01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 1 OF 6 October 2010 Addendum 2 Sampling and Analysis Plan North Cavalcade Street Superfund Site Remedial Action Houston, Harris County, Texas Prepared October 25, 2010 The purpose of this addendum to the North Cavalcade Street Superfund Site Remedial Action Sampling and Analysis Plan is to incorporate in situ swell sampling in and around the southeast and northwest source areas. The objective of the in situ swell sampling is to confirm the concentrations of listed waste constituents (waste codes K001 and F034) meet land disposal requirements (LDRs). Samples shall be collected in each source area grid as established for the contained in determination in August, 2010. Swell samples shall also be collected from adjacent trenches. Two samples shall be collected from Grids 3 and 4 as these grids contain both hazardous and non-hazardous swell. Swell samples shall consist of a 5-point composite sample. Grid locations and sample points are shown in Figures 1 & 2. This document is to be used in concert with the Sampling and Analysis Plan for the site. The following paragraphs describe specific drilling and sampling and analysis procedures to be followed for this task. Sampling Procedures The following paragraphs describe the drilling methods to be used and the generation of soil boring logs. Sampling Procedures and Analyses A total of up to 12 swell samples will be collected for chemical analysis and submitted to an offsite subcontract laboratory. Composite samples will be collected for semi-volatile organic compounds (SVOCs), and TCLP metals (Pb, As, Cr). Composite samples shall consist of five hand auger borings. Each hand auger boring shall consist of three sample aliquots collected at 002133

Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 1 OF 6 October 2010

Addendum 2 Sampling and Analysis Plan North Cavalcade Street Superfund Site Remedial Action Houston, Harris County, Texas

Prepared October 25, 2010

The purpose of this addendum to the North Cavalcade Street Superfund Site Remedial Action

Sampling and Analysis Plan is to incorporate in situ swell sampling in and around the

southeast and northwest source areas. The objective of the in situ swell sampling is to confirm

the concentrations of listed waste constituents (waste codes K001 and F034) meet land disposal

requirements (LDRs).

Samples shall be collected in each source area grid as established for the contained in

determination in August, 2010. Swell samples shall also be collected from adjacent trenches.

Two samples shall be collected from Grids 3 and 4 as these grids contain both hazardous and

non-hazardous swell. Swell samples shall consist of a 5-point composite sample. Grid locations

and sample points are shown in Figures 1 & 2.

This document is to be used in concert with the Sampling and Analysis Plan for the site. The

following paragraphs describe specific drilling and sampling and analysis procedures to be

followed for this task.

Sampling Procedures The following paragraphs describe the drilling methods to be used and the generation of soil

boring logs.

Sampling Procedures and Analyses A total of up to 12 swell samples will be collected for chemical analysis and submitted to an

offsite subcontract laboratory. Composite samples will be collected for semi-volatile organic

compounds (SVOCs), and TCLP metals (Pb, As, Cr). Composite samples shall consist of five

hand auger borings. Each hand auger boring shall consist of three sample aliquots collected at

002133

Page 2: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

NORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1

VERSION 1.0

01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October 2010

0, 1 and 2 feet below ground surface. Sample aliquots will be collected into a stainless steel

bowl, homogenized using a stainless steel spoon, and transferred into sample containers for

SVOC and TCLP metals analysis.

En Core® samplers shall be used to collect one grab sample from the center of each grid or

trench. The use of En Core® samplers shall be in accordance with manufacturer’s instructions

contained in Attachment A.

The subcontracted analytical laboratory will provide all sample containers and will perform the

analyses on the soil samples. The containers will be cleaned in accordance with EPA protocol.

Immediately upon sample collection, the sample containers will be properly labeled then placed

into ice-cooled chests for shipment to the laboratory. Sample preservation requirements,

holding times, and required sample container types are presented in Table 1.

Sample Identification Samples will be labeled using the following convention:

SWELL-NonHaz-MMDDYY-##

Or

SWELL-Haz-MMDDYY-##

Where

NonHaz or Haz represents the classification of the grid or trench sampled.

MMDDYY – stands for the month, day, and year of sample collection.

## - is the sequential number of the sample collected.

Decontamination Procedures The hand auger, stainless steel bowls, spoons, and other associated sampling equipment will be

decontaminated prior to use, after each grid or trench, and prior to leaving the site. Disposable

sampling equipment is not to be reused or decontaminated. Disposable equipment will be

discarded after use. Decontamination will involve scrubbing the equipment with a solution

potable water and Alconox, or equivalent, followed by a distilled and DI water rinse. All

002134

Page 3: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

NORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1

VERSION 1.0

01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 3 OF 6 October 2010

equipment will be allowed to air dry prior to reuse. Sampling tools that will not be used

immediately after decontamination will be placed in sealable plastic bags or wrapped in

aluminum foil for temporary storage.

002135

Page 4: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

NORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1

VERSION 1.0

01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 4 OF 6 October 2010

(This page intentionally left blank.)

002136

Page 5: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

SOUTHEAST SOURCE AREA

MW ES-)

•• MW 1\ ES-1

C~ LL

TRACT 2 667 ACRES

MAR. -)

D. EIC L CASTI

MW

MW F4 1 •

REC. WE L

RR SIGN "230 "

002137

dhernand
Callout
GRID 1 will be treated as Hazardous Waste. Already sampled.
dhernand
Callout
GRID 2 will be treated as Hazardous Waste
dhernand
Callout
East GRID 3 will be treated as Hazardous Waste
dhernand
Callout
East GRID 4 will be treated as Hazardous Waste
dhernand
Callout
GRID 5 will be treated as Hazardous waste
dhernand
Callout
GRID 6 will be treated as Non-Hazardous Waste
dhernand
Callout
GRID 7 will be treated as Non-Hazardous Waste
ctoburen
Polygonal Line
dhernand
Callout
West GRID 4 will be treated as Non-Hazardous Waste
dhernand
Callout
West GRID 3 will be treated as Non-Hazardous Waste
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Polygonal Line
dhernand
Callout
Southern Trench will be treated as Hazardous Waste.
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
mohare
Text Box
Figure 1 FSP Addendum 2 North Cavalcade Street Superfund Site Remedial Action
Page 6: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

L-J ) 811-1 89- \ ~~.~f-~~-p-p---~~M--'-:'W-:-:.~--L----r\ TRACT :3 978 ACRES ) MAR. 22,

89-1 P-\1\ MW ~ REC-. ~ III MW Z \

1 9@2) 1 -2 WELL -- 05 CONC.

D. EICHEN PAD

\L CASTING BOX 16105

rON, TX. 772 '. 011-70-1 ~4

REC. ~WELL

N

C) 0 20 40 60

~ I

1"=20'

EXISTING WATER

MW 010-1

~W 6] 010-2 CO

: WMBO

MW 09-5 •

REC'\jj WELL

MW C9-3 •

y-J ~EC. -b. ~ELL . Ul --'

\ \ \

\

• • • • • • • • • • • • • • • • PP \ • • • • • • • • • ~ \

• • • I \

PR \ I \ I •

\ \ I \

\ I I

\

~

o « o cr

CP#70 S/8"CIRS .A

." l ORM DRAIN

\ NORTHWEST SOURCE AREA

----- -----_ .. - -- _ .. _ .. _ .. _.. .._ .. _.. .-_.----------------------------------

• MW Q1

MW MW -2 •• E6-1

RE WE

EXISTI G ;~==~=~~::.:;--~---~--~ :-~-------------------- --- ---- -----------------A TT TEOECO t""J E C . \

::_:2~nw~s:ou~m:e-:39:5:52:0.~dg~n:J~====W==E=L=L======::==~--~~~~::~~~~~==~~~ ________ j\~Ll~~~~~~g~fv~T:~L~~AE~~~J::S~~~~~U~~~~~ \ HOUSTON. TEXAS

\ / CH2MHILL

002138

ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Line
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
ctoburen
Oval
dhernand
Text Box
Both GRIDs 8 and 9 will be treated as Hazardous Waste
ctoburen
Callout
GRID 8
ctoburen
Callout
GRID 9
mohare
Text Box
Figure 2 FSP Addendum 2 North Cavalcade Street Superfund Site Remedial Action
Page 7: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

Table 1Analytical Parameters for Swell SamplesNorth Cavalcade Superfund Site Remedial ActionHouston, Harris County, Texas

Analysis MethodTurnaround Time

(working days)Preservation/

Storage Container

TCLP Metals (Pb, As, Cr) SW-845 1311 1 4º Celsius (2) 4oz jarVOCs SW-846 8260B 1 4º Celsius (3) Encore SamplerSVOCs SW-846 8270C 1 4º Celsius (2) 4oz jar

oz = ounceNotes:

Soil Samples

03_NCRA_FSP_Addendum2_Table1_AnalyticalParameters.xlsx Page 1 of 1 October 2010

002139

Page 8: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

NORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1

VERSION 1.0

01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX October 2010

(This page intentionally left blank.)

002140

Page 9: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

Attachment A Sampler Equipment Standard Operating Procedure

002141

Page 10: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

NORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1

VERSION 1.0

01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX October 2010

(This page intentionally left blank.)

002142

Page 11: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

Sampling Procedures

Using TheEn Core® T-Handle

En Novative Technologies, Inc.1795 Industrial DriveGreen Bay, WI 54302

Phone: 920-465-3960 • Fax: 920-465-3963Toll Free: 888-411-0757

www.ennovativetech.com

NOTE:

1. En Core® Sampler is a SINGLE USE device. It cannot becleaned and/or reused.

2. En Core® Sampler is designed to store soil. Do not use EnCore Sampler to store solvent or free product!

3. En Core® Sampler must be used with En Core® T-Handleand/or En Core® Extrusion Tool exclusively. (These items aresold separately.)

4. Cap coring body while it is still on T-handle. Push cap over flatarea of ridge and twist to lock cap in place. CAP MUST BE SEATEDTO SEAL SAMPLER (see diagram).

PREPARING SAMPLER FOR SHIPMENT:5. Remove the capped Sampler by depressing locking lever onT-Handle while twisting and pulling Sampler from T-Handle.

6. Lock plunger by rotating extended plunger rod fully counter-clockwise until wings rest firmly against tabs (see plunger diagram).

7. Attach completed tear-off label (from En Core Sampler bag) tocap on coring body.

8. Return full En Core Sampler to zipper bag. Seal bag and put onice.

BEFORE TAKING SAMPLE:1. Hold coring body and push plunger rod down until small o-ringrests against tabs. This will assure that plunger moves freely.

2. Depress locking lever on En Core T-Handle. Place coring body,plunger end first, into open end of T-Handle, aligning the (2) slotson the coring body with the (2) locking pins in the T-Handle. Twistcoring body clockwise to lock pins in slots. Check to ensure Sampleris locked in place. Sampler is ready for use.

TAKING SAMPLE:3. Turn T-Handle with T-up and coring body down. This positionsplunger bottom flush with bottom of coring body (ensure thatplunger bottom is in position). Using T-Handle, push Sampler intosoil until coring body is completely full. When full, small o-ring willbe centered in T-Handle viewing hole. Remove Sampler from soil.Wipe excess soil from coring body exterior.

En Core® En Core® T-Handle Sampler Correctly Capped(Locking arm grooves seated over coring body ridge.)

Sampler Incorrectly Capped(Cap appears crooked; locking arm grooves not

fully seated over coring body ridge.)

Top

Bottom

002143

Page 12: Addendum 2 Sampling and Analysis PlanNORTH CAVALCADE STREET SUPERFUND SITE FIELD SAMPLING PLAN ADDENDUM 1 VERSION 1.0 01_NCRA_FSP_ADDENDUM2_TEXT_2010-1025.DOCX PAGE 2 OF 6 October

IMPORTANT: FAILURE TO USE THE EN CORE® SAMPLER IN COMPLIANCE WITHTHE WRITTEN INSTRUCTIONS PROVIDED HEREIN VOIDS ALL EXPRESS ANDIMPLIED WARRANTIES, INCLUDING WARRANTY OF MERCHANTABILITY AND FIT-NESS FOR A PARTICULAR PURPOSE.PRINCIPLE OF USE. The En Core Sampler Cartridge System is a volumetric

sampling system designed to collect, store and deliver a soil sample. The EnCore Sampler comes in two sizes for sample volumes of approximately 25 or 5grams. There are four components: the cartridge with a movable plunger; acap with two locking arms; a T-handle (purchased separately); and an extru-sion handle (purchased separately). NOTE: The En Core Sampler is designed tostore soil. It is not designed to store solvent or free product.The soil is stored in a sealed headspace-free state. The seals are achieved by

three special Viton® * o-rings, two located on the plunger and one on the capof the Sampler. At no time and under no condition should these o-rings beremoved or disturbed.QUALITY CONTROL. The cartridge is sealed in an airtight package to pre-

vent contamination prior to use. Due to the stringent quality control require-ments associated with the use of this system, the disposable cartridge isdesigned to be used only once.WARRANTY. En Novative Technologies, Inc. ("En Novative Technologies")

warrants that the En Core Sampler shall perform consistent with the researchconducted under En Novative Technologies' approval, within thirty (30) daysfrom the date of delivery, provided that the Customer gives En NovativeTechnologies prompt notice of any defect or failure to perform and satisfacto-ry proof thereof. THIS WARRANTY DOES NOT APPLY TO THE FOLLOWING, ASSOLELY DETERMINED BY EN NOVATIVE TECHNOLOGIES: (a) Damage caused byaccident, abuse, mishandling or dropping; (b)Samplers that have beenopened, taken apart or mishandled; (c)Samplers not used in accordance withthe directions; and (d)Damages exceeding the cost of the sampler. Seller war-rants that all En Core Samplers shall be free from defects in title. THE FORE-GOING WARRANTIES ARE IN LIEU OF ALL OTHER WARRANTIES, WHETHER ORAL,WRITTEN, EXPRESSED, IMPLIED OR STATUTORY, INCLUDING ANY INFORMATIONPROVIDED BY SALES REPRESENTATIVES OR IN MARKETING LITERATURE. IMPLIEDWARRANTIES OF FITNESS AND MERCHANTABILITY SHALL NOT APPLY. EnNovative Technologies' warranty obligations and Customer's remedies, exceptas to title, are solely and exclusively as stated herein.LIMITATION OF LIABILITY. IN NO EVENT SHALL EN NOVATIVE TECHNOLOGIES

BE LIABLE FOR ANTICIPATED PROFITS, INCIDENTAL, SPECIAL OR CONSEQUEN-TIAL DAMAGES, INCLUDING, BUT NOT LIMITED TO, DAMAGES FOR LOSS OF REV-ENUE, DOWN TIME, REMEDIATION ACTIVITIES, REMOBILIZATION OR RESAM-PLING, COST OF CAPITAL, SERVICE INTERRUPTION OR FAILURE OF SUPPLY, LIA-BILITY OF CUSTOMER TO A THIRD PARTY, OR FOR LABOR, OVERHEAD, TRANS-PORTATION, SUBSTITUTE SUPPLY SOURCES OR ANY OTHER EXPENSE, DAMAGE ORLOSS, INCLUDING PERSONAL INJURY OR PROPERTY DAMAGE. En NovativeTechnologies' liability on any claim of any kind shall be replacement of the EnCore Sampler or refund of the purchase price. En Novative Technologies shallnot be liable for penalties of any description whatsoever. In the event the EnCore Sampler will be utilized by Customer on behalf of a third party, suchthird party shall not occupy the position of a third-party beneficiary of theobligation or warranty provided by En Novative Technologies, and no suchthird party shall have the right to enforce same. All claims must be broughtwithin one (1) year of shipment, regardless of their nature.

EXTRUSION PROCEDURES

USING THE EXTRUSION TOOL

CAUTION! Always use the Extrusion Tool to extrude soil from the En Core Sampler. If the ExtrusionTool is not used, the Sampler may fragment, causing injury.

1. To attach En Core Sampler to En Core Extrusion Tool: Depress lock-ing lever on Extrusion Tool and place Sampler, plunger end first, intoopen end of Extrusion Tool, aligning slots on coring body with pins inExtrusion Tool. Turn coring body clockwise until it locks into place.Release locking lever.

2. Rotate and gently push Extrusion Tool plunger knob clockwise untilplunger slides over wings of coring body. (When properly positionedplunger will not rotate further.)

3. Hold Extrusion Tool with capped Sampler pointed upward so soildoes not fall out when cap is removed. Remove cap from Sampler byrotating cap until locking arms are aligned with the flat area of ridgeand pull cap off. To release soil core push down on plunger knob ofEn Core Extrusion Tool. Remove and properly dispose of En CoreSampler.

Warranty and Disclaimers

* Viton® is a registered trademark of DuPont Dow Elastomers.

En Novative Technologies, Inc.1795 Industrial DriveGreen Bay, WI 54302

Phone: 920-465-3960 • Fax: 920-465-3963Toll Free: 888-411-0757

www.ennovativetech.com