8
ADDENDUM #1 PROJECT: April 23, 2019 Virginia Polytechnic Institute & State University Drone Park Poles Electrical Receptacles IFB# 0058171 Blacksburg, Virginia 24061 Changes and Clarifications - General See the attached Pre-Bid Sign-in sheet from the non-mandatory Pre-Bid Meeting held at the project site on Wednesday, 10 April 2019, at 2:00 pm local time. Changes and Clarifications - Drawings SHEET C5.01, TEMPORARY CONSTRUCTION FENCE DETAIL ADDITION A detail was added for the temporary construction fence (CF). A REVISED SHEET C5.01 HAS BEEN ATTACHED TO THIS ADDENDUM #1. Changes and Clarifications – Bid Form Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions and descriptions remain the same. The bid closing date remains 3 May 2019 at 2:00 PM; the bid opening date remains 6 May 2019 at 2:00 PM. This addendum will be posted on VT Procurement website at www.procurement.vt.edu.

ADDENDUM #1 · Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions

  • Upload
    others

  • View
    18

  • Download
    1

Embed Size (px)

Citation preview

Page 1: ADDENDUM #1 · Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions

ADDENDUM #1

PROJECT:

April 23, 2019

Virginia Polytechnic Institute & State University Drone Park Poles Electrical Receptacles IFB# 0058171Blacksburg, Virginia 24061

Changes and Clarifications - General

See the attached Pre-Bid Sign-in sheet from the non-mandatory Pre-Bid Meeting held at the project site on Wednesday, 10 April 2019, at 2:00 pm local time.

Changes and Clarifications - Drawings

SHEET C5.01, TEMPORARY CONSTRUCTION FENCE DETAIL ADDITIONA detail was added for the temporary construction fence (CF). A REVISED SHEET C5.01 HAS BEEN ATTACHED TO THIS ADDENDUM #1.

Changes and Clarifications – Bid Form

Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work.

All other terms, conditions and descriptions remain the same. The bid closing date remains 3 May 2019 at 2:00 PM; the bid opening date remains 6 May 2019 at 2:00 PM. This addendum will be posted on VT Procurement website at www.procurement.vt.edu.

Page 2: ADDENDUM #1 · Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions
Page 3: ADDENDUM #1 · Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions
Page 4: ADDENDUM #1 · Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions

321

C

B

A

SEAL

SCALE:

4

D

E

5

APPROVED BY

CHECKED BY

REVISIONS

TITLE

DRAWN BY

DATE

SHEET NO.

DEI PROJECT NO: 50106352

SEPTEMBER 4, 2018

Dewberry Engineers Inc.9300 Harris Corners Pkwy - Suite 220Charlotte, NC 28269Phone: 704.509.9918Fax: 704.509.9937www.dewberry.com

UN

MA

NN

ED

AE

RIA

L V

EH

ICLE

PA

RK

(EC

01)

ELE

CTR

ICA

L U

PG

RA

DE

S

100%

CO

NS

TRU

CTI

ON

DO

CU

ME

NTS

BLA

CK

SB

UR

G, V

IRG

INIA

RSN

RSN

C5.01

CIVIL DETAILS

ABT

·

·

·

·

··

VT SID APPROVAL

UBO APPROVAL

CULVERT INLET PROTECTION DETAIL

TRK04/12/20191 ADDENDUM 1

1

Page 5: ADDENDUM #1 · Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions

Standard Bid Form Format Page 1 of 4

DGS-30-220 Standard Bid Form Format(Rev. 04/15)

BID FORM

DATE: 3 May 2019

PROJECT: Drone Park Poles Electrical ReceptaclesVirginia Tech – Blacksburg, VA

IFB No.: R0058171 (G1423-18-334146)

To: Commonwealth of VirginiaVirginia Polytechnic & State UniversityProcurement Department, North End Center (033), Suite 2100300 Turner StreetBlacksburg, VA 24016ATTN: Reed Nagel

In compliance with and subject to your Invitation for Bids and the documents therein specified, all of which are incorporated herein by reference, the undersigned bidder proposes to furnish all labor, equipment, and materials and perform all work necessary for construction of this project, in accordance with the Plans and Specifications dated 19 October 2018, and the Addenda noted below, as prepared by Dewberry Engineers, Charlotte, North Carolina for the consideration of the following amount:

BASE BID (including the following parts but excluding work in Additive Bid Items):

Lump sum price for construction of the following in accordance with the Drawings and Specifications:

Nineteen (19) new electrical receptacles and infrastructure for one (1) new wireless communications access point. The wireless access point is to be furnished by Virginia Tech and installed by the Contractor. Work is to be accomplished in three (3) phases as shown on Drawing No. C3.00. Individual phases of the work are shown on Drawing Nos. C3.01, C3.02 and C3.03. Phase 1 shall be completed before Phase 2 is started, and Phase 2 shall be completed before Phase 3 is started. The Contractor shall erect and maintain all erosion and sediment control (E&SC) measures as indicated on the project Drawings and in the project Specifications. In the event of a conflict between the Drawings and the Specifications the Specifications shall govern. Prior to the commencement of Phase 1 construction activities, Contractor shall coordinate with Virginia Tech’s (VT’s) Facilities (Renovations) Department and Virginia Tech’s Site and Infrastructure Development (SID) Department to coordinate an inspection of the initially installed E&SC measures. No further E&SC measures shall be installed prior to the VT SID inspection. The Contractor shall protect all existing conditions at the Virginia Tech Drone Park as indicated on Drawing No. C2.01. Any existing conditions specifically not identified on Drawing C2.01 shall be protected as found before the start of construction at all times during construction. A 5’-0” x 5’-0” concrete pad with channel framing is to be installed by the Contractor (see Details on Drawing No. E0.01) for an existing equipment cabinet that will be furnished and installed by VT’s Network Infrastructure & Services (N&IS) Department. The Contractor is to coordinate this installation with VT Facilities and VT NI&S personnel.

TOTAL BASE BID AMOUNT IS:

_______________________________________________________ DOLLARS ($ )

Page 6: ADDENDUM #1 · Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions

Standard Bid Form Format Page 2 of 4

ADDITIVE BID ITEM 1: Lump sum pricing for the following:

Elimination of Phase 3 from the scope of work.

_______________________________________________________ DOLLARS ($ )

ADDITIVE BID ITEM 2: Lump sum price for the following:

In lieu of installing the underground electrical conduits outside of the periphery of the Drone Park’s netting, as indicated on the Drawings, install the conduits on the inside of the Drone Park’s netting, effectively using the netting as construction fencing.

_______________________________________________________ DOLLARS ($ )

Contract award will be based on the TOTAL BASE BID AMOUNT shown above (including any properly submitted bid modifications) plus as many Additive Bid Items taken in sequence as the Owner in its discretion decides to award.

The bidder has relied upon the following public historical climatological records:National Weather Service for Blacksburg, VA.

The undersigned understands that time is of the essence and agrees that the date for Substantial Completion of the entire project shall be on or before 3 June 2019 based on a Notice authorizing Work to proceed on or before 1 May 2019, and Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion as determined by the A/E.

Acknowledgment is made of receipt of the following Addenda:

.

If notice of acceptance of this bid is given to the undersigned within 30 days after the date of opening of bids, or any time thereafter before this bid is withdrawn, the undersigned will execute and deliver a contract in the prescribed form (Commonwealth of Virginia Contract Between Owner and Contractor, Form CO-9) within 10 days after the contract has been presented to him for signature. The required payment and performance bonds, on the forms prescribed, shall be delivered to the Owner along with the signed Contract.

Immigration Reform and Control Act of 1986: The undersigned certifies that it does not and shall not during the performance of the Contract for this project violate the provisions of the Federal Immigration Reform and Control Act of 1986, which prohibits employment of illegal aliens, or knowingly employ an unauthorized alien as defined in the Federal Immigration Reform and Control Act of 1986.

DISQUALIFICATION OF CONTRACTORS: By signing this bid or proposal, the undersigned certifies that this Bidder or any officer, director, partner or owner is not currently barred from bidding on contracts by any Agency of the Commonwealth of Virginia, or any public body or agency of another state, or any agency of the federal government, nor is this Bidder a subsidiary or affiliate of any firm/corporation that is currently barred from bidding on contracts by any of the same. We have attached an explanation of any previous disbarment(s) and copies of notice(s) of reinstatement(s).

Page 7: ADDENDUM #1 · Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions

Standard Bid Form Format Page 3 of 4

Either the undersigned or one of the following individuals, if any, is authorized to modify this bid prior to the deadline for receipt of bids by writing the modification and signing his name on the face of the bid, on the envelope in which it is enclosed, on a separate document, or on a document which is telefaxed to the Owner:

_________________________________________________________

_________________________________________________________

_________________________________________________________

I certify that the firm name given below is the true and complete name of the bidder and that the bidder is legally qualified and licensed by the Virginia Department of Professional and Occupational Regulation, Board for Contractors, to perform all Work included in the scope of the Contract.

Virginia License No.: ______________ Bidder: ______________________________(Name of Firm)

Contractor Class: ________________ By:___________________________________(Signature)

Specialty: _______________________ Valid until: ______________________

FEIN/SSN: _____________________ Title: _______________________________

If General Partnership (List Partners' Names)

_________________________________

_________________________________

_________________________________

_________________________________

Business Address:

____________________________________

____________________________________

____________________________________

____________________________________

Telephone # ________________________

FAX # _______________________________

If Corporation, affix Corporate Seal &list State of Incorporation

State: _____________________________

(Affix Seal)

Page 8: ADDENDUM #1 · Bid Additive No. 1 has been relabeled as Bid Additive Item 2. A new Bid Additive 1 has been added to eliminate Phase 3 from the scope of work. All other terms, conditions

Standard Bid Form Format Page 4 of 4

Virginia State Corporation Commission ID No.: _______________; or

If Contractor is a foreign business entity not required to be authorized to transact business in the Commonwealth under Titles 13.1 or 50 of the Code of Virginia, or as otherwise required by law, please provide an explanation as to why such entity is not required to be so authorized: ____________________ _____________________________________________________________________________________