2 Addendum No. 2 page 1 Project: Ag-Science & Research Farm - 2017 Seymour High School Seymour, Indiana Proj. No: 1582.01 Date: August 26, 2016 This addendum is a part of the bid documents. Acknowledge receipt on the Proposal Form. Specifications 1. Section 01230 - Alternates 1.04, D, 1: Add the following: j. EF-11 and all associated ductwork, electric power circuit and switch 1.04, D, 2: Add the following: b. Open box and conduit in masonry block wall for future switch to control EF-11 2. Section 05300 - Metal Roof Decking 2.02, B, Item 6 change to read: “…1-1/2”, 22 gage metal deck, Type B…” 3. Section 08800 - Glass and Glazing 2.02, B, Item 4 change to read: 4. Tint color to be standard “Grey” 4. Section 10200 - Louvers 2.01, A: Add the following 5. Construction Specialties 2.02, A: “Construction Specialties” Aluminum Louver A4085 is approved equal 5. Section 10200 - Louvers Add the following louver type: Soffit Louver: Basis of Specification: Ruskin ET125-30 See AD 2-7 for size & location 6. Section 11450 - Food Service Equipment 3.04, Item #6, Electric Range: Delete Item #6 from this section. Ranges will be Owner Furnished. 3.04, Item #12, Exhaust Hood System: See Specification Section 11455, not 12455 7. Section 15950 - Testing Adjusting and Balancing Work of this section may be completed by HVAC contractor. A separate “Certified” T & B contractor is not required.

Addendum No. 2 - Kovert Hawkins · Acknowledge receipt on the Proposal Form. Specifications 1. ... McGraw-Edison IST-E02-LED-E1-BL2-AP-CWB-XXXV ... Addendum No. 2 page 5 23. E-301:

Embed Size (px)

Citation preview

2

Addendum No. 2 page 1

Project: Ag-Science & Research Farm - 2017 Seymour High SchoolSeymour, Indiana

Proj. No: 1582.01

Date: August 26, 2016

This addendum is a part of the bid documents. Acknowledge receipt on the Proposal Form.

Specifications 1. Section 01230 - Alternates

1.04, D, 1: Add the following:j. EF-11 and all associated ductwork, electric power circuit and switch

1.04, D, 2: Add the following:b. Open box and conduit in masonry block wall for future switch to control EF-11

2. Section 05300 - Metal Roof Decking2.02, B, Item 6 change to read:

“…1-1/2”, 22 gage metal deck, Type B…”

3. Section 08800 - Glass and Glazing2.02, B, Item 4 change to read:4. Tint color to be standard “Grey”

4. Section 10200 - Louvers2.01, A: Add the following 5. Construction Specialties

2.02, A: “Construction Specialties” Aluminum Louver A4085 is approved equal

5. Section 10200 - LouversAdd the following louver type: Soffit Louver: Basis of Specification: Ruskin ET125-30See AD 2-7 for size & location

6. Section 11450 - Food Service Equipment3.04, Item #6, Electric Range: Delete Item #6 from this section. Ranges will be Owner Furnished.

3.04, Item #12, Exhaust Hood System: See Specification Section 11455, not 12455

7. Section 15950 - Testing Adjusting and BalancingWork of this section may be completed by HVAC contractor. A separate “Certified” T & B contractor is not required.

2

Addendum No. 2 page 2

Drawings 1. C-101: Site Development Plan

Drawing is REVISED as follows: See attached drawing AD 2-21. Parking lot area has been reduced. 2. One of the handicap parking spaces has been deleted.3. Concrete pavement on south side of building under overhang, between the wing walls has been eliminated except for a 6’-0” wide walk to the entry door

2. C-101: KeynotesNote 1, add the following: This work in Alternate No. 8

Note 4, add the following: This work in Alternate No. 8 Note 5, add the following: This work in Alternate No. 8

Note 6, change the size of the concrete pavement to 20’ x 30’ x 5”Note 14, add the following: This work in Alternate No. 8

3. C-102: Site Dimension PlanDrawing is REVISED as follows: See attached drawing AD 2-31. Parking lot area has been reduced. 2. Concrete pavement on south side of building under overhang, between the wing walls has been eliminated except for a 6’-0” wide walk to the entry door.

4. C-201: Site Drainage PlanDrawing is REVISED as follows: See attached drawing AD 2-4 1. Parking lot area has been reduced. 2. Area of disturbance has been reduced.

5. L-101: Site Seeding PlanDrawing is REVISED as follows: See attached drawing AD 2-5 1. Parking lot area has been reduced. 2. Area of disturbance has been reduced.

6. U-102: Site Utility Plan - WaterThe meter will be changed to 1-1/2”. Indiana-American will perform the following work and shall NOT be included in the Base Bid:1. Tap main2. Extend service line from south side of road to north side3. Cut and patch street4. Furnish and install meter and pitContractor will connect new building service line at the property line.Tap fee will be paid directly by Owner for water service and should NOT be included in the Base Bid.

2

Addendum No. 2 page 3

7. S-201: Roof Framing PlanChange the northern most roof joist from 44LH12 to 44LH09Change the high roof joist at Roof Step from 44LH12 to 44LH09Change the southern most roof joist from 44LH12 to 44LH09

8. S-201: Roof Structure DetailsDetail 1/S201: Delete the section cut marker X/S201. This is not applicable

Detail 2/S201: Section cut marker X/S201 should read 4 or 5 / S201 as applicable

Detail 6/S201. Revised per attached drawing AD 2-1

Detail 7/S201. Change continuous steel embed plate to 1/8” x 4”

9. A-301: Roof PlanAll flashing work related to KEC and KMUA shall be included in Alternate No. 5.

10. A-401: Reflected Ceiling PlanAdd (2) soffit louvers for exhaust fan ductwork. See AD 2-7, copy attached.

11. A-801: Aluminum Storefront Frame ElevationsElevation 2 shall be a fixed mullion, not removable.

12. P-301: Gas Piping DiagramChanges to 2/P201, Gas Piping Diagram are shown on AD 2-6, copy attached.

13. M-101: Mechanical Mezzanine PlanIn room 101, the 26 x 24 duct is connected to a 6” plenum at the louver. Note the louver size is 36” x 36”.

14. M-101: Mechanical PlanIn room 109, EF-11 and all associated ductwork shall be included in Alternate No. 2, not the Base Bid.

15. M-201: Fan ScheduleNote that EF-5, EF-6, EF-7, EF-8, EF-9, EF-10 and EF-11 are all included in Alternate No. 2. This includes all associated control wiring, test and balance, etc.

16. M-201: Fan ScheduleEF-13, Toilet Room Exhaust, will be controlled by occupancy sensor only. All work by Division 16. No work required by Temperature Control Contractor.

EF-15, General Exhaust, will be controlled by line voltage stat. All work by Division 16. No work required by Temperature Control Contractor.

2

Addendum No. 2 page 4

17. E-101: Lighting Fixture ScheduleThe following are approved as equal substitutions:Type ‘A1’: Metalux 24CZ-LD4-60-UNV-L840-HCD1-UType ‘A2’: Metalux 24CZ-LD4-50-UNV-L840-HCD1-UType ‘A2-EM’: Metalux 24CZ-LD4-50-UNV-EL14W-L840-HCD1-UType ‘B’: Metalux 22CZ-LD4-39-UNV-L840-HCD1-UType ‘B-EM’: Metalux 22CZ-LD4-39-UNV-EL14W-L840-HCD1-UType ‘C’: Metalux HBLED-LD4-48HT-W-A-UNV-L840-CD4-UType ‘D’: Halo PD610ED010 / PDM6A840 / 61VWType ‘E’: Sure-Lites SEL17Type ‘F’: Metalux 4SNLED-LD4-30SL-LW-UNV-L840-CD1-UType ‘X’: Sure-Lites LPXH7NCSDType ‘OLF1’: Halo Commercial PD620ED010 / PDM6A840 / 61VCType ‘OLF1-EM’: Halo Commercial PD620ED010IEM / PDM6A840 / 61VEMCType ‘OLF2’: McGraw-Edison IST-E02-LED-E1-BL2-APType ‘OLF2-EM’: McGraw-Edison IST-E02-LED-E1-BL2-AP-CWB-XXXVType ‘LL1’: McGraw-Edison GLEON-AF-04-LED-E1-T4FT-AP-HSS

18. E-201: Enlarged Partial Power PlanThe wall switch for EF-11 adjacent to the north door, Base Bid shall be open box and conduit in masonry block wall for future switch. Switch, power circuit (wire and conduit to Panel) shall be included in Alternate Bid No. 2.

19. E-201: Enlarged Partial Power PlanDelete EF-12 and circuit D-19

20. E-201: Enlarged Partial Power PlanEF-15 located above ceiling in Classroom 112 shall be controlled by a line-voltage thermostat located in Data 105. See drawing M-101 for location of fan and thermostat.

21. E-201: Power PlanEF-13 located above ceiling in Men 115 shall be controlled by ceiling mounted occupancy sensors located in Women 114 and Men 115. Sensors shall have relay tap for fan. See drawing M-101 for location of fan.

22. E-301: Panel ScheduleMove circuit C-23 to Panel ‘D’ and include the work for EF-11 in Alternate No. 2.

2

Addendum No. 2 page 5

23. E-301: Panel ScheduleThe main service feed and branch feeders shall be changed from Copper to Aluminum as follows:

Main Panel “M” change service feeds as follows:(4) 3” conduits each with (4) #500kcmil XHHW Aluminum

Sub Panel “A” change branch feeders as follows:(1) 3” conduit with (4) #250kcmil XHHW & (1) #3 XHHW ground Aluminum

Sub Panel “B” change branch feeders as follows:(2) 3” conduits each with (4) #300kcmil XHHW & (1) #1/0 XHHW ground Aluminum

Sub Panel “C” change branch feeders as follows:(1) 3” conduit with (4) #500kcmil XHHW & (1) #1 XHHW ground Aluminum

Sub Panel “D” change branch feeders as follows:(1) 3” conduit with (4) #500kcmil XHHW & (1) #1 XHHW ground Aluminum

Prepared by,

Hal E. Kovert, AIAPrincipal

file: 1518.01/E-1

Attachments: AD2-1, AD2-2, AD2-3, AD2-4, AD2-5, AD2-6, AD-7

Total Pages: (12) Twelve

End of Addendum No. 2

Delete This Note For MAU-1

All gas piping For MAU-2 beyond branch for MAU-1 shall be included in Alternate No. 2. Provide plug in pipe if Alternate No. 2 is not accepted.

Delete Pressure Gauge & Inside Shut-off Valve