1
An Introduction toAcumen Fuse™
Dr Dan Patterson PMP, CEO Acumen
February 2010
Slide 2
Project analytics thought leader– Headquartered in Austin, TX– North America presence, global reseller network– Privately held, strong legacy within PPM space
Specialists in project analytics– Risk workshops: world leader– Project assessments, schedule analysis
Oracle OPN, MS Partner– Oracle accredited trainer
Project analytics tool: Acumen Fuse™
Acumen Introduction
Slide 3
What is Acumen Fuse™?Metric analysis & visualization toolCost, schedule, quality, risk, performance & EVPatent pending ribbons for visualization Solutions for resolution– Improves scheduling maturity– Provides insight & confidence– Provides control during execution
Slide 5
Analysis RibbonsMeans of flattening data, retaining sequenceGrouping activities into higher level entitiesEnables metric analysis beyond project levelGreat visual aid for simplifying data
Project Ribbon
Activity Ribbon(e.g. Critical/
non critical)
Path Ribbon
Slide 6
Path RibbonsDetermines all paths between any two activities– Gives insight into upcoming complexity, cost, effort– Powerful simplification technique – Great for figuring out which paths to accelerate
Slide 7
Metric Analyzers
Ribbon Analysis
Phase Analysis
Ribbon Analyzer: Analysis by ribbon Phase Analyzer: Analysis by phaseIntersection Analyzer: Pinpointed analysis
Slide 8
Metric ScorecardsActivity-based reportCombined metric scores into total scoreCustomizable weightingsAuto generate Scorecards from Metric Libraries
Slide 9
Ribbon View
Slide 10
Metric Libraries
Over 100 metricsCustomizable tripwiresPowerful metric editor
Slide 11
DCMA 14 Point AssessmentSupported within Acumen Fuse™True compliance with “Total Task” definitionAdditional schedule metrics included– e.g. Logic density
Merge with other schedule, cost, risk metricsIncludes tripwire metricsFull support for UN/CEFACT XML Schema
Slide 12
Types of AnalysisSnapshot: single project– Pinpoint specific hotspots by ribbon– Pinpoint periods of concern– Pinpoint driver activities
Comparison: program/portfolio– Compare performance– Project selection decision support
Trending: changes over time– Performance trending– Timephased comparison
Slide 13
Product Demos14 Point Schedule AssessmentNetwork Path AnalysisRisk AnalysisPerformance AnalysisPortfolio AnalysisEarned Value Analysis
Slide 14
Case StudyEPC projectThree project locations– Houston – engineering, project management– Calgary - engineering– New Orleans - fabrication
Three competing Engineering biddersObjectives– Select winning bid– Develop achievable detailed schedule– Execute successfully
Slide 15
Case StudyBid Phase
Opened up EPC contracts for bidExpected three bidders to replyTarget duration of approx. 3 yearsBidder A came back first– Evaluated planned duration– Evaluated quality of schedule
Results– 807 days duration (way less than 3 years), questionable scope– Poor quality schedule: logic, hard constraints, high durations– Major issues early on in the schedule– Calgary location generally was of poor schedule quality
Slide 16
Bid ComparisonCompared Bidder A, B, C & reviewed:– Total duration– Cost– Quality of schedule
ResultsBidder Schedule Duration Cost Quality Selected
Bidder A MS Project 807 days $33MM Very Poor ✗Bidder B Primavera P6 1216 days $49MM Reasonable ✗Bidder C MS Project 1269 days $36MM Sound ✓
Slide 17
Detailed Schedule DevelopmentScope further defined, schedule developedRisk Assessment workshop– Validate risk inputs & review outputs/exposure
Create sound Risk-adjusted baseline for execution
ResultsEngineering has highest # of aggressive activitiesAggressive activities fall early onAverage risk range peaks in 2011 with constructionConstruction carrying major schedule risk drivers
Slide 18
ExecutionTrack schedule performanceTrack cost spendTrack by location
More non-critical work completed than critical, New Orleans – behind scheduleCalgary – significant cost overrun, cost overrun in early 2009
Slide 19
Portfolio AnalysisCompare projects within a portfolio/programCombine metrics into a single scorecard
Slide 20
Other Example Use CasesSchedule Critique– Review quality of planning
Ongoing Project Surveillance– Review monthly performance, changes to plan– IBR reviews, DCMA compliance
Portfolio Analysis– Compare performance of projects within a portfolio– Determine overall strategic value of projects
Contractor Performance Tracking– Track against agreed upon baseline– Early warning indicators for project delay/overruns
Risk Exposure Reduction– Identify & eliminate risk hot spots through targeted risk response
Slide 21
Platform Support
Sources can be schedule, cost, risk, EV, other…Workbooks are platform agnosticUnlimited # of data sources– MS Project 2003/2007– Oracle Primavera P6– Oracle Pertmaster/Risk Analysis– Deltek Open Plan– Deltek Cobra– MS Excel– XML/UNCEFACT
Merging of data sources – Integrate cost & schedule
Slide 22
Summary & BenefitsOne-stop shop for project analysisAn addition not a replacement for existing scheduling/risk tool investmentsValue for both owners & contractorsMulti platform supportOver 100 metricsHighly customizableIncludes web-based training
Slide 23
Acumen Clients & References
Slide 24
Find Out More!