The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 1 of 28
Public Disclosure Copy
Public Disclosure Copy
West Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
AFRICA | Africa | Agriculture and Rural Development Global Practice | IBRD/IDA | Adaptable Program Loan | FY 2011 | Seq No: 8 | ARCHIVED on 23-Apr-2015 | ISR18901 |
Implementing Agencies: CORAF/WECARD
Key Dates
Key Project Dates
Board Approval date:30-Sep-2010 Effectiveness Date:25-Jul-2011
Planned Mid Term Review Date:01-Jun-2013 Actual Mid-Term Review Date:30-Nov-2013
Original Closing Date:30-Jun-2016 Revised Closing Date:30-Jun-2016
Project Development Objectives
Project Development Objective (from Project Appraisal Document)The development objective of WAAPP1-B is to generate and accelerate adoption of improved technologies in the participating countries’ top agricultural commodity priorities areas that are aligned with the sub-region’s top agricultural commodity priorities as outlined in the ECOWAP.
Has the Project Development Objective been changed since Board Approval of the Project Objective? No
PHRPDODEL
Name Previous Rating Current Rating
Progress towards achievement of PDO Satisfactory Satisfactory
Overall Implementation Progress (IP) Satisfactory Satisfactory
Overall Risk Rating -- Moderate
Components
NameEnabling conditions for sub-regional cooperation in the generation, dissemination and adoption of agricultural technologies:(Cost $8.37 M)
National Centers of Specialization (NCOS):(Cost $29.45 M)
Funding of Demand-driven Technology Generation and Adoption:(Cost $46.21 M)
Project Coordination, Management, Monitoring, and Evaluation:(Cost $9.80 M)
Overall Ratings
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 2 of 28
Public Disclosure Copy
Public Disclosure Copy
Implementation Status and Key Decisions
This is an interim Implementation Status Rreport (ISR). The next implementation support missions for all series of WAAPP (thus including for WAAPP-1b) started on April 13 and will be concluded on May 26, 2015. Thus the ISR will be upated then with latest/actual results and conclusions of the support missions.But overall WAAPP continues to progress satisfactorily towards achieving its PDO. Particularly right now the Program, among others, is playing a critical role in the aquisition and distriubtion of foundation and certified seeds to the Ebola affected countries. All the three countries of WAAPP-1B are participating in supplying the Ebola affected countries. For example WAAPP Burkina is in the process of supplying 1000 tons of certified seed rice and 50 tons of maize to Sierra Leone and Liberia; WAPP Cote d'Ivoire had already delivered 60 tons of foundation rice seeds to Guinea.
Risks
Systematic Operations Risk-rating Tool
Risk Category Rating at Approval Previous Rating Current Rating
Political and Governance -- -- Moderate
Macroeconomic -- -- Moderate
Sector Strategies and Policies -- -- Low
Technical Design of Project or Program -- -- LowInstitutional Capacity for Implementation and Sustainability -- -- Low
Fiduciary -- -- Low
Environment and Social -- -- Moderate
Stakeholders -- -- Low
Other -- -- --
Overall -- -- Moderate
Results
Project Development Objective IndicatorsPHINDPDOTBL
Direct project beneficiaries (Number, Core)
Baseline Actual (Previous) Actual (Current) End Target
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 3 of 28
Public Disclosure Copy
Public Disclosure Copy
Value 0.00 1760577.00 1760577.00 2900000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Project beneficiairies direct/indirect, breakdown 40% of whom are female - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 202640.00 202640.00 400000.00
Date 30-Sep-2010 21-Nov-2013 21-Nov-2013 30-Jun-2016
PHINDPDOTBL
Project beneficiairies direct/indirect, breakdown 40% of whom are female - NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 1277049.00 1277049.00 2000000.00
Date 30-Sep-2010 21-Nov-2013 21-Nov-2013 30-Jun-2016
PHINDPDOTBL
Project beneficiairies direct/indirect, breakdown 40% of whom are female - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 280888.00 280888.00 500000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Technologies generated by the Project with at least 15% productivity increase over the control technology (cumulative, disagreededby country (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 24.00 24.00 34.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 4 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDPDOTBL
Technologies generated by the Project with at least 15% productivity increase over the control technology (cumlative, disag. by country) - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 10.00 10.00 12.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Technologies generated by the Project with at least 15% productivity increase over the control technology (cumulative, disag. by country)- BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 7.00 7.00 10.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Technologies generated by the Project with at least 15% productivity increase over the control technology (cumulative, disag. by country)- NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 7.00 7.00 12.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Area under improved technologies disseminated under the project (Hectare(Ha), Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 627444.00 627444.00 900000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Area under improved technologies disseminated under the project - CI (Hectare(Ha), Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 93208.00 93208.00 150000.00
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 5 of 28
Public Disclosure Copy
Public Disclosure Copy
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Area under improved technologies disseminated under the project - BF (Hectare(Ha), Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 203992.00 203992.00 250000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Area under improved technologies disseminated under the project - NG (Hectare(Ha), Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 330244.00 330244.00 500000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Processors/Producers who have adopted at least one new technology (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 537692.00 537692.00 950000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Processors/Producers who have adopted at least one new technology - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 120870.00 120870.00 250000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 6 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDPDOTBL
Processors/Producers who have adopted at least one new technology - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 118822.00 118822.00 200000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDPDOTBL
Processors/Producers who have adopted at least one new technology- NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 298000.00 298000.00 500000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
Overall CommentsThe results will be updated at the end of the current Implementation support mission (April 13-June 3, 2015).
Intermediate Results IndicatorsPHINDIRITBL
National Regulations on genetic materials fertilizer and pesticides aligned to regional (ECOWAS) regulations and adopted (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 9.00 9.00 9.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
National regulations on genetic materials, fertilizer and pesticides aligned to regional (ECOWAS) regulations and adopted CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3.00 3.00 3.00
Date 30-Sep-2010 31-Oct-2013 31-Oct-2013 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 7 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
National regulations on genetic materials, fertilizer and pesticides aligned to regional (ECOWAS) regulations and adopted- BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3.00 3.00 3.00
Date 30-Sep-2010 31-Oct-2013 31-Oct-2013 30-Jun-2016
PHINDIRITBL
National regulations on genetic materials, fertilizer and pesticides aligned to regional (ECOWAS) regulations and adopted- NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3.00 3.00 3.00
Date 30-Sep-2010 31-Oct-2013 31-Oct-2013 30-Jun-2016
PHINDIRITBL
Regulations for fertilizer at ECOWAS level developed and adopted (Yes/No, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value N Y Y Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national and regional (CORAF) level (Yes/No, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value N N N Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 8 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national and regional (CORAF) level - CI (Yes/No, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value N N N Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national and regional (CORAF) level - BF (Yes/No, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value N N N Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national/regional level-CORAF (Yes/No, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value N Y Y Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national and regional (CORAF) level- NG (Yes/No, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value N N N Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 9 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Hits for the national/regional web-based information system on agricultural technologies and research skills (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 125502.00 125502.00 187000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Hits for the national/regional web-based information system on agricultural technologies and research skills - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 286.00 286.00 2000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Hits for the national/regional web-based information system on agricultural technologies and research skills - NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 21616.00 21616.00 30000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Hits for the national/regional web-based information system on agricultural technologies and research skills - CORAF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 100000.00 100000.00 150000.00
Date 21-Nov-2014 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 10 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Hits for the national/regional web-based information system on agricultural technologies and research skills - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3600.00 3600.00 5000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
National/regional action plan on gender, communication, climate change developed (breakdown by country) (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 9.00 9.00 12.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
National/regional action plan on gender, communication, climate change developed- CORAF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3.00 3.00 3.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
National/regional action plan on gender, communication, climate change developed-BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3.00 3.00 3.00
Date 30-Sep-2014 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 11 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
National/regional action plan on gender, communication, climate change developed-NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 1.00 1.00 3.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
National/regional action plan on gender, communication, climate change developed-CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 2.00 2.00 3.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Technologies generated/adapted by NCoS and demonstrated by the Project in the project area (breakdown by technology) (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 19.00 19.00 36.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Technologies generated/adapted by NCoS and demonstrated by the Project in the project area (breakdown by technology)-NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 6.00 6.00 12.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 12 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Technologies generated/adapted by NCoS and demonstrated by the Project in the project area (breakdown by technology)-CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 7.00 7.00 12.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Technologies generated/adapted by NCoS and demonstrated by the Project in the project area (breakdown by technology)-BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 6.00 6.00 12.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Technologies generated/adapted by NCoS and demonstrated in at least 3 ECOWAS countries outside the country of origin (breakdown bytechnology and by country) (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3.00 3.00 12.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Technologies generated by NCoS and demonstrated in at least 3 ECOWAS countries outside the country of origin - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3.00 3.00 4.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Aug-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 13 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Technologies generated by NCoS and demonstrated in at least 3 ECOWAS countries outside the country of origin - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 0.00 0.00 4.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Aug-2016
PHINDIRITBL
Technologies generated by NCoS and demonstrated in at least 3 ECOWAS countries outside the country of origin - NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 0.00 0.00 4.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Aug-2016
PHINDIRITBL
Client days of training provided (including scientists, extension agents, agro-dealers, farmers, community members) (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 16365.00 16365.00 30000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Client days of training provided (including scientistes, extension agents, etc) - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3631.00 3631.00 7500.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 14 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Client days of training provided (including scientistes, extension agents, etc) - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3617.00 3617.00 7500.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Client days of training provided (including scientistes, extension agents, etc) - NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 9117.00 9117.00 15000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Scientific exchange visit (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 26.00 26.00 45.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Scientific exchange visits - NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 8.00 8.00 15.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 15 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Scientific exchange visits - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 8.00 8.00 15.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Scientific exchange visits - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 10.00 10.00 15.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Scholarships (disaggregated by MSc and PhD) (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 133.00 133.00 156.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Scholarships (disaggregated by MSc and PhD)- NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 24.00 24.00 38.00
Date -- 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 16 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Scholarships (disaggregated by MSc and PhD) - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 63.00 63.00 63.00
Date -- 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Scholarships (disaggregated by MSc and PhD) - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 46.00 46.00 55.00
Date -- 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
National demand-driven research proposals projects financed by the national Competitive Agricultural Research Grant System (CARGS) (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 74.00 74.00 95.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
National demand-driven research proposals projects financed by the national Competitive Agricultural Research Grant System (CARGS)- NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 19.00 19.00 30.00
Date -- 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 17 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
National demand-driven research proposals projects financed by the national Competitive Agricultural Research Grant System (CARGS)- BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 19.00 19.00 25.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
National demand-driven research proposals projects financed by the national Competitive Agricultural Research Grant System (CARGS)- CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 36.00 36.00 40.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Multi-country research proposals financed by the regional Competitive Agricultural Research Grant System (CARGS) maintained by CORAF (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 6.00 6.00 10.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country) (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 10.00 10.00 36.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 18 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country) - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 2.00 2.00 8.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country) - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 6.00 6.00 14.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country) - NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 0.00 0.00 12.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country) - CORAF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 2.00 2.00 2.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 19 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Foundation seeds and breed stock produced with the Project support - Fingerlings (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 6674391.00 6674391.00 10000000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Foundation seeds and breed stock produced with the Project support - Fingerlings NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 6674391.00 6674391.00 10000000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Foundation seeds and breed stock produced with the project support - Cereals (Metric ton, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 216674.00 216674.00 252800.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Foundation seeds and breed stock produced with the project support - Cereals - NG (Metric ton, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 214394.00 214394.00 250000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 20 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Foundation seeds and breed stock produced with the project support - Cereals - CI (Metric ton, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 715.00 715.00 800.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Foundation seeds and breed stock produced with the project support - Cereals - BF (Metric ton, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 1565.00 1565.00 2000.00
Date 30-Sep-2009 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Foundation seeds and breed stock produced with the project support - Plantain (Hectare(Ha), Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 4369.00 4369.00 50000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Foundation seeds and breed stock produced with the project support - Plantain - CI (Hectare(Ha), Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 4369.00 4369.00 50000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 21 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Foundation seeds and breed stock produced with the Project support - Cassava (x1,000 plants) (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 27190.00 27190.00 45000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Foundation seeds and breed stock produced with the Project support - Cassava-CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 9190.00 9190.00 15000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Foundation seeds and breed stock produced with the Project support - Cassava- NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 18000.00 18000.00 30000.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Demonstration plots established (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value -- 1183.00 1183.00 2000.00
Date -- 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 22 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Demonstration plots established - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value -- 875.00 875.00 1000.00
Date -- 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Demonstration plots established - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value -- 308.00 308.00 500.00
Date -- 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Demonstration plots established - NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value -- 0.00 0.00 500.00
Date -- 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Number of publications released in regional/national magazines (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 24.00 24.00 46.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 23 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Number of publications released in regional/national magazines - BF (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 3.00 3.00 8.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Number of publications released in regional/national magazines - CI (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 1.00 1.00 8.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Number of publications released in regional/national magazines - NG (Number, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 20.00 20.00 30.00
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Procurement and FM activities executed in conformity with the timing of the procurement plan, the implementation manual, and IDA procedures (Yes/No, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value -- Y Y Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 24 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Projects reports presented within 45 days of the end of the relevant period (Yes/No, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value N Y Y Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
A harmonized M & E system is established and operational in each country for data collection, analysis and reporting (Yes/No, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value N Y Y Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
A harmonized M & E system is established and operational in each country for data collection, analysis and reporting - BF (Yes/No, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value N Y Y Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
A harmonized M & E system is established and operational in each country for data collection, analysis and reporting - CI (Yes/No, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value N N N Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 31-Oct-2013
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 25 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
A harmonized M & E system is established and operational in each country for data collection, analysis and reporting - NG (Yes/No, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value N Y Y Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Sub-projects granted with environmental management plan have implemented the plan effectively (Yes/No, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value N Y Y Y
Date 30-Sep-2010 21-Nov-2014 21-Nov-2014 30-Jun-2016
PHINDIRITBL
Disbursement rate of IDA funds (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value -- 63.00 63.00 100.00
Date 30-Sep-2010 17-Oct-2014 17-Oct-2014 30-Jun-2016
PHINDIRITBL
Disbursement rate of IDA funds - NG (Percentage, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 64.00 64.00 100.00
Date 30-Sep-2010 17-Oct-2014 17-Oct-2014 30-Jun-2016
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 26 of 28
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Disbursement rate of IDA funds - CI (Percentage, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 74.00 74.00 100.00
Date 30-Sep-2010 17-Oct-2014 17-Oct-2014 30-Jun-2016
PHINDIRITBL
Disbursement rate of IDA funds - BF (Percentage, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 47.00 47.00 100.00
Date 30-Sep-2010 17-Oct-2014 17-Oct-2014 30-Jun-2016
Overall CommentsThe results will be updated at the end of the current Implementation Support Mission (Apri 13-June 3, 2015).
Data on Financial Performance
Disbursements (by loan)
Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed
P117148 IDA-48220 Effective USD 45.00 45.00 0.00 35.21 8.74 78%
P117148 IDA-H6260 Effective USD 30.00 30.00 0.00 25.27 4.54 84%
P117148 IDA-H6270 Effective USD 15.00 15.00 0.00 8.40 5.97 56%
P117148 TF-10258 Effective USD 5.13 5.13 0.00 3.87 1.26 75%
P117148 TF-98013 Effective USD 1.00 1.00 0.00 0.66 0.34 66%
P117148 TF-98014 Effective USD 6.00 6.00 0.00 3.75 2.25 62%
P117148 TF-98015 Effective USD 6.00 6.00 0.00 5.71 0.29 95%
P117148 TF-98016 Effective USD 6.00 6.00 0.00 1.79 4.21 30%
Key Dates (by loan)
The World Bank Implementation Status & Results ReportWest Africa Agricultural Productivity Program APL (WAAPP-1B) (P117148)
4/23/2015 Page 27 of 28
Public Disclosure Copy
Public Disclosure Copy
Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date
P117148 IDA-48220 Effective 30-Sep-2010 06-Jun-2011 12-Jan-2012 30-Jun-2016 30-Jun-2016
P117148 IDA-H6260 Effective 30-Sep-2010 21-Jun-2011 21-Sep-2011 30-Jun-2016 30-Jun-2016
P117148 IDA-H6270 Effective 30-Sep-2010 25-Jan-2011 25-Jul-2011 30-Jun-2016 30-Jun-2016
P117148 TF-10258 Effective 08-Mar-2012 08-Mar-2012 24-May-2012 30-Jun-2014 30-Nov-2015
P117148 TF-98013 Effective 17-Dec-2010 17-Dec-2010 18-Apr-2013 31-May-2015 31-May-2015
P117148 TF-98014 Effective 21-Jun-2011 21-Jun-2011 21-Jun-2011 31-May-2015 31-May-2015
P117148 TF-98015 Effective 06-Jun-2011 06-Jun-2011 12-Jan-2012 31-May-2015 31-May-2015
P117148 TF-98016 Effective 25-Jan-2011 25-Jan-2011 17-Jan-2012 31-May-2015 31-May-2015
Cumulative Disbursements
Restructuring History
Level 2 Approved on 17-Dec-2014
Related Project(s)