6
MicroBooNE Experiment Report Aleena Rafique, on behalf of the MicroBooNE collaboration All Experimenters’ Meeting 12/11/2017 1

AEM 12 11 17 - INDICO-FNAL (Indico)...POT (Week of 12/4/2017) 1.0E19 7.5E18 5.OE18 2.5E18 O.OEOO o 2.4E18 1.8E18 1.2E18 6.OE17 O.OEOO Delivered POT POT on tape Day Average Jobs Running

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AEM 12 11 17 - INDICO-FNAL (Indico)...POT (Week of 12/4/2017) 1.0E19 7.5E18 5.OE18 2.5E18 O.OEOO o 2.4E18 1.8E18 1.2E18 6.OE17 O.OEOO Delivered POT POT on tape Day Average Jobs Running

MicroBooNE ExperimentReport

AleenaRafique,onbehalfoftheMicroBooNE collaborationAllExperimenters’Meeting

12/11/2017

1

Page 2: AEM 12 11 17 - INDICO-FNAL (Indico)...POT (Week of 12/4/2017) 1.0E19 7.5E18 5.OE18 2.5E18 O.OEOO o 2.4E18 1.8E18 1.2E18 6.OE17 O.OEOO Delivered POT POT on tape Day Average Jobs Running

BeamStatistics

AverageBNBuptime:92% AverageDAQuptime:96.9%

AleenaRafique 2

POTdelivered:0.95X1019POTrecorded:0.92X1019

Page 3: AEM 12 11 17 - INDICO-FNAL (Indico)...POT (Week of 12/4/2017) 1.0E19 7.5E18 5.OE18 2.5E18 O.OEOO o 2.4E18 1.8E18 1.2E18 6.OE17 O.OEOO Delivered POT POT on tape Day Average Jobs Running

ComputingSummary

AleenaRafique 3

Page 4: AEM 12 11 17 - INDICO-FNAL (Indico)...POT (Week of 12/4/2017) 1.0E19 7.5E18 5.OE18 2.5E18 O.OEOO o 2.4E18 1.8E18 1.2E18 6.OE17 O.OEOO Delivered POT POT on tape Day Average Jobs Running

DataManagement

• Collaborationisreducingdataeventsizeinordertogetsizablestatisticsintimeforsummer2018conferences• Miniretreatthisweek(Tuesday-Thursday)forvalidatingdata/MClatestsamples.

AleenaRafique 4

Page 5: AEM 12 11 17 - INDICO-FNAL (Indico)...POT (Week of 12/4/2017) 1.0E19 7.5E18 5.OE18 2.5E18 O.OEOO o 2.4E18 1.8E18 1.2E18 6.OE17 O.OEOO Delivered POT POT on tape Day Average Jobs Running

MicroBooNE Publication

• AcceptedbyJINST“Measurementofcosmic-rayreconstructionefficienciesintheMicroBooNE LArTPC usingasmallexternalcosmic-raycounter”• https://arxiv.org/abs/1707.09903

AleenaRafique 5

Page 6: AEM 12 11 17 - INDICO-FNAL (Indico)...POT (Week of 12/4/2017) 1.0E19 7.5E18 5.OE18 2.5E18 O.OEOO o 2.4E18 1.8E18 1.2E18 6.OE17 O.OEOO Delivered POT POT on tape Day Average Jobs Running

Summary

• MicroBooNE isrunningstablywithcontinuousneutrinodata-taking• Data/MCeventsizereductioneffortsareongoing• Testingmodifiedsoftwaretriggersettingstoincreasebandwidthbyloweringlightcollectionthreshold• Staytunedforsignalprocessingpaper,comingoutsoon

AleenaRafique 6