1
ACCURATE POWER MEASUREMENTS OF HIGH CAPACITANCE PV MODULES WITH SHORT PULSE SIMULATORS IN A SINGLE FLASH C. Monokroussos 1 , D. Etienne 1 , K. Morita 2 , C. Dreier 1 , U. Therhaag 1 and W. Herrmann 3 1 TÜV Rheinland (Shanghai) Co., Ltd., Shanghai TÜV Rheinland Building, No.177, Lane 777, West Guangzhong Road, 200072, Shanghai, P.R. China 2 TÜV Rheinland Japan Ltd., 4-5-24 Chigasaki-higashi, Tsuzuki-ku, 224-0033, Yokohama, Japan 3 TÜV Rheinland Energie und Umwelt GmbH, Am Grauen Stein, 51105, Cologne, Germany ABSTRACT: A method for measuring accurately and rapidly the current-voltage characteristics of high-capacitance photovoltaic devices using pulse sunlight simulators is detailed. The data acquisition is performed in a single light flash, whose duration can be as short as milliseconds. The method allows sufficient time for every individual IV data point to relax from capacitive effects, while employing efficient time management to the applied measurement load to achieve full IV tracking in a single flash of lightThe method, which is called Dynamic IV (t-IV), was validated in an experiment, which examined three different types of commercially available high-capacitance PV modules. The results of the Dynamic IV were compared against steady-state IV measurements of each module showing agreement with deviations largely overlapping within the limits of the measurement repeatability and not exceeding 0.2% on maximum power output. DYNAMIC IV METHODOLOGY The time required to measure a single IV data point free of capacitive artefacts is related to the capacitance of the device and its applied load. As long as the irradiance level is maintained constant, the required time is approximately increasing proportionally to the capacitance change of the device caused by the applied load. VALIDATION OF DYNAMIC IV MEASUREMENTS IN LABORATORIAL ENVIRONMENT The performance of three commercially available modules was measured under standard test conditions (STC) using two different approaches; dynamic IV and multiflash IV. The results of the methods are compared to examine the accuracy of t-IV measurements. The selected modules are listed in table I in alphabetical order. The test samples will be referred to in this work as modules A, B and C in an order that does not necessarily correspond to their order of appearance in table I. Figure 7: Relative percent difference of the performance parameters (I SC , V OC , P MAX and FF) between t-IV and multiflash measurements of technology groups A, B, C. Figure 8: Repeatability of the performance parameters (I SC , V OC , P MAX , V MPP , I MPP and FF) over 10 measurements obtained with dynamic IV and multiflash for technology group C. Figure 3: The variation of PV module capacitance is shown for two commercially available BCT and HJT modules. The dotted points correspond to the device capacitance extracted from t-IV measurements for the BCT and HJT modules. Figure 4: The dynamic behaviour of PV modules can be modelled. The characteristics of one particular point have been enlarged to illustrate the magnitude of the deviations. Figure 5: Applied load distributions for two modules showing moderate (mesh A) and high (mesh B) capacitive behaviour. Figure 6: An example of application of dynamic IV algorithm to predict the steady-state IV characteristics. 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0 0.2 0.4 0.6 0.8 1 1.2 Normalised Module Voltage Normalised Module Current Steady-State IV (Sweep-Time:100ms) Single Flash IV (Sweep-Time:10ms) Dynamic IV (Sweep-Time:10ms) 0 0,2 0,4 0,6 0,8 1 1,2 0 0,2 0,4 0,6 0,8 1 1,2 0 2 4 6 8 10 Normalised Module Current Normalised Module Voltage Time [ms] Measured Voltage Measured Current Sampled Measured Voltage Sampled Measured Current Hold-Time at Certain Applied Voltage Figure 1: Comparison of the IV characteristics of a high-capacitive module between different measurement techniques. The blue data points represent the dynamic IV curve, performed in 10ms, showing agreement with the steady-state characteristics. Figure 2: The sampled IV data points, which are free of measurement artefacts, are highlighted with a triangle. The measurement time increases almost exponentially with voltage to compensate for transient errors. -0.2 0 0.2 0.4 0.6 0.8 1 0 1 2 3 4 5 6 7 8 9 10 11 Normalised Module Voltage to V OC Time [ms] Applied Load Mesh A Applied Load Mesh B Region of Interest Time Required to Stabilise the Flash Characteristic 0.8 0.85 0.9 0.95 1 1.05 0 0.2 0.4 0.6 0.8 1 Normalised Module Current Time [A.U.] Measured Current Model Input Modelled Current Required measurement time using dynamic modelling Required measurement time without using dynamic modelling I SC V OC P MAX FF I SC V OC P MAX V MPP I MPP FF 0.0 0.2 0.4 0.6 0.8 1.0 0.60 0.70 0.80 0.90 1.00 Normalised Module Capacitance [A.U.] Normalised Module Voltage to V OC Module A Exp. Fit. - Module A Module B Exp. Fit. - Module B 2 4 6 8 10 12 0 0.2 0.4 0.6 0.8 1 1.2 Time [ms] Normalised Module Current Dynamic IV Measured Dynamic IV Modelled Dynamic IV Measured Dynamic IV Modelled Table I PV Module Manufacturer Cell Type Cell Intercon. Ser. / Par. Sanyo Electric, Co. Ltd HIT ®,* 72s/1p SunPower Corporation c-Si, back-contact 72s/1p Yingli Energy, Co., Ltd c-Si, n-type 60s/1p APPLICATION TO PRODUCTION LINE MEASUREMENTS In order to evaluate the measurement accuracy of dynamic IV measurements under industrial conditions an experiment was conducted. Initially, the t-IV profile of a reference module was analysed in laboratorial conditions. The resulting profile was then used as a guideline to rate different test samples of the same module type, but different class. The results of dynamic IV were compared with the result of multiflash method. Unsorted Modules Reference Module Figure 9: Relative percent difference of the performance parameters between t-IV and multiflash measurements. The purple bars correspond to the test samples, while the green bar represents the reference module, whose t- IV has been optimised. CONCLUSIONS A method to perform accurate power measurements of high-capacitance modules with pulse simulators in single flash was presented. Laboratorial calibration was shown to be achievable with an additional contribution to the measurement uncertainty of ±0.3%. The second gained encouraging results, which indicated that the added contribution to measurement uncertainty can be kept as low as ±0.6%, if appropriate quality assurance is in place. However, the implementation of dynamic IV measurements for industrial rating will require further research. Acknowledgements: The contribution of Yingli Green Energy Holding Company Limited is gratefully acknowledged. The authors would also like to acknowledge Mr. Feng Yi Zhou of TÜV Rheinland (Shanghai) Co., Ltd and Akiyuki Iwaya-san of TÜV Rheinland Japan Ltd for their kind support throughout this project.

ACCURATE POWER MEASUREMENTS OF HIGH CAPACITANCE PV … · A method to perform accurate power measurements of high-capacitance modules with pulse simulators in single flash was presented

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ACCURATE POWER MEASUREMENTS OF HIGH CAPACITANCE PV … · A method to perform accurate power measurements of high-capacitance modules with pulse simulators in single flash was presented

ACCURATE POWER MEASUREMENTS OF HIGH CAPACITANCE PV MODULES WITH SHORT PULSE SIMULATORS IN A SINGLE FLASH

C. Monokroussos1, D. Etienne1, K. Morita2, C. Dreier1, U. Therhaag1 and W. Herrmann3

1 TÜV Rheinland (Shanghai) Co., Ltd., Shanghai TÜV Rheinland Building, No.177, Lane 777, West Guangzhong Road, 200072, Shanghai, P.R. China 2 TÜV Rheinland Japan Ltd., 4-5-24 Chigasaki-higashi, Tsuzuki-ku, 224-0033, Yokohama, Japan

3 TÜV Rheinland Energie und Umwelt GmbH, Am Grauen Stein, 51105, Cologne, Germany

ABSTRACT: A method for measuring accurately and rapidly the current-voltage characteristics of high-capacitance photovoltaic devices using pulse sunlight simulators is detailed. The data acquisition is performed in a single light flash, whose duration can be as short as milliseconds. The method allows sufficient time for every individual IV data point to relax from capacitive effects, while employing efficient time management to the applied measurement load to achieve full IV tracking in a single flash of lightThe method, which is called Dynamic IV (t-IV), was validated in an experiment, which examined three different types of commercially available high-capacitance PV modules. The results of the Dynamic IV were compared against steady-state IV measurements of each module showing agreement with deviations largely overlapping within the limits of the measurement repeatability and not exceeding 0.2% on maximum power output.

DYNAMIC IV METHODOLOGY The time required to measure a single IV data point free of capacitive artefacts is related to the capacitance of the device and its applied load. As long as the irradiance level is maintained constant, the required time is approximately increasing proportionally to the capacitance change of the device caused by the applied load.

VALIDATION OF DYNAMIC IV MEASUREMENTS IN LABORATORIAL ENVIRONMENT

The performance of three commercially available modules was measured under standard test conditions (STC) using two different approaches; dynamic IV and multiflash IV. The results of the methods are compared to examine the accuracy of t-IV measurements. The selected modules are listed in table I in alphabetical order. The test samples will be referred to in this work as modules A, B and C in an order that does not necessarily correspond to their order of appearance in table I.

Figure 7: Relative percent difference of the performance parameters (ISC, VOC, PMAX and FF) between t-IV and multiflash measurements of technology groups A, B, C.

Figure 8: Repeatability of the performance parameters (ISC, VOC, PMAX, VMPP, IMPP and FF) over 10 measurements obtained with dynamic IV and multiflash for technology group C.

Figure 3: The variation of PV module capacitance is shown for two commercially available BCT and HJT modules. The dotted points correspond to the device capacitance extracted from t-IV measurements for the BCT and HJT modules.

Figure 4: The dynamic behaviour of PV modules can be modelled. The characteristics of one particular point have been enlarged to illustrate the magnitude of the deviations.

Figure 5: Applied load distributions for two modules showing moderate (mesh A) and high (mesh B) capacitive behaviour.

Figure 6: An example of application of dynamic IV algorithm to predict the steady-state IV characteristics.

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 10

0.2

0.4

0.6

0.8

1

1.2

Normalised Module Voltage

Nor

mal

ised

Mod

ule

Cur

rent

Steady-State IV (Sweep-Time:100ms)Single Flash IV (Sweep-Time:10ms)Dynamic IV (Sweep-Time:10ms)

0

0,2

0,4

0,6

0,8

1

1,2

0

0,2

0,4

0,6

0,8

1

1,2

0 2 4 6 8 10

Nor

mal

ised

Mod

ule

Cur

rent

Nor

mal

ised

Mod

ule

Volta

ge

Time [ms]

Measured VoltageMeasured CurrentSampled Measured VoltageSampled Measured Current

Hold-Time at Certain Applied Voltage

Figure 1: Comparison of the IV characteristics of a high-capacitive module between different measurement techniques. The blue data points represent the dynamic IV curve, performed in 10ms, showing agreement with the steady-state characteristics.

Figure 2: The sampled IV data points, which are free of measurement artefacts, are highlighted with a triangle. The measurement time increases almost exponentially with voltage to compensate for transient errors.

-0.2

0

0.2

0.4

0.6

0.8

1

0 1 2 3 4 5 6 7 8 9 10 11

Nor

mal

ised

Mod

ule

Volta

ge

to V

OC

Time [ms]

Applied Load Mesh A

Applied Load Mesh B

Region of Interest

Time Required to Stabilise the Flash Characteristic

0.8

0.85

0.9

0.95

1

1.05

0 0.2 0.4 0.6 0.8 1

Nor

mal

ised

Mod

ule

Cur

rent

Time [A.U.]

Measured CurrentModel InputModelled Current

Required measurement time using dynamic modelling

Required measurement time without using dynamic modelling

ISC VOC PMAX FF ISC VOC PMAX VMPP IMPP FF

0.0

0.2

0.4

0.6

0.8

1.0

0.60 0.70 0.80 0.90 1.00

Nor

mal

ised

Mod

ule

Cap

acita

nce

[A.U

.]

Normalised Module Voltage to VOC

Module AExp. Fit. - Module AModule BExp. Fit. - Module B

2 4 6 8 10 12

0

0.2

0.4

0.6

0.8

1

1.2

Time [ms]

Nor

mal

ised

Mod

ule

Cur

rent

Dynamic IV MeasuredDynamic IV Modelled

Dynamic IV MeasuredDynamic IV Modelled

Table I

PV Module Manufacturer Cell Type Cell Intercon. Ser. / Par.

Sanyo Electric, Co. Ltd HIT®,* 72s/1p SunPower Corporation c-Si, back-contact 72s/1p Yingli Energy, Co., Ltd c-Si, n-type 60s/1p

APPLICATION TO PRODUCTION LINE MEASUREMENTS

In order to evaluate the measurement accuracy of dynamic IV measurements under industrial conditions an experiment was conducted. Initially, the t-IV profile of a reference module was analysed in laboratorial conditions. The resulting profile was then used as a guideline to rate different test samples of the same module type, but different class. The results of dynamic IV were compared with the result of multiflash method.

Unsorted Modules Reference Module

Figure 9: Relative percent difference of the performance parameters between t-IV and multiflash measurements. The purple bars correspond to the test samples, while the green bar represents the reference module, whose t-IV has been optimised.

CONCLUSIONS

A method to perform accurate power measurements of high-capacitance modules with pulse simulators in single flash was presented. Laboratorial calibration was shown to be achievable with an additional contribution to the measurement uncertainty of ±0.3%. The second gained encouraging results, which indicated that the added contribution to measurement uncertainty can be kept as low as ±0.6%, if appropriate quality assurance is in place. However, the implementation of dynamic IV measurements for industrial rating will require further research.

Acknowledgements: The contribution of Yingli Green Energy Holding Company Limited is gratefully acknowledged. The authors would also like to acknowledge Mr. Feng Yi Zhou of TÜV Rheinland (Shanghai) Co., Ltd and Akiyuki Iwaya-san of TÜV Rheinland Japan Ltd for their kind support throughout this project.