7
Hyannis HyArts Cultural D Walkway To The Sea Artists Address Town, MA GENERAL G0 COVER SHEET CIVIL C1.1 EXISTING SITE PLAN C1.2 PROPOSED SITE P ARCHITECTURAL A1 FLOOR PLANS / ELEVATIONS A2 STRUCTURAL A3 DETAILS / SCHEDULES / ELECTRICAL DRAWING SHEETS: A GENERAL NOTES: TOWN OF BARNSTABLE Department of Public Works Structures & Grounds 800 Pitchers Way, Hyannis, MA 02061 --- --- G1 Site Plan PATH INITIALS DATE DRAWING TITLE REVISIONS NO.: DATE: COMMENTS: 1 ------- ------- 2 3 4 5 DRAWING NOTES: DRAWN BY: SCALE: SHEET NO.: PROJECT INFO: DATE: AS NOTED 04-11-2017 WALKWAY TO THE SEA NEW SHANTIES RUTH RUSHER PARK HYANNIS, MA

Address Town, MA Walkway To The Sea Artists · PDF fileWalkway To The Sea Artists Shanties Address Town, MA GENERAL ... A3 DETAILS / SCHEDULES / ELECTRICAL ... MPCS. NEW U.G.ELECTRICBY

  • Upload
    dinhnga

  • View
    219

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Address Town, MA Walkway To The Sea Artists · PDF fileWalkway To The Sea Artists Shanties Address Town, MA GENERAL ... A3 DETAILS / SCHEDULES / ELECTRICAL ... MPCS. NEW U.G.ELECTRICBY

Hyannis HyArts Cultural DistrictWalkway To The Sea Artists Shanties

AddressTown, MA

GENERAL

G0 COVER SHEET

CIVIL

C1.1 EXISTING SITE PLAN

C1.2 PROPOSED SITE P

ARCHITECTURAL

A1 FLOOR PLANS / ELEVATIONS

A2 STRUCTURAL

A3 DETAILS / SCHEDULES / ELECTRICAL

DRAWING SHEETS:

A

GENERAL NOTES:

TO

WN

OF

BA

RN

ST

AB

LE

Dep

artm

ent o

f Pub

lic W

orks

Str

uctu

res

& G

roun

ds80

0 P

itche

rs W

ay, H

yann

is, M

A 0

2061

------

G1

Site Plan

PA

TH

INIT

IALS

DA

TE

DRAWING TITLE

REVISIONS

NO.:DATE: COMMENTS:

1

--------------

2

3

4

5

DRAWING NOTES:

DRAWN BY:

SCALE:

SHEET NO.:

PROJECT INFO:

DATE:

AS NOTED 04-11-2017

WA

LK

WA

Y T

O T

HE

SE

AN

EW

SH

AN

TIE

SR

UT

H R

US

HE

R P

AR

K

HY

AN

NIS

, M

A

AutoCAD SHX Text
88
AutoCAD SHX Text
AXXX
AutoCAD SHX Text
SYMBOL LEGEND
AutoCAD SHX Text
SEE DETAIL 88 ON SHEET XXX
AutoCAD SHX Text
BREAK LINE
AutoCAD SHX Text
DIMENSION LINE
AutoCAD SHX Text
EXTENT
AutoCAD SHX Text
DOOR TAG
AutoCAD SHX Text
WINDOW TAG
AutoCAD SHX Text
00
AutoCAD SHX Text
LIST OF ABBREVIATIONS
AutoCAD SHX Text
APPROX.
AutoCAD SHX Text
CONT.
AutoCAD SHX Text
O.C.
AutoCAD SHX Text
P.T.
AutoCAD SHX Text
MIN
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N.I.C.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
SIM
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
U.O.N.
AutoCAD SHX Text
V.I.F.
AutoCAD SHX Text
AutoCAD SHX Text
APPROXIMATE
AutoCAD SHX Text
CONTINUOUS
AutoCAD SHX Text
ON CENTER
AutoCAD SHX Text
PRESSURE TREATED
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
SIMILAR TO
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
UNLESS OTHERWISE NOTED
AutoCAD SHX Text
VERIFY IN FIELD
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
FD
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
CB
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
OD
AutoCAD SHX Text
OVERHEAD DOOR
AutoCAD SHX Text
O.H.
AutoCAD SHX Text
OPPOSITE HAND
AutoCAD SHX Text
V
AutoCAD SHX Text
VOMITORY
AutoCAD SHX Text
CMU
AutoCAD SHX Text
CONCRETE MASONRY UNIT
AutoCAD SHX Text
MAX
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
BIT.
AutoCAD SHX Text
BITUMINOUS
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
PAV.
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
HT
AutoCAD SHX Text
HEIGHT
AutoCAD SHX Text
I IN
AutoCAD SHX Text
INVERT IN
AutoCAD SHX Text
I OUT
AutoCAD SHX Text
INVERT OUT
AutoCAD SHX Text
ID
AutoCAD SHX Text
INTERIOR DIAMETER
AutoCAD SHX Text
A.F.F.
AutoCAD SHX Text
ABOVE FINISH FLOOR
AutoCAD SHX Text
+/-
AutoCAD SHX Text
PLUS OR MINUS
AutoCAD SHX Text
S.S.
AutoCAD SHX Text
STAINLESS STEEL
AutoCAD SHX Text
L.C.C.
AutoCAD SHX Text
LEAD COATED COPPER
AutoCAD SHX Text
T.
AutoCAD SHX Text
TREAD
AutoCAD SHX Text
HC
AutoCAD SHX Text
HANDICAP
AutoCAD SHX Text
W/
AutoCAD SHX Text
WITH
AutoCAD SHX Text
E.W.
AutoCAD SHX Text
EACH WAY
AutoCAD SHX Text
EQ
AutoCAD SHX Text
EQUAL
AutoCAD SHX Text
VCB
AutoCAD SHX Text
VINYL COVE BASE
AutoCAD SHX Text
G1 CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING AND COORDINATING ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS. IN CASE OF CONFLICT, THE ARCHITECT SHALL BE NOTIFIED AND SHALL RESOLVE THE CONFLICT.
AutoCAD SHX Text
G3 THE CONTRACTOR SHALL MAKE NO DEVIATION FROM DESIGN DRAWINGS WITHOUT PRIOR REVIEW BY THE ARCHITECT.
AutoCAD SHX Text
G4 WORK NOT INDICATED ON A PART OF THE DRAWINGS BUT REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN AT CORRESPONDING PLACES SHALL BE REPEATED.
AutoCAD SHX Text
G5 ALL WORK SHALL COMPLY WITH APPLICABLE CODES AND LOCAL LAWS AND REGULATIONS.
AutoCAD SHX Text
G6 GENERAL CONTRACTOR SHALL COORDINATE LOCATIONS OF OPENINGS, PITS, BOXES, SUMPS, TRENCHES, SLEEVES, DEPRESSIONS, GROOVES, AND CHAMFERS, WITH MECHANICAL, ELECTRICAL AND PLUMBING TRADES.
AutoCAD SHX Text
G7 THE STRUCTURAL DESIGN OF THE BUILDING IS BASED ON THE FULL INTERACTION OF ALL ITS COMPONENT PARTS. NO PROVISIONS HAVE BEEN MADE FOR CONDITIONS OCCURRING DURING CONSTRUCTION. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO MAKE PROPER AND ADEQUATE PROVISIONS FOR STABILITY OF, AND ALL STRESSES TO, THE STRUCTURE DUE TO ANY CAUSE DURING CONSTRUCTION.
AutoCAD SHX Text
G8 CONTRACTOR SHALL NOT SCALE DRAWINGS. CONTRACTOR SHALL REQUEST ALL DIMENSIONS OR INFORMATION REQUIRED TO PERFORM THE WORK FROM THE ARCHITECT. WORK COMPLETED BY THE CONTRACTOR WITHOUT DIMENSIONS OR INFORMATION SHALL BE DONE AT HIS OWN RISK AND SHALL BE REMOVED AND REINSTALLED TO THE SPECIFICATIONS OF THE ARCHITECT AT NO ADDITIONAL COST TO THE OWNER.
AutoCAD SHX Text
G9 MEANS AND METHODS OF CONSTRUCTION AS WELL AS COMPLIANCE WITH OSHA AND OTHER SAFETY LAWS AND REGULATIONS IS EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR, HIS SUBCONTRACTOR(S), SUPPLIERS, CONSULTANTS AND SERVANTS.
AutoCAD SHX Text
G2 IN ANY CASE OF CONFLICT BETWEEN THE DRAWINGS AND THE PROJECT SPECIFICATIONS, THE MORE STRINGENT REQUIREMENTS SHALL GOVERN.
Page 2: Address Town, MA Walkway To The Sea Artists · PDF fileWalkway To The Sea Artists Shanties Address Town, MA GENERAL ... A3 DETAILS / SCHEDULES / ELECTRICAL ... MPCS. NEW U.G.ELECTRICBY

DA

TE

INIT

IALS

PA

TH

TO

WN

OF

BA

RN

ST

AB

LE

Dep

artm

ent o

f Pub

lic W

orks

Str

uctu

res

& G

roun

ds80

0 P

itche

rs W

ay, H

yann

is, M

A 0

2061

WA

LK

WA

Y T

O T

HE

SE

AN

EW

SH

AN

TIE

SR

UT

H R

US

HE

R P

AR

K

HY

AN

NIS

, M

A

------

C1.1

Existing Site Plan

DRAWING TITLE

REVISIONS

NO.:DATE: COMMENTS:

1

--------------

2

3

4

5

DRAWING NOTES:

DRAWN BY:

SCALE:

SHEET NO.:

PROJECT INFO:

DATE:

AS NOTED 4-11-2017

.

1/8" - 1'-0"

EXISTING SITE PLAN

AutoCAD SHX Text
25'
AutoCAD SHX Text
25'
AutoCAD SHX Text
30'
AutoCAD SHX Text
30'
AutoCAD SHX Text
29'
AutoCAD SHX Text
28'
AutoCAD SHX Text
27'
AutoCAD SHX Text
26'
AutoCAD SHX Text
31'
AutoCAD SHX Text
32'
AutoCAD SHX Text
30
AutoCAD SHX Text
30'
AutoCAD SHX Text
29'
AutoCAD SHX Text
28'
AutoCAD SHX Text
27'
AutoCAD SHX Text
26'
AutoCAD SHX Text
24'
AutoCAD SHX Text
23'
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
25.66
AutoCAD SHX Text
26.87
AutoCAD SHX Text
27.92
AutoCAD SHX Text
29.69
AutoCAD SHX Text
29.82
AutoCAD SHX Text
30.24
AutoCAD SHX Text
29.84
AutoCAD SHX Text
29.42
AutoCAD SHX Text
29.42
AutoCAD SHX Text
27.75
AutoCAD SHX Text
27.71
AutoCAD SHX Text
26.20
AutoCAD SHX Text
26.17
AutoCAD SHX Text
26.36
AutoCAD SHX Text
24.79
AutoCAD SHX Text
24.80
AutoCAD SHX Text
25.49
AutoCAD SHX Text
25.87
AutoCAD SHX Text
25.73
AutoCAD SHX Text
25.42
AutoCAD SHX Text
25.86
AutoCAD SHX Text
25.54
AutoCAD SHX Text
25.75
AutoCAD SHX Text
29.47
AutoCAD SHX Text
29.22
AutoCAD SHX Text
31.38
AutoCAD SHX Text
25.51
AutoCAD SHX Text
26.65
AutoCAD SHX Text
28.02
AutoCAD SHX Text
28.94
AutoCAD SHX Text
29.62
AutoCAD SHX Text
29.10
AutoCAD SHX Text
SOUTH STREET
AutoCAD SHX Text
OCEAN STREET
AutoCAD SHX Text
26.16
AutoCAD SHX Text
26.17
AutoCAD SHX Text
32.46
AutoCAD SHX Text
32.12
AutoCAD SHX Text
28.55
AutoCAD SHX Text
29.59
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
B
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
K
AutoCAD SHX Text
W
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
K
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
TOP OF SPIKE ELEV=23.24 NGVD '29
AutoCAD SHX Text
BM
AutoCAD SHX Text
40
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
80
AutoCAD SHX Text
SCALE IN FEET ELEVATION DATUM IS NGVD '29
AutoCAD SHX Text
# 49 ASSESSORS MAP: 326 PARCEL: 025 N/F NEW ENGLAND TEL & TEL CO REF 900/343
AutoCAD SHX Text
SPRINK HEAD (TYP)
AutoCAD SHX Text
SKETCH PLAN SHOWING WALKWAY TO THE SEA AT THE TOWN OF BARNSTABLE MUNICIPAL COMPLEX IN BARNSTABLE (HYANNIS) MA FOR THE TOWN OF BARNSTABLE D.P.W. - SURVEY SECTION SCALE: 1"=40' - DATE: AUG. 1, 2016
AutoCAD SHX Text
MAINLAND ZONE 1927
Page 3: Address Town, MA Walkway To The Sea Artists · PDF fileWalkway To The Sea Artists Shanties Address Town, MA GENERAL ... A3 DETAILS / SCHEDULES / ELECTRICAL ... MPCS. NEW U.G.ELECTRICBY

D

O

U

B

L

E

D

O

O

R

S

S

I

N

G

L

E

D

O

O

R

D

O

U

B

L

E

D

O

O

R

S

S

I

N

G

L

E

D

O

O

R

S

I

N

G

L

E

D

O

O

R

D

O

U

B

L

E

D

O

O

R

S

S

IN

G

LE

D

O

O

R

D

O

U

B

LE

D

O

O

R

S

DOUBLE DOORS

SIN

GL

E D

OO

R

N

E

W

2

0

0

A

U

N

D

E

R

G

R

O

U

N

D

S

IN

G

L

E

P

H

A

S

E

E

L

E

C

T

R

IC

S

E

R

V

IC

E

(A

L

U

M

IN

U

M

) IN

2

"

S

C

H

E

D

U

L

E

4

0

P

V

C

C

O

N

D

U

IT

B

Y

O

T

H

E

R

S

(N

IC

)

NE

W U

.G.

ELE

CT

RIC

BY

OT

HE

RS

N

E

W

U

N

D

E

R

G

R

O

U

N

D

E

L

E

C

T

R

I

C

F

E

E

D

B

Y

O

T

H

E

R

S

N

E

W

U

N

D

E

R

G

R

O

U

N

D

E

L

E

C

T

R

IC

F

E

E

D

B

Y

O

T

H

E

R

S

N

E

W

U

N

D

E

R

G

R

O

U

N

D

E

L

E

C

T

R

IC

F

E

E

D

B

Y

O

T

H

E

R

S

ALTERNATE 3

(FOUNDATION)

29'

30'

28'

27'

R

E

L

O

C

A

T

E

E

X

IS

T

IN

G

B

E

N

C

H

A

N

D

P

A

D

2

1

'

-

0

"

M

I

N

.

2

3

'

-

0

"

21'-0

"

2

1

'

-

0

"

21

'-0

"

2

1

'-

0

"

EXISTING TREE TO BE

REMOVED (ALTERNATE 3)

N

E

W

B

R

I

C

K

W

A

L

K

N

E

W

B

R

I

C

K

W

A

L

K

N

E

W

B

R

I

C

K

W

A

L

K

N

E

W

B

R

IC

K

W

A

LK

R

E

L

O

C

A

T

E

D

B

E

N

C

H

A

N

D

P

A

D

EXISTING BRICK PAVER

WALK TO REMAIN

EX

IST

ING

BE

NC

H

TO

RE

MA

IN

20' F

IR

E

S

E

P

A

R

A

T

IO

N

D

IS

T

A

N

C

E

20' F

IR

E

S

E

P

A

R

A

T

IO

N

D

IS

T

A

N

C

E

NEW COMMERCIAL GRADE

WEATHER TIGHT ELECTRIC

METER SOCKET WITH

BIPASS. BY OTHERS NIC

FUTURE SHANTY

LOCATION

MP

CS

N

E

W

U

.

G

.

E

L

E

C

T

R

I

C

B

Y

O

T

H

E

R

S

N

E

W

U

N

D

E

R

G

R

O

U

N

D

E

L

E

C

T

R

I

C

F

E

E

D

B

Y

O

T

H

E

R

S

NEW COMMERCIAL GRADE

WEATHER TIGHT 30

CIRCUIT 200 AMP PANEL

WITH MAIN. BY OTHERS

NIC

NEW 200A SERVICE UP

POLE IN SCHEDULE 80 PVC

CONDUIT BY

OTHERS

EACH UNIT TO HAVE

SQUARE D OR BETTER 8

CIRCUIT SUB PANEL BY

OTHERS

ALL U.G.ELECTRIC FEEDS TO

BE COPPER (3) #8 WIRE

IN 1-1/4 PVC SCHEDULE

40 CONDUIT (BY

OTHERS)

EACH BUILDING

FOUNDATION TO BE

GROUNDED BY THIS

CONTRACTOR N

E

W

C

A

B

L

E

S

E

R

V

IC

E

IN

2

" S

C

H

E

D

U

L

E

4

0

P

V

C

C

O

N

D

U

IT

B

Y

O

T

H

E

R

S

N

E

W

U

N

D

E

R

G

R

O

U

N

D

C

A

B

L

E

F

E

E

D

B

Y

O

T

H

E

R

S

NE

W U

ND

ER

GR

OU

ND

CA

BLE

FE

ED

BY

OT

HE

RS

N

E

W

U

N

D

E

R

G

R

O

U

N

D

C

A

B

L

E

F

E

E

D

B

Y

O

T

H

E

R

S

EACH

BUILDING TO

BE GROUNDED

N

E

W

U

N

D

E

R

G

R

O

U

N

D

C

A

B

L

E

F

E

E

D

B

Y

O

T

H

E

R

S

PROTECT EXISTING

DRYWELLS FROM SILT

INFILTRATION

PROTECT EXISTING

DRYWELLS FROM SILT

INFILTRATION

NOTE:

ALL ELECTRIC AND CABLE

WORK BY OTHERS. (NIC)

ALTERNATE 1

(FOUNDATION)ALTERNATE 2

(BUILDING)

ALTERNATE 4 (BUILDING)

DA

TE

INIT

IALS

PA

TH

TO

WN

OF

BA

RN

ST

AB

LE

Dep

artm

ent o

f Pub

lic W

orks

Str

uctu

res

& G

roun

ds80

0 P

itche

rs W

ay, H

yann

is, M

A 0

2061

WA

LK

WA

Y T

O T

HE

SE

AN

EW

SH

AN

TIE

SR

UT

H R

US

HE

R P

AR

K

HY

AN

NIS

, M

A

------

C1.2

Proposed Site Plan

DRAWING TITLE

REVISIONS

NO.:DATE: COMMENTS:

1

--------------

2

3

4

5

DRAWING NOTES:

DRAWN BY:

SCALE:

SHEET NO.:

PROJECT INFO:

DATE:

AS NOTED 4-11-2017

.

1/8" - 1'-0"

PROPOSED SITE PLAN

AutoCAD SHX Text
25'
AutoCAD SHX Text
25'
AutoCAD SHX Text
30'
AutoCAD SHX Text
30'
AutoCAD SHX Text
29'
AutoCAD SHX Text
28'
AutoCAD SHX Text
27'
AutoCAD SHX Text
26'
AutoCAD SHX Text
31'
AutoCAD SHX Text
32'
AutoCAD SHX Text
30
AutoCAD SHX Text
30'
AutoCAD SHX Text
29'
AutoCAD SHX Text
28'
AutoCAD SHX Text
27'
AutoCAD SHX Text
26'
AutoCAD SHX Text
24'
AutoCAD SHX Text
23'
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
25.66
AutoCAD SHX Text
26.87
AutoCAD SHX Text
27.92
AutoCAD SHX Text
29.69
AutoCAD SHX Text
29.82
AutoCAD SHX Text
30.24
AutoCAD SHX Text
29.84
AutoCAD SHX Text
29.42
AutoCAD SHX Text
29.42
AutoCAD SHX Text
27.75
AutoCAD SHX Text
27.71
AutoCAD SHX Text
26.20
AutoCAD SHX Text
26.17
AutoCAD SHX Text
26.36
AutoCAD SHX Text
24.79
AutoCAD SHX Text
24.80
AutoCAD SHX Text
25.49
AutoCAD SHX Text
25.87
AutoCAD SHX Text
25.73
AutoCAD SHX Text
25.42
AutoCAD SHX Text
25.86
AutoCAD SHX Text
25.54
AutoCAD SHX Text
25.75
AutoCAD SHX Text
29.47
AutoCAD SHX Text
29.22
AutoCAD SHX Text
31.38
AutoCAD SHX Text
25.51
AutoCAD SHX Text
26.65
AutoCAD SHX Text
28.02
AutoCAD SHX Text
28.94
AutoCAD SHX Text
29.62
AutoCAD SHX Text
29.10
AutoCAD SHX Text
SOUTH STREET
AutoCAD SHX Text
OCEAN STREET
AutoCAD SHX Text
26.16
AutoCAD SHX Text
26.17
AutoCAD SHX Text
32.46
AutoCAD SHX Text
32.12
AutoCAD SHX Text
28.55
AutoCAD SHX Text
29.59
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
B
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
K
AutoCAD SHX Text
W
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
K
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
MAINLAND ZONE 1927
AutoCAD SHX Text
TOP OF SPIKE ELEV=23.24 NGVD '29
AutoCAD SHX Text
BM
AutoCAD SHX Text
40
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
80
AutoCAD SHX Text
SCALE IN FEET ELEVATION DATUM IS NGVD '29
AutoCAD SHX Text
# 49 ASSESSORS MAP: 326 PARCEL: 025 N/F NEW ENGLAND TEL & TEL CO REF 900/343
AutoCAD SHX Text
SPRINK HEAD (TYP)
AutoCAD SHX Text
SKETCH PLAN SHOWING WALKWAY TO THE SEA AT THE TOWN OF BARNSTABLE MUNICIPAL COMPLEX IN BARNSTABLE (HYANNIS) MA FOR THE TOWN OF BARNSTABLE D.P.W. - SURVEY SECTION SCALE: 1"=40' - DATE: AUG. 1, 2016
AutoCAD SHX Text
E
AutoCAD SHX Text
E
Page 4: Address Town, MA Walkway To The Sea Artists · PDF fileWalkway To The Sea Artists Shanties Address Town, MA GENERAL ... A3 DETAILS / SCHEDULES / ELECTRICAL ... MPCS. NEW U.G.ELECTRICBY

2

3

'

-

0

"

21'-0

"

MP

CS

9'-6

" ±

10°

9'-9

9

16

"± 32'-7

11

16

"± 36'-2

1

4

"± 17'-7

13

16

69'-7

3

4

29°

39°

11

'-8

1 8

"

BUILDING 1

(BASE BID)

BUILDING 2

(BASE BID)

BUILDING 4

(ALTERNATE 1)

(ALTERNATE 2)

BUILDING 3

(BASE BID)

BUILDING 5

(ALTERNATE 3)

(ALTERNATE 4)

18

'-1

11

16

5'-8

3 4

13

'-3

1 4

2

1

'

-

0

1

3

1

6

"

2

0

'

-

3

5

8

"

2

2

'

-

1

1

3

4

"

20'-7

11

16

"

2

1

'

-

0

"

39°

CENTER OF IRRIGATION BOX

DA

TE

INIT

IALS

PA

TH

TO

WN

OF

BA

RN

ST

AB

LE

Dep

artm

ent o

f Pub

lic W

orks

Str

uctu

res

& G

roun

ds80

0 P

itche

rs W

ay, H

yann

is, M

A 0

2061

WA

LK

WA

Y T

O T

HE

SE

AN

EW

SH

AN

TIE

SR

UT

H R

US

HE

R P

AR

K

HY

AN

NIS

, M

A

------

C1.3

BUILDING LAYOUT

DRAWING TITLE

REVISIONS

NO.:DATE: COMMENTS:

1

--------------

2

3

4

5

DRAWING NOTES:

DRAWN BY:

SCALE:

SHEET NO.:

PROJECT INFO:

DATE:

AS NOTED 4-11-2017

.

1/8" - 1'-0"

BUILDING LAYOUT PLAN

AutoCAD SHX Text
30
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
Page 5: Address Town, MA Walkway To The Sea Artists · PDF fileWalkway To The Sea Artists Shanties Address Town, MA GENERAL ... A3 DETAILS / SCHEDULES / ELECTRICAL ... MPCS. NEW U.G.ELECTRICBY

12'-0"

6'-0" 6'-0"

10

'-0"

5'-0"

5'-0

"

10

'-0"

5'-0"

5'-0

"

12'-0"

101

102

6'-0" 6'-0"

2

1

A2

A

A2

B

ACTIVE

LEAF

7'-8

1 2

"

7'-8

1 2

"

12

10

12

10

1'-4" x 1'-4" PVC CUPOLA WITH

COPPER ROOF

ARCHITECTURAL ASPHALT SHINGLE

ROOF SYSTEM

1X4 CORNERBOARD

FIBERGLASS DOOR SYSTEM

FIBERGLASS DOOR SYSTEM

BRICK WALK

ADA THRESHOLD

FIBERGLASS DOOR

W/ IMPACT RESISTANT

DOUBLE INSULATED

GLAZING

1X6 PVC RAKE W/ RAKE TRIM

LIGHT FIXTURE TO BE INSTALLED AT

CENTER OF DORMER (NOT SHOWN)

TOP OF PLATE

TOP OF SLAB

TOP OF PLATE

TOP OF SLAB

7'-8

1 2

"

ARCHITECTURAL ASPHALT SHINGLE ROOF SYSTEM

1X4 PVC TRIM

PVC FRIEZE

PVC SKIRT

PVC SHUTTERS

IMPACT RESISTANT VINYL COATED

WOOD WINDOWS

12

10

PRE-DIPPED WHITE CEDAR

SHINGLE SIDING. ONE COLOR

FOR EACH BUILDING. COLOR

TO BE SELECTED BY THE OWNER

PRE-DIPPED WHITE CEDAR

SHINGLE SIDING. ONE COLOR

FOR EACH BUILDING. COLOR

TO BE SELECTED BY THE OWNER

PVC FLOWER BOX & BRACKETS

PVC VENT

1'-4" x 1'-4" PVC CUPOLA WITH

COPPER ROOF

A2

A

A2

B

16X16 COPPER ROOF

CUPOLA

10

:1

2 P

IT

CH

10:12 PITCH

10

:1

2 P

IT

CH

10

:1

2 P

IT

CH

RIDGE RIDGE

COVER ENTIRE ROOF WITH

ICE AND WATER SHIELD

DA

TE

INIT

IALS

PA

TH

TO

WN

OF

BA

RN

ST

AB

LE

Dep

artm

ent o

f Pub

lic W

orks

Str

uctu

res

& G

roun

ds80

0 P

itche

rs W

ay, H

yann

is, M

A 0

2061

WA

LK

WA

Y T

O T

HE

SE

AH

YA

RT

S S

HA

NT

IES

RU

TH

R

US

HE

R P

AR

K

HY

AN

NIS

, M

A

---MRM

A1

Plan & Elevations

Scheme 1B

DRAWING TITLE

REVISIONS

NO.:DATE: COMMENTS:

1

--------------

2

3

4

5

DRAWING NOTES:

DRAWN BY:

SCALE:

SHEET NO.:

PROJECT INFO:

DATE:

AS NOTED 4-11-17

.

1/2" = 1'-0"

FLOOR PLAN

.

1/2" = 1'-0"

FRONT ELEVATION.

1/2" = 1'-0"

LEFT ELEVATION

.

1/2" = 1'-0"

REAR ELEVATION

.

1/2" = 1'-0"

RIGHT ELEVATION

.

1/2" = 1'-0"

ROOF PLAN

Page 6: Address Town, MA Walkway To The Sea Artists · PDF fileWalkway To The Sea Artists Shanties Address Town, MA GENERAL ... A3 DETAILS / SCHEDULES / ELECTRICAL ... MPCS. NEW U.G.ELECTRICBY

7'-8

1 2

"

12

10

12

10

10" CONC FOUNDATION WALL

MIN 4'-0" BELOW GRADE W/

(2) #5 BARS TOP & BOTTOM

6" COMPACTED STONE

5" CONCRETE SLAB 1

2

" EXTERIOR GRADE PLYWOOD

H2.5A HURRICANE CLIP

2X6 TIE BEAM

ARCHITECTURAL ASPHALT SHINGLE ROOF SYSTEM

ON (2) LAYERS 15# BLDG FELT ON

ICE AND WATER SHIELD ON

5

8

" EXTERIOR GRADE PLYWOOD (OPTIONAL)

ON 1X12 ROUGH SAWN PINE BOARDS

2X4 COLLAR TIE

RIDGE SHINGLES

ANCHOR BOLTS @

2'-0" O.C.

2X6 RAFTER

STARTER FLASHING

2X8 RIDGE BOARD

10 MIL REINF VAPOR BARRIER

1X4 FRIEZE

NEW BRICK WALK BEYOND

TOP OF PLATE

TOP OF SLAB

PRE-DIPPED WHITE CEDAR SHINGLE SIDING. MAILBEC OR

EQUAL. EACH SHED TO BE A DIFFERENT COLOR. COLOR TO

BE SELECTED BY THE OWNER. SHINGLE SIDING ON HOUSE

WRAP ON VERTICAL WOOD BOARDS

SHED FRAMING SYSTEM BY CONTRACTOR.

SUBMIT ENGINEERED STAMPED SHOP DRAWINGS

OF FRAMING SYSTEM FOR REVIEW.

1X12 VERTICAL ROUGH SAWN WOOD BOARDS

GRADE

1X12 PVC SKIRT (TYPICAL)

2x6 @ 16" O.C.

2x6 @ 16" O.C. 2x6 @ 16" O.C.

2X8 RIDGE BD

2X

8 R

ID

GE

B

D

HEADER (2) 2X8

A2

A

A2

B

TIE BEAMS

12'-0"

10

'-0

"

10" 10'-4" 10"

10

"8

'-4

"

10

"

A2

A

A2

B

10" REINFORCED CONCRETE FOUNDATION. MIN

4'-0" BELOW GRADE (TYPICAL)

5" REINFORCED CONC SLAB

ON 15 MIL VAPOR BARRIER

NEW DORMER SCAB OVER ROOF

SIMPSON STHD10 STRAP TIES AT EACH CORNER

AND EACH SIDE OF REAR WINDOW AND FRONT

DOORS

7'-8

1 2

"

6'-1

0"

12

10

6" COMPACTED STONE

5" CONCRETE SLAB

IMPACT RESISTANT WINDOWS

H2.5A HURRICANE CLIP

2X6 TIE BEAM

2X4 COLLAR TIE

RIDGE SHINGLES

2X6 RAFTER

STARTER FLASHING

2X8 RIDGE BOARD

10 MIL REINF VAPOR BARRIER

10" THICK CONC FOUNDATION W/

(2) #5 BARS TOP & BOTTOM

PVC FRIEZE

PRE-DIPPED WHITE CEDAR SHINGLE SIDING. MAILBEC OR

EQUAL. EACH SHED TO BE A DIFFERENT COLOR. COLOR TO

BE SELECTED BY THE OWNER. SHINGLE SIDING ON HOUSE

WRAP ON VERTICAL WOOD BOARDS

ARCHITECTURAL ASPHALT SHINGLE ROOF SYSTEM

ON (2) LAYERS 15# BLDG FELT ON

ICE AND WATER SHIELD ON

5

8

" EXTERIOR GRADE PLYWOOD (OPTIONAL) ON

1X12 ROUGH SAWN PINE BOARDS

THE USE OF PLYWOOD SHEATHING ON ROOF IS REQUIRED

IF NAILS WILL PENETRATE THROUGH THE 1X12 BOARDS

INTO THE INTERIOR SPACE

TOP OF PLATE

TOP OF SLAB

STARTER FLASHING

6" COMPACTED EARTH

GRADE

ADA COMPLIANT THRESHOLD

1X6 PVC FASCIA

4'-0

"

MIN

B

EL

OW

GR

AD

E

PRE-DIPPED WHITE CEDAR SHINGLE

SIDING. MAILBEC OR EQUAL. EACH

SHED TO BE A DIFFERENT

COLOR. COLOR TO BE

SELECTED BY THE OWNER

1X12 ROUGH SAWN PINE BOARDS

7

1

4

"

1X8 PVC RAKE

FIBERGLASS DOOR

SHED FRAMING SYSTEM BY CONTRACTOR.

SUBMIT ENGINEERED STAMPED SHOP DRAWINGS

OF FRAMING SYSTEM FOR REVIEW.

1X12 VERTICAL ROUGH SAWN WOOD BOARDS

A2

1

CUPOLA NOT SHOWN

DRIP EDGE

NOTE:

SIMPSON STHD10 STRAP TIES TO BE INSTALLED

WHEN FOUNDAITON AND SLAB ARE POURED

UNIT PAVERS TO MATCH EXISTING

BEDDING SAND

COMPACTED DENSE GRADED TO

95% COMPACTION

1

8

" JOINTS HAND TIGHT. FILL ALL JOINTS WITH

POLYMERIC SAND, GRAY COLOR

EDGE RESTRAINT AT ALL PLANTING BED

EDGES PER MANUFACTURERS

COMMERCIAL RECOMMENDATION

COMPACTED SUBGRADE

LANDSCAPE FABRIC

GRADE

6"

MIN

GRADE

4'-0"

MIN

B

ELO

W

GR

AD

E

CUT GRADE AS REQUIRED

NEW REINFORCED

CONCRETE FOUNDATION

GRADE

4'-0

"

MIN

B

EL

OW

GR

AD

E

1'-4

" ±

NEW REINFORCED

CONCRETE FOUNDATION

DA

TE

INIT

IALS

PA

TH

TO

WN

OF

BA

RN

ST

AB

LE

Dep

artm

ent o

f Pub

lic W

orks

Str

uctu

res

& G

roun

ds80

0 P

itche

rs W

ay, H

yann

is, M

A 0

2061

WA

LK

WA

Y T

O T

HE

SE

AH

YA

RT

S S

HA

NT

IES

RU

TH

R

US

HE

R P

AR

K

HY

AN

NIS

, M

A

---MRM

A2

Plan & Elevations

DRAWING TITLE

REVISIONS

NO.:DATE: COMMENTS:

1

--------------

2

3

4

5

DRAWING NOTES:

DRAWN BY:

SCALE:

SHEET NO.:

PROJECT INFO:

DATE:

AS NOTED 4-11-17

.

1/2" = 1'-0"

SECTION A

.

1/2" = 1'-0"

ROOF FRAMING PLAN

.

1/2" = 1'-0"

FOUNDATION PLAN

.

1/2" = 1'-0"

SECTION B

1

3" = 1'-0"

PAVER DETAIL

2

1-1/2" = 1'-0"

FOUNDATION WHERE GRADE RISES

2

1-1/2" = 1'-0"

FOUNDATION WHERE GRADE DROPS

Page 7: Address Town, MA Walkway To The Sea Artists · PDF fileWalkway To The Sea Artists Shanties Address Town, MA GENERAL ... A3 DETAILS / SCHEDULES / ELECTRICAL ... MPCS. NEW U.G.ELECTRICBY

A2

A

A2

B

SURFACE MOUNTED

EXTERIOR LIGHT

CRAFTMADE Z11407

NAUTICAL

BURNISHED

COPPER FINISH

SURFACE MOUNTED

MOTION ACTIVATED

EXTERIOR LIGHT

W/ OVERRIDE

SWITCH

EXTERIOR GIF

DUPLEX

OUTLET

EXTERIOR GIF

DUPLEX

OUTLET

4' TRACK LIGHTING

W/ (3) HEADS

4' TRACK LIGHTING

W/ (3) HEADS

4' T

RA

CK

L

IG

HT

IN

G

W/ (3

) H

EA

DS

NEW FLUSH

PANEL

NEW 40 AMP PANEL PROVIDE

1 EXTERIOR LIGHT BREAKER

1 INTERIOR LIGHT BREAKER

1 EXTERIOR OUTLET BREAKER

1 INTERIOR OUTLET BREAKER

2 EMPTY SLOTS FOR FUTURE USE

ALL NEW LIGHTING FIXTURES

TO BE LED.

SURFACE MOUNTED

EXTERIOR LIGHT

CRAFTMADE Z11407

NAUTICAL

BURNISHED

COPPER FINISH

ON DORMER

EA HEAD 50W LED

HAMPTON BAY

EA HEAD 50W LED

HAMPTON BAY

EA

H

EA

D 50W

LE

D

HA

MP

TO

N B

AY

NOTE:

ALL ELECTRICAL WORK BY OTHERS (N.I.C.)

DOOR AND FRAME SCHEDULE

MARK

WD HGT THK

SIZE

MATL GLAZING

WD HGT

LOUVER

DOOR

MATL EL

HEAD JAMB SILL

DETAIL

FRAME

FIRE

RATING

LABEL

SET

NO

KEYSIDE

RM NO

HARDWARE

NOTES

0 HR

0 HR

1

2

--

--

--

--

WINDOW SCHEDULE

MARK

Width HEIGHT

SIZE

TYPE Manufacturer MATERIAL NOTES

Impact Resistan Unit / Applied Exterior Grill

Impact Resistant Unit / Applied Exterior Grill

WINDOW

TYPE 1

WINDOW

TYPE 2

DOOR

101

DOOR

102

SCHEDULE OF INSPECTIONS:

Provide the Project Management Team

with a regularly updated construction

schedule and reasonable notice for

inspections of the following work:

· General:

Unforeseen conditions.

· Site Work:

Building layout

Subgrade utilities and drains.

· Concrete:

Form work

Reinforcing

Bearing conditions

· Framing:

Anchors and Bearing conditions

Field modifications of shop work

Complete framing prior to concealment

· Thermal and Moisture Protection:

Waterproofing

Dampproofing

Flashing

Thermal and sound insulation

Vapor barriers

Roofing substrate

· Electrical, Mechanical, and Plumbing Systems:

Equipment and distribution layout

Completed installation prior to

concealment

· Finishes & Fixtures:

Flooring, Wall finish

Ceilings, Millwork

Casework

Mechanical, Plumbing and Electrical

fixtures

SELECTIVE DEMOLITION

Comply with EPA regulations and hauling and disposal regulations of authorities having jurisdiction.

A. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Owner's operations will not be disrupted.

B. It is not expected that hazardous materials will be encountered in the Work. If materials

suspected of containing hazardous materials are encountered, do not disturb; immediately

notify Architect and Owner. Owner will remove hazardous materials under a separate

contract.

C. Maintain services/systems indicated to remain and protect them against damage during

selective demolition operations. Before proceeding with demolition, provide temporary

services/systems that bypass area of selective demolition and that maintain continuity of

services/systems to other parts of the building.

D. Locate, identify, shut off, disconnect, and cap off utility services and mechanical/electrical

systems serving areas to be selectively demolished. Call Dig-Safe for underground utility

locations prior to start of work.

E. Provide temporary barricades and other protection required to prevent injury to people and

damage to adjacent buildings and facilities to remain.

F. Provide and maintain shoring, bracing, and structural supports as required to preserve

stability and prevent movement, settlement, or collapse of construction and finishes to remain

or construction being demolished.

G. Provide temporary weather protection to prevent water leakage and damage to structure and

interior areas.

H. Protect existing finish work that are to remain. Cover and protect equipment that have not

been removed.

I. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting

methods least likely to damage construction to remain or adjoining construction.

J. Promptly remove demolished materials from Owner's property and legally dispose of them.

Do not burn demolished materials.

STRUCTURAL NOTES:

1. THIS CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE ORDERING

OF MATERIALS AND THE START OF WORK. NOTIFY THE ARCHITECT IMMEDIATELY IF FIELD

CONDITIONS DIFFER FROM WHAT IS SHOWN ON THE DRAWINGS.

2. ALL CONCRETE TO BE 3,500 PSI AT 28 DAYS. PROVIDE ARCHITECT WITH SHIPMENT SLIPS

STATING CONCRETE DESIGN STRENGTH FROM THE CONCRETE SUPPLIER

3. ALL METAL CONNECTORS AND NAILS TO BE STAINLESS STEEL.

4. ALL WOOD IN CONTACT WITH GROUND OR CONCRETE TO BE PRESSURE TREATED

LUMBER

5. NON STAINLESS STEEL METAL ITEMS TO BE SEPARATED FROM PRESSURE TREATED

LUMBER

DA

TE

INIT

IALS

PA

TH

TO

WN

OF

BA

RN

ST

AB

LE

Dep

artm

ent o

f Pub

lic W

orks

Str

uctu

res

& G

roun

ds80

0 P

itche

rs W

ay, H

yann

is, M

A 0

2061

WA

LK

WA

Y T

O T

HE

SE

AH

YA

RT

S S

HA

NT

IES

RU

TH

R

US

HE

R P

AR

K

HY

AN

NIS

, M

A

---MRM

A3

Electrical

Schedules

DRAWING TITLE

REVISIONS

NO.:DATE: COMMENTS:

1

--------------

2

3

4

5

DRAWING NOTES:

DRAWN BY:

SCALE:

SHEET NO.:

PROJECT INFO:

DATE:

AS NOTED 4-11-17

.

1/2" = 1'-0"

ELECTRICAL PLAN - By Others Not In Contract