Acc Ltd Laheri Cement Works

Embed Size (px)

Citation preview

  • 7/28/2019 Acc Ltd Laheri Cement Works

    1/67

    ACC Lakheri Cement Works Strength Performance Passion 22nd 23rd Aug 2012

    National Award for Excellence inEnergy Management 2012by CII Sohrabji Godrej Green Business Centre

    ACC Ltd - Lakheri

    Distt Bundi (Rajasthan)

    ACC Lakheri Cement Works

    Lakheri, Bundi, Rajasthan

  • 7/28/2019 Acc Ltd Laheri Cement Works

    2/67

    2

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Company Profile and Plant History

    Process & Business Growth

    Energy Conservation Activities

    Reduction on Specific energy figures

    Global Bench Mark Specific energy

    Innovative projects Environmental projects

    Involvement of Employees

    Team work in ENCON

    Monitoring, Reporting and implementation methodologies

    Renewable Energy Sources, Utilization of waste

    Agenda

  • 7/28/2019 Acc Ltd Laheri Cement Works

    3/67

    3

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Name of plant : Lakheri Cement Works Year of establishment : 1905

    I up-gradation, 1997 : Wet to Dry process 0.48 MTPA

    II up-gradation, 2007 : addn 1 PH with calciner string

    Present capacity : 1.5 MTPA

    Process : Dry

    No of Kilns : One (1)

    Types of cement produced : PPC and OPC

    Captive Power Plant (CPP) : 25 MW

    Major suppliers of plant & machinery: Alstom, Pfeiffer, Siemens, ABB,SKF, FLSmidth, BHEL, ELGI, Elecon, MICO, GE, etc.

    Company Profile

  • 7/28/2019 Acc Ltd Laheri Cement Works

    4/67

    4

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Plant History

    Plant History 1905 : Foundation of Lakheri started with four cylindrical, pillbox-shaped vertical

    Kilns to produce hydraulic lime

    1917 : Installation of Indias first cement plant at barren foot hills of Arawali mountaininstalled capacity of 0.32 mtpa using wet process of manufacturing from 3 nos. of kilns.

    1997 : Modernization and Expansion by replacing wet process kilns with a single dry process

    kiln of capacity 1200 TPD and raising its cement manufacturing capacity to 0.60 MTPA.

    2000 : By adopting Kaizens as a way of life, Total productive maintenance (TPM) philosophy,employees innovations and dedications, The plant could achieve production to a level of 0.7mtpa from the same establishment.

    2007 : The capacity of the plant is raised by more than two folds to a level of 1.5 mtpa byadding second string of pre-heater with calciner to the existing kiln with replacement of gratecooler and addition of new close circuit cement grinding system.

    2007 : Installation of 25 MW capacity Thermal power plant. The manufacturing process issupported by an economical and reliable captive thermal power source.

    2009 : Conceived Shikhar Project, In plant R & D with TSS support in Kiln Calciner StringPre heater and cooler modification. Usage of AFR. Transformation of Lakheri.

    2011 : No 1 performer in all ACC plants. Winner of National Level energy conservationaward, Green Tech Environment Excellence award and Golden Peacock Environment

    Management award. IMEA Award, Green Manufacturing Excellence Award.

  • 7/28/2019 Acc Ltd Laheri Cement Works

    5/67

    5

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Process Flow

    Clinkerproduction

    Raw materialpreparation

    Raw mealpreparation

    Cementgrinding

    Shipping

    station Shippingstation

    Raw materialextraction

  • 7/28/2019 Acc Ltd Laheri Cement Works

    6/67

    6

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Business Growth

    0

    200000

    400000

    600000

    800000

    1000000

    1200000

    1400000

    1600000

    1995-96 1998-99 2002-03 2005 2007 2008 2011

    Clinker Total Cement PPC

    First Up

    gradation

    Wet to dry

    Second Up gradation

    1600 TPD to 3200 TPD

  • 7/28/2019 Acc Ltd Laheri Cement Works

    7/67

    7

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy Policy

    Energy Policy

    We, at Lakheri Cement works are committed to formulate and implement Total

    Energy Management System and in the process continuously strive to improve

    the energy performance in all its activities through

    Reduction in energy consumption by continuously improving the manufacturing

    process, without impairing productivity.

    Minimizing the waste and utilize the same for value addition.

    To adopt energy efficient technologies and optimize utilization of fuels and otherresources.

    To increase the use of renewable sources of fuel and energy and optimization of raw

    material by the use of alternative material.

    Creating awareness among employees through various forums, upgrade their skills toconserve energy and natural resources, to achieve above goals.

    Date: 01.07.2009 (Director Plant)

    Place: Lakheri Lakheri Cement Works

  • 7/28/2019 Acc Ltd Laheri Cement Works

    8/67

    8

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy Conservation Activities

    Energy Conservation Cell atcorporate level which act as

    facilitator

    Energy Communities like

    Electrical ,Thermal, Clinkerfactor, MTBF are formed at to

    enhance energy efficiency of

    all ACC plants.

    An Energy Performance Cel l

    ( Lakhelavya) is formed at

    plant level with Energy

    Manager as coordinator and

    participation of various HODsfor implementation of

    identified projects

  • 7/28/2019 Acc Ltd Laheri Cement Works

    9/67

    9

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Brainstorming for energy conservation conducted every year.

    Small group and Energy Circle teams are formed comprising of

    workmen and middle management staff which work towards focused

    improvements for enhancing the productivity and energy conservation.

    The meeting for Energy consumption and analysis is carried out on daily

    basis

    Variance of energy consumption review weakly dash board meeting for

    each module

    An unique initiative ofEnergy Observation Tour ( EOT) on daily basis

    by staff employees to observe and stop any energy wastages in the plant.

    Implementation of ISO : 50001 ( Energy Management System)

    Energy Conservation Activities

  • 7/28/2019 Acc Ltd Laheri Cement Works

    10/67

    10

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Onl inepower consumption is monitored on daily basis and the analysisof the deviations is discussed in the daily production meeting which isheaded by DGM (Prod) and weekly chaired by Sr GM/ Directo r Plant.

    Internal and external training programme conducted for staff as well as

    shop floor level. Internal and External energy audits by TERI, CII, Orchid,

    Cholamandalam and Techport.

    The specific power consumption for all the sections vis-a-vis their

    respective targets and the deviations are analyzed and correctiveactions are implemented.

    Energy awareness prorgramme like poster, painting, quiz, slogan,nukkad conducted at nearby school and plant level.

    Employees are awarded for best innovative projects at plant level, R.Olevel and H.O level

    Best Kaizen and best suggestion from SHIKHAR suggestion boxscheme are awarded every month.

    Energy Conservation Activities

  • 7/28/2019 Acc Ltd Laheri Cement Works

    11/67

  • 7/28/2019 Acc Ltd Laheri Cement Works

    12/67

    12

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Chairperson

    Respective HOD

    AE E&I Shift I/C

    W/S

    Shift I/C

    Mines

    Shift I/C

    Crusher

    Shift I/C

    Kiln

    Shift I/C

    CM

    S

    H

    OP

    F

    L

    O

    O

    R

    T

    E

    A

    M

    Shift I/C

    PP

    Shift I/C

    VRM

    Energy Conservation Cell

  • 7/28/2019 Acc Ltd Laheri Cement Works

    13/67

    13

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy Reporting Format

  • 7/28/2019 Acc Ltd Laheri Cement Works

    14/67

    14

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy Reporting Format

  • 7/28/2019 Acc Ltd Laheri Cement Works

    15/67

    15

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy Review Format

  • 7/28/2019 Acc Ltd Laheri Cement Works

    16/67

    16

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Daily Production meeting formatEnergy Review Format

  • 7/28/2019 Acc Ltd Laheri Cement Works

    17/67

    17

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Weekly Dash Board Review Format

  • 7/28/2019 Acc Ltd Laheri Cement Works

    18/67

    18

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Group Discussion of Energy Circles Nukkad by plant Employee on ENCON

    Daily Energy Talk during dash board Training program for employees

    Awareness Creation on Energy Conservation

  • 7/28/2019 Acc Ltd Laheri Cement Works

    19/67

    19

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Specific Energy Consumption

    93.81

    91.19

    84.59

    82.27

    79.979

    70

    75

    80

    85

    90

    95

    2008 2009 2010 2011 2012

    YTD

    Target

    2012

    Specific Electrical Energy (Unit/ Ton Cement)

  • 7/28/2019 Acc Ltd Laheri Cement Works

    20/67

    20

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Specific Energy Consumption

    723721

    713

    717

    709 709

    700

    705

    710

    715

    720

    725

    2008 2009 2010 2011 2012 YTD Target

    2012

    Specific Therm al Energy ( Kcal/ Kg Clinker)

  • 7/28/2019 Acc Ltd Laheri Cement Works

    21/67

    21

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Specific Energy Reduction

    1.80 1.781.46

    1.30 1.18

    0.00

    0.50

    1.00

    1.50

    2.00

    kWh/ ton

    Mat.

    2008 2009 2010 2011 2012

    YTD

    Sp energy Section wise, RMP

  • 7/28/2019 Acc Ltd Laheri Cement Works

    22/67

    22

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Specific Energy Reduction

    18.92 17.2515.31 14.27

    14.02

    0.00

    3.00

    6.00

    9.00

    12.00

    15.00

    18.00

    21.00

    kWh/ ton

    Mat.

    2008 2009 2010 2011 2012

    YTD

    Sp energy Section wise,RML

  • 7/28/2019 Acc Ltd Laheri Cement Works

    23/67

    23

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Specific Energy Reduction

    36.61 37.32 37.2636.04

    34.00

    30.00

    32.00

    34.00

    36.00

    38.00

    kWh/ ton

    Mat.

    2008 2009 2010 2011 2012

    YTD

    Sp energy Section wise, Clinkering

  • 7/28/2019 Acc Ltd Laheri Cement Works

    24/67

    24

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Specific Energy Reduction

    38.72 37.8337.93

    37.15 36.77

    30.00

    32.00

    34.00

    36.00

    38.0040.00

    kWh/ ton

    Mat.

    2008 2009 2010 2011 2012

    YTD

    Sp energy Section wise, Grinding

  • 7/28/2019 Acc Ltd Laheri Cement Works

    25/67

    25

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Weekly Dash Board Review Format

    6765

    79.9

    0

    20

    40

    60

    80

    kWh/ ton

    Cement

    National

    Bench Mark

    International

    Bench Mark

    Lakheri Cement

    667 660709

    0

    100

    200

    300

    400

    500

    600

    700

    800

    kcal/ kg

    Clinker

    National

    Bench Mark

    International

    Bench Mark

    Lakheri

    Cement

    National & International Benchmark

    Comparison of

    Specific

    Electrical Energy

    Comparison of

    Specific Thermal

    Energy

    Ref: Report of the Working Group on Cement Industry for XIIth 5 year Plan 2012-2017 - Department ofIndian Policy & Promotion, Ministry of Commerce & Industry. December 2011

  • 7/28/2019 Acc Ltd Laheri Cement Works

    26/67

    26

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    PAT Obligation ( Gate to Gate )

    936.85 938.23854.54 834.93

    793.3

    970 940

    0

    200

    400

    600

    800

    1000

    1200

    2008 2009 2010 2011 2012

    YTD

    Base line

    data

    Target in

    2014-15

    Kc

    al/KgofCem

    en

  • 7/28/2019 Acc Ltd Laheri Cement Works

    27/67

    27

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    0.00

    2000.00

    4000.00

    6000.00

    8000.00

    10000.00

    12000.00

    14000.00

    2008 2009 2010 2011 2012 YTD

    Wind Power Generation, Mwh

    Green Energy

    7.5 MW Captive Wind Plant at Jodhpur

  • 7/28/2019 Acc Ltd Laheri Cement Works

    28/67

    28

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy Conservation Projects ( Summary for last 3 years)

    Excellence in Energy ManagementExcellence in Energy Management

    No investment

    No of project implemented : 17

    Equivalent Kwh : 4.15 Million Kwh

    Total Energy Saving : 3569 Million Kcal

    Medium Investment

    No of project implemented : 32

    Equivalent Kwh : 27.077 Million Kwh

    Total Energy Saving : 23286 Million Kcal

    Net CO2 reduction : 25452 Ts Co2

    (Grid Emission factor

    0.94 Tco2/MWh)

  • 7/28/2019 Acc Ltd Laheri Cement Works

    29/67

    29

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Title of the Projects ImplementedAnnual Saving

    ( Rs Million)

    Investment

    Rs. Million

    Modification in new P.H. lower(C-7)

    cyclone inlet ,top cyclone(C-1) inlet & dip

    tube height and Cooler IKN Horse shoe

    modification)

    6.0 3.0

    Replacement of low efficiency pumps with

    a single high efficiency pump

    0.39 0.788

    Installation of VFD for DC Fan in VRM,

    Packer 4, Primary Crusher0.84 1.05

    Install Multi step capacity controller on

    selected compressors to optimize

    operating pressure

    2.03 1.44

    Installation VFD drive for cooler fan no3,

    fan no -04

    0.95 0.7

    Energy Conservation Projects in year 2009

  • 7/28/2019 Acc Ltd Laheri Cement Works

    30/67

    30

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Title of the Projects ImplementedAnnualSaving

    ( Rs Million)

    InvestmentRs. Million

    Operate 132 kW compressor and stop 160

    kW compressor top reduce operatingload/unload power

    0.25 nil

    Reduce operating pressure range for

    compressors (N0.332CP04,332CP03,442

    CP 01)

    0.32 nil

    Rectify unloading system to reduce unload

    power for 160 kW screw compressor no.332

    CP O4

    0.63 nil

    Modify piping and operate coal conveying

    compressors at low pressure0.32 0.03

    Dilution Air Fan operation, optimization in

    compound mode (New VRM running) 0.56 NIL

    Energy Conservation Projects in year 2009

  • 7/28/2019 Acc Ltd Laheri Cement Works

    31/67

    31

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Title of the Projects ImplementedAnnualSaving

    ( Rs Million)

    InvestmentRs. Million

    CFL for colony residence lighting (1500 nos) 0.40 0.135

    Mill out put and Sp power optimizationthrough (1) Process optimization (increasing

    grinding press) (2) size of mill feed L/S (3)

    Usage of Marvel slurry 4) Mill fan inlet

    damper removal

    8.56 nil

    Idle running of dust separation group to be

    avoided by interlocking with wobbler group0.14 nil

    Energy Saving by reducing damper settingof Clinker silo bag filter fan Drive no.521FN01

    0.24 nil

    Installation of GRR in E-mill Fan 1.58 0.6

    Energy Conservation Projects in year 2009

  • 7/28/2019 Acc Ltd Laheri Cement Works

    32/67

    32

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Title of the Projects Implemented Annual Saving( Rs Million)

    InvestmentRs. Million

    Area increased by Removing inlet silencer of

    cooler fan ( High pressure drop in cooler

    fan3,5 & 8)* Saving=0.25unit/mmWg*3

    0.22 nominal

    PID control of cooler fan operation 0.92 nil

    Reduction of cement-06 mill power by

    Optimization of output by chemical dosing2.59 nominal

    Power saving by using 556CP01/CP02 air to

    old cement mill by providing separate CM-

    06 GGLS compressor and stopping one old

    cement mill compressor.

    0.81 nominal

    TOTAL 27.75 7.74

    Energy Conservation Projects in year 2009

  • 7/28/2019 Acc Ltd Laheri Cement Works

    33/67

    33

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Major Energy Conservation Projects in year 2010

    Title of the Projects ImplementedAnnual Saving

    (Rs. Million)

    Investment

    (Rs. Million)

    Modification in Fan inlet box in order

    to minimize the velocity differencebetween duct and fan I/L

    0.42 0.03

    Replacement of VRM1 main motor

    (1200 KW) with 1000 KW motor

    (Spare motor)

    0.67 Nil

    Installation of VFD drive forcooler fan no3

    1.346 0.65

    Installation of VFD drive for cooler

    fan no 041.098 0.7

  • 7/28/2019 Acc Ltd Laheri Cement Works

    34/67

    34

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Major Energy Conservation Projects in year 2010

    Title of the Projects ImplementedAnnualSaving

    (Rs. Million)

    Investment

    (Rs. Million)

    Installation of VFD drive for cooler fan

    no -06 1.098 0.8

    Installation of VFD for PD Blower of

    new high momentum burner0.336 0.75

    Installation of GRR for E-mill vent fan 0.623 0.5

    E-mill fan casing modification as pernew impeller

    2.079 0.65

  • 7/28/2019 Acc Ltd Laheri Cement Works

    35/67

    35

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Major Energy Conservation Projects in year 2010

    Title of the Projects ImplementedAnnualSaving

    (Rs. Million)

    Investment

    (Rs. Million)

    Installation of VFD for cement mill

    separator fan 0.123 0.18

    Installation of High capacity PD blower

    in place of two PD blowers0.673 Nil

    Installation of chemical mixing pump to

    increase the output of CM6 to 160 TPH

    from 154, hence reduce sp. power

    consumption

    6.57 0.5

    Modify piping for low pressure

    compressor to reduce pressure drop

    and operate compressors at lower

    pressure

    0.33 0.2

  • 7/28/2019 Acc Ltd Laheri Cement Works

    36/67

    36

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Title of the Projects ImplementedAnnual Saving

    (Rs. Million)

    Investment

    (Rs. Million)

    Modification of cyclone for

    improvement of collection efficiencyand thermal efficiency

    72.0 3.0

    Replacing kiln inlet seal with the

    iteca seal to improve thermal as well

    as electrical efficiency

    2.0 1.5

    Installation of high momentum

    burner

    2.64 6.0

    Total 92.00 14.668

    Major Energy Conservation Projects in year 2010

  • 7/28/2019 Acc Ltd Laheri Cement Works

    37/67

    37

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Major Energy Conservation Projects in year 2011

    Title of the Projects ImplementedAnnualSaving

    (Rs. Million)

    Investment

    (Rs. Million)

    Replacement of E.E. Impeller for

    cooler Fan No. 4 0.560 0.2

    Replacement of E.E. Impeller for

    cooler Fan No. 100.120 0.2

    Connection of 930 KVAR capacitors

    with VRM-2 Main Drive0.30 Nil

    Attending false air in graces in TAduct. 3.12 1.2

  • 7/28/2019 Acc Ltd Laheri Cement Works

    38/67

    38

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Major Energy Conservation Projects in year 2011

    Title of the Projects Implemented

    Annual

    Saving

    (Rs. Million)

    Investment

    (Rs. Million)

    Attending to cooler old panel, plategaps, side casting gap and under

    grates.

    1.81 1.0

    Replacing the Conventional chokes

    with Electronic Chokes for 30 No'sTube light Fittings.

    0.08 0.07

    Reduce pressure drop in down comer

    duct Preheater

    1.19 1.0

    1000W halogen replaced with 400W

    MH0.41 0.10

  • 7/28/2019 Acc Ltd Laheri Cement Works

    39/67

    39

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Major Energy Conservation Projects in year 2011

    Title of the Projects ImplementedAnnualSaving

    (Rs. Million)

    Investment

    (Rs. Million)

    Installation of VFD for PD blower

    no.351PD03 1.01 0.5

    optimization of compressed air

    system1.05 Nil

    Attending false air in graces in TA

    duct.3.12 1.2

    Regarding of grinding media in

    second chamber of close circuitcement mill

    5.17 4.5

  • 7/28/2019 Acc Ltd Laheri Cement Works

    40/67

    40

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Major Energy Conservation Projects in year 2011

    Title of the Projects ImplementedAnnualSaving

    (Rs. Million)

    Investment

    (Rs. Million)

    Attended Calciner tertiary air bend - for

    flap control open , false air (3%) -Pressure Loss 30-40 mmwg

    0.06 0.05

    In colony ordinary 100/60w bulb

    replaced with CFL1.34 0.05

    Improvement in efficiency of VRM2 1.45 4.0

    Total 20.79 14.07

  • 7/28/2019 Acc Ltd Laheri Cement Works

    41/67

    41

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Implemented Projects 2012

    Energy saving project :Installation of 18 kw screw compressor in place of 35 kw compressor for

    old coal mill bag house and fuel transportation.

    Cost benefit analysis:Cost of new compressor = Nil

    ( used spare in Kiln section)Saving in Power =12 kwh

    Run hrs. Per day = hrs. 20

    Annual savings in Kwh = 79200

    Annual cost savings = 3.56

    Lakhs (@ unit cost of Rs.4.50/-)

    Simple Pay back period =

    Immediate

  • 7/28/2019 Acc Ltd Laheri Cement Works

    42/67

    42

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy saving project :Stoppage of old cement mill compressor during OPC Grinding by

    interconnecting with CM6 compressor no 556 CP01/02

    Cost benefit analysis:Cost for interconnection = Nil

    Saving in Power =20 kwhRun hrs. Per day = hrs. 24

    Annual savings in Kwh = 72000

    Annual cost savings =

    3.24Lakhs (@ unit cost ofRs.4.50/-)

    Simple Pay back period =

    Immediate

    Implemented Projects 2012

  • 7/28/2019 Acc Ltd Laheri Cement Works

    43/67

    43

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy saving project :Removing the dampers of cooler fan no 3,4,5 and 8 having VFDs to avoid

    loss of power through dampers.

    Cost benefit analysis:Cost for removing dampers = Nil

    Saving in Power = 6.8 kwhRun hrs. Per day = hrs. 24

    Annual savings in Kwh = 53960

    Annual cost savings = 2.42

    Lakhs (@ unit cost of Rs.4.50/-)Simple Pay back period =

    Immediate.

    Implemented Projects 2012

  • 7/28/2019 Acc Ltd Laheri Cement Works

    44/67

    44

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Implemented Projects 2012

    Energy saving project :Installation of Energy Efficient Impeller for cooler fan no 4 ,6,9

    and 10.

    Cost benefit analysis:

    Cost of replacement of impellers = 6.0 Lakhs

    Saving in Power =13 kwhRun hrs. Per day = hrs. 24

    Annual savings in Kwh = 1.03

    Annual cost savings =4.63 Lakhs (@ unit cost of

    Rs.4.50/-)

    Simple Pay back period = 15 months

  • 7/28/2019 Acc Ltd Laheri Cement Works

    45/67

    45

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy saving project :Installation of power factor improving capacitors in CPP and LC # 3.

    Improvement in PF from 0.92 to 0.95

    Cost benefit analysis:Cost for installation of APFC =

    10 LakhsSaving in Power =15 kwh

    Run hrs. Per day = hrs. 24

    Annual savings in Kwh = 118800

    Annual cost savings = 5.34Lakhs (@ unit cost of Rs.4.50/-)

    Simple Pay back period = 6

    months

    Implemented Projects 2012

  • 7/28/2019 Acc Ltd Laheri Cement Works

    46/67

    46

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Energy saving project :Modify piping and to run compressor at lower operating pressure for coal

    transportation compressor.

    Implemented Projects 2012

    Cost benefit analysis:Cost for Modifying pipe line = Nil

    Saving in Power =5 kwh

    Run hrs. Per day = 6

    Annual savings in Kwh = 59400 kwh

    Annual cost savings = 2.67 Lakhs (@ unit cost of Rs.4.50/-)Simple Pay back period = Immediate

    Before After

  • 7/28/2019 Acc Ltd Laheri Cement Works

    47/67

    47

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    DescriptionInvestment

    Rs Lakh

    Unit/ton

    cmt

    Medium Voltage Drives (HT VFD) for

    Calciner Fan - 1200 KW 75.0 1.25

    Retrofit impeller of high efficiency (78-80%

    at operating parameters) in VRM -1 Fan

    for Power saving 20.0 1.48Medium Voltage Drives (HT VFD) for Coal

    Mill Vent Fan - 650 KW 50.0 1.40

    Installation of Capacitor Banks to improve

    the Power factor and hence operatingefficiency of TG

    15.0 0.35

    TOTAL 160 4.48

    Road map to achieve bench mark..

    Electrical energy

  • 7/28/2019 Acc Ltd Laheri Cement Works

    48/67

    48

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    DescriptionInvestment

    Rs Lakh

    Unit/ton

    cmt

    Installation VFD with high efficiency

    impeller Retrofitting in Cooler fan no 471

    FN06, 471FN07, 471FN09 20.0 0.4

    Installation of VFD for Compressors 15.0 0.15

    Installation Heavy duty pressureregulating valve for all bag filters.

    5.0 0.15

    Compressed air management system 35.0 0.10

    75.0 0.8

    TOTAL235 5.28

    Road map to achieve bench mark..

    Electrical energy

  • 7/28/2019 Acc Ltd Laheri Cement Works

    49/67

    49

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    DescriptionInvestment

    Rs Lakh

    Kcal/

    kg clk

    Modification of remaining Cyclone for

    improvement of collection efficiency and

    thermal efficiency 25 8

    Utilisation of waste heat from Preheater &

    cooler exhaust 3000

    (1.5

    MW)Installing rotoscale for Calciner coal

    feeding system

    150 2

    TOTAL3175 10

    Thermal energy

    Road map to achieve bench mark..

  • 7/28/2019 Acc Ltd Laheri Cement Works

    50/67

    50

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Project Title: Optimization of cooler efficiency

    Synopsis:

    We have observed that clinker cooler and ESP exit temperature is inhigher side 170-180 C and 280-300 C respectively. This is resulting

    a direct impact on thermal efficiency and cost of production.

    After so many ideation sessions following has been done forimproving the cooler efficiency.

    Innovative Projects - 1

  • 7/28/2019 Acc Ltd Laheri Cement Works

    51/67

    51

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Innovative Projects - 1

    Modification in Cooler IKN

    Blocking of two rows of IKN out of eight rows.

    Sp. aeration distribution changed 02 rows for Fan No 01 and

    04 rows for fan No 02, as against earlier 03 in Fan 01 and

    05 in Fan 02. Reduced inlet width of IKN from more than 1200 mm to 1050

    mm.

    Last 5 rows of cooler grate plate pattern changed from one

    moving one stationary to two moving one stationary .Horse shoe & sealing of gaps

    Changed in pattern of IKN horse shoe, less width of fines side

    and more width of coarse side (E mill), in original design it

    was just reverse

  • 7/28/2019 Acc Ltd Laheri Cement Works

    52/67

    52

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Innovative Projects -1

    Reduction of cooler IKN area

    Intercompartment sealing

    Increasing the number of Static rows in Cooler

    last compartment

    Benefits: By this cooler modification there is a substantial reduction in clinkertemperature to 150-160 C from 170-180 C and ESP exit temperature decreased to 250-260

    C from 280-300 C.

    Saving: Finally it is impacted reduction in sp thermal energy by 8 MJ/ton Clinker.Annual saving Rs17.6 Lac.

    Other Benefits: Conservation of natural resources by reducing coal consumption and

    helps to mitigate CO2 emission

  • 7/28/2019 Acc Ltd Laheri Cement Works

    53/67

    53

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Innovative Projects - 2

    Project Title: Increasing use of Alternative fuels

    Synopsis:

    Co-Processing refers to the use as alternative fuels and raw materials(AFR) or disposal of waste materials in industrial processes to recover

    energy and material from them. Due to the high temperature (> 1200

    degree C) and long residence time in cement kiln all types of wastes

    can be effectively disposed without any harmful emissions.Co-processing leaves no residue as the incombustible, inorganic

    content of the waste materials are incorporated in the clinker matrix.

    Therefore, after the waste is co-processed, it becomes a part of the

    product and no liability lies with the waste generators, whatsoever.Respecting the waste management hierarchy Co-processing of waste is

    done only when the options of Reduce, Reuse and Recycling have been

    addressed. Thus, Co processing ranks higher on the waste disposal

    hierarchy and eliminates the need for landfills and incineration.

  • 7/28/2019 Acc Ltd Laheri Cement Works

    54/67

    54

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Innovative Projects - 2

    Approach and Methodology:

    After internal discussion & study of site, it was decided to make

    feeding arrangement for Alternative fuels at kiln inlet.

    After finalizing the drawings, Procurement of steel, double flap

    damper & shut off slide gate had been done.

    During plant major shut down, The AFR feeding system has been

    installed.

    Trials of the various Alternative fuels like Mustard Husk, Saw dust,

    Soya Husk, Tire Chips etc. has been taken

  • 7/28/2019 Acc Ltd Laheri Cement Works

    55/67

    55

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Innovative Projects - 2

  • 7/28/2019 Acc Ltd Laheri Cement Works

    56/67

    56

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Innovative Projects - 2

    Results: After various trials, it has been found that there is noadverse effect on emissions or kiln operation due to co processing ofAFR materials into Kiln.

    Cost benefits:

    It has been evaluated that

    Basis: Co processing of 100 T of Alternative Fuels

    Quantity of AF = 100 T

    Cost of AF (Biomass) = 2000 Rs/T

    CV of AF = 3000 Kcal/Kg

    TSR = 0.33%

    Savings = 800 Rs/T

    Other Benefit :

    Conservation of Natural Resources.

    Reduction in CO2 emission

  • 7/28/2019 Acc Ltd Laheri Cement Works

    57/67

    57

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Innovative Projects - 3

    Project Title : Reduce specific thermal energy consumption bymixing of High VM biomass with low VM pet-coke.

    Key Issues:

    High cost of conventional fuel

    Separate arrangement required for AFR feeding in kiln/calciner

    Problem of AF handling

    Inadequate availability of AF

    Pet coke contains low VM - Difficult to burn

    Need fine grindingHas to maintain excess Oxygen for proper burning

    High ash of other fossil fuels

  • 7/28/2019 Acc Ltd Laheri Cement Works

    58/67

    58

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    At Lakheri 100% Petcoke is being used in kiln firing. As petcock

    contains low VM hence some excess amount of oxygen required

    for proper combustion. This excess air leads to reduce thermal

    efficiency of the kin system.

    Increasing cost of Petcock and conventional coal is also a factor

    for considering Alternative Fuel (AF). But again the feeding of

    alternative fuel in kiln requires lot of arrangement and modification

    to be done. Due to improper availability of AF this capitalexpenditure looks some time unviable

    Looking above Lakheri plant after many ideation sessions and

    brain storming came with a unique solution to feed Saw dust in theKiln by blending with Petcock itself.

    Innovative Projects - 3

  • 7/28/2019 Acc Ltd Laheri Cement Works

    59/67

    59

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    The methodology used isUse of saw dust To increase VM of firing fuel

    Lab scale trial of grinding of pet coke with saw dust

    Check availability of saw dust in near by villages

    Plant scale trial

    Optimum storage of biomass

    Optimization of burning operation

    After many trials this feeding methodology found very successful

    this has resulted reduction in preheater temperatures from 285 c to

    274 c and there is considerable amount of power saving due to less

    air require for kiln/calciner.

    The Saw dust is being grind with petcock in the Ball Mill

    Innovative Projects - 3

  • 7/28/2019 Acc Ltd Laheri Cement Works

    60/67

    60

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Analysis of Petcoke

    Sample

    Details

    Proximate Analysis CV

    cal/gm

    (GOD)

    % S% Moisture (As

    recd.)% VM % Ash

    Pet

    coke5.2 9.1 0.6 8390 5.4

    Analysis of Saw Dust

    Sample

    Details

    Proximate Analysis

    CV

    cal/gm

    (GOD)

    % S%

    Moisture(As recd.)

    %VM % Ash %Fixed C

    Saw Dust 17.364.9

    0.5 17.3 4440 0.1

    Innovative Projects - 3

  • 7/28/2019 Acc Ltd Laheri Cement Works

    61/67

    61

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Results :Reduction in %O2 at kiln inlet by 0.4%

    (2.4 to 2.0%)

    Reduction in %O2 at PH outlet 0.6%

    (4.4 to 3.8%)

    Increase in AFR TSR from 0.65% to 1.8%

    , fuel replacement cost w.r.t Indian gradefuel = 800 Rs/ts (5.0 Lac)

    Reduction in sp thermal energy

    consumption from 2998 to 2965 ,

    equivalent to 7.9 Kcal i.e. 94.6 Rs Lacby considering only 50% = 47.3 L

    Total Benefit = Rs 52.3 L

    Innovative Projects - 3

    723

    721

    713

    717

    709709

    700

    705

    710

    715

    720

    725

    2008 2009 2010 2011 2012 YTD Target

    2012

    Specific Therm al Energ y ( Kcal/ Kg Clinker )

  • 7/28/2019 Acc Ltd Laheri Cement Works

    62/67

    62

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    RABH

    ESP

    Air Cooling Tower

    Sewage Water Treatment

    Environmental Projects

    RABH Air cooled condenser

  • 7/28/2019 Acc Ltd Laheri Cement Works

    63/67

    63

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Environmental Projects

    Dust Suppression System Continuous Emission Monitoring System

  • 7/28/2019 Acc Ltd Laheri Cement Works

    64/67

    64

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Environmental Projects

  • 7/28/2019 Acc Ltd Laheri Cement Works

    65/67

    65

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Continuous weather monitoring system Environment monitoring Van

    Jatropha Plantation 7.5 MW Wind Power

    Environmental Projects

    Alternative fuels & Raw Materials

  • 7/28/2019 Acc Ltd Laheri Cement Works

    66/67

    66

    ACC Lakheri Cement Works 22nd 23rd Aug 2012Strength Performance Passion

    Alternative fuels & Raw Materials

    Marble Slurry Bio mass

    Shredded TiresAFR feeding

    Alternative Raw

    materials

    Marble Slurry

    Lime Sludge

    Coagulation Sludge

    Alternative Fuels

    Biomass - Mustard Husk,Saw Dust, Rice Husk, tree

    pruning etc.

    Shredded Tires Industrial Solid Waste

    Expired Products

    ETP Sludge

    Expired ProductsJatropha Plantation

  • 7/28/2019 Acc Ltd Laheri Cement Works

    67/67

    67

    Thank You