issue areas (first row), plus the timeline, indicative costs, and proposed key supporting organizations. The areas of broad capacity gaps and needs derive from the capacity needs assessment.

Page 48: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

40

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Tab

le 6

.1 S

tart

-up

cap

acit

y in

terv

enti

on

s fo

r yo

uth

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts1

Lea

d re

spon

sibi

lity

Prop

osed

key

su

ppor

ting

orga

niza

tions

1M

ind-

set

trans

form

atio

nFo

rmul

ate

and

desi

gn

new

initi

ativ

es

to p

rom

ote

and

achi

eve

min

d-se

t tra

nsfo

rmat

ion

in th

e ea

rly y

ears

of A

gend

a 20

63

Adv

ocat

e an

d lo

bby

for

min

d-se

t tra

nsfo

rmat

ion

and

an A

fric

an o

wne

rshi

p ag

enda

am

ong

yout

h

Urg

ent

A c

ontin

ent-w

ide

mov

emen

t tha

t cha

nges

th

e m

ind-

sets

of y

outh

, di

rect

ing

them

tow

ard

trans

form

ing

the

cont

inen

t

Des

ign

and

form

ulat

e pr

ogra

ms (

$150

,000

)A

dvoc

acy

and

awar

enes

s($

500,

000)

$650

,000

Yout

h ne

twor

ks/

grou

ps a

t all

leve

ls

Mem

ber

Stat

esC

SOs

REC

s

2C

reat

e an

A

gend

a 20

63

mov

emen

t

Incr

ease

kno

wle

dge

and

awar

enes

s of

Age

nda

2063

Sens

itize

you

th a

cros

s the

co

ntin

ent b

y de

velo

ping

cr

eativ

e an

d in

nova

tive

mat

eria

ls to

pub

liciz

e an

d pr

omot

e yo

uth

owne

rshi

p/pa

rtici

patio

n in

Age

nda

2063

Firs

t yea

rA

fric

an y

outh

’s o

wn

Age

nda

2063

Cos

ts re

late

d to

hol

ding

se

min

ars o

n A

gend

a 20

63

(pac

kage

s — tra

nspo

rt,

logi

stic

s, an

d fin

anci

al

reso

urce

s,)

$250

,000

Yout

h ne

twor

ks/

grou

ps a

t all

leve

ls

Mem

ber

Stat

esC

SOs

Med

ia h

ouse

s/gr

oups

3In

terg

ener

atio

nal

dial

ogue

/ne

twor

k

Prom

ote

dial

ogue

am

ong

age

grou

psLe

ad th

e pr

oces

s of f

oste

ring

inte

rgen

erat

iona

l dia

logu

e as

a

maj

or c

apac

ity u

nder

taki

ng to

in

crea

se in

form

ed o

wne

rshi

p an

d co

mm

itted

col

labo

ratio

n ac

ross

age

gro

ups a

nd

gene

ratio

ns

Firs

t yea

rA

uni

que

fram

ewor

k fo

r en

gagi

ng th

e co

mm

itmen

t an

d en

ergy

of A

fric

ans o

f di

ffere

nt a

ges

Con

sulta

tive

proc

ess

acro

ss a

ll ag

e gr

oups

on

fost

erin

g di

alog

ue($

400,

000)

$400

,000

Yout

h ne

twor

ks/

grou

ps a

t all

leve

ls

TBD

4Yo

uth

empo

wer

men

t an

d pa

rtici

patio

n in

dec

isio

n-m

akin

g

Enfo

rce

delib

erat

e ar

rang

emen

ts fo

r th

e tra

nsfe

r of

resp

onsi

bilit

y an

d pr

omot

e yo

uth

parti

cipa

tion

in

aspe

cts o

f Age

nda

2063

Lead

the

desi

gn o

f yo

uth

deve

lopm

ent a

nd

empo

wer

men

t stra

tegi

es a

nd

tool

s (in

clud

ing

train

ing)

ai

med

at i

ncre

asin

g an

d st

reng

then

ing

youn

g pe

ople

’s

invo

lvem

ent i

n th

e so

cial

, ec

onom

ic, a

nd p

oliti

cal l

ife o

f th

eir c

ount

ries i

n su

ppor

t of

Afr

ica’

s dev

elop

men

t

Urg

ent

Act

ive

parti

cipa

tion

of

yout

h in

dev

elop

men

t at

all

leve

ls. T

his c

ould

al

so in

clud

e se

tting

up

syst

ems a

nd m

echa

nism

s fo

r ens

urin

g th

e su

pply

an

d de

man

d of

you

ths

for v

ario

us c

ontin

enta

l, re

gion

al, a

nd n

atio

nal

inst

itutio

ns.

Org

aniz

e se

min

ars a

nd

roun

dtab

le to

faci

litat

e th

e em

pow

erm

ent a

nd

parti

cipa

tion

of y

outh

($

100,

000)

$100

,000

Yout

h ne

twor

ks/

grou

ps a

t all

leve

ls

CSO

sM

edia

hou

ses/

grou

ps

Page 49: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

41

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No.

Are

as o

f bro

ad

capa

city

gap

s an

d ne

eds

iden

tified

/pr

iori

tized

Are

as fo

r im

prov

emen

tPr

opos

ed in

itial

CD

star

t‑up

ap

proa

ches

/inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts1

Lea

d re

spon

sibi

lity

Prop

osed

key

su

ppor

ting

orga

niza

tions

5B

ridge

the

skill

s ga

pTr

ansf

orm

the

educ

atio

n sy

stem

with

a

view

to a

ligni

ng it

w

ith A

gend

a 20

63

Com

mis

sion

the

esta

blis

hmen

t of

pla

tform

s for

trip

artit

e so

cial

dia

logu

e be

twee

n la

bor

unio

ns, e

mpl

oyer

bod

ies,

and

yout

h or

gani

zatio

ns.

This

will

take

into

acc

ount

ad

voca

cy a

nd p

olic

y ch

ange

ai

med

at r

evita

lizin

g vo

catio

nal,

grad

uate

, po

stgr

adua

te, a

nd o

n-th

e-jo

b tra

inin

g to

ens

ure

that

ed

ucat

iona

l qua

lifica

tions

are

be

st su

ited

to th

e ne

eds o

f the

m

arke

t.

Firs

t yea

rA

redu

ctio

n in

you

th

empl

oym

ent i

n A

fric

a as

wel

l as i

ncre

ased

de

velo

pmen

t and

gro

wth

in

gro

ss n

atio

nal p

rodu

ctVo

catio

nal,

grad

uate

, po

stgr

adua

te, a

nd o

n-th

e-jo

b tra

inin

g to

ens

ure

that

thei

r edu

catio

nal

qual

ifica

tions

are

the

best

fit

for t

he jo

b m

arke

t

Con

sulta

tive

proc

ess a

t na

tiona

l lev

els t

o re

view

po

licie

s($

250,

000)

$250

,000

Yout

h ne

twor

ks a

t al

l lev

els w

ith

the

supp

ort

of M

inis

tries

/D

epar

tmen

ts

of b

asic

an

d hi

gher

ed

ucat

ion

at

the

natio

nal

leve

l

Aca

dem

iaU

nive

rsiti

esC

SOs

REC

s

6Ec

onom

ic a

ctor

s (e

mpl

oym

ent a

nd

entre

pren

eurs

hip)

Yout

h as

crit

ical

ec

onom

ic a

ctor

sD

esig

n pi

lot a

nd e

xpan

d yo

uth

CD

sche

mes

that

focu

s on

the

train

ing

of y

outh

to b

e em

ploy

men

t cre

ator

s rat

her

than

em

ploy

men

t see

kers

, pa

rtner

ing

the

priv

ate

and

publ

ic se

ctor

s in

criti

cal a

reas

Firs

t yea

rYo

uth

econ

omic

pa

rtici

patio

n, in

clud

ing

incr

easi

ng y

outh

op

portu

nitie

s for

self-

empl

oym

ent a

nd o

ther

fo

rms o

f em

ploy

men

t

Dev

elop

and

impl

emen

t po

licy

($35

0,00

0)$3

50,0

00Yo

uth

netw

orks

/gr

oups

at a

ll le

vels

Priv

ate

sect

orC

SOs

AU

REC

sM

embe

r St

ates

7In

vent

ors a

nd

inno

vato

rsEn

ablin

g en

viro

nmen

ts fo

r yo

uth

to b

e cr

eato

rs

Faci

litat

e th

e ur

gent

cre

atio

n of

sc

ienc

e pa

rks a

nd in

nova

tion

hubs

/cen

ters

at t

he n

atio

nal

and

regi

onal

leve

ls to

pro

mot

e ac

cess

to a

nd e

xcha

nge

of

info

rmat

ion,

kno

wle

dge,

ex

perie

nces

, and

stra

tegi

es,

and

new

tech

nolo

gies

Firs

t yea

rK

now

ledg

e ce

nter

s tha

t w

ill d

rive

inno

vatio

n fo

r de

velo

pmen

t acr

oss t

he

cont

inen

t

Set u

p an

d ru

n co

sts o

f na

tiona

l and

regi

onal

ne

twor

ks ($

400,

000)

$400

,000

Yout

h gr

oups

, w

orki

ng w

ith

CSO

s and

la

bor u

nion

s

Priv

ate

sect

orM

embe

r St

ates

Indi

cativ

e se

ed a

mou

nt re

quire

d fo

r sta

rt-up

CD

inte

rven

tions

in th

is C

DP

$2,4

00,0

00

1. A

vera

ge e

stim

ate

for m

ajor

you

th st

akeh

olde

r gro

ups f

or st

art-

up C

D a

nd st

reng

then

ing

arra

ngem

ents

.

Page 50: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

42

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Tab

le 6

.2 S

tart

-up

cap

acit

y in

terv

enti

on

s fo

r w

om

en

No.

Bro

ad c

apac

ity

gaps

and

nee

dsA

reas

for

impr

ovem

ent

Prop

osed

CD

inte

rven

tions

Tim

elin

eTa

rget

s or d

esire

d ou

tcom

esC

ostin

g el

emen

tsIn

dica

tive

cost

s1Le

ad

resp

onsi

bilit

yPr

opos

ed k

ey

supp

ortin

g or

gani

zatio

ns

1Em

pow

erm

ent

and

parti

cipa

tion

Mai

nstre

am A

gend

a 20

63 p

rogr

ams/

proj

ects

for w

omen

Set u

p sy

stem

s and

m

echa

nism

s for

ens

urin

g th

at

visi

onar

y w

omen

are

incl

uded

in

key

dec

isio

n-m

akin

g pr

oces

ses f

or “

The

“Afr

ica

We

Wan

t”D

esig

n fo

llow

-up

mec

hani

sms

that

mon

itor t

he tr

aini

ng a

nd

deve

lopm

ent o

f wom

en o

n A

gend

a 20

63

Urg

ent

Age

nda

2063

im

plem

enta

tion

is h

eavi

ly

driv

en b

y w

omen

Prom

ote

parti

cipa

tion

thro

ugh

dial

ogue

, ed

ucat

ion,

and

trai

ning

/w

orks

hops

($35

0,00

0)

$350

,000

Wom

en’s

ne

twor

ks a

t al

l lev

els

Mem

ber

Stat

esC

SOs

Aca

dem

iaA

UC

REC

s

2M

ind-

set

trans

form

atio

nN

eed

to d

esig

n ne

w

initi

ativ

es to

pro

mot

e an

d ac

hiev

e m

ind-

set

trans

form

atio

n in

the

early

yea

rs o

f Age

nda

2063

Form

a m

ind-

set

trans

form

atio

n br

ains

torm

ing

team

, inc

ludi

ng a

cade

mia

and

yo

uth

Org

aniz

e a

serie

s of m

ind-

set

trans

form

atio

n pi

lot s

emin

ars

acro

ss th

e co

ntin

ent

Urg

ent

Acc

eler

atin

g A

fric

a’s

trans

form

atio

n by

in

crea

sing

thei

r sel

f-co

nfide

nce

and

belie

f in

them

selv

es, a

nd e

ither

re

writ

ing

the

narr

ativ

e or

w

ritin

g a

new

nar

rativ

e ba

sed

on P

an-A

fric

anis

m

and

Afr

ican

rena

issa

nce

Des

ign

and

form

ulat

e pr

ogra

ms (

$150

,000

)A

dvoc

acy

and

awar

enes

s($

300,

000)

$450

,000

Wom

en’s

ne

twor

ks a

t al

l lev

els

AU

CM

embe

r St

ates

Aca

dem

iaC

SOs

3A

gric

ultu

ral

prod

uctiv

ity a

nd

prod

uctio

n

Leve

rage

the

skill

s, kn

owle

dge,

and

co

mm

itmen

t of

wom

en in

agr

icul

ture

Agg

ress

ivel

y pu

rsue

m

echa

nism

s and

pro

gram

s at

all l

evel

s to

take

adv

anta

ge

of a

nd le

vera

ge th

e po

tent

ial

of w

omen

as l

eade

rs a

nd

inno

vato

rs in

agr

icul

ture

Firs

t yea

rW

omen

are

eco

nom

ic

driv

ers o

f the

Afr

ican

ec

onom

y th

roug

h ta

rget

ed p

rogr

ams t

o su

ppor

t and

stre

ngth

en

wom

en fa

rmer

s and

en

trepr

eneu

rs

Trai

ning

and

wor

ksho

ps

on a

gri-b

usin

ess w

ealth

- cr

eatio

n sk

ills (

$300

,000

)C

onte

nt d

evel

opm

ent

and

supp

ort f

or ro

llout

($

200,

000)

$500

,000

Wom

en’s

ne

twor

ks a

t al

l lev

els

Mem

ber

Stat

esA

UC

/NEP

AD

REC

sPr

ivat

e se

ctor

CSO

s

4Th

e nu

mbe

r of

wom

en

empl

oyed

at

cont

inen

tal,

regi

onal

, an

d na

tiona

l in

stitu

tions

The

need

for a

de

liber

ate

incl

usio

n of

w

omen

em

ploy

men

t at

all

leve

ls

Des

ign/

impl

emen

t em

ploy

men

t-orie

nted

in

tern

ship

s on

a la

rger

scal

e to

incr

ease

the

invo

lvem

ent o

f yo

ung

wom

en in

con

tinen

tal,

regi

onal

, and

nat

iona

l st

ruct

ures

Firs

t 2

year

sW

omen

taki

ng u

p po

sitio

ns a

t the

co

ntin

enta

l, re

gion

al, a

nd

natio

nal l

evel

s

Con

tent

dev

elop

men

t an

d su

ppor

t for

rollo

ut

($40

0,00

0)

$400

,000

Wom

en’s

ne

twor

ks a

t al

l lev

els

Priv

ate

sect

orC

SOs

Page 51: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

43

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN5

Rei

nven

t th

e Afr

ican

ed

ucat

ion

syst

em w

ith a

fo

cus o

n w

omen

Incr

ease

the

num

ber

of w

omen

enr

olle

d in

edu

catio

nal

inst

itutio

ns

Adv

ocat

e th

roug

h fo

rum

s, di

alog

ue, a

nd p

olic

y de

velo

pmen

t for

incr

ease

d en

rollm

ent o

f wom

en in

STE

M

Firs

t yea

rM

ass p

rodu

ctio

n of

w

omen

’s sk

ills i

n cr

itica

l an

d se

ctor

-spe

cific

skill

s ar

eas

Con

sulta

tive

proc

ess a

nd

cont

ent d

evel

opm

ent

at th

e na

tiona

l lev

el to

re

view

pol

icie

s($

300,

000)

$300

,000

Wom

en’s

ne

twor

ks a

t al

l lev

els

6Fl

agsh

ip

Proj

ects

Wom

en’s

incl

usio

n an

d pa

rtici

patio

n in

de

liver

ing

on th

ese

proj

ects

Dev

elop

and

impl

emen

t a

supp

ly a

nd d

eman

d sy

stem

w

ith th

e ai

m o

f ach

ievi

ng

wom

en’s

par

ticip

atio

n in

thes

e pr

ojec

ts

Firs

t yea

rB

uild

the

capa

city

of

wom

en to

par

take

in

deliv

erin

g on

the

flags

hip

Proj

ects

thro

ugh

train

ing,

fin

ance

, and

an

enab

ling

envi

ronm

ent

Des

ign

and

man

age

o sy

stem

($40

0,00

0)Tr

aini

ng se

min

ars a

nd

wor

ksho

ps ($

250,

000)

$650

,000

Wom

en’s

ne

twor

ks a

t al

l lev

els

CSO

sM

embe

r St

ates

Indi

cativ

e se

ed a

mou

nt re

quire

d fo

r sta

rt-up

CD

inte

rven

tions

in th

is C

DP

$2,6

50,0

00

1 Av

erag

e es

timat

e fo

r maj

or w

omen

’s st

akeh

olde

r net

wor

ks fo

r sta

rt-u

p CD

and

stre

ngth

enin

g ar

rang

emen

ts.

Page 52: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

44

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Tab

le 6

.3 S

tart

-up

cap

acit

y in

terv

enti

on

s fo

r ac

adem

ia a

nd

thin

k ta

nks

No.

Bro

ad c

apac

ity

gaps

and

nee

dsA

reas

for

impr

ovem

ent

Prop

osed

CD

inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

Lea

d re

spon

sibi

lity

Prop

osed

key

su

ppor

ting

orga

niza

tions

1M

ind-

set

trans

form

atio

nFi

ne-tu

ning

an

Afr

ican

ex

iste

ntia

l ide

olog

y bu

ilt o

n A

fric

an v

alue

s an

d co

nfide

nce

for a

de

stin

y of

gre

atne

ss

Set u

p ta

sk te

ams t

o de

velo

p an

d im

plem

ent a

cur

ricul

um

on A

fric

an id

eolo

gy, a

nd

the A

fric

an D

evel

opm

ent

Para

digm

at a

ll st

eps o

f the

ed

ucat

ion

proc

ess

Firs

t 2

year

sSe

nse

of c

onfid

ence

, co

nsci

ousn

ess,

wor

king

on

Afr

ica’

s des

tiny,

and

ow

ners

hip

of th

e Afr

ican

na

rrat

ive

and

bran

d

Con

tinen

t-wid

e co

nsul

tativ

e pr

oces

s ($

1,00

0,00

0)

$1,0

00,0

00A

cade

mia

/th

ink

tank

sM

embe

r St

ates

CSO

sPr

ivat

e se

ctor

AU

C a

nd A

U

inst

itutio

nsR

ECs

2R

edes

ign

the

educ

atio

n sy

stem

Tran

sfor

m A

fric

an

educ

atio

n, fo

cusi

ng

on A

fric

an id

eolo

gies

an

d va

lues

and

em

phas

izin

g C

TS a

nd

STEM

Bui

ld c

apac

ity b

y re

desi

gnin

g th

e cu

rren

t edu

catio

nal

syst

em to

refo

rm a

nd d

esig

n th

e co

nten

t of a

new

Afr

ican

ed

ucat

ion

agen

da g

roun

ded

in

Afr

ican

val

ues a

nd a

spira

tions

Firs

t 2

year

sD

evel

op a

uni

que

cont

inen

tal e

duca

tiona

l ag

enda

driv

en b

y th

e vi

sion

of A

gend

a 20

63

Expe

nses

rela

ted

to th

e re

desi

gn o

f the

edu

catio

n sy

stem

($80

0,00

0)

$800

,000

Aca

dem

ia/

thin

k ta

nks

Thin

k ta

nks

Mem

ber

Stat

esC

SOs

Red

esig

n an

d ch

ange

A

fric

an e

duca

tion

curr

icul

a

Reo

rient

the

acad

emic

pro

gram

an

d co

rrec

t the

dis

conn

ectio

n be

twee

n un

iver

sity

cur

ricul

a an

d th

e im

pera

tives

of A

gend

a 20

63

Firs

t 2

year

sA

fric

an e

duca

tion

curr

icul

um is

Afr

o-ce

ntric

w

ith a

focu

s on

prod

ucin

g gr

adua

tes f

or A

fric

a’s

deve

lopm

ent

Con

tent

dev

elop

men

t, co

nsul

tativ

e pr

oces

ses,

and

nego

tiatio

n an

d lo

bbyi

ng o

n pr

opos

als

($35

0,00

0)

$350

,000

Aca

dem

ia/

thin

k ta

nks

Mem

ber

Stat

esA

UPr

ivat

e se

ctor

REC

s

3Fl

agsh

ip p

roje

cts

rela

ted

to

acad

emia

Prod

uce

hard

skill

s re

leva

nt to

flag

ship

pr

ojec

ts

Rei

nvig

orat

e th

e st

reng

then

ing

and

expa

nsio

n of

TV

ET

train

ing

cent

ers t

hrou

gh th

e de

velo

pmen

t of f

ocus

ed

prog

ram

s for

Age

nda

2063

Urg

ent

Mas

sive

pro

duct

ion

of

criti

cal t

echn

ical

and

vo

catio

nal s

kills

for

Age

nda

2063

flag

ship

pr

ojec

ts a

nd o

ther

pr

ogra

ms

Cos

ts re

late

d to

cu

rric

ulum

rede

sign

an

d ed

ucat

ion

train

ing

($40

0,00

0)

$400

,000

Aca

dem

ia/

thin

k ta

nks

Mem

ber

Stat

esA

UPr

ivat

e se

ctor

REC

s

4D

ata

and

info

rmat

ion

Res

earc

h an

d da

ta

gene

ratio

n an

d ga

ther

ing

Des

ign

and

impl

emen

t ex

pert

supp

ort p

roce

sses

to

impl

emen

t a n

ew A

fric

an

appr

oach

to th

e da

ta re

volu

tion

and

know

ledg

e sy

stem

s tha

t bu

ild th

e ca

paci

ty fo

r Afr

ican

da

ta u

se, p

rodu

ctio

n, a

nd a

m

aint

enan

ce a

nd k

now

ledg

e-m

anag

emen

t sys

tem

for

deliv

erin

g on

Age

nda

2063

Firs

t 2

year

sG

reat

er o

pera

tiona

lizat

ion

of a

dat

a re

volu

tion

to

buttr

ess t

he v

isio

n fo

r Th

e Afr

ica

We

Wan

t and

A

fric

an o

wne

rshi

p

Syst

ems d

esig

n, tr

aini

ng,

and

the

pilo

ting

of d

ata

Afr

ican

dat

a us

e,

prod

uctio

n, a

nd a

m

aint

enan

ce a

nd

know

ledg

e- m

anag

emen

t sy

stem

($50

0,00

0)

$500

,000

Aca

dem

ia/

thin

k ta

nks

Thin

k ta

nks

CSO

s

Page 53: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

45

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

No.

Bro

ad c

apac

ity

gaps

and

nee

dsA

reas

for

impr

ovem

ent

Prop

osed

CD

inte

rven

tions

Tim

elin

eTa

rget

s or

desi

red

outc

omes

Cos

ting

elem

ents

Indi

cativ

e co

sts

Lea

d re

spon

sibi

lity

Prop

osed

key

su

ppor

ting

orga

niza

tions

5In

crea

se th

e nu

mbe

r of

train

ers i

n th

e Afr

ican

ed

ucat

ion

syst

em

Trai

ning

trai

ners

to

redu

ce th

e cu

rren

t sk

ills g

aps

Des

ign

and

inst

itute

a n

ew

sche

me,

“B

uild

ing

the

capa

city

of

cap

acity

bui

lder

s” fo

r ac

adem

ia

Firs

t yea

rR

educ

e th

e sk

ills g

ap a

nd

incr

ease

the

prod

uctio

n of

indi

vidu

als’

skill

s to

pre

pare

them

for

cont

ribut

ing

to th

e fla

gshi

p pr

ojec

ts

Res

ourc

es fo

r the

exp

erts

to

trai

n th

e tra

iner

s on

the

requ

ired

skill

s for

the

flags

hip

proj

ects

($50

0,00

0)

$500

,000

Aca

dem

iath

ink

tank

sC

SOs

Priv

ate

sect

or

Indi

cativ

e se

ed a

mou

nt re

quire

d fo

r sta

rt-up

CD

inte

rven

tions

in th

is C

DP

$3,5

50,0

00

Not

e: T

BD =

to b

e de

term

ined

.

Page 54: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

46

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

7INDICATIVE CAPACITIES REQUIRED FOR

FLAGSHIP PROGRAMS OF THE FIRST 10‑YEAR IMPLEMENTATION PLAN

This section analyzes and presents indicative capacities required for the flagship programs of the first 10-year plan. The key capacity dimensions prioritized include the required

CTS, as well as soft, composite, and trans-formative capacities. Each of these categories is accompanied by a column on proposed sourcing.

Page 55: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

47

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLANTa

ble

7.1

Ind

icat

ive

cap

acit

ies

req

uir

ed fo

r fl

agsh

ip p

rog

ram

s o

f th

e fi

rst 1

0-ye

ar p

lan

Flag

ship

pr

ogra

ms

(in fi

rst 1

0-ye

ar p

lan)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

1.

Inte

grat

ed

Hig

h-sp

eed

Trai

n N

etw

ork

Rai

lway

en

gine

ers

Civ

il en

gine

ers

Mec

hani

cal

engi

neer

sQ

uant

ity

surv

eyor

sC

onst

ruct

ion

proj

ect

man

ager

sFi

nanc

ial

inve

stm

ent

spec

ialis

tsIn

fras

truct

ure

spec

ialis

tsLa

nd

surv

eyor

sA

rchi

tect

sEl

ectri

cal

engi

neer

s

Mem

ber

Stat

esPr

ivat

e se

ctor

Aca

dem

iaC

TS

prof

essi

onal

bo

dies

Afr

ican

CTS

di

aspo

ra (i

n C

hina

, Ind

ia,

and

the

Wes

t)

Stra

tegi

c pl

anni

ngO

rgan

izat

iona

l and

co

ordi

natio

n ca

pabi

lity

Crit

ical

/stra

tegi

c th

inki

ng a

nd re

sults

-ba

sed

man

agem

ent

Proc

ess f

acili

tatio

n an

d or

gani

zatio

nal s

kills

(in

clud

ing

“fun

ctio

nal”

ca

paci

ties)

Crit

ical

supp

ort

syst

ems a

nd p

roce

sses

, in

clud

ing

the

use

of te

chno

logy

and

in

nova

tion

Dev

elop

pro

gram

sPl

an a

nd im

plem

ent

proj

ects

Fina

nce

the

owne

rshi

p an

d m

obili

zatio

n of

do

mes

tic re

sour

ces

Kno

wle

dge

syst

ems

to sp

eed

up p

roje

ct

impl

emen

tatio

nR

isk

man

agem

ent a

nd

miti

gatio

n an

d th

e ab

ility

to d

eal w

ith

bum

ps in

the

road

Leve

rage

ass

ets

Abi

lity

to n

egot

iate

and

be

per

suas

ive

Stak

ehol

der/

partn

ersh

ip-b

uild

ing

abili

ties

AU

CA

UC

In

stitu

tions

(N

EPA

D, P

AP,

an

d so

on)

REC

sPr

ivat

e se

ctor

Key

age

ncie

s (A

fDB

, EC

A,

and

so o

n)

Stro

ng c

omm

itmen

t at

the

lead

ersh

ip le

vel

Com

mitm

ent t

o de

velo

pmen

t out

com

esPr

oact

ive

appr

oach

Res

ults

orie

ntat

ion

(res

ults

-driv

en)

Acc

ount

abili

ty (f

or

resu

lts a

nd e

ffici

ency

)C

ontin

uous

hig

h le

vel

of e

nerg

y/co

mm

itmen

tA

bilit

y to

wor

k as

a

team

/com

mitm

ent

Trus

tPr

oble

m-s

olvi

ng sk

ills

Dili

genc

e an

d th

orou

ghne

ssSp

eed

and

urge

ncy

for

wor

k/ac

hiev

emen

tH

igh

ener

gy a

nd d

rive

Hea

vy w

orkl

oad

abili

ties/

hard

wor

king

at

titud

ePa

n-A

fric

an sp

irit a

nd

valu

es

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

Tran

sfor

mat

ive

lead

ersh

ip (i

nclu

ding

vi

sion

ing)

Top

lead

ersh

ip

and

man

agem

ent

optim

ism

/com

mitm

ent

Ow

ners

hip

of

deci

sion

-mak

ing

ICT

and

tech

nolo

gica

l pr

edis

posi

tion

Com

mitm

ent t

o in

nova

tion

and

inve

ntio

nR

isk

man

agem

ent

abili

ties

Peop

le m

otiv

ated

to

war

d a

shar

ed/

insp

iratio

nal v

isio

nC

hang

e re

adin

ess:

cr

eate

and

mai

ntai

n th

e de

sire

for c

hang

eA

bilit

y fo

r shi

fts in

m

ind-

set

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

can

pa

rtici

pate

in th

e im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

soft,

com

posi

te,

and

trans

form

ativ

e ca

paci

ty d

imen

sion

s to

ach

ieve

the

goal

s4.

Bui

ld in

a

sens

e of

urg

ency

-dr

iven

mon

itorin

g an

d tra

ckin

g on

im

plem

enta

tion

prog

ress

, as w

ell a

s fo

r ris

k an

d ch

alle

nges

m

anag

emen

t (con

tinue

d)

Page 56: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

48

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Flag

ship

pr

ogra

ms

(in fi

rst 1

0-ye

ar p

lan)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

2.

The A

fric

an

Virt

ual a

nd

e-U

nive

rsity

Kno

wle

dge

and

data

m

anag

emen

t sp

ecia

lists

Softw

are

deve

lope

rsM

icro

soft

syst

ems

engi

neer

sA

cade

mic

s an

d re

sear

cher

sIC

T sp

ecia

lists

Aca

dem

iaPr

ivat

e se

ctor

Afr

ican

di

aspo

raYo

uth

CTS

pr

ofes

sion

al

bodi

es

Crit

ical

supp

ort

syst

ems a

nd p

roce

sses

, in

clud

ing

the

use

of te

chno

logy

and

in

nova

tion

Stak

ehol

der/

partn

ersh

ip-b

uild

ing

abili

ties

Prog

ram

dev

elop

men

t, pr

ojec

t pla

nnin

g, a

nd

impl

emen

tatio

nPr

oces

s fac

ilita

tion

and

orga

niza

tiona

l ski

lls

(incl

udin

g “f

unct

iona

l”

capa

citie

sK

now

ledg

e sy

stem

s to

spee

d up

pro

ject

im

plem

enta

tion

Proj

ect p

lann

ing

and

impl

emen

tatio

nFi

nanc

ing

owne

rshi

p an

d D

RM

Ris

k m

anag

emen

t and

m

itiga

tion

and

the

abili

ty to

dea

l with

bu

mps

in th

e ro

ad

AU

CPr

ivat

e se

ctor

Com

mitm

ent t

o de

velo

pmen

t out

com

esPr

oact

ive

appr

oach

Res

ults

orie

ntat

ion

(res

ults

-driv

en)

Acc

ount

abili

ty (f

or

resu

lts a

nd e

ffici

ency

)C

ontin

uous

hig

h le

vel

of e

nerg

y/co

mm

itmen

tA

bilit

y to

wor

k as

a

team

/com

mitm

ent

Trus

tD

ilige

nce

and

thor

ough

ness

Spee

d an

d ur

genc

y fo

r w

ork/

achi

evem

ent

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

ICT

and

tech

nolo

gica

l pr

edis

posi

tion

Inno

vatio

n an

d in

vent

ion

com

mitm

ent

Ris

k m

anag

emen

t ab

ilitie

sPe

ople

mot

ivat

ed

tow

ard

a sh

ared

/in

spira

tiona

l vis

ion

Cha

nge

read

ines

s:

crea

te a

nd m

aint

ain

the

desi

re fo

r cha

nge

Abi

lity

for m

ind-

set

shift

s

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

can

pa

rtici

pate

in th

e im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

soft,

com

posi

te,

and

trans

form

ativ

e ca

paci

ty d

imen

sion

s to

ach

ieve

the

goal

s4.

Bui

ld in

a

sens

e of

urg

ency

-dr

iven

mon

itorin

g an

d tra

ckin

g of

im

plem

enta

tion

prog

ress

, as w

ell a

s fo

r ris

k an

d ch

alle

nges

m

anag

emen

t

Tab

le 7

.1 In

dic

ativ

e ca

pac

itie

s re

qu

ired

for

flag

ship

pro

gra

ms

of t

he

firs

t 10-

year

pla

n (c

ontin

ued)

Page 57: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

49

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLANFl

agsh

ip

prog

ram

s (in

firs

t 10-

year

pla

n)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

3.

Form

ulat

e a

Com

mod

ities

St

rate

gy

AU

CM

embe

r St

ates

REC

sK

ey a

genc

ies

(AfD

B, E

CA

, an

d so

on)

Stra

tegi

c pl

anni

ngO

rgan

izat

iona

l and

co

ordi

natio

n ca

pabi

lity

Crit

ical

/stra

tegi

c th

inki

ng a

nd re

sults

-ba

sed

man

agem

ent

Faci

litat

e th

e pr

oces

ses

and

orga

niza

tiona

l sk

ills (

incl

udin

g “f

unct

iona

l” c

apac

ities

)D

evel

op p

rogr

ams

Abi

lity

to n

egot

iate

and

be

per

suas

ive

AU

CA

UC

in

stitu

tions

(N

EPA

D, P

AP,

an

d so

on)

REC

sPr

ivat

e se

ctor

Polit

ical

will

Com

mitm

ent t

o de

velo

pmen

t out

com

esTr

ust

Res

ults

orie

ntat

ion

(res

ults

-driv

en)

Acc

ount

abili

ty (f

or

resu

lts a

nd e

ffici

ency

)C

ontin

uous

hig

h le

vel

of e

nerg

y/co

mm

itmen

tA

bilit

y to

wor

k as

a

team

/com

mitm

ent

Prob

lem

-sol

ving

skill

s

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

Top

lead

ersh

ip

and

man

agem

ent

optim

ism

/com

mitm

ent

Peop

le m

otiv

ated

to

war

d a

shar

ed/

insp

iratio

nal v

isio

nO

wne

rshi

p of

de

cisi

on-m

akin

gR

isk

man

agem

ent

abili

ties

Abi

lity

for s

hifts

in

min

d-se

t

Scre

en

indi

vidu

als/

inst

itutio

ns

care

fully

in

sear

ch

of th

ese

attit

udin

al/

pred

ispo

sitio

n ca

paci

ties

befo

re th

ey

are

invo

lved

/ho

ldin

g ke

y ro

les i

n th

is

maj

or fl

agsh

ip

prog

ram

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

can

pa

rtici

pate

in th

e im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

soft,

com

posi

te,

sand

tran

sfor

mat

ive

capa

city

dim

ensi

ons

to a

chie

ve th

e go

als

4. B

uild

in a

sens

e of

urg

ency

-driv

en

mon

itorin

g an

d tra

ckin

g of

the

impl

emen

tatio

n pr

ogre

ss, a

s wel

l as

for r

isk

and

chal

leng

es

man

agem

ent (c

ontin

ued)

Page 58: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

50

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Flag

ship

pr

ogra

ms

(in fi

rst 1

0-ye

ar p

lan)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

4.

Esta

blis

h an

Ann

ual

Afr

ican

Fo

rum

Not

ap

plic

able

AU

CM

embe

r St

ates

REC

sC

SOs

Org

aniz

atio

nal a

nd

coor

dina

tion

capa

bilit

yC

ritic

al/s

trate

gic

thin

king

and

resu

lts-

base

d m

anag

emen

tSt

akeh

olde

r/pa

rtner

ship

-bui

ldin

g ab

ilitie

sFa

cilit

ate

the

proc

esse

s an

d th

e or

gani

zatio

nal

skill

s (in

clud

ing

“fun

ctio

nal”

cap

aciti

es)

Prog

ram

dev

elop

men

tA

bilit

y to

neg

otia

te a

nd

be p

ersu

asiv

e

Priv

ate

sect

orK

ey a

genc

ies

(AfD

B, E

CA

, an

d so

on)

Abi

lity

to w

ork

as a

te

am/c

omm

itmen

tPa

n-A

fric

an sp

irit a

nd

valu

esSt

rong

com

mitm

ent a

t th

e le

ader

ship

leve

lR

esul

ts o

rient

atio

n (r

esul

ts-d

riven

)A

ccou

ntab

ility

(for

re

sults

and

effi

cien

cy)

Trus

tPr

oble

m-s

olvi

ng sk

ills

Dili

genc

e an

d th

orou

ghne

ssA

bilit

y to

han

dle

a he

avy

wor

kloa

d/ha

rdw

orki

ng a

ttitu

dePa

n-A

fric

an sp

irit a

nd

valu

es

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

Peop

le m

otiv

ated

to

war

d a

shar

ed/

insp

iratio

nal v

isio

nPo

litic

al w

illTo

p le

ader

ship

an

d m

anag

emen

t op

timis

m/c

omm

itmen

tO

wne

rshi

p of

de

cisi

on-m

akin

gR

isk

man

agem

ent

abili

ties

Cha

nge

read

ines

s:

crea

te a

nd m

aint

ain

the

desi

re fo

r cha

nge

Abi

lity

to sw

itch

min

d-se

ts

To sc

reen

in

divi

dual

s/In

stitu

tions

ca

refu

lly,

in se

arch

of

thes

e at

titud

inal

/pr

edis

posi

tion

capa

citie

s be

fore

they

be

com

e in

volv

ed/h

old

key

role

s in

this

maj

or

flags

hip

prog

ram

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

can

pa

rtici

pate

in th

e im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

soft,

com

posi

te,

and

trans

form

ativ

e ca

paci

ty d

imen

sion

s to

ach

ieve

the

goal

s4.

Bui

ld in

a

sens

e of

urg

ency

-dr

iven

mon

itorin

g an

d tra

ckin

g of

im

plem

enta

tion

prog

ress

, as w

ell a

s fo

r ris

k an

d ch

alle

nges

m

anag

emen

t

Tab

le 7

.1 In

dic

ativ

e ca

pac

itie

s re

qu

ired

for

flag

ship

pro

gra

ms

of t

he

firs

t 10-

year

pla

n (c

ontin

ued)

Page 59: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

51

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLANFl

agsh

ip

prog

ram

s (in

firs

t 10-

year

pla

n)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

5.

Esta

blis

h th

e C

ontin

enta

l Fr

ee T

rade

A

rea

by 2

017

Fina

ncia

l In

vest

men

t A

dvis

ors/

expe

rtsIn

tra-A

fric

an

trade

sp

ecia

lists

Econ

omis

tsFr

ee tr

ade

spec

ialis

tsR

egio

nal

inte

grat

ion

spec

ialis

tsLo

gist

ical

/fr

eigh

t ex

perts

Act

uarie

s and

ris

k as

sess

ors

AU

CM

embe

r St

ates

REC

sPr

ivat

e se

ctor

Afr

ican

di

aspo

raC

SOs

Stra

tegi

c pl

anni

ngC

ritic

al/s

trate

gic

thin

king

and

resu

lts-

base

d m

anag

emen

tLe

vera

ge a

sset

sR

isk

man

agem

ent a

nd

miti

gatio

n an

d th

e ab

ility

to d

eal w

ith

bum

ps in

the

road

Org

aniz

atio

nal a

nd

coor

dina

tion

capa

bilit

yFa

cilit

ate

the

proc

esse

s an

d th

e or

gani

zatio

nal

skill

s (in

clud

ing

“fun

ctio

nal”

cap

aciti

es)

Stak

ehol

der/

partn

ersh

ip-b

uild

ing

abili

ties

Dev

elop

pro

gram

sPl

an a

nd im

plem

ent

proj

ects

Fina

nce

owne

rshi

p an

d D

RM

Abi

lity

to n

egot

iate

and

be

per

suas

ive

Priv

ate

sect

orK

ey a

genc

ies

(AfD

B, E

CA

, et

c.)

Stro

ng c

omm

itmen

t at

the

lead

ersh

ip le

vel

Com

mitm

ent t

o de

velo

pmen

t out

com

esPr

oact

ive

appr

oach

Res

ults

orie

ntat

ion

(res

ults

-driv

en)

Acc

ount

abili

ty (f

or

resu

lts a

nd e

ffici

ency

)C

ontin

uous

hig

h le

vel

of e

nerg

y/co

mm

itmen

tA

bilit

y to

wor

k as

a

team

/com

mitm

ent

Trus

tPr

oble

m-s

olvi

ng sk

ills

Dili

genc

e an

d th

orou

ghne

ssSp

eed

and

urge

ncy

for

wor

k/ac

hiev

emen

tH

igh

ener

gy a

nd d

rive

Abi

lity

to h

andl

e a

heav

y w

orkl

oad

/ha

rdw

orki

ng a

ttitu

dePa

n-A

fric

an sp

irit a

nd

valu

es

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

Tran

sfor

mat

ive

lead

ersh

ip (i

nclu

ding

vi

sion

ing)

Top

lead

ersh

ip

and

man

agem

ent

optim

ism

/com

mitm

ent

Ow

ners

hip

of

deci

sion

-mak

ing

ICT

and

tech

nolo

gica

l pr

edis

posi

tion

Inno

vatio

n an

d in

vent

ion

com

mitm

ent

Ris

k m

anag

emen

t ab

ilitie

sPe

ople

mot

ivat

ed

tow

ard

a sh

ared

/in

spira

tiona

l vis

ion

Cha

nge

read

ines

s:

crea

te a

nd m

aint

ain

the

desi

re fo

r cha

nge

Abi

lity

for s

hifts

in

min

d-se

t

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

can

pa

rtici

pate

in th

e im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

soft,

com

posi

te,

and

trans

form

ativ

e ca

paci

ty d

imen

sion

s to

ach

ieve

the

goal

s4.

Bui

ld in

a

sens

e of

urg

ency

-dr

iven

mon

itorin

g an

d tra

ckin

g of

im

plem

enta

tion

prog

ress

, as w

ell a

s fo

r ris

k an

d ch

alle

nges

m

anag

emen

t (con

tinue

d)

Page 60: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

52

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Flag

ship

pr

ogra

ms

(in fi

rst 1

0-ye

ar p

lan)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

6.

Impl

emen

tatio

n of

the

Gra

nd

Inga

Dam

Pr

ojec

t

Wat

er

spec

ialis

ts/

Hyd

rolo

gist

sC

hem

ical

En

gine

ers

Proj

ect

man

ager

sC

hem

ical

En

gine

er/

Tech

nolo

gist

Wat

er

reso

urce

sc

ient

ists

Irrig

atio

n sp

ecia

lists

Dam

co

nstru

ctio

n an

d m

anag

emen

t sp

ecia

lists

Aqu

atic

Sc

ient

ist

Mar

ine

Bio

-sc

ient

ist

Geo

logi

sts

Toxi

colo

gist

s

Mem

ber

Stat

esPr

ivat

e se

ctor

Aca

dem

iaC

TS

prof

essi

onal

bo

dies

Afr

ican

CTS

di

aspo

ra (i

n C

hina

, Ind

ia,

and

the

Wes

t)

Stra

tegi

c pl

anni

ngD

evel

op p

rogr

ams

Plan

and

impl

emen

t pr

ojec

tsSt

akeh

olde

r/pa

rtner

ship

-bui

ldin

g ab

ilitie

sO

rgan

izat

iona

l and

co

ordi

natio

n ca

pabi

lity

Crit

ical

/stra

tegi

c th

inki

ng a

nd re

sults

-ba

sed

man

agem

ent

Proc

ess f

acili

atio

n an

d or

gani

zatio

nal s

kills

(in

clud

ing

“fun

ctio

nal”

ca

paci

ties)

Crit

ical

supp

ort

syst

ems a

nd p

roce

sses

, in

clud

ing

the

use

of te

chno

logy

and

in

nova

tion

Fina

nce

owne

rshi

p an

d D

RM

Kno

wle

dge

syst

ems

to sp

eed

up p

roje

ct

impl

emen

tatio

nR

isk

man

agem

ent a

nd

miti

gatio

n an

d th

e ab

ility

to d

eal w

ith

bum

ps in

the

road

Leve

rage

ass

ets

Abi

lity

to n

egot

iate

and

be

per

suas

ive

AU

CPr

ivat

e se

ctor

Key

age

ncie

s (A

fDB

, EC

A,

and

so o

n)

Com

mitm

ent t

o de

velo

pmen

t of

outc

omes

Hig

h en

ergy

and

driv

ePa

n-A

fric

an sp

irit a

nd

valu

esSt

rong

com

mitm

ent a

t th

e le

ader

ship

leve

lPr

oact

ive

appr

oach

Res

ults

orie

ntat

ion

(res

ults

-driv

en)

Acc

ount

abili

ty (f

or

resu

lts a

nd e

ffici

ency

)C

ontin

uous

hig

h le

vel

of e

nerg

y/co

mm

itmen

tA

bilit

y to

wor

k as

a

team

/com

mitm

ent

Trus

tPr

oble

m-s

olvi

ng sk

ills

Dili

genc

e an

d th

orou

ghne

ssSp

eed

and

urge

ncy

for

wor

k/ac

hiev

emen

tA

bilit

y to

han

dle

a he

avy

wor

kloa

d/ha

rdw

orki

ng a

ttitu

de

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

Tran

sfor

mat

ive

lead

ersh

ip (i

nclu

ding

vi

sion

ing)

Top

lead

ersh

ip

and

man

agem

ent

optim

ism

/com

mitm

ent

Ow

ners

hip

of

deci

sion

-mak

ing

ICT

and

tech

nolo

gica

l pr

edis

posi

tion

Inno

vatio

n an

d in

vent

ion

com

mitm

ent

Ris

k m

anag

emen

t ab

ilitie

sPe

ople

mot

ivat

ed

tow

ard

a sh

ared

/in

spira

tiona

l vis

ion

Cha

nge

read

ines

s:

crea

te a

nd m

aint

ain

the

desi

re fo

r cha

nge

Abi

lity

to sh

ift m

ind-

sets

To sc

reen

in

divi

dual

s/in

stitu

tions

ca

refu

lly,

in se

arch

of

thes

e at

titud

inal

/pr

edis

posi

tion

capa

citie

s be

fore

they

be

com

e in

volv

ed/h

old

key

role

s in

this

maj

or

flags

hip

prog

ram

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

can

pa

rtici

pate

in th

e im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

soft,

com

posi

te,

and

trans

form

ativ

e ca

paci

ty d

imen

sion

s to

ach

ieve

the

goal

s4.

Bui

ld in

a

sens

e of

urg

ency

-dr

iven

mon

itorin

g an

d tra

ckin

g on

im

plem

enta

tion

prog

ress

, as w

ell a

s fo

r ris

k an

d ch

alle

nges

m

anag

emen

t

Tab

le 7

.1 In

dic

ativ

e ca

pac

itie

s re

qu

ired

for

flag

ship

pro

gra

ms

of t

he

firs

t 10-

year

pla

n (c

ontin

ued)

Page 61: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

53

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLANFl

agsh

ip

prog

ram

s (in

firs

t 10-

year

pla

n)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

7.

The

Pa

n-A

fric

an

E-N

etw

ork

Net

wor

k C

ontro

llers

Inte

grat

ed

Dev

elop

ers

(Jav

a, P

erl,

PHP)

ICT

spec

ialis

tsSy

stem

s en

gine

ers

IT S

ecur

ity

spec

ialis

tsTe

leco

m-

mun

icat

ions

en

gine

ers/

spec

ialis

ts

AU

CPr

ivat

e se

ctor

Yout

hA

fric

an

dias

pora

Crit

ical

/stra

tegi

c th

inki

ng a

nd re

sults

-ba

sed

man

agem

ent

Org

aniz

atio

nal a

nd

coor

dina

tion

capa

bilit

yPr

oces

s fac

ilita

tion

and

orga

niza

tiona

l ski

lls

(incl

udin

g “f

unct

iona

l”

capa

citie

s)St

akeh

olde

r/pa

rtner

ship

-bui

ldin

g ab

ilitie

sC

ritic

al su

ppor

t sy

stem

s and

pro

cess

es,

incl

udin

g th

e us

e of

tech

nolo

gy a

nd

inno

vatio

nD

evel

op p

rogr

ams

Plan

and

impl

emen

t pr

ojec

tsFi

nanc

e ow

ners

hip

and

DR

MK

now

ledg

e sy

stem

s to

spee

d up

pro

ject

im

plem

enta

tion

Ris

k m

anag

emen

t and

m

itiga

tion

and

the

abili

ty to

dea

l with

bu

mps

in th

e ro

adLe

vera

ge a

sset

sA

bilit

y to

neg

otia

te a

nd

be p

ersu

asiv

e

AU

CPr

ivat

e se

ctor

Con

tinen

tal

yout

h or

gani

zatio

ns

Com

mitm

ent t

o de

velo

pmen

t out

com

esPr

oact

ive

appr

oach

Res

ult o

rient

atio

n (r

esul

ts-d

riven

)A

ccou

ntab

ility

(for

re

sults

and

effi

cien

cy)

Con

tinuo

us h

igh

leve

l of

ene

rgy/

com

mitm

ent

Abi

lity

to w

ork

as a

te

am/c

omm

itmen

tTr

ust

Prob

lem

-sol

ving

skill

sD

ilige

nce

and

thor

ough

ness

Hig

h en

ergy

and

driv

eA

bilit

y to

han

dle

a he

avy

wor

kloa

d/ha

rdw

orki

ng a

ttitu

dePa

n-A

fric

an sp

irit a

nd

valu

es

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

Inno

vatio

n an

d in

vent

ion

com

mitm

ent

ICT

and

tech

nolo

gica

l pr

edis

posi

tion

Tran

sfor

mat

ive

lead

ersh

ip (i

nclu

ding

vi

sion

ing)

Top

lead

ersh

ip

and

man

agem

ent

optim

ism

/com

mitm

ent

Ow

ners

hip

of

deci

sion

-mak

ing

Ris

k m

anag

emen

t ab

ilitie

sPe

ople

mot

ivat

ed

tow

ard

a sh

ared

/in

spira

tiona

l vis

ion

Cha

nge

read

ines

s:

crea

te a

nd m

aint

ain

the

desi

re fo

r cha

nge

Abi

lity

to sh

ift m

ind-

sets

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

ca

n be

use

d in

im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

com

posi

te, s

oft,

and

trans

form

ativ

e ca

paci

ty d

imen

sion

s to

ach

ieve

the

goal

s4.

Bui

ld in

a

sens

e of

urg

ency

-dr

iven

mon

itorin

g an

d tra

ckin

g on

im

plem

enta

tion

prog

ress

, as w

ell a

s fo

r ris

k an

d ch

alle

nges

m

anag

emen

t (con

tinue

d)

Page 62: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

54

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Flag

ship

pr

ogra

ms

(in fi

rst 1

0-ye

ar p

lan)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

8.

Sile

ncin

g th

e G

uns b

y 20

20

Afr

ican

co

nflic

t re

solu

tion

spec

ialis

tsPa

nel o

f wis

e/pe

ace

mak

ers

Peac

e an

d se

curit

y ex

perts

Con

flict

an

d se

curit

y tra

ckin

g sp

ecia

lists

AU

CPr

ivat

e se

ctor

Afr

ican

di

aspo

raA

fric

an

secu

rity

inst

itutio

ns

Dev

elop

pro

gram

sR

isk

man

agem

ent a

nd

miti

gatio

n an

d th

e ab

ility

to d

eal w

ith

bum

ps in

the

road

Crit

ical

supp

ort

syst

ems a

nd p

roce

sses

, in

clud

ing

the

use

of te

chno

logy

and

in

nova

tion

Stak

ehol

der/

partn

ersh

ip-b

uild

ing

abili

ties

Stra

tegi

c pl

anni

ngO

rgan

izat

iona

l and

co

ordi

natio

n ca

pabi

lity

Crit

ical

/stra

tegi

c th

inki

ng a

nd re

sults

-ba

sed

man

agem

ent

Proc

ess f

acili

tatio

n an

d or

gani

zatio

nal s

kills

(in

clud

ing

“fun

ctio

nal”

ca

paci

ties)

Plan

and

impl

emen

t pr

ojec

tsFi

nanc

e ow

ners

hip

and

DR

MK

now

ledg

e sy

stem

s to

spee

d up

pro

ject

im

plem

enta

tion

Abi

lity

to n

egot

iate

and

be

per

suas

ive

AU

CA

UC

in

stitu

tions

(N

EPA

D, P

AP,

an

d so

on)

REC

sPr

ivat

e se

ctor

Key

age

ncie

s (A

fDB

, EC

A,

and

so o

n)

Polit

ical

will

Acc

omm

odat

ive

appr

oach

es to

so

vere

ignt

y w

illin

gnes

s ca

paci

ties

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

Ris

k m

anag

emen

t ab

ilitie

sTr

ansf

orm

ativ

e le

ader

ship

(inc

ludi

ng

visi

onin

g)To

p le

ader

ship

an

d m

anag

emen

t op

timis

m/c

omm

itmen

tO

wne

rshi

p of

de

cisi

on-m

akin

gPe

ople

mot

ivat

ed

tow

ard

a sh

ared

/in

spira

tiona

l vis

ion

Cha

nge

read

ines

s:

crea

te a

nd m

aint

ain

the

desi

re fo

r cha

nge

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

ca

n be

use

d in

im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

com

posi

te, s

oft,

and

trans

form

ativ

e ca

paci

ty d

imen

sion

s to

ach

ieve

the

goal

s4.

Bui

ld in

a

sens

e of

urg

ency

-dr

iven

mon

itorin

g an

d tra

ckin

g on

im

plem

enta

tion

prog

ress

, as w

ell a

s fo

r ris

k an

d ch

alle

nges

m

anag

emen

t

Tab

le 7

.1 In

dic

ativ

e ca

pac

itie

s re

qu

ired

for

flag

ship

pro

gra

ms

of t

he

firs

t 10-

year

pla

n (c

ontin

ued)

Page 63: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

55

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLANFl

agsh

ip

prog

ram

s (in

firs

t 10-

year

pla

n)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

9.

Afr

ican

O

uter

Spa

ce

Stra

tegy

Ast

rona

uts

Spac

e te

chno

logi

sts

Tech

nolo

gy

and

inno

vatio

n sp

ecia

lists

Phys

icis

tsSa

telli

te

posit

ioni

ng a

nd

info

rmat

ion

anal

ysis

spec

ialis

ts

AU

CPr

ivat

e se

ctor

Aca

dem

iaC

TS

prof

essi

onal

bo

dies

Afr

ican

CTS

di

aspo

ra (i

n C

hina

, Ind

ia,

and

the

Wes

t)

Stra

tegi

c pl

anni

ngO

rgan

izat

iona

l and

co

ordi

natio

n ca

pabi

lity

Crit

ical

/stra

tegi

c th

inki

ng a

nd re

sults

-ba

sed

man

agem

ent

Proc

ess f

acili

tatio

n an

d or

gani

zatio

nal s

kills

(in

clud

ing

“fun

ctio

nal”

ca

paci

ties)

Crit

ical

supp

ort

syst

ems a

nd p

roce

sses

, in

clud

ing

the

use

of te

chno

logy

and

in

nova

tion

Dev

elop

pro

gram

sPl

an a

nd im

plem

ent

proj

ects

Fina

nce

owne

rshi

p an

d D

RM

Kno

wle

dge

syst

ems

to sp

eed

up p

roje

ct

impl

emen

tatio

nR

isk

man

agem

ent a

nd

miti

gatio

n an

d th

e ab

ility

to d

eal w

ith

bum

ps in

the

road

Leve

rage

ass

ets

Abi

lity

to n

egot

iate

and

be

per

suas

ive

AU

CPr

ivat

e se

ctor

Key

age

ncie

s (A

fDB

, EC

A,

and

so o

n)

Stro

ng c

omm

itmen

t at

the

lead

ersh

ip le

vel

Com

mitm

ent t

o de

velo

pmen

t out

com

esPr

oact

ive

appr

oach

Res

ults

orie

ntat

ion

(res

ults

-driv

en)

Acc

ount

abili

ty (f

or

resu

lts a

nd e

ffici

ency

)C

ontin

uous

hig

h le

vel

of e

nerg

y/co

mm

itmen

tA

bilit

y to

wor

k as

a

team

/com

mitm

ent

Trus

tPr

oble

m-s

olvi

ng sk

ills

Dili

genc

e an

d th

orou

ghne

ssH

igh

ener

gy a

nd d

rive

Abi

lity

to h

andl

e a

heav

y w

orkl

oad/

hard

wor

king

atti

tude

Pan-

Afr

ican

spiri

t and

va

lues

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

ca

n be

use

d in

im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

com

posi

te, s

oft,

and

trans

form

ativ

e ca

paci

ty d

imen

sion

s to

ach

ieve

the

goal

s4.

Bui

ld in

a

sens

e of

urg

ency

-dr

iven

mon

itorin

g an

d tra

ckin

g on

im

plem

enta

tion

prog

ress

, as w

ell a

s fo

r ris

k an

d ch

alle

nges

m

anag

emen

t (con

tinue

d)

Page 64: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

56

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Flag

ship

pr

ogra

ms

(in fi

rst 1

0-ye

ar p

lan)

CT

S pr

ofes

sion

als

requ

ired

fo

r fla

gshi

p pr

ogra

ms

Prop

osed

so

urci

ng

of C

TS

prof

essi

onal

sC

ompo

site

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng o

f co

mpo

site

ca

paci

ties

Soft

cap

aciti

es

requ

ired

Prop

osed

so

urci

ng

of so

ft

capa

citie

s

Cha

nge

and

tran

sfor

mat

ive

capa

citie

s req

uire

d

Prop

osed

so

urci

ng

of c

hang

e an

d tr

ans.

capa

citie

sPr

opos

ed C

D

inte

rven

tion

10.

The A

fric

an

Pass

port

and

the

Free

M

ovem

ent o

f Pe

ople

Not

ap

plic

able

AU

CM

embe

r St

ates

APR

M

Proc

ess f

acili

tatio

n an

d or

gani

zatio

nal s

kills

(in

clud

ing

“fun

ctio

nal”

ca

paci

ties)

Stra

tegi

c pl

anni

ngO

rgan

izat

iona

l and

co

ordi

natio

n ca

pabi

lity

Crit

ical

/stra

tegi

c th

inki

ng a

nd re

sults

-ba

sed

man

agem

ent

Crit

ical

supp

ort

syst

ems a

nd p

roce

sses

, in

clud

ing

the

use

of te

chno

logy

and

in

nova

tion

Dev

elop

pro

gram

sPl

an a

nd im

plem

ent

proj

ects

Fina

nce

owne

rshi

p an

d D

RM

Kno

wle

dge

syst

ems

to sp

eed

up p

roje

ct

impl

emen

tatio

nR

isk

man

agem

ent a

nd

miti

gatio

n an

d th

e ab

ility

to d

eal w

ith

bum

ps in

the

road

Leve

rage

ass

ets

Abi

lity

to n

egot

iate

and

be

per

suas

ive

AU

CR

ECs

Mem

ber

Stat

es

Pan-

Afr

ican

spiri

t and

va

lues

Stro

ng p

oliti

cal w

ill a

t th

e le

ader

ship

leve

lC

omm

itmen

t to

deve

lopm

ent o

utco

mes

Proa

ctiv

e ap

proa

chR

esul

ts o

rient

atio

n (r

esul

ts-d

riven

)A

ccou

ntab

ility

(for

re

sults

and

effi

cien

cy)

Abi

lity

to w

ork

as a

te

am/c

omm

itmen

tTr

ust

Prob

lem

-sol

ving

skill

sD

ilige

nce

and

thor

ough

ness

Spee

d an

d ur

genc

y fo

r w

ork/

achi

evem

ent

Indi

vidu

als/

inst

itutio

ns

that

will

hav

e be

en c

aref

ully

sc

reen

ed

for t

hese

ca

paci

ties

befo

re th

ey

beco

me

invo

lved

Peop

le m

otiv

ated

to

war

d a

shar

ed/

insp

iratio

nal v

isio

nA

bilit

y fo

r min

d-se

t sh

ifts

Cha

nge

read

ines

s:

crea

te a

nd m

aint

ain

the

desi

re fo

r cha

nge

Tran

sfor

mat

ive

lead

ersh

ip (i

nclu

ding

vi

sion

ing)

Top

lead

ersh

ip

and

man

agem

ent

optim

ism

/com

mitm

ent

Ow

ners

hip

of

deci

sion

-mak

ing

com

mitm

ent

Ris

k-m

anag

emen

t ab

ilitie

s

1. Id

entif

y an

d es

tabl

ish

a po

ssib

le

rost

er o

f qua

lified

/su

itabl

e Afr

ican

sp

ecia

lists

who

ca

n be

use

d in

im

plem

enta

tion

2. O

rgan

ize

shor

t or

ient

atio

n tra

inin

g on

th

e ob

ject

ives

3. D

esig

n an

d pr

ovid

e re

fres

her t

rain

ing

on

the

com

posi

te, s

oft,

and

trans

form

ativ

e ca

paci

ty d

imen

sion

s to

ach

ieve

the

goal

s4.

Bui

ld in

a

sens

e of

urg

ency

-dr

iven

mon

itorin

g an

d tra

ckin

g on

im

plem

enta

tion

prog

ress

, as w

ell a

s fo

r ris

k an

d ch

alle

nges

m

anag

emen

t

Tab

le 7

.1 In

dic

ativ

e ca

pac

itie

s re

qu

ired

for

flag

ship

pro

gra

ms

of t

he

firs

t 10-

year

pla

n (c

ontin

ued)

Page 65: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

57

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

8GAPS IN AFRICA’S CRITICAL

TECHNICAL SKILL AREAS: SAMPLE ANALYSIS

Africa and its nations are lagging behind in their depth and availability of CTS and spe-cialists, including those with vocational skills. This short section offers a sample analysis of CTS categories to better underscore the enor-mity of the endeavor that is Agenda 2063. (A more comprehensive analysis is in the docu-ment African Critical Technical Skills: Key Capacity Dimensions Needed for the First 10 Years of Agenda 2063).

The total population of the few countries here is smaller than Africa’s, but they are far ahead of the rest of the continent in the level and availability of CTS and specialists. The im-perfections of the analysis below — especially the small base of countries — underscore Afri-ca’s data challenge.

Engineers

Numbers in selected African countries. The estimated number of engineers in Kenya is 7,221, in Tanzania, 2,614, in Malawi, 300,4 and in Rwanda, 175,5 so there is an average of approximately 2,576 engineers in these countries. As many countries in Africa are still “least developed,” one can assume that their average is even lower. Optimistically, it may be that the average of engineers in just Malawi, Rwanda, and Tanzania — around 1,029 — reflects the average of most African countries (except for those with far smaller populations). So, using this average, one

could put the total number of engineers in Af-rica at 55,602, for a ratio of 0.0476 engineers per 1,000 people.

But a good proportion of these engineers are lost every year to other continents, mainly Europe and America. For example, up to 300 qualified engineers leave South Africa every year, according to the Engineering Council of South Africa, leaving the country with fewer than three civil engineers per 100,000 people and depriving 79 of the country’s 231 local municipalities of all their civil engineers, technologists, and technicians.

Comparison with other developing countries. With a population of 200.4 million, Brazil has some 750,000 engineers, for a ratio of 3.75 engineers per 1,000 people — almost 100 times as many per 1,000 people as Tanzania. Tanzania, with a population of 50,710,7986 and 2,614 engineers, has a ratio of only 0.051 engineers per 1,000 people, or a shortfall of (at a ratio of 3.698 per 1,000 people) 187,554 engineers.

Kenya has an equivalent shortfall of 166,924 engineers. (This is based on a population of 46,445,079 and 7,221 engineers, for a ratio of 0.155 engineers per 1,000 people, or 3.594 engineers per 1,000 people).

For Africa as a whole, with an estimated population of 1,166,239,000 and 55,602 en-gineers, at a ratio of 3.702 for 1,000 people,

Page 66: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

58

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

the shortfall in engineers (compared to what Africa ought to have) is 4,317,795.

The current African ratio of 0.107 per 1,000 people is also very low, especially compared to a developing economy such as Venezue-la’s (estimated population of 28 million and 180,000 engineers, for a ratio of 6.428 engi-neers per 1,000 people). Using this country as a benchmark, Africa has a shortfall of 6.380 engineers per 1,000 people.

Targets for 2023. The Tanzanian popula-tion of 50,710,798 is forecast to reach about 57 million by 2023. Its current shortage of en-gineers is 3.698 per 1,000 people, which will rise to 4.157 engineers by 2023 based on cur-rent trends. For Tanzania to bridge this gap, it will have to produce a minimum of 236,961 additional engineers — an average of 33,852 every year for the next seven years.

By 2023, the current African population of 1.166 billion is estimated to reach 1.3 billion. The current Africa-wide shortage of engineers is about 3.702 per 1,000 people, a gap that will grow to 4.126 in seven years. To close that gap, Africa has to produce a minimum of 5,365,013 additional engineers — 766,431 a year. To be at Venezuela’s current level (7.112 engineers per 1,000 people) by 2023, it will have to invest heavily in producing engineers, for a minimum of 9,245,855–1,320,837 a year.

Medical doctors and specialists

Current situation. Africa is also lagging in its numbers of medical doctors and specialists. According to World Bank statistics, Africa has an average ratio of 0.307 physicians (medical doctors) per 1,000 people, or a mere 358,035 for nearly 1.2 billion people.

Comparison with other developing coun-tries. That number is very low compared to,

for example, Brazil, which for its roughly 200 million people has 378,756 physicians, at an estimated ratio of 1.89 per 1,000 people. That leaves a gap with Africa of 1.583 medical doctors per 1,000 people, or 20,721 doctors.

Targets for 2023. By 2023, the African pop-ulation is estimated to reach 1.3 billion. To reach Brazil’s current level, Africa will have to invest significantly in training doctors, too — a minimum of 23,098, or 3,211 per year.

Here are three developed countries with their populations and number of doctors per 1,000 people:

• Canada: 34,419,000 and 2.07.

• United Kingdom: 60,566,000 and 2.79.

• United States: 321,225,000 and 2.45.

This yields a ratio of 7.31 for a combined pop-ulation of 416,210,000, or a shortfall in Africa (population nearing 1.2 billion) of 8,167,172 medical doctors, at 7.003 doctors per 1,000 people. To close this gap, Africa has the mam-moth task of training an additional 9,103,900 physicians — 1,300,557 a year — which will be borne by the AUC, RECs, Member States, and stakeholder groups, among others.

Researchers and STEM specialists

Another yawning gap that Africa has to bridge is in the STEM sector. African research is dominated by Algeria, Egypt, Kenya, Nige-ria, and South Africa. During 2003–2012, all three sub-Saharan African regions doubled their annual research output and increased its quality, raising Sub- Saharan Africa’s share of global research from 0.44 percent to 0.72 per-cent over the decade. Still, since Africa has 12 percent of the global population, a consid-erable gap remains.

Page 67: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

59

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

In Sub- Saharan Africa, research in the phys-ical sciences and STEM makes up only 29 percent of all research, compared to an av-erage of 68 percent in Malaysia and Vietnam.

Sub- Saharan Africa relies on overseas col-laboration and visiting academics for a steep share of its research output. Some 40–80 per-cent of its science and technology innovation publications are with external partners. The majority of those are in fields, such as health and agriculture, of most interest to interna-tional donors, to the neglect of areas, such as engineering (as above), needed to en-able Africa to develop fundamental STEM research — despite decades of extractive re-source activity. Donors’ heavy influence also dissuades Africa from looking within its own research communities. Sub- Saharan Africa collaborates by far the most with international partners; inter-African collaborations are just 2 percent, 2.9 percent, and 0.9 percent of all East African, Southern African, and West and Central African output.7

The continent remains far from the target set by the Lagos Plan of Action and AU 2007 ini-tiative calling on African countries to allocate

1 percent of gross domestic product (GDP) to science. With Africa’s combined GDP at approximately $2.6 trillion, the amount that could be allocated to science is $200 billion.

African countries can no longer afford to depend only on external sources to finance their basic research. African governments and the private sector should make a firm com-mitment to invest in STEM and innovations. This is vital for the continent to participate in the global knowledge economy and cultivate local capacity, including among youth and women.

Three other critical skill areas

The following figures paint a similar picture for mining specialists and engineers, geolo-gists, and quantity surveyors.

These data underscore Africa’s enormous CTS challenge for Agenda 2063. To deliver on the flagship projects, it must make concert-ed efforts urgently to bridge the CTS chasm between what Africa has and what it ought to have.

Figure 8.1 Mining specialists and engineers

0

2,500

5,000

7,500

United StatesNigeria South Africa

Average for Africa

Number of mining specialists and engineers

Source: Compiled by ACBF Capacity Team.

Page 68: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

60

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

Figure 8.2 Geologists

0

2,000

4,000

6,000

CanadaKenyaSouth AfricaMalaysia

Number of geologists

Average for Africa

Source: Compiled by ACBF Capacity Team.

Figure 8.3 Quantity surveyors

0

1,000

2,000

3,000

Hong KongKenyaNigeria

Number of quantity surveyors

Average for Africa

Source: Compiled by ACBF Capacity Team.

Page 69: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

61

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

NOTES

1. The crucial dimension 1 in Capacity Require-ments for the New African Vision; and see proposal 5.

2. See Chapter 4 of Capacity Requirements for the New African Vision.

3. AU and NEPAD (2012).

4. Nyasa Times (2011).

5. Institution of Engineers Rwanda (2015).

6. Tanzania’s population as of January 2015.

7. Khumbah (2015).

Page 70: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

62

CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10-YEAR PLAN

REFERENCES

AU (African Union) and NEPAD Agency (New Part-nership for Africa’s Development Planning and Coordinating Agency). 2012. Africa’s Capacity Development Strategic Framework. Midrand, South Africa: NEPAD Agency.

Institution of Engineers Rwanda. 2015. List of Ap-proved Engineers. http://www.engineersrwanda .org/list.php (accessed October 30, 2015)

Khumbah, N. 2015. “STEM Education and African De-velopment.” Pan African Visions. November 4. http://panafricanvisions.com/2015/stem -education-and-african-development/

Nyasa Times. 2011. “Malawi engineers body elect Mtumbuka as president.” Nyasa Times. August 29. http://www.nyasatimes.com/2011/08/29/malawi -engineers-body-elect-mtumbuka-as-president/ (accessed October 10, 2015).

Page 71: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes
Page 72: AFRICAN UNION AGENDA 2063 Capacity Development Plan Framework€¦ · CAPACITY DEVELOPMENT PLAN FRAMEWORK: BUTTRESSING IMPLEMENTATION OF THE FIRST 10‑YEAR PLAN REFERENCES 62 Boxes

Ca

pa

city D

ev

elo

pm

en

t Pla

n F

ra

me

wo

rk

2 Fairbairn Drive, Mount PleasantHarare, Zimbabwe

Tel: (+263-4) 304663, 304622, 332002, 332014Cell: +263 772 185 308 - 10Fax: (+263-4) 792894, 702915,E-mail: [email protected] site: www.acbf-pact.org

ISBN: 978-1-77937-064-8EAN:9781779370648

The June 2015 AU Ministerial Retreat of the Executive Council and the Summit in Johannesburg, South Africa emphasized the importance of the capacity dimensions for delivering on Agenda 2063. The Executive Council proposed that the finalized capacity assessment work should highlight the critical skills needed and the role of universities in providing training.

The work on Capacity Dimensions for Agenda 2063 was initiated by the AUC, with close support of the ACBF, which has produced three documents:

• African Critical Technical Skills: Key Capacity Dimensions Needed for the First 10 Years of Agenda 2063.

• Capacity Requirements for the New African Vision: Agenda 2063 — “The Africa We Want.”

• Capacity Development Plan Framework: Buttressing Implementation of the First 10-Year Plan — “The Africa We Want.”

The preliminary findings and recommendations from the capacity needs assessment were presented to the June 2015 Heads of State and Government Summit. The Summit emphasized the capacity dimensions for Agenda 2063, including:

• Critical, technical, and sector-specific skills and training.

• The importance of developing mechanisms to enhance the role of youth and women as central capacity pillars.

• Mind-set transformation, including setting up multistakeholder groups.

This report proposes multilevel and multistakeholder capacity development plans that identify an initial set of foundational capacity-strengthening activities for the First 10-Year Implementation Plan of Agenda 2063.