Project No. 1600053.RA IVDA DFAS Bldg. No.2, Roofing., EDA Grant No. 07-49-06572 Addendum No. 1 ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp. Phone: 909-335-7400 1177 Idaho St, Ste 200 Mobile 909 910 8990 Redlands, CA 92374 Fax: 909-335-7299 TO: All Interested Parties: BID DATE: Thursday January 12, 2017 at 2:00 PM This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents Specifications dated as November 2016. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. This Addendum consists of one pages and five attachments. I - CHANGES TO PRIOR ADDENDA: Item I-1. N/A II - CHANGES TO BIDDING REQUIREMENTS: Item II-1. Substitute page 2 of 7 of Bid form. This substitute page provides for an Alternate bid item for TPO roofing. The page also provides for an allowance See Attachment 1 Item II-2. Insert section 01 2300 Alternates. See Attachment 2 Item II-3. Add two pages of Building Assessment Report (Attachment 6). These pages demonstrate that the building has had the asbestos abated. Contractor shall not include any labor or material costs for hazardous material abatement associated with any part of this work. III - CHANGES TO SPECIFICATIONS: Item III-1. Add section 07 543 Adhered Thermoplastic (PVC) Membrane Roofing as Alternate Bid No. 1 Attachment 3 Item III-2. Add to section 02 4119 Selective Demolition Item 3.3 Selective Demolition new line A – 3 to read as follows: Existing roofing section is an average thickness off 4.5” Item III-3. Change Section 07 5500 BUILT UP ROOFING Paragraph 2.02 INSULATION paragraphs A and B as follows: A. Insulation panels to be 4.5 inches (50 mm) maximum thickness for each layer. Insulation shall be multiple layers and achieve minimum 'R' value 15 at narrowest point, roof drains of at least R14.25. Tapered layer shall slope at 1/4 in per ft. minimum. B. Rigid polyisocyanurate board, with a strong white or black fibrous glass facer conforming to or exceeding the requirements of ASTM C 1289 / FS HH-I-1972. Tapered Polyiso Insulation, with the following characteristics: 1. Board Thickness: tapered 2. Thermal Resistance (LTTR value) of: R value 5.6 minimum per inch

ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

Project No. 1600053.RA IVDA DFAS Bldg. No.2, Roofing., EDA Grant No. 07-49-06572

Addendum No. 1

ADDENDUM NO. 1 DATE: 01/08/17

RE: IVDA DFAS Building 2, RoofingEDA Grant No. 07-49-06572

FROM: MILLER Architectural Corp. Phone: 909-335-74001177 Idaho St, Ste 200 Mobile 909 910 8990Redlands, CA 92374 Fax: 909-335-7299

TO: All Interested Parties:

BID DATE: Thursday January 12, 2017 at 2:00 PM

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents Specifications dated as November 2016. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

This Addendum consists of one pages and five attachments.

I - CHANGES TO PRIOR ADDENDA:

Item I-1. N/A

II - CHANGES TO BIDDING REQUIREMENTS:

Item II-1. Substitute page 2 of 7 of Bid form. This substitute page provides for an Alternate bid item for TPO roofing. The page also provides for an allowance See Attachment 1

Item II-2. Insert section 01 2300 Alternates. See Attachment 2

Item II-3. Add two pages of Building Assessment Report (Attachment 6). These pages demonstrate that the building has had the asbestos abated. Contractor shall not include any labor or material costs for hazardous material abatement associated with any part of this work.

III - CHANGES TO SPECIFICATIONS:

Item III-1. Add section 07 543 Adhered Thermoplastic (PVC) Membrane Roofing as Alternate Bid No. 1 Attachment 3

Item III-2. Add to section 02 4119 Selective Demolition Item 3.3 Selective Demolition new line A – 3 to read as follows: Existing roofing section is an average thickness off 4.5”

Item III-3. Change Section 07 5500 BUILT UP ROOFING Paragraph 2.02 INSULATION paragraphs A and B as follows:

A. Insulation panels to be 4.5 inches (50 mm) maximum thickness for each layer. Insulation shall be multiple layers and achieve minimum 'R' value 15 at narrowest point, roof drains of at least R14.25. Tapered layer shall slope at 1/4 in per ft. minimum.

B. Rigid polyisocyanurate board, with a strong white or black fibrous glass facer conforming to or exceeding the requirements of ASTM C 1289 / FS HH-I-1972. Tapered Polyiso Insulation, with the following characteristics:

1. Board Thickness: tapered2. Thermal Resistance (LTTR value) of: R value 5.6 minimum per inch

Page 2: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

Project No. 1600053.RA IVDA DFAS Bldg. No.2, Roofing., EDA Grant No. 07-49-06572

Addendum No. 2

IV - CHANGES TO DRAWINGS

Item IV-1. Substitute new sheet A-101 with additional key notes and General Notes as clouded. Attachment 4

Item IV-2. Details 1, 2, 3 and plenum photos Attachment 5

END OF ADDENDUM

Page 3: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

Project: DFAS BUILDING NO. 2 ROOFING IMPROVEMENTS,EDA GRANT NO. 07-49-06572

Bid form

00100 Bid Issuance Set

Page 2 of 7

ADDENDUM 1 - ATTACHMENT #1

3. BID AMOUNTS

BASE BID – ROOFING IMPROVEMENTSITEMNO.

ITEM DESCRIPTION QUANTITY AMOUNT

001 Lump Sum Price Reroof L. S. $

002 Allowance 1 $20,000.00

Total Bid Amount Including Allowance - DFAS Building No. 2, Roofing Improvements $___________________________________________________________(Total Bid Amount in Numbers)

________________________________________________________(TOTAL BID AMOUNT WRITTEN)

Alternate Bid 1

Add $_________________OrSubtract $ ______________

The undersigned Bidder agrees to achieve Final Completion of the Work and all Major Milestones within the Contract Time set forth in the Contract Documents.4. ALTERNATES: The following amounts shall be added to or deducted from the Base Bid at

the AGENCY’s option. Refer to Section 012300 Alternates for description of work.

5. TIME FOR COMPLETION: The entire Project shall be completed within 60 consecutivecalendar days. Bidder acknowledges liability for liquidated damages in the amount asstipulated herein for each calendar day of delay.

6. AGENCY’S RIGHT TO REJECT: It is understood that the AGENCY reserves the right toreject this bid and that the bid shall remain open to acceptance and is irrevocable for aperiod of one hundred twenty (120) days.

7. BID SECURITY: The required bid security in the amount of not less than five percent (5%)of the bid is attached hereto.

8. PROPOSED SUBCONTRACTORS: The required list of proposed subcontractors isattached hereto. Bidder understands and acknowledges that all subcontractors providinggoods and services in excess of $100,000.00 must be bonded in accordance with theSubletting and Subcontracting Fair Practices Act.

9. NONCOLLUSION AFFIDAVIT: The required notarized Bidder’s Non-collusion Affidavit isattached hereto.

10. SITE VISIT CERTIFICATION: The required Site Visit Certification is attached hereto.11. CONTRACTOR INFORMATION SHEETS: The required Contractor Information Sheets are

attached hereto.

Page 4: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

1600076.RA IVDA DFAS Bldg. No. 2ADDENDUM #1 Roofing Improvements

Alternates - 1 - 01 2300

ADDENDUM 1 - ATTACHMENT #2

SECTION 012300

ALTERNATES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes But is Not Limited To:1. Administrative and procedural requirements to prepare and process Alternates.

B. With its bid, Contractor has provided prices for following alternate products, materials, equipment, systems, methods, units of work, or major elements of The Work. Any of these Alternates may, at Owner's option, be selected for The Work in place of corresponding requirements of Contract Documents1. Alternate Section 075419 Adhered Thermoplastic (PVC) Roofing Membrane

C. Contractor acknowledges that the Alternate will be complete for scope of work affected.

D. Contractor will coordinate related work and modify surrounding work as required to properly integrate with other contract work.

PART 2 - PRODUCTS Not Used

PART 3 - EXECUTION Not Used

END OF SECTION

Page 5: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

ADDENDUM #1 - ATTACHMENT #3 Alternate bid Item

SECTION 07543

ADHERED THERMOPLASTIC (PVC) MEMBRANE ROOFING

PART 1 – GENERAL CONDITIONS

1.1 DESCRIPTION

A. Summary:

Install an adhered thermoplastic (PVC) membrane roof system, including, but not limited to,

air/vapor retarder, isocyanurate insulation, primed gypsum cover board, PVC membrane

flashings, PVC metal edge/fascia flashing, and other components to comprise a weathertight roof

system. The roof system shall comply with the herein specified roofing manufacturer’s standard

written and detail requirements. Note: Sika Sarnafil products and system installation

requirements have been utilized as the basis of design for this project, however equal products

approved by architect may be used.

B. System Description:

1. Any product listed in paragraph B is Over the properly prepared concrete deck; install 32-mil

minimum Sarnavap Self-Adhered vapor retarder. Apply Sarnacol Self-Adhered Water Based

Primer to concrete roof deck. Sarnavap Self-Adhered vapor retarder must be installed on the

same day as the primer application, primer drying time is typically 30 minutes to 3 hours.

Overlap vapor retarder 3 inches lengthwise and 6 inches at end laps. Stagger end laps at

least 12 inches.

2. Install one and a half inch (1-1/2”) thick minimum tapered Sarnatherm isocyanurate insulation

board providing an average R-30.0/Long Term Thermal Resistance (LTTR). The insulation

shall be secured the vapor retarder using low-rise urethane foam board adhesive. Low-rise

adhesive ¼” to ½” wide ribbon spacing shall be 12-inches on-center maximum spacing for

field roof area attachment. Perimeter and corner ribbon spacing must be increased to be six

inches (6”) and four inches (4”) on-center maximum spacing respectively in accordance with

Factory Mutual Data Sheets 1-28/29 requirements.

3. Install a layer of Georgia-Pacific 1/2” Dens-Deck Prime gypsum cover board. The cover

board shall be installed directly over the isocyanurate insulation and shall be secured using

low-rise urethane foam board adhesive. Low-rise adhesive ¼” to ½” wide ribbon spacing shall

be 12-inches on-center maximum spacing for field roof area attachment. Perimeter and

corner ribbon spacing must be increased to be six inches (6”) and four inches (4”) on-center

maximum spacing respectively in accordance with Factory Mutual Data Sheets 1-28/29

requirements.

4. Install a layer of 80-mil thermoplastic (PVC) membrane (EnergySmart White). The

membrane shall be installed directly over the gypsum cover board and shall be adhered

using VOC compliant, water-based adhesive. The membrane shall meet or exceed Cool

Roof Rating Council (CRRC) requirements for Title 24 compliance.

Page 6: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

5. Perform all flashing and detail work in strict accordance with the roofing manufacturer’s

standard written and detail requirements (as indicated within the project detail drawings

and/or specification requirements, those specific project requirements shall supersede

any corresponding minimum/standard requirements).

A. Work Included:

The work includes but is not necessarily limited to the installation of:

1. Substrate Preparation.

2. Vapor Retarder

3. Isocyanurate Insulation with fiberglass Facer.

4. Gypsum Cover Board

5. PVC Roof Membrane Adhesive.

6. Low-Rise Foam Board Adhesive.

7. Thermoplastic (PVC) Roof Membrane.

8. Thermoplastic (PVC) Flashing Membrane.

9. Metal Flashings

10. Sealants.

11. Equipment Access/Walkway Tread

1.2 QUALITY ASSURANCE

A. Pre-Bidding Report: To find and resolve conflicts or lack of definition that may create construction

problems, each Bidder for the Work of Section 07543 shall submit a written report to Architect at

least 15 days before Bids are due for the Work of this Section.

B. Pre-Roofing Conference and Inspection: After approval of submittals but prior to beginning

installation of Work of this Section, the Owner’s Representative shall hold a meeting at the site

attended by the Architect, Roofing Applicator, Sheet Metal, Mechanical, and Electrical

Subcontractors, and the Roofing Material Manufacturer to describe in detail the roof system(s) to

be installed and to establish agreement, coordination, and responsibilities among the involved

trades.

C. The roofing system shall be applied only by an Applicator authorized by the specified Roofing

Manufacturer prior to bid. The Applicator shall have a minimum of five (5) years documented

experience with the Roofing Manufacturer. The Owner’s Representative reserves the right to

request a list of reference projects to verify Applicator's performance/work history. All references

must be of similar size and scope, and must be within 100 miles of this project.

Page 7: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

D. The Roofing Manufacturer shall have directly produced the specified field and flashing

membranes for the number of years equal to, or greater than that of the warranty term (20

years). The membrane shall have also maintained a consistent base formulation for the same

number of years.

E. The Roofing Manufacturer shall have a Sustainable Product Certification conforming to the

requirements of NSF/ANSI 347 – Sustainability Assessment for Single Ply Roofing Membranes.

Minimum certification level established for this project is: Platinum.

F. Use only a Manufacturer who has initiated a post consumer recycling program and can

demonstrate a minimum of five projects where the existing PVC membrane has been removed

and recycled into new roofing membrane or PVC components.

G. Membrane Manufacturer must have Recycled Content Certification from UL (Underwriters

Laboratories) Environment.

H. Membrane thickness stated in this document refers to minimum waterproofing membrane PVC

polymer thickness. ASTM 10% less thickness is not allowed. This is a non-negotiable minimum

requirement.

I. Unreinforced or polyester reinforced membranes are prohibited.

J. Re-labeled / re-packaged ("Private-labeled”) primary and flashing membranes will not be

accepted.

K. Membrane Manufacturer must have ISO 14001 Certification and a Responsible Care Program

in-place with current good standing status.

L. Membrane Manufacturer must not require the use of membrane cut edge sealant at any location.

This is a maintenance item that the Owner does not accept.

M. The Manufacturer shall provide interim and final roof inspection from a directly employed

dedicated team of experienced inspectors. Sales personnel may not be used for onsite inspection

of installations.

1.3 PRE-INSTALLATION MEETING

A. Arrange for a Pre-Installation Meeting between the Applicator, Owner's Representative, Roofing

Manufacturer's Representative, and related trades to be held at least two (2) weeks prior to the

beginning of roof system installation.

B. Review contract documents, manufacturer's instructions, project conditions, and proposed

methods and procedures related to installation.

1. Identify conditions that would be detrimental to proper installation.

2. Review special details, corner conditions, drainage patterns, penetrations and similar

conditions of adjacent construction that will affect or impact surface preparation and

installation operations.

Page 8: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

3. Review substrates and surfaces to receive materials in order to verify compliance with

specified requirements, and with manufacturer's substrate tolerance recommendations and

surface preparation requirements, including flatness, levelness, damage and imperfections,

and quality of attachment to structure.

4. Review limitations of floor and roof decks for structural loading both during and after

installation.

C. Review governing regulations and specified requirements for certificates, inspection, reports and

closeout submittals.

D. Review sequence of installation, finalize construction schedule, and verify availability of materials,

installer's personnel, equipment and facilities necessary to make progress and avoid delays.

E. Review temporary protection procedures required to be followed to provide protection of stored

and installed products and accessories both during and after installation.

F. Owner’s Representative shall record significant meeting discussions, agreements and

disagreements, including required corrective measures and actions to be taken before work

begins. Distribute copy of minutes to Architect and Owner's Authorized Representative, to each

party present, and to parties who should have been present no later than 3 business days

following the meeting.

G. Do not proceed with installation until all attendees, including all parties who should have been

present, provide written acknowledgement of receipt and agreement to the conditions and

requirements as described in the "Meeting Minutes". If disagreements cannot be successfully

resolved, initiate necessary actions to remove impediments to execution of the Work and

reconvene meeting at earliest available date to resolve outstanding disagreements.

1.4 PERFORMANCE REQUIREMENTS

A. General: Provide installed roofing membrane and base flashings that remain watertight; do not

permit the passage of water; and resist specified uplift pressures, thermally induced movement,

and exposure to weather without failure.

B. Material Compatibility: Provide roofing materials that are compatible with one another under

conditions of service and application required, as demonstrated by roofing membrane

manufacturer based on testing and field experience.

C. The applicator shall submit evidence that the proposed roof system meets local building code

requirements and has been tested and approved or listed by the following test organizations.

1. ASCE 7-10 “Minimum Design Loads for Buildings and other Structures” and SPRI's "Wind

Load Design Guide for Fully Adhered and Mechanically Fastened Roofing Systems".

a. Corner Design Uplift Pressure: 93 lbs. / Ft2

b. Perimeter Design Uplift Pressure: 62 lbs. / Ft2

c. Field-of-Roof Design Uplift Pressure: 37 lbs. / Ft2

d. Safety Factor 2.0

Page 9: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

2. Underwriters Laboratories, Inc.: Class A assembly

D. Energy Performance:

Low-Slope Roofs: Provide roof system with an initial Solar Reflectance Index (SRI) of not less

than 100 when calculated according to ASTM E 1980 based on testing identical products by a

qualified testing agency. Roof membrane (not post installation applied finish) shall comply with

current California Title 24 Part 6 minimum 3-year aged solar reflectance of 0.63 and a minimum

thermal emittance of 0.75 requirements.

1.5 SUBMITTALS:

A. Submittals with bid (utilizing the base specified system:

1. Product Data: A list of each primary component to be used in the roof system and the

Manufacturer's current literature for each component.

2. Shop Drawings: All Perimeter and Penetration Details. Insulation layout with thickness,

slopes and approved attachment patterns for field of roof, perimeter and corner roof

locations.

3. Sample copy of Roofing Manufacturer's warranty.

4. Sample copy of Contractor's warranty.

5. Letter from Roofing Manufacturer confirming that the Contractor is an authorized applicator of

the specified roof system.

6. Approved copy of Manufacturer’s Notice of Award.

B. Submittals of equals

Submit proposed equals to be considered for use on this project no less than fifteen (15) days

prior to bid date. Proposed roof systems which have been reviewed and accepted will be listed in

an addendum prior to bid date; only then will roof systems be accepted at bidding. All below

referenced letters must be original, wet-ink signed by the proposed Roofing Manufacturer's

Technical Director/Manager. Submittals shall include the following:

1. Two 12 inch x 12 inch membrane samples and two samples of each component to be used in

the roofing system.

Page 10: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

2. Manufacturer's specification matching the herein specified requirements for all Sub-Sections as described. The Manufacturer shall also provide written confirmation that all detail and flashing conditions will be installed in strict accordance with the OWNER'S Standards as indicated within this specification and otherwise stated within the Contract Documents. Acceptance of any other, non-specified manufacturer's material(s) will not be deemed as acceptance for use of said manufacturer's minimum detail and/or installation requirements.

3. Letter from the proposed Roofing Manufacturer stating that the Manufacturer has a minimum

of 20 years consistent experience in directly producing the proposed roof system. The letter

shall also state that the proposed Manufacturer's membrane has maintained a consistent

formulation for a minimum of 20 years.

4. Letter from the Cool Roof Rating Council (CRRC) stating that the proposed PVC membrane

demonstrates the required Solar Reflectance Index requirements as stated in Section 1.4 D

above. Submit listing as an approved product by the CRRC.

5. Letter from proposed Roofing Manufacturer describing the specified certified polymer

thickness program. Included shall be a sample copy of the proposed Manufacture's

certificate for polymer thickness as specified.

6. Letter from the proposed Roofing Manufacturer confirming that it has been engaged in a

post-consumer recycling program in compliance with the requirements as started in

Section 1.2 E above. The proposed Roofing Manufacturer shall provide written proof

that its post-consumer recycling program has achieved UL Environmental certification.

7. Complete list of material physical and mechanical properties for each membrane and

component including; weights and thicknesses; ultimate elongation; puncture resistance;

seam peel strength; breaking strength; tear strength; dimensional stability; low

temperature bend; and post-consumer recycle content.

8 Sample copy of specified warranties.

a. Manufacturer's 20-Year System Warranty (with no ponding/standing water exclusions).

b. Contractor's Two (2) Year Warranty

9. Letter from the proposed Roofing Manufacturer confirming that the Contractor is an

authorized applicator of the proposed roof system per the requirements of Section 1.2 C

listed above.

1.6 PRODUCT DELIVERY, STORAGE, and HANDLING:

A. All products delivered to the job-site shall be in the original unopened containers or wrappings

bearing all seals and approvals. Handle all materials to prevent damage. Place all materials on

pallets and fully protect from moisture.

1.7 JOB CONDITIONS

Page 11: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

A. PVC materials may be installed under certain adverse weather conditions but only after

consultation with the Roofing Manufacturer, as installation time and system integrity may be

affected.

B. Uninterrupted waterstops shall be installed at the end of each day’s work and shall be completely

removed before proceeding with the next day’s work.

C. The Applicator shall conduct adhesion uplift resistance tests in accordance with the latest revision

of the SPRI/ANSI Testing Standards to verify condition of deck and to confirm expected uplift

resistance values. Adhesion tests shall be performed a minimum of one (1) week prior to job

start.

D. Arrange work sequence to avoid use of newly constructed roofing as a walking surface or for

equipment movement and storage. Where such access is absolutely required, the Applicator

shall provide all necessary protection and barriers to segregate the work area and to prevent

damage to adjacent areas. A substantial protection layer consisting of 1/2" plywood over

polyester felt or 1/2" plywood over insulation board shall be provided for all new and existing roof

areas which receive rooftop traffic during construction.

E. The Applicator shall verify that all roof drain lines are functioning correctly (not clogged or

blocked) before starting work. Applicator shall report any such blockages to the Owner’s

Representative for corrective action prior to beginning roof system installation.

1.8 BIDDING REQUIREMENTS

A. Bidders Responsibility

Bidders must have held their Roofing Contractors License (C39) for a minimum of five (5) years,

with a continuous “Good-Standing” status to qualify to bid on this project. Any discrepancy

between measurements and conditions listed within this specification, roof plans, and details, and

those actually incurred on the job will be the responsibility of the Applicator.

1.9 WARRANTIES

A. Roofing Manufacturer’s 20 Year Full System Warranty: 60 MPH Windspeed Coverage

Upon successful completion of all the work to the Roofing Manufacturer’s and Owner’s

Representative’s satisfaction, the 20 Year Full System warranty shall be issued. The System

warranty shall provide Non-Penal Sum (replacement cost) coverage for the roof membrane, all

associated accessories that comprise the roof system, and all contractor labor. The warranty

shall be non-prorated, and shall not exclude ponding/standing water and no time limit shall be

assigned for any such ponding/standing water during the warranty term. The warranty shall not

exclude regular foot traffic or storage of equipment, materials, tools, etc. of any kind upon the roof

membrane surface. Warranty shall not obligate the Owner to perform manufacturer defined

maintenance work as a condition of continued warranty coverage.

B. Roofing Applicator/Contractor Two (2) Year Warranty

Page 12: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

The Applicator/Contractor shall supply the Owner with a separate two year workmanship

warranty. In the event any work related to roofing, flashing, or metal is found to be within the

Applicator/Contractor warranty term, defective or otherwise not in accordance with the Contract

Documents, the Applicator/Contractor shall repair that defect at no cost to the Owner.

C. "Early Bird” warranties are not to be issued as they will not be accepted by the Owner. The

above specified Warranty will be issued only upon acceptance by the Roofing Manufacturer’s

Technical Department and the Owner’s Representative’s final approval.

PART 2 - PRODUCTS

2.1 GENERAL

A. The components of the adhered PVC membrane roof system are to be products of Sika Sarnafil

or architect approved equal and/or products utilized by Sika Sarnafil or architect approved equal

to designate type, quality, and performance standards for this project.

B. Substitutions: Upon pre-approval in accordance with Section 1.5 B above.

2.2 MANUFACTURER AND MEMBRANE

A. 1. Sika Sarnafil: G410 80-mil minimum thickness. Western Region Contact: (909) 942-0079.

2. Carlisle Syntec: Sure-Flex PVC KEE HP 80-mil Minimum.

3. Or equal as approved by Architect.

B. G410-80: Fiberglass reinforced membrane with an integral lacquer coating to repel dirt and

sustain long-term solar reflectivity.

C. Membrane shall be manufactured by Extrusion/Spread Coating process only, producing a

monolithic membrane with fully encapsulated fiberglass reinforcement layer and a minimum of

40-mils of "weathering” polymer above the fiberglass reinforcement layer.

D. Membrane shall conform to ASTM D4434 (latest revision), “Standard for Polyvinyl Chloride Sheet

Roofing”. Classification: Type II Grade I (fiberglass reinforcement).

E. Roofing Manufacturer shall certify in writing that the product supplied for this project has a

minimum polymer thickness of 80 mils. ASTM less than 80-mil tolerance for membrane

thickness is not accepted. Listing of Manufacturer does not exclude 80-mil Minimum Thickness

requirement.

F. Membrane shall comply with California Building Code (CBC) Title 24, Section 118 requirements

for solar reflectivity and emissivity. Manufacturer and membrane shall be listed in the Cool Roof

Rating Council (CRRC) product listing as outlined by the Department of Energy (DOE) and the

Environmental Protection Agency (EPA).

G. As manufactured, membrane shall conform to the following physical properties:

Page 13: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

1. Color to be “EnergySmart” White.

2. Thickness to be 80-mil (2.00 mm).

Property ASTM Test Minimum Physical

Method Properties Requirements

Overall Thickness, mil D751 80

Thickness Over Scrim, mil -- 40

Reinforcing Material -- Fiberglass

Felt Weight, oz/yd2 -- 9

(feltback membrane only)

Breaking Strength, lbf/in (N) D751 110 (489)

Elongation at Break, % D751 250 & 220

M.D.(1) & C.M.D. (1)

Seam Strength, % of original (2) D751 Pass

Retention of Properties D3045 --

After Heat Aging

Breaking Strength, % of original D751 Pass

Elongation, % of original D751 Pass

Tearing Resistance, lbf (N) D1004 22 (98)

Low Temperature Bend, -40F(-40C) D2136 Pass

Accelerated Weather Test G154 10,000

(Florescent Light UV Exposure),Hours

Cracking (7x magnification) None

Discoloration (by observation) Negligible

Crazing (7x magnification) None

Linear Dimensional Change, % D1204 -0.01

Weight Change After Immersion D570 1.7

in Water, %

Static Puncture Resistance, lbf (kg) D5602 Pass

Dynamic Puncture Resistance, D5635 Pass

ft-lbf (J)

Recycle Content 9% Pre-consume, 1% Post-consumer*Results may differ based upon statistical variations depending upon mixing methods and equipment, temperature, application

methods, test methods, actual site conditions, and curing conditions.

(1) M.D. = Machine Direction, C.M.D. = Cross Machine Direction

(2) Failure occurs through membrane rupture not seam failure.

2.3 FLASHING MATERIALS

A. Wall/Curb Flashing

1. G410 Membrane: Fiberglass reinforced membrane adhered to approved substrate using

Stabond adhesive. Consult Sarnafil Product Data Sheets for additional information.

2. S327 Membrane: Polyester reinforced membrane for mechanically-attached flashings to

approved substrate using Sarnastop.

Page 14: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

3. Sarnaclad: PVC-coated, heat-weldable sheet metal. Sarnaclad is a 24 gauge, G90

galvanized metal sheet with a 20 mil (1 mm) unsupported PVC membrane laminated on one

side. Consult Sarnafil Product Data Sheet for additional information.

B. Perimeter Flashing:

1. High Wind PVC Clad Metal Edge (Sika Sarnafil Detail 1-1A or architect approved equal):

PVC coated, heat-weldable sheet metal with continuous 20-gauge galvanized metal cleat.

Sarnaclad (or architect approved equal) is a 24 gauge, G90 galvanized metal sheet with a 20

mil (1 mm) unsupported PVC membrane laminated on one side.

C. Miscellaneous Flashing;

1. Aluminum Membrane Attachment Bar (Sarnastop)

2. Termination Reglet (Sarnareglet)

3. Pipe Boots (Sarnastack)

4. Universal Corners (Sarnacorners)

5. Flashing Membrane Adhesive (Stabond)

2.4 COVER BOARD / ISOCYANURATE INSULATION

A. Georgia-Pacific DensDeck® Cover Board: Impact and mold resistant, gypsum core fire cover

board with pre-coated glass-mat facers. Manufactured to meet the following requirements:

1. ASTM C 1177 (Consensus Standard).

2. Smoke Developed (ASTM E-84): 0 (Zero).

3. Flame Spread (ASTM E-84): 0 (Zero).

4. Mold Resistance (ASTM D3273): 10 (highest level of performance for mold

resistance).

5. Compressive Strength (ASTM C 473): 900 psi, nominal.

6. Weight (nominal): 2.0 Lbs./Ft2.

7. Board Size: 1/2" X 4' X 8'.

B. Tapered Insulation: 1-1/2" minimum starting thickness (R-30 Average) x 4’ x 4’ sloped rigid roof

insulation panels composed of polyisocyanurate closed-cell foam core with polymer bonded glass

fiber mat facer laminated to both sides. Manufactured to meet the following requirements:

1. ASTM C1289-11, Type II, Class 2, Grade 2 (20 psi)

2. Zero Ozone Depletion Potential (ODP) from blowing agent (HCFC-free).

3. Long-Term Thermal Resistance (LTTR) R-Value based on ASTM 1303-11 and/or CAN/ULC-

S770-09: Regardless of published values.

4. Facer Type: Polymer bonded glass fiber mat both sides.

5. Board Size: 1/2" min. x 4’ x 4’.

6. Tapered Insulation Slope: 1/4" per foot or as indicated otherwise. Cricket slope to be double

the primary slope.

2.5 VAPOR RETARDER

Page 15: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

A. Sarnavap Self-Adhered Primer WB: A water-based primer designed for use with Sarnavap Self-

Adhered Vapor Retarder to promote adhesion to most substrates.

B. Sarnavap Self-Adhered: A 32-mil (0.8 mm) self-adhesive vapor retarder that can also serve as

temporary roof protection. Sarnavap Self-Adhered is available in rolls 44.9 inches x 133.8 feet

(1.14 x 40.8 m). Consult Product Data Sheet for additional information.

2.6 ATTACHMENT COMPONENTS

A. Membrane Adhesive

1. V.O.C. Compliant Water Based Adhesive (Sarnacol 2121 Adhesive): Water-based adhesive

used to attach the membrane to the horizontal or near-horizontal substrate. Consult Product

Data Sheets for additional information.

B. Cover Board / Insulation Adhesive (Sarnacol 2163 Adhesive):

1. A low odor, VOC compliant, one step, low-rise urethane foam used to attach insulation to

approved compatible substrates. Adhesive is applied with a gravity fed applicator or by hand

with a dual component caulk gun. Consult Product Data Sheets for additional information.

C. Flashing Membrane Adhesive (Stabond Adhesive): Solvent-based reactivating-type adhesive

used to attach the membrane to the flashing substrate. Consult Product Data Sheets for

additional information.

D. Sarnafastener CD-10: A nail-in, corrosion-resistant fastener used with membrane attachment bar

to secure roof membrane at roof perimeter, vertical flashings and penetrations.

E. Sarnafastener-XP: Corrosion-resistant #15 fastener used with membrane attachment bar to

attach roof membrane at roof perimeter, vertical flashings and penetrations.

F. Membrane Attachment Bar (Sarnastop): One (1) inch wide, pre-punched aluminum membrane

attachment bar. Used to attach PVC membrane at all perimeter and base-angle transitions.

Consult Sarnafil Product Data Sheet for additional information.

2.7 WALKWAY PROTECTION

A. Equipment Access/Walkway Tread (Sarnatred): Polyester reinforced, 96 mil/2.4 mm), weldable

membrane with surface embossment. Used as a protection layer from rooftop traffic. Sarnatred

is supplied in rolls of 39.3 inches wide and 50.0 feet long. Consult Sarnafil Product Data Sheet

for additional information.

2.8 MISCELLANEOUS ACCESSORIES

Page 16: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

A. Sealing Tape: Compressible foam with pressure-sensitive adhesive on one side. Used with

metal flashings as a preventive measure against air and windblown moisture entry.

B. Sarnasolv: Solvent cleaner used for the general cleaning of scuff marks, etc., from the

Membrane surface.

2.9 SEALANTS

A. Depending on substrates, the following sealants are options for temporary overnight tie-ins:

1. Multiple layers of roofing cement and felt.

2. Mechanical attachment with rigid bars and compressed sealant.

2.10 MISCELLANEOUS FASTENERS AND ANCHORS:

A. All fasteners, anchors, nails, straps, bars, etc. shall be post-galvanized steel, aluminum or

stainless steel.

PART 3 - EXECUTION

3.1 EXAMINATION:

A. Report to Owner in writing all conditions that interfere with or prevent correct installation of work

of this Section.

3.2 PRE-INSTALLATION MEETING

A. Refer to Section 1.3 of this specification for meeting agenda requirements.

Discuss the following additional project aspects:

1. Safety

2. Set up

3. Construction schedule

4. Contract conditions

5. Coordination of the work

6. Structural Loading Limitations/Requirements

7. Review of Deck and/or Substrate Conditions

3.3 SUBSTRATE CONDITION

A. Applicator shall be responsible for acceptance or provision of proper substrate to receive new

roofing materials.

B. Applicator shall verify that the work done under related sections meets the following conditions:

1. Roof drains and/or scuppers have been installed functioning properly.

Page 17: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

2. Roof curbs, equipment supports, vents and other roof penetrations are properly secured and

prepared to receive new roofing materials.

3. All surfaces are smooth and free of dirt, debris and incompatible materials.

4. All roof surfaces shall be free of water.

3.4 SUBSTRATE PREPARATION

A. The roof deck and existing roof construction must be structurally sound to provide support for the

new roof system. The Applicator shall load materials on the rooftop in such a manner to eliminate

risk of deck overload due to concentrated weight. The Owners Representative shall ensure that

the roof deck is secured to the structural framing according to local building code and in such a

manner as to resist all anticipated wind loads in that location.

3.5 SUBSTRATE INSPECTION

A. A dry, clean and smooth substrate shall be prepared to receive the new PVC membrane roof

system.

B. The Applicator shall inspect the substrate for defects such as excessive surface roughness,

contamination, structural inadequacy, or any other condition that will adversely affect the quality

of work.

C. The substrate shall be clean, smooth, dry, free of flaws, sharp edges, loose and foreign material,

oil and grease. Roofing shall not start until all defects have been corrected.

D. All roof surfaces shall be free of water.

E. PVC membrane shall be applied over compatible and accepted substrates only.

3.6 VAPOR RETARDER INSTALLATION

A. Apply primer to properly prepared substrate. The substrate must be clean, dry and free of dust,

grease or other contaminants. Shake primer well before using. Apply to clean and dry surfaces

with a paint brush, roller or sprayer. Application rates will vary depending on substrate. Sarnavap

Self-Adhered must be installed on the same day as the primer application. Drying time is typically

30 minutes to 3 hours.

B. Begin Sarnavap Self-Adhered application at the bottom of the slope. Unroll Sarnavap Self-

Adhered onto the substrate without adhering for alignment. Overlap each preceding sheet by 3

inches (75 mm) lengthwise and by 6 inches at each end. Stagger end laps by at least 12 inches

(300 mm). Do not immediately remove the silicone release sheet. Once aligned, peel back

release sheet and press membrane onto the substrate. Use a 100 lb. linoleum roller to press

membrane down onto substrate. Do not cut membrane to remove air bubbles trapped under laps.

Squeeze out air bubbles by pushing the roller to the edge of the laps.

3.7 COVER BOARD / INSULATION INSTALLATION

Page 18: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

A. Insulation and cover board shall be adhered to the concrete deck with approved low-rise urethane

foam board adhesive at a rate according to ASCE 7-10 uplift resistance and the Roofing

Manufacturer’s requirements for attachment rates and patterns.

3.8 INSTALLATION OF PVC ROOF MEMBRANE:

A. General

1. Roof membrane is to be adhered according to the Roofing Manufacturer, local building code

and herein specified requirements.

2. Membrane overlaps shall be shingled with the flow of water where possible.

3. Lay membrane rolls perpendicular to the direction of water flow when possible.

4. Tack welding of membrane full or half-width rolls for purposes of temporary restraint during

installation on windy days is not permitted. Consult Roofing Manufacturer’s Technical

Department for further information.

5. Hot-air weld overlaps according to roofing manufacturer’s Take test cuts at least 3 times per

day.

6. Membrane flashings shall extend 2-1/2 inches past the membrane attachment bar and shall

be hot-air welded to the field membrane as required.

3.9 HOT-AIR WELDING OF SEAM OVER LAPS:

A. All field seams shall be hot-air welded using robotic welding equipment only (no hand-held

welders). Seam overlaps should be 3 inches wide except for certain details.

3.10 MEMBRANE FLASHINGS:

A. All flashings shall be installed concurrently with the roof membrane as the job progresses.

B. Stabond Adhesive for Membrane Flashings: Stabond adhesive shall be applied according to

instruction found on the Product Data Sheets. The bonded sheet shall be pressed firmly in place

with a hand roller.

C. All flashings shall extend a minimum of eight (8) inches above roofing level unless otherwise

accepted in writing. No bitumen shall be in contact with the PVC membrane. All flashing

membranes shall be mechanically fastened along the counter-flashed top edge with Sarnastop at

six inches (6”) on-center.

3.11 METAL FLASHINGS

A. Metal details, fabrication practices and installation methods shall conform to the applicable

requirements of the following:

1. Sika Sarnafil’s (or architect approved equal) written and detail installation instructions for

products as specified.

2. Factory Mutual Loss Prevention Data Sheet 1-49 (latest issue).

3. Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA) – latest

issue.

Page 19: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

B. Metal joints shall be watertight. Metal flashings shall be securely fastened into approved solid

substrate or metal stud backing plates. Fasteners shall penetrate the substrate or metal studs as

required by manufacturer. Counter flashings shall overlap base flashings at least four (4) inches.

Hook strips shall extend past metal studs or building joints and shall be securely sealed from air

entry.

3.12 WALKWAY INSTALLATION

A. Sarnatred Walkway: Apply a continuous coat of Stabond adhesive to the deck sheet and the

back of Walkway in accordance with Sika Sarnafil’s or architect approved equal) Technical

requirements and press Walkway into place with a water-filled, foam-covered roller. Hot-air weld

the entire perimeter of the Walkway to the field membrane.

3.13 TEMPORARY CUT-OFF

A. Flashings shall be installed concurrently with the roof membrane in order to maintain a watertight

condition as the work progresses:

1. Temporary waterstops shall be constructed to provide a 100% watertight seal.

2. Stagger of the insulation joints shall be made even by installing partial panels of

insulation.

3. New membrane shall be carried into the waterstop sealant.

4. Waterstop shall be sealed to the deck and/or substrate so that water will not be allowed to

travel under the new or existing roofing.

5. When work resumes, the contaminated membrane shall be cut out.

6. Sealant, contaminated membrane, insulation fillers, etc. shall be removed from work area

and properly disposed of offsite. These materials shall not be used in new work.

B. If inclement weather occurs while temporary waterstop is in place, Applicator shall provide the

labor necessary to monitor the situation to maintain a watertight condition.

C. If water is allowed to enter under the newly-completed roofing, the affected area shall be removed

and replaced at the Applicator's expense.

3.14 FIELD QUALITY CONTROL

A. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect

roofing installation on completion and submit report to Owner’s Representative.

B Repair or remove and replace components of membrane roofing system where test results or

inspections indicate that they do not comply with specified requirements.

3.15 PROTECTION AND CLEANING

Page 20: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA – DFAS BUILDING NO. 2 075419- Adhered Thermoplastic PVC Membrane Roofing

ADDENDUM #1

A. Protect membrane roofing system from damage and wear during remainder of construction

period. When remaining construction will not affect or endanger roofing, inspect roofing for

deterioration and damage, provide written report, with copies to the Owner’s Representative.

B. Correct deficiencies in or remove membrane roofing system that does not comply with

requirements, repair substrates, and repair or reinstall membrane roofing system to a condition

free of damage and deterioration at time of Contract Completion and according to warranty

requirements.

END OF SECTION

Page 21: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

SHEET OF SHEETS5

mark

DATE:

1600053.RAPROJECT NO:

DWG FILE:

DRAWN BY:

CHECKED BY:

DRAWING SCALE:

1177 Idaho Street, Suite 200Redlands, CA 92374

Phone: (909) 335-7400Fax: (909) [email protected]

owner approval

dateinitials phase

revisions/addenda

date comment

IV

DA

D

FA

S B

UIL

DIN

G N

o. 2

- R

OO

FIN

G A

ND

M

EC

HA

NIC

AL

S

CR

EE

N

PA

IN

TIN

G, A

LT

ER

NA

TE

F

OR

W

IN

DO

W R

EP

LA

CE

ME

NT

ED

A G

RA

NT

N

O. 0

7-4

9-0

65

72

1111 E

AS

T M

ILL S

TR

EE

T

SA

N B

ER

NA

RD

IN

O, C

A 92408

IN

LA

ND

V

AL

LE

Y D

EV

EL

OP

ME

NT

A

GE

NC

Y

1601 E

AS

T T

HIR

D S

TR

EE

T, S

UIT

E 100

SA

N B

ER

NA

RD

IN

O, C

A 92408

project information

A-103.DWG

GWM

1/06/2017

sheet name

sheet number

D

E

A

R

T

S

L

C

I

N

E

A

T

S

C

T

E

C

H

T

I

LC

F

A

O

R

I

N

A

I

F

O

E

GARY W.

MILLER

No. C14635

REN. 9-30-17

A-103

DP

3/32" = 1'-0"

ROOF PLAN

3

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
ROOF PLAN
AutoCAD SHX Text
3/32" = 1'-0"
AutoCAD SHX Text
KEY NOTES:
AutoCAD SHX Text
X
AutoCAD SHX Text
1.BUILT-UP ROOF OVER TAPERED INSULATION (MINIMUM 1/8" PER FOOT SLOPE). BUILT-UP ROOF OVER TAPERED INSULATION (MINIMUM 1/8" PER FOOT SLOPE). 2.EXISTING ROOF DRAIN - SEE DETAIL 5/A-501 EXISTING ROOF DRAIN - SEE DETAIL 5/A-501 3.EXISTING PENTHOUSE TO BE PAINTED AND THE ROOF TO BE REPLACED EXISTING PENTHOUSE TO BE PAINTED AND THE ROOF TO BE REPLACED 4.EXISTING MECHANICAL ENCLOSURE - PAINT EXISTING MECHANICAL ENCLOSURE - PAINT 5.EXISTING SHEET METAL PLENUMS (TOTAL 4) SHALL BE REMOVED AND ANY ROOF PENETRATIONS EXISTING SHEET METAL PLENUMS (TOTAL 4) SHALL BE REMOVED AND ANY ROOF PENETRATIONS SHALL BE FILLED WITH 2X6 FRAMING AND CAPPED WITH NEW SHEET METAL, ALL PIPING SHALL BE REMOVED. PROVIDE RIM JOISTS INSIDE PERIMETER OF EACH PENETRATION ATTACH USING " 14" POWDER DRIVEN FASTENERS @ 16" O.C. FIELD FRAMING SHALL ATTACH TO PERIMETER RIM JOINTS WITH SIMPSON A34 ANGLE @ EA. END. ALL FAN SQUIRREL CAGES SHALL BE REMOVED. 6.THE MISSING CORRUGATED METAL PANELS ON THE WEST SIDE SHALL NOT BE REPAIRED AS THE MISSING CORRUGATED METAL PANELS ON THE WEST SIDE SHALL NOT BE REPAIRED AS PART OF THIS CONTRACT. 7.ALL EXISTING SHEET METAL CAPS, SHALL BE EXTENDED TO AT LEAST 8” ABOVE FINISHED ALL EXISTING SHEET METAL CAPS, SHALL BE EXTENDED TO AT LEAST 8” ABOVE FINISHED ABOVE FINISHED ROOFING AND SHALL BE CAPPED WITH NEW 24-GAUGE GALVANIZED SHEET METAL. 8.FLASH AT MECHANICAL ROOMS FLASH AT MECHANICAL ROOMS 9.SAW CUT AND REMOVE CONC. EQUIPMENT CURBS. FLAT (E) CONC. PADS THAT WILL BE SAW CUT AND REMOVE CONC. EQUIPMENT CURBS. FLAT (E) CONC. PADS THAT WILL BE COVERED BY NEW INSULATION MAY REMAIN.
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
3
AutoCAD SHX Text
A-501
AutoCAD SHX Text
3
AutoCAD SHX Text
A-501
AutoCAD SHX Text
3
AutoCAD SHX Text
A-501
AutoCAD SHX Text
3
AutoCAD SHX Text
A-501
AutoCAD SHX Text
4
AutoCAD SHX Text
A-501
AutoCAD SHX Text
6
AutoCAD SHX Text
A-501
AutoCAD SHX Text
HIGH
AutoCAD SHX Text
LOW
AutoCAD SHX Text
4
AutoCAD SHX Text
A-501
AutoCAD SHX Text
6
AutoCAD SHX Text
A-501
AutoCAD SHX Text
HIGH
AutoCAD SHX Text
LOW
AutoCAD SHX Text
1
AutoCAD SHX Text
A-501
AutoCAD SHX Text
TYPICAL AT MECHANICAL ENCLOSURE SUPPORTS.
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/8" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/8" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/8" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
TAPERED INSULATION SLOPE 1/8" PER FOOT (TYP.)
AutoCAD SHX Text
TAPERED INSULATION SLOPE 1/8" PER FOOT (TYP.)
AutoCAD SHX Text
TAPERED INSULATION SLOPE 1/4" PER FOOT (TYP.)
AutoCAD SHX Text
TAPERED INSULATION SLOPE 1/4" PER FOOT (TYP.)
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
1/4" / 1'-0"
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
SEE DETAIL 2/A-501 FOR TYPICAL VENT PIPE PENETRATION DETAIL.
AutoCAD SHX Text
1.
AutoCAD SHX Text
STUCCO ENCLOSED MECHANICAL ROOM WILL REMAIN BUT THE ROOF WILL BE REPLACED.
AutoCAD SHX Text
2.
AutoCAD SHX Text
ANY ROOF PENETRATIONS THAT ARE NOT UNDERNEATH THE ELEVATION OF THE TAPERED INSULATION MUST BE REPLACED WITH NEW PROPERLY FLASHED CAPS. IF THE ROOF PENETRATION IS UNDERNEATH THE TAPERED INSULATION, THEN THE OPENING MUST BE COVERED WITH 2 x 4 FRAMING AT 16” ON CENTER PLYWOOD, ONE LAYER OF GYPSUM BOARD TO BRING ON CENTER PLYWOOD, ONE LAYER OF GYPSUM BOARD TO BRING IT FLUSH WITH THE DECK, THEN COVERED WITH INSULATION TO ALIGN WITH ROOFING INSULATION.
AutoCAD SHX Text
3.
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4.
AutoCAD SHX Text
THE ANTENNA SHALL BE REMOVED.
AutoCAD SHX Text
5.
AutoCAD SHX Text
EXTENT VENT PIPES TO A MIN. OF 12" ABOVE NEW ROOF.
AutoCAD SHX Text
[ATTACHMENT #4]
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
C
AutoCAD SHX Text
1
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
00/00/00
AutoCAD SHX Text
--
AutoCAD SHX Text
00/00/00
AutoCAD SHX Text
--
AutoCAD SHX Text
DRAWING NAME: Z:\PROJECTS\2016 PROJECTS\IVDA ROOF & GLAZING 1600053.RA\DRAWINGS\CONSTRUCTION DOCUMENTS\A-103.DWG | PLOT DATE: 1/6/2017 3:13 PM | PLOTTED BY: CHRISTOS HARDT | COPYRIGHT 2016 MILLER ARCHITECTURAL CORPORATION ALL RIGHTS RESERVEDZ:\PROJECTS\2016 PROJECTS\IVDA ROOF & GLAZING 1600053.RA\DRAWINGS\CONSTRUCTION DOCUMENTS\A-103.DWG | PLOT DATE: 1/6/2017 3:13 PM | PLOTTED BY: CHRISTOS HARDT | COPYRIGHT 2016 MILLER ARCHITECTURAL CORPORATION ALL RIGHTS RESERVED | PLOT DATE: 1/6/2017 3:13 PM | PLOTTED BY: CHRISTOS HARDT | COPYRIGHT 2016 MILLER ARCHITECTURAL CORPORATION ALL RIGHTS RESERVED1/6/2017 3:13 PM | PLOTTED BY: CHRISTOS HARDT | COPYRIGHT 2016 MILLER ARCHITECTURAL CORPORATION ALL RIGHTS RESERVED | PLOTTED BY: CHRISTOS HARDT | COPYRIGHT 2016 MILLER ARCHITECTURAL CORPORATION ALL RIGHTS RESERVEDCHRISTOS HARDT | COPYRIGHT 2016 MILLER ARCHITECTURAL CORPORATION ALL RIGHTS RESERVED | COPYRIGHT 2016 MILLER ARCHITECTURAL CORPORATION ALL RIGHTS RESERVED
Page 22: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

ADDENDUM 1 ATTACHMENT 5

DETAIL 1

Disconnect, raise and reinstall bottom

horizontal channel with to provide a

minimum of 2” clearance between

bottom of channel and new roofing level.

Provide new pitch pockets for BUR

roofing or if PVC roof alternate is used

provide flashing per Mfr’s standard detail.

Trim bottom of corrugated metal siding to

match the bottom of the raised channel

and reattach to the channel

Page 23: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

ADDENDUM 1 ATTACHMENT 5

DETAILS 2 & 3

Remove all pipe within the mechanical enclosure

Extend existing water pipes so connection is at least

12” above finished level of roofing and provide new

valve.

Raise sill at two mechanical rooms to clear adjacent

roofing by a minimum of 4” and flash per Mfr’s

published details.

Page 24: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

ADDENDUM 1 ATTACHMENT 5

TYPICAL ROOF PLENUMS TO BE REMOVED

Page 25: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp
dking
Text Box
Final -October 14, 2013
gary
Text Box
ADDENDUM 1 ATTACHMENT 6 PAGE 1
Page 26: ADDENDUM NO. 1 DATE: 01/08/17 IVDA DFAS Building 2 ......ADDENDUM NO. 1 DATE: 01/08/17 RE: IVDA DFAS Building 2, Roofing EDA Grant No. 07-49-06572 FROM: MILLER Architectural Corp

IVDA Building # 2 Building Assessment  Addendum # 1 to Assessment and Recommendations Report 

 

Vanir Construction Management, Inc.  October 15, 2013  Page 1 of 1 

 

Addendum No 1.  This Addendum is written to update the Assessment and Recommendations Report date July 25, 2012. It serves to summarize decisions and actions subsequent to and in response to the Report. 

a. Summary 

The Assessment and Recommendations Report was presented to IVDA staff in Late July, 2012. The Report and much of its recommendations were accepted by the Agency with a request that the Report be considered as a “draft” until specific recommendations in the Report could be implemented. 

In general, the Assessment and Recommendations Report was accepted, and a series of Next Steps (Report Section V.) was authorized and implemented.    

The following is the status of the five Next Steps discussed in the Report.  

1. Suspended Ceilings: The recommendations to remove all existing suspended ceilings prior to further work was accepted and accomplished. 

2. Structural Testing: The recommendations for limited structural testing were generally agreed as necessary but not authorized due to funding limitations. 

The limited structural is again recommended and includes: 

a) Selective coring and shear testing of existing shear walls. b) Excavation of selected shear wall foundations. c) Geotechnical borings to confirm soils types and capacities. 

This work is still recommended and should be done prior to further structural design.    

3. Demolition Documents: The recommendation was accepted. Vanir was authorized and contracted to develop demolition plans and specifications. Those were accomplished and issued for bid as:  

DFAS Bldg #2 Abatement and Demolition Project EDA Grant # 07‐49‐06572 

January 31, 2013 

The work of demolition and abatement has been completed in accordance with those documents. 

4. Core and Shell Design: The recommendations for developing design and construction documents for the core and shell improvements recommended in the Report was generally agreed as necessary but not authorized due to funding limitations. 

The Agency has issued an RFP describing the design approach recommended in the Report and is currently in the process of selecting a qualified firm for these services.     

5. Bidding and Construction: This recommendation indicated the flexibility of various project delivery methods for consideration. This recommendation will be considered as a part of, and when item 4. above is authorized. Additional hazardous abatement may be required depending on the final design recommendations.  

 

End of Addendum 