Renewable energy project pipeline progress Accredited, committed and probable capacity by state (since 1 January 2016 – 31 December 2017) NT WA SA QLD VIC NSW ACT Accredited projects 43 MW Committed 12 MW Probable 163 MW Accredited projects 221 MW Committed 471 MW Probable 345 MW TAS Accredited projects 4 MW Committed 1 MW Accredited projects 107 MW Committed 1864 MW Probable 65 MW Accredited projects 60 MW Committed 996 MW Probable 540 MW Accredited projects 26 MW Accredited projects 1 MW Probable 144 MW Total 6532 MW Accredited projects 529 MW Committed 526 MW Probable 351 MW MW = Megawatts

Accredited, committed and probable capacity by state ... · Renewable energy project pipeline progress Accredited, committed and probable capacity by state (since 1 January 2016 –

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Accredited, committed and probable capacity by state ... · Renewable energy project pipeline progress Accredited, committed and probable capacity by state (since 1 January 2016 –

Renewable energy project pipeline progressAccredited, committed and probable capacity by state (since 1 January 2016 – 31 December 2017)

NT

WASA

QLD

VIC

NSWACT

Accredited projects

43 MWCommitted

12 MWProbable

163 MW

Accredited projects

221 MWCommitted

471 MWProbable

345 MW TAS

Accredited projects

4 MWCommitted

1 MW

Accredited projects

107 MWCommitted

1864 MWProbable

65 MW

Accredited projects

60 MWCommitted

996 MWProbable

540 MW

Accredited projects

26 MW

Accredited projects

1 MWProbable

144 MW

Total 6532 MW

Accredited projects

529 MWCommitted

526 MWProbable

351 MW

MW = Megawatts