dsdlaforce
Callout
Add as a third paragraph in the El Paso County Signature block: “In accordance with ECM Section 1.12, these construction documents will be valid for construction for a period of 2 years from the date signed by the El Paso County Engineer. If construction has not started within those 2 years, the plans will need to be resubmitted for approval, including payment of review fees at the Planning and Community Development Directors discretion.” Unresolved
Page 2: Add as a third paragraph in the El Paso County …...Add as a third paragraph in the El Paso County Signature block: “In accordance with ECM Section 1.12, these construction documents
Page 3: Add as a third paragraph in the El Paso County …...Add as a third paragraph in the El Paso County Signature block: “In accordance with ECM Section 1.12, these construction documents
dsdlaforce
Callout
Show/callout the additional protection noted in the response letter.
dsdlaforce
Callout
Per ECM Chapter 11 Section 11.3.3 A geotechnical analysis and report shall be prepared with recommendations for the foundation preparation and embankment construction. Therefore, add a note that this analysis/report shall be conducted and submitted to the County prior to Construction. Recommendations from the report shall be incorporated in the retaining wall and embankment design and construction.
Page 4: Add as a third paragraph in the El Paso County …...Add as a third paragraph in the El Paso County Signature block: “In accordance with ECM Section 1.12, these construction documents
dsdlaforce
Callout
Revise to reflect the retaining wall and additional protection along the pipe.
Page 5: Add as a third paragraph in the El Paso County …...Add as a third paragraph in the El Paso County Signature block: “In accordance with ECM Section 1.12, these construction documents

Markup Summary

Subject: CalloutPage Label: 1Lock: UnlockedAuthor: dsdlaforceDate: 11/7/2017 1:57:04 PM

Add as a third paragraph in the El PasoCounty Signature block:“In accordance with ECM Section 1.12,these construction documents will bevalid for construction for a period of 2years from the date signed by the El PasoCounty Engineer. If construction has notstarted within those 2 years, the plans willneed to be resubmitted for approval,including payment of review fees at thePlanning and Community DevelopmentDirectors discretion.”

Unresolved

Add as a third paragraph in the El Paso County Signature block: “In accordance with ECM Section 1.12, these construction documents will be valid for construction for a period of 2 years from the date signed by the El Paso County Engineer. If construction has not started within those 2 years, the plans will need to be resubmitted for approval, including payment of review fees at the Planning and Community Development Directors discretion.” Unresolved (1)

Subject: CalloutPage Label: 3Lock: UnlockedAuthor: dsdlaforceDate: 11/9/2017 3:29:57 PM

Per ECM Chapter 11 Section 11.3.3 Ageotechnical analysis and report shall beprepared with recommendations for thefoundation preparation and embankmentconstruction.Therefore, add a note that thisanalysis/report shall be conducted andsubmitted to the County prior toConstruction. Recommendations fromthe report shall be incorporated in theretaining wall and embankment designand construction.

Per ECM Chapter 11 Section 11.3.3 A geotechnical analysis and report shall be prepared with recommendations for the foundation preparation and embankment construction. Therefore, add a note that this analysis/report shall be conducted and submitted to the County prior to Construction. Recommendations from the report shall be incorporated in the retaining wall and embankment design and construction. (1)

Subject: CalloutPage Label: 4Lock: UnlockedAuthor: dsdlaforceDate: 11/7/2017 2:02:15 PM

Revise to reflect the retaining wall andadditional protection along the pipe.

Revise to reflect the retaining wall and additional protection along the pipe. (1)

Subject: CalloutPage Label: 3Lock: UnlockedAuthor: dsdlaforceDate: 11/7/2017 2:03:40 PM

Show/callout the additional protectionnoted in the response letter.

Show/callout the additional protection noted in the response letter. (1)

Add as a third paragraph in the El Paso County Signature block:“In accordance with ECM Section 1.12, these construction documents will be valid for construction for a period of2 years from the date signed by the El Paso County Engineer. If construction has not started within those 2 years,the plans will need to be resubmitted for approval, including payment of review fees at the Planning andCommunity Development Directors discretion.”

Unresolved

Per ECM Chapter 11 Section 11.3.3 A geotechnicalanalysis and report shall be prepared withrecommendations for the foundation preparation andembankment construction.Therefore, add a note that this analysis/report shallbe conducted and submitted to the County prior toConstruction. Recommendations from the reportshall be incorporated in the retaining wall andembankment design and construction.

Revise to reflectthe retaining walland additionalprotection alongthe pipe.

Show/callout the additional protectionnoted in the response letter.