ADVANCED OUTFITTING
Presented by:-Adarsh E.K.Akhil Anant
Chandan KumarHarikrishnan
Outline
Introduction to Outfitting
Zonal Design Work
Introduction to Advanced Outfitting
Types of Advanced Outfits
Benefits & Impact of Advanced Outfitting on Shipbuilding Industry
Conclusion
Overview
Outfitting
Structural Component
Construction
Ship Construction
Structural Units Assembly Blocks
Rings(Grand Blocks)Ship
Outfitting• Installation of various systems & equipments• Allow the ship to operate and perform various missions• Occurs during construction of pieces that make the ship or once
those pieces are assembled
Structural
Electrical (power distribution))
Joinery
Painting & Insulation
HVAC
Piping
OutfittingOutfitting
Outfitting (Stages)• Some outfitting must be done during the building• of the structural units or blocks since it would be • difficult and expensive later in const. process.• e.g. Pipe-Work in Double Bottom sections
• Some outfitting must be done during the building• of the structural units or blocks since it would be • difficult and expensive later in const. process.• e.g. Pipe-Work in Double Bottom sections
• Pre-Outfitting
Advanced Outfitting
Performing outfitting task early in the shipconstruction process i.e. at unit, block or grand block stages
ConventionalOutfitting
Occurs at the assembled stage and require worksto move to dry dock, slipway or land-level facility bringing with them materials & equipments
Conventional Outfitting• Used to be “one job after the other”
Main Hull(outer shell) built
Equipments & Machinery lowered
Connected Piping work laid
Cables connected
• Very slow• 10% of piping and other outfit work were done when
floated • Balanced fitting out in floating condition
Drawbacks
Difficulty of the task2
Excess of Man-hours required 3
Obstructions in outfitting process4
Reduction in productivity of the shipyard5
Zonal Design Work• Outfit design is divided into Engine room, area other than
engine room and accommodation.• It reduces work by focusing on zones.• It forces all departments to pay attention to the planning and
interfaces in which they are involved.• It forces Production to take an active role early in the product
development.• Improved scheduling by early involvement of all
departments.• It promotes the use of multi-skilled teams.• Production efficiency is improved by performing all the work,
which can be done by the same workers at the same time and same location.
Pre-requisites to Advanced Outfitting
• The development of planning similar to the Shipbuilding Policy and Build Strategy approach
• Technical documentation format suitable for direct use by Production
• Highly trained workers• Decision making/planning delegated to appropriate level• Early involvement of Production in the design process• Concurrent development of product and process design
to facilitate maximum work in flat position
Advanced Outfitting
The fitting to ship structure, outfit items at a significantly earlier time in the building sequence than is traditional.
Principle
Organization of information and materials to a plan that applies labor and facilities to integrate ship’s structure and outfit materials at the earliest and most cost effective stage of the construction process.
1.On-Unit
2.On-Block
3.On-Board
Types
Goals of Advanced Outfitting
Improved quality, productivity and worker safety
Improved use of cranes
Avoid interference between trades
Simplify outfit planning
Reduce outfitting time
Minimize on board outfitting
1.On-Unit Outfitting
Enhances safety
Reduces both required man-hours and durations which would otherwise be allocated on outfitting on-block and
on-board
20% of the items are fitted in this stage
Features
An Example
Seawater Service Pump And An Air-conditioning Water Pump
Steps• Shown in previous slide is a machinery unit which will
contain both a Seawater Service Pump and an Air-Conditioning Water Pump.
• Vertical Seawater Service Pump is fitted to the subcontractor-furnished painted foundation which was built according to a shipyard-provided detail drawing.
• A pipe support, to be subsequently fitted, is included. The horizontal Air-Conditioning Water Pump is on the platen alongside are scheduled to be fitted on block.
A strainer has been fitted to the Seawater Service Pump, the Air-Conditioning Water Pump has been fitted and a valve is being lifted into position
A pipe piece is being lifted by the shop's bridge crane for bolting to the Seawater Service Pump
A second worker temporarily assists by guiding a strainer to its final position while the gasket and a few bolts are secured
Pipe piece supports are being fitted
The completed unit is being transported for fitting on-block
2.On-Block Outfitting
On-Block outfitting purposes refer to a rather flexible relationship between block and zone.
The zone applies to a region being outfitted. Following block turnover, the
fitting arrangement on deck is another zone
50% of the items are fitted in this stage
Features
On Block Advanced Outfitting
Advanced Outfitted
Grand Block
Modular Engine Room
Outfitting
Examples
forecastle upside down forecastle deck right upside up
side shell and engine room flat upside down
aside shell and engine room flat right side up
• Outfitting components , units, and grand units are sometimes fitted in a block zone defined for hull construction.
• However, when they are to be fitted to ceilings, blocks should be inverted because fitting down-hand enhances safety and efficiency.
• Following block turnover, the outfit zone encompasses the components, units, and/or grand units fitted to the floor.
Double Bottom On-block Outfitting
• Outfit items should be fitted in the zone of a double bottom block before its tank top panel is installed.
• At a later stage, a different outfit zone encompasses everything to be fitted to the tank top.
• The primary goals of this manufacturing level are to outfit ceilings and double bottoms when blocks can be manipulated to provide ideal access.
Outfit Units
Engine room tank top unit
Engine room tank top componentsfitted on-block
When a large quantity is planned, the completed block
should be transferred to an indoor or outdoor region designated
for out fitting in accordance with an on-flow concept.
On-flow means work packages start and complete in unison
Separation by stage is in accordance with the following sequence which reflects block turnover:
• on-ceiling fitting• on-ceiling welding or nil• on-floor fitting• on-floor welding or nil
When the items to be fitted compose a small quantity per block, outfit work can be performed at the site where the block was assembled
Divisions By Problem Area
• It addresses problems which are inherently different.
• Each work package for outfitting on-block can be assigned to the appropriate team of assembly specialists.
• These classifications are further subdivided by the quantities of items to be fitted, resulting in the following problem area divisions:
Hull large quantity / small quantity
1
Machinery large quantity / small quantity
Superstructure large quantity/ small quantity
2 3
Erection
Outfitted blocks can be erected in combination with outfit units. On-block outfitting work is often greatly facilitated by block turnover for down-hand on-ceiling outfitting and painting. Complex blocks may be outfitted together to ensure accurate fits at erection.
3.On-Board Outfitting
Conventional method of outfitting
Only those heavy equipments which cannot be erected at the general stage
are left to be done at this stage.
30% of the items are fitted in this stage
Features
On-Board Outfitting(contd)
Ideally, assembly and painting work are left for accomplishment on-board .
These works are limited to:• Fitting of components that are too large to fit on
block like main engine, diesel generators etc• Connecting distributive systems at block butts and
seams• Pulling only the ends of electric cables that were
fitted on block
On-Board Outfitting(contd)
• Pulling electric cables that could not be pulled on block
• Connecting electric cables• Clean up• Painting touch up• Installation of the main drive line • Finish painting
Problems Faced
• A worker is performing fitting work of a certain problem classification, on board.
• The worker had to carry tools from the shop to the relatively inaccessible and dark workplace.
• In addition, the welding-cable leads had to be pulled into position and thereafter the worker had to commute from the shop, up the gangway, and down into the machinery space.
• The same work could have been performed in a shop on-unit.
Fitting work of the identical problem classification shown in is being performed on unit in a shop the smart way.
• When traditional system-by-system work is performed on board relatively out of sight of supervision, workers pressed to meet a schedule are prone to improvise and risk damage and accidents.
• Sometimes just the access to a work site is dangerous in traditional system-by-system outfitting of machinery spaces.
• Some shipyards have another type called Blue Sky(Landing outfit on the ship under construction on the berth before the compartment is decked over), but this is really a subset of On Board.
• On-board outfitting in the main machinery space of a large vessel is facilitated by providing temporary access through the shell. Otherwise, workers expend significant energy ascending a gangway and climbing down machinery-space ladders and vice versa.
Advanced Outfitting Practices-A Comparison
Current use of advanced outfit by UK,US and EU shipbuilders
UK shipbuilders lag behind US and EU shipyards in levels of advanced outfitting in pipe work, electrical, and HVAC functions.
Benefits of Advanced Outfitting
• Reduced/eliminated overhead work
• Improved access, (workers and material) ventilation and lighting
• Reduced/eliminated scaffolding
• Improved tool/equipment availability
• Reduction in time cycle and cost
20% Advanced Outfitting
80% conventional Outfitting
80% Advanced Outfitting
20% conventional Outfitting
50% Advanced Outfitting
50% conventional Outfitting
Recommendations*
• Encourage shipyards to develop manufacturing plans that strive to produce super blocks that are at least 80 percent outfitted before they are sent to the assembly shipyard.
• Involve all shipyards in the design process and encourage the sharing of information on advanced outfitting practices.
• Ensure production designs are nearly complete before construction begins and that the necessary equipment and materials are available in a timely fashion to facilitate advanced outfitting.
* By RAND Cooperation Europe
Impact on Shipbuilding Industry• Has modernized shipbuilding and its approach to facing
problems head on.
• More and more computer applications are being resorted. Exclusive softwares are being developed.
• Modular construction is getting popular esp. accommodation area.
• The outfitting time after a ship has been floated out has been reduced from 12 months to 2 months in countries like Japan.
Conclusion
The introduction of new and appropriate technology makes a big difference. In fact it is in going for difference that will make a difference. Without training there can be no technology upgradation, and without technology upgradation ,there can be no competitive edge. In absence of focus on technology we will be working hard and not smart. Are we going to work hard or work smart to be present in this decade and coming ones?