Real Challenges for Civil Engineers – No.02
Client requirement – Build up another floor on top of existing slab
Engineering challenge – Introduce starter bars for columns or walls
Conventional Method –
Break the existing beam to the extent of anchorage length of proposed column or wall reinforcement
Problems Encountered
1. Breaking of concrete slab and beam may weaken the structure2. Other structures may affect due to vibration while concrete breaking3. Minimum 4 days will be taken to complete the task4. Risk for the job5. High cost and time incurred at the end of the job
Existing Beam
Existing Slab
New column or wall
New Method introduced by the HILTI with the development of Technology
Drill holes to the existing concrete beam and fix reinforcement with HILTI RE 500 OR HILTI HY 150 bonding agent
Advantages
1. No concrete breaking is required2. No vibration hence no chance to develop cracks3. Maximum 1 day to complete the total task4. Low cost ( less than Rs.150/- to fix Y10 bar at nominal embedment depth )5. Application is so simple and no chance for mistakes – Zero human errors6. No risk for the job7. Pullout test will be done by HILTI Engineers before concreting to ensure the strength 8. All technical support will be given by HILTI Engineers
Method statement
1. Consult your structural Engineer for the design of column or wall reinforcement2. Calculate the stress to be developed in the reinforcement due to moment3. Call HILTI Engineer to get instruction for reinforcement fixing4. Drill holes to specified diameter and depth5. Clean holes with blow out pump provided6. Insert HILTI RE 500 OR HILTI HY 150 chemical with the use of dispenser
provided ( No hand mixing)7. Insert the reinforcement bars and keep 8 hrs for RE 500 OR 40 minutes for
HY 150 to cure8. Arrange reinforcement as usual9. Roughen the concrete surface and apply any bonding agent if necessary and do
the concreting as usual
Sample calculation
Assumptions : Concrete grade 25N/mm2 Existing column size 270 X 270 mm and clear cover 30mm Similar size column to be on top Moment develop at the support of new column M = 20 kNm
M = T * Z where T = ultimate tension develop in the reinforcement at the connection Z = lever arm = 0.775d = 0.775(270 – 30) = 186 mm T = M/Z = 20 / 0.186 = 107.5 kN ( for 2 bars of the column )
Check for concrete / bond failure
Assume 2Y16 to be introduced with HILTI RE 500 as bonding agent and embedment depth of 300mm
150mm
270mm
According to the HILTI specifications for embedment depth of 300mm
Tension capacity of 2Y16 bar with RE 500 = 2 X 43.7 x 300/150 x 1.00 x 0.8 = 139.8 > 107.5 kN
Hence application is satisfactory with Safety Factor of 139.8/107.5 = 1.3
Check for steel failure Ultimate tension capacity of 2y16 steel bars = 2 X 0.87 fyAs = 2 X 0.87 X 460 X 201 = 160.9 kN > 107.5 kN Satisfactory
Hole diameter = 22mm Hole depth = 300mm chemical consumption = 70 ml
Existing bars
New bars to introduce
Technical Assistance Neelanga Sooriyarachchi B.Sc. Eng (Hons);MBA; AMIE(SL) Engineering Service Manager0717712968
T.D.Wijitha KumaraB.Sc.Eng(Hons);CEng;MIE(SL);MSSE(SL);MBATechnical Manager0717772815
Office207, Nawala Road, NugegodaTe. 0114713352, 0114542320Fax. 0114723208Email. [email protected]
Product of Hilti Engineering Division
Hilti Sales Engineers / Sales Executives
Chandima Samarasinghe – Colombo AreaB.Sc. Eng ( Hons)Te. 0717579369
Lalith Chaminda – Colombo AreaB.Sc. Eng ( Elec) Te. 0718540846
Nadun Ranatunga – Colombo AreaSales ExecutiveTe. 0713733107
Sampath Bandara – Kurunegala, Kandy, Anuradapura, BatticaloaSales ExecutiveTe. 0713733106
Tuwan Burah – Southern, UvaSales ExecutiveTe. 0717124687