18
Addis Revival : As Light Rail Road Construction Continues Fast

Addis Revival; A Photo Essay About the Ongonig Light Railway Project in Addis Ababa PPT

Embed Size (px)

DESCRIPTION

This typical work shows the ongoing Light Railway Project in Addis Ababa

Citation preview

  • Addis Revival : As Light Rail Road Construction Continues Fast

  • Addis Revival: As Light Rail Road Construction Continues Fast

    Photo Essay Assignment

    Prepared by : Ameyu Etana GSR/3000/06

    Submitted to : Dr. Srinath

    Thursday January 02, 2014

  • Reportage Addis which is the diplomatic hub of a world and a head

    quarter of African Union is rising. Though the recent light rail way makes it busy, one could guess simply what the future look like. This is what Addis is for and what one call Addis revival.

    Ethiopian Railways Corporation (ERC) commenced the 34.25 km double track electrified light rail transit project in December 2011 after securing funds from Exim Bank of China.

    The project given to China Railway Group Limited(CREC) has two line rail tracks. One which extends 17.35km from East to West direction stretching from Ayat village to Tor Hailoch passing through Megenagna, Legehar and Mexico.

  • Continu And the rest is from North to South direction, which covers

    16.9km. This will pass through Menelik square, Merkato, Lideta, Legehar, Meskel square, Gotera and Kaliti. The two directions will have a common track of about 2.8km.

    The Addis Ababa Light Rail Transit will have a total of 41 rails each with a capacity to carry 286 passengers. This will enable the light rail transit to provide transportation service to 15,000 people per hour in one direction and 60,000 in all four directions.

    Generally, this photo essay will try to show simply the ongoing light rail way construction in some parts of Addis Ababa. Thank You! Enjoy it.

  • Construction around Estifanos area

    This site is among West- East light rail way construction that connects Hayat with Tor Hailoch. Tuesday Dec 31, 2013

  • Team work of machine and workers at Bambis

    To make the path clear for project builders assigned groups work efficiently. Tues Dec 31, 2013

  • Light Rail Sight at the heart of Meskel Square

    This is the adjacent place that separates the West East and North-South rail construction. Wed Jan 01, 2014

  • The construction separates commuters from taxi

    After it is finished, it is believed the transportation renders services at the expense of recent problems. Wed Jan 01, 2014

  • The alternative way creates hardships as it air dust

    The non-conducive environment for health is the utmost problem that is created by the light railway construction. Wed Jan 01, 2014

  • The rail way is becoming the new beauty of Addis

    Additional to ring roads around Gotera, the new light rail way in construction adds beauty to Addis Ababa. Wed Jan 01, 2014

  • The beneath rocks of Addis is loosing

    Construction machines digging of a 10-20 meters deep tunnel for the concrete wall is underway around Mexico. Wed Jan 01, 2013

  • Machines are busy either there is lorry or not

    This is around Sebategna. The contractor had fenced the area. But it is late as it yet begins digging the outer parts of land. Wed Jan 01, 2014.

  • Rail is still new for the biggest market, Merkato

    The site around Zewditu A/Qoran is new for the area as the place had no previous experience of railway. Wed Jan 01, 2014

  • Railway construction ruins many older buildings

    This is a former electronics shop in front of Anwar Mosque at Merkato. Mainly the tight way and shanty shops around Gojjam Berenda ruined for the sake of the construction. Wed Jan 01, 2014

  • Many aren't looking far to arrive Merkato with rail

    The way from Kelifa to Merkato is asking tough efforts as the topography is not suitable. Wed Jan 01, 2014

  • A traffic jam initiated by railway construction

    Like any other places the way from Yohannes to Piassa jammed by vehicles for more than hours. Tues Dec 31, 2013

  • The new faces of Georges and Atikilt Tera

    The underground way around St. George church is finished before months. Now, by making it open for traffic the next way is being built to make rail transportation come true. Wed Jan 01, 2013

  • I Thank You.

    But I need comment for what Ive done. Please, use this address: email,

    [email protected] or

    [email protected].

    Telephone:+251-910-019-364