Adam Bedard, CEOARB Midstream, LLC

Condensate from the Rockies Producing Region

October 29, 2015

Page 2: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Market Observations

• Lease condensate production from the Rockies (Williston, PRB, DJ) projected to grow by 84,000 b/d, from 266,000 b/d to 350,000 b/d, over the next five years

• 95% of that growth is from the DJ Basin

• Lease condensate production can be blended into the pipelines, but pipelines have specs that limit the % light ends

• However, excess takeaway capacity and batching make hitting any sort of “blend wall” difficult• Possibly a problem only in the DJ, depending on how concentrated the barrels area

• Rail can access the Canadian diluent market or Gulf Coast market (Splitters/Exports) and provide an uplift to distressed light barrels

• However current pipeline capacity is causing previously distressed barrels to receive a higher price, closing the arb.

• Rail provides Rockies’ producers with a coastal market, rather than only delivering a Cushing market

• Producers can get Brent-based pricing 2

Page 3: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

• Growth oriented, infrastructure development company focused on early stage, organicdevelopment projects and acquisitions in gas liquids, condensate, and crude oil

• Provide marketing and logistics services to producers and refiners

• Quantitative analytics drive development strategy• Current Projects/Marketing

• Marketing ~20,000 b/d• DJ Basin Energy Hub: Niobrara Connector (“NiCon”)• Midland Basin (Big Spring) Energy Hub: Gateway Project

ARB Midstream Overview

3

Page 4: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Organic Projects – Energy Rail Hubs

Permian GatewayNiobrara Connector• Located in Howard County• 350 acres• Pipe connection to new

gathering system• Drilling materials in bound,

liquids outbound

• Located in the heart of DJ• 230 Acres• Under construction• Drilling materials in bound,

liquids outbound

4

Page 5: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Rockies Drilling UpdateImpact of declining rig count outpaces influence of high grading and efficiencies

5

Page 6: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Rockies Rig Count Down from 265 to 96 (64%) YoY

0

50

100

150

200

250

300

Oct-14 Jan-15 Apr-15 Jul-15 Oct-15

Hz R

ig C

ount

Bakken PRB DJ-Niobrara 6

Page 7: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Bakken Rig Count Down By 113 rigs, nearly 2/3 YoY

-113-65%

Oct 2014175 Rigs

Oct 201562 Rigs

7

Page 8: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

PRB rigs down by 70% YoY

-23-70%

Oct 201433 Rigs

Oct 201510 Rigs

8

Page 9: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

DJ Basin Rig Count Holding Up Slightly Stronger, But Still Down 58%

33-58%

Oct 201457 Rigs

Oct 201524 Rigs

9

Page 10: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

-

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15

Hz R

ig E

ffici

ency

(wel

ls dr

illed

per

mon

th p

er ri

g)

Williston PRB DJ-Niobrara

Rigs Are Drilling 35% More Wells/Month Today Compared to a Year AgoDJ: 24 today = 37 a year ago Bakken: 62 today = 81 a year ago PRB: 10 today = 19 a year ago

10

Page 11: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Lease Condensate ProductionHow much condensate will be produced from the Bakken and Niobrara plays?

11

Page 12: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

20 25 30 35 40 45 50 55 60 65 70 75 80 85 90

Eagle Ford

SCOOP

Utica

Bakken

Miss Lime

DJ Basin

PRB

Canadian Condensate

Natural Gasoline

API Gravity

Condensate

PRB and Bakken Are Not a Significant Source of Condensate. DJ, Utica, SCOOP and EF are Major Sources

Source: DI Desktop12

Page 13: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Lease Condensate Makes up 15% of Rockies Total Production. Projected to Grow by 84,000 b/d over next 5 years (f/ 266 Mb/d up to 350 Mb/d)

-

500,000

1,000,000

1,500,000

2,000,000

2,500,000

Crud

e O

il an

d Le

ase

Cond

ensa

te P

rodu

ctio

n (b

/d)

Rockies (Bakken, PRB, DJ) Crude Oil and Lease Condensate Production vs Time

Heavy (<22°) Intermediate (>22° and <38°) Light (>38° and <45°) Condensate (>45°)

-

500,000

1,000,000

1,500,000

2,000,000

2,500,000

Crud

e O

il an

d Le

ase

Cond

ensa

te P

rodu

ctio

n (b

/d)

Rockies (Bakken, PRB, DJ) Crude Oil and Lease Condensate Production vs Time

Heavy (<22°) Intermediate (>22° and <38°) Light (>38° and <45°) Condensate (>45°)

Forecast

13

Page 14: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Condensate is Fastest Growing Quality Segment, Projected to Grow by 31% Over Next Five Years

37,294 102,188

1,313,333

266,398

40,625 123,139

1,452,937

349,828

-

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

Heavy (<22°) Intermediate (>22° and<38°)

Light (>38° and <45°) Condensate (>45°)

Crud

e O

il an

d Le

ase

Cond

ensa

te P

rodu

ctio

n (b

/d)

Dec. 2014 to Dec. 2019: Bakken, PRB, DJ

Dec-14

Dec-19

14

Page 15: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Bakken Production Drops By 180,000 b/d by Mid 2016, Rebounds Early 2018. Growth in Lease Condensate is Small at (8,000 b/d).

Source: DI Desktop

-

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

Crud

e O

il an

d Le

ase

Cond

ensa

te P

rodu

ctio

n (b

/d)

Williston Basin Production Forecast

Heavy (<22°) Intermediate (>22° and <38°) Light (>38° and <45°) Condensate (>45°) Source: ARB Analytics

Forecast

15

Page 16: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

-

20,000

40,000

60,000

80,000

100,000

120,000

140,000

Crud

e O

il an

d Le

ase

Cond

ensa

te P

rodu

ctio

n (b

/d)

PRB Production Forecast

Heavy (<22°) Intermediate (>22° and <38°) Light (>38° and <45°) Condensate (>45°)

PRB: Only 6,000 b/d condensate. Overall Production Shrinks Over Next five Years, Doesn’t Achieve 2014 levels

Source: ARB Analytics

Forecast

16

Page 17: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

Crud

e O

il an

d Le

ase

Cond

ensa

te P

rodu

ctio

n (b

/d)

DJ Basin Production Forecast

Heavy (<22°) Intermediate (>22° and <38°) Light (>38° and <45°) Condensate (>45°)

DJ: Condensate projected to grow by 78,000 b/d

Source: ARB Analytics

Forecast

17

Page 18: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

Unk

now

n<3

0 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 65+

Prod

uctio

n (b

pd)

API Gravity

DJ Production by API

Splitter Stabilizer/Diluent/Exports

Refining/Blending

End Market for DJ Light Barrel? Cushing by pipe, Rail (to splitter), Rail for Export, Rail to Canada

Source: DI Desktop, ARB Analytics

25% of DJ Production: API > 50

18

Page 19: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Takeaway Capacity, Blending, and Deducts

19

Page 20: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Take-or-Pay Commitments May Override Potential Uplift from Other End Markets

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

1,100,000

Prod

uctio

n &

Tak

eaw

ay C

apac

ity (b

/d)

DJ Supply/Demand By Type

Rail

Pipeline

Refinery

20

Page 21: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Likely to Be Enough Heavier DJ Barrels to Blend Off Lights and Meet Pipe Specs

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

API-3

1AP

I-32

API-3

3AP

I-34

API-3

5AP

I-36

API-3

7AP

I-38

API-3

9AP

I-40

API-4

1AP

I-42

API-4

3AP

I-44

API-4

5AP

I-46

API-4

7AP

I-48

API-4

9AP

I-50

API-5

1AP

I-52

API-5

3AP

I-54

API-5

5AP

I-56

API-5

7AP

I-58

API-5

9AP

I-60

API-6

1AP

I-62

API-6

3AP

I-64

API-6

5

Prod

uctio

n (b

/d)

DJ Basin: Production By API

White Cliffs SpecsPXP “NIO” Specs

Source: HPDI, FERC21

Page 22: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

End Markets

22

Page 23: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Where Should DJ Condensate Go?• Utilized Condensate

Pricing Model Developed by Univ. Bauer College of Business

• Provides Sum of Whole Value ex-Splitter

Source: Bauer College of Business, Argus23

Page 24: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Uplift from Splitting $3.57/bbl Today, Compared to $4.88 Two Years Ago

$4.88 $2.72 $3.57 $-

$20

$40

$60

$80

$100

$120

Jan-13 Jan-14 Jan-15

WTI, Brent, and “Split Products” – October 2013, 2014, 2015 – DJ 46API

WTI Brent Split Products Split Products - WTI

Oct - 13 Oct - 14 Oct - 15

Source: Bauer College of Business24

Page 25: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Options for a DJ Barrel (60 API)

• Pipeline to Cushing• DJ Lease Barrel: WTI-$5• Quality Deduct: -$6 (60 API)• Value at Lease: WTI-$11

• Rail to Canada as Diluent• Canadian condensate: WTI-$2

• Implies: If rail is less than $9/bbl, this works

• Rail to Gulf Coast for Splitting• Splitter Uplift: +$3/bbl

• Implies if rail + splitter fee is < $14/bbl, this works

25

Page 26: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

Market Observations

• Lease condensate production from the Rockies (Williston, PRB, DJ) projected to grow by 84,000 b/d, from 266,000 b/d to 350,000 b/d, over the next five years

• 95% of that growth is from the DJ Basin

• Lease condensate production can be blended into the pipelines, but pipelines have specs that limit the % light ends

• However, excess takeaway capacity and batching make hitting any sort of “blend wall” difficult• Possibly a problem only in the DJ, depending on how concentrated the barrels area

• Rail can access the Canadian diluent market or Gulf Coast market (Splitters/Exports) and provide an uplift to distressed light barrels

• However current pipeline capacity is causing previously distressed barrels to receive a higher price, closing the arb.

• Rail provides Rockies’ producers with a coastal market, rather than only delivering a Cushing market

• Producers can get Brent-based pricing 26

Page 27: Adam Bedard, CEO ARB Midstream, LLC · Condensate from the Rockies Producing Region October 29, 2015. ... ARB Midstream Overview 3. Organic Projects – Energy Rail Hubs ... Lease

EndAdam Bedard, CEOARB [email protected]

27