116
AC S U THE NEW YORK TIMES BUILDING BENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER 1 A CASE STUDY FOR THE USE OF IPD/BIM FOR THE ANALYSIS AND DESIGN OF THE NEW YORK TIMES BUILDING NEW YORK, NY EXISTING CONDITIONS PROJECT GOALS TENANT CORE REDESIGN TENANT REDESIGN INTRODUCTION CORE ENVELOPE OVERVIEW IPD/BIM LESSONS CONCLUSIONS QUESTIONS FAÇADE REDESIGN

AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

Embed Size (px)

Citation preview

Page 1: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

A C S U

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

1

A CASE STUDY FOR THE USE OF

IPD/BIMFOR THE ANALYSIS AND DESIGN OF

THE NEW YORK TIMES BUILDING

NEW YORK, NY

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 2: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

OWNED BY THE NEW YORK TIMES COMPANY & FORESTCITY RATNER COMPANIES

RENZO PIANO BUILDING WORKSHOP

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

2 ARCHITECTURE

FXFOWLE ARCHITECTS

52 STORY TOWER

746 FEET TALL

CERAMIC TUBE SHADING ARRAY OVER ULTRA CLEAR

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

GLASS CURTAIN WALL SYSTEM

EXPOSED STRUCTURAL STEEL

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 3: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

N

30’ 0”

30’-0”

20’-0”FOUNDATIONS:•(7) - 24” DIAMETER CAISSONS WITH 6,000 PSI

•6,000 PSI SPREAD FOOTINGS EVERYWHERE ELSE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

3 STRUCTURE

30’ 0”

30’-0”

30’-0”

30’-0”GRAVITY SYSTEM:•COMPOSITE STEEL SYSTEM

•3” METAL DECKING SPANS 10’•2 ½” N.W. CONCRETE

•TYPICAL FLOOR-TO-FLOOR HEIGHT IS 13.75’

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

32’-6” 32’-6”40’-0” 40’-0”

20’-0”

30’-0”BUILT-UP COLUMNS:•30” X 30”•WEB PLATES VARY 7” TO 1”•FLANGE PLATES VARY 4” TO 2”

FOUNDATION LOCATIONSTYPICAL FLOOR PLAN

COLUMN HIERARCHY

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 4: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

2 21

3 3

4

CANTILEVER BAYS:•MIDDLE LINE IS A VIERENDEEL FRAME (1)•EXTERIOR LINES ARE SINGLE STEEL RODS (2)

7 777

7 7

88

NTHE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

4 STRUCTURE

4

5

4

6

5

4

6

5

LATERAL FORCE RESISTING SYSTEM:•STEEL ROD X-BRACING (3)•CONCENTRIC BRACES BEHIND ELEVATOR SHAFTS (4)•ECCENTRIC BRACES AT ELEVATOR LOBBY ENTRANCES

•CHEVRON (5)•SINGLE DIAGONAL (6)

4

6

5

7

7

7

7

7

7

8

8

8

8

8

8

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

2 213 3

SINGLE DIAGONAL (6)•OUTRIGGERS AT 28TH AND 51ST FLOOR (7)•THERMAL BELT TRUSSES (8)

7 77

7

88

1ST – 27TH FLOOR FRAMING29TH – 50TH FLOOR FRAMING28TH & 51ST FLOOR FRAMING

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 5: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

51

COOLING

6250 TON CHILLED WATER SYSTEM

(5) 1,200 TON CENTRIFUGAL CHILLERS

(1) 250 TON SINGLE STAGE ABSORPTION CHILLER

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

5 MECHANICAL

28

( )

HEATING

PURCHASED HIGH-PRESSURE STEAM

LOW PRESSURE DISTRIBUTED TO FLOOR-BY-FLOORAHU’S HEATING COIL

HUMIDIFICATION

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

COGENERATION PLANT

NATURAL-GAS FIRED

PROVIDES 1.4 MW OF ELECTRICITY

WASTE HEAT PRODUCES PERIMETER HEATING HOT WATER

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 6: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

LIGHTING

INTERIOR (SBLD)18,000 (2) 14W FLUORESCENT LAMP FIXTURES

DIGITALLY ADDRESSABLE BALLASTS

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

6 LIGHTING/ELECTRICAL

COMPLEX DAYLIGHT HARVESTING SYSTEM

DESIGNED TO 1.1 W/FT2

DIMMED TO 30 FC

EXTERIOR (OVI)250W METAL HALIDE LAMPS ILLUMINATING THE

FAÇADE

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

1 FC AT TOP, 3 FC AT SIGNAGE

ELECTRICAL (FLACK + KURTZ)5 SERVICE ENTRANCES

CONDUIT IN NYT SPACE

BUS DUCT IN FCRC

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 7: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

SUMMARY SCHEDULE

FUNCTION: CLASS A OFFICE SPACE

FIRST FLOOR RETAIL, OPEN-AIR PAPER BIRCHGARDEN CULTURAL CENTER & PERFORMANCE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

7 CONSTRUCTION MANAGEMENT

GARDEN, CULTURAL CENTER & PERFORMANCESPACE

ASSUMED $1 BILLION

APPROXIMATELY 1.5 MILLION SQUARE FEET

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CORE & SHELL: AMEC

NYT INTERIORS: TURNER CONSTRUCTION

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 8: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

E I P D M

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

8 PROJECT GOALS

EMPLOY INTEGRATED PROJECT DELIVERY METHODSWITH USE OF BUILDING INFORMATION MODELING

TOOLS TO AID IN THE FOLLOWING ANALYSESEXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 9: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

DECREASE THE BUILDING’S LIFE CYCLE COST BYANALYZING:

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

9 TENANT

ANALYZING:

• BUILDING MECHANICAL SYSTEMS

• BUILDING LIGHTING SYSTEMS

• BUILDING STRUCTURAL SYSTEMS

• BUILDING ARCHITECTURE

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 10: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

10 CORE

OPTIMIZE THE STRUCTURAL CORE WHILE ANALYZING THEEFFECTS ON:

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

EFFECTS ON:

• BUILDING MECHANICAL SYSTEMS

• BUILDING ELECTRICAL SYSTEMS

• BUILDING ARCHITECTURE

• BUILDING CONSTRUCTION COST AND SCHEDULING

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 11: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

11 ENVELOPE

OPTIMIZE THE BUILDING ENVELOPE TO IMPROVE THEINDOOR ENVIRONMENTAL QUALITY AND DECREASE

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

INDOOR ENVIRONMENTAL QUALITY AND DECREASEBUILDING ENERGY CONSUMPTION BY ANALYZING:

• ENVELOPE THERMAL PERFORMANCE

• DAYLIGHT HARVESTING CAPABILITIES

• RENEWABLE ENERGY INCORPORATION

• BUILDING ARCHITECTURE

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN • BUILDING CONSTRUCTION COST

Page 12: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

12 OVERVIEW

FACADE

EXISTING CONDITIONS

PROJECT GOALS

TENANTCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

TENANT

WORK

FLOW

CORE

ENVELOPE

OVERVIEW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CORE

Page 13: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

13 ARCHITECTURAL LAYOUT

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

ORIGINAL 5-17 PROPOSED 5-17

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 14: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

APPLIED COST DATA TO FCRC SPACES

AVG: $60.58 /FT2/YEAR

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

14 RENT CHANGES

ORIGINAL: $1,279,000 /FLOOR/YEAR

PROPOSED: $1,409,000 /FLOOR/YEAR

AVERAGE DIFFERENCE: $130,000 /FLOOR/YEAR

$2,846,736.54 /Year Additionally

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

y

PROPOSED FCRC 32ND FLOOR

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 15: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

ITERATIVE DECK AND BEAM DESIGN

•14 DIFFERENT SOLUTIONS REDUCED TO ONEPOTENTIAL SOLUTION

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

15 REDESIGN OF GRAVITY SYSTEM

LS = LONG SPAN DECK & TS = TYPICAL SPAN DECKWF = WIDE FLANGE SHAPE & SB = SMARTBEAM

LS/WF/NW TS/WF/NWLS/SB/NW TS/SB/NWLS/WF/LW TS/WF/LWLS/SB/LW TS/SB/LW

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION Cor

e

Exte

rior

Cor

e

Exte

rior

WF = WIDE FLANGE SHAPE & SB = SMARTBEAMNW = N.W CONCRETE & LW = L.W. CONCRETE

•SOLUTION?:•L.W. CONCRETE ON LONG SPAN DECK WITHW-SHAPES Framing Option 1Framing Option 2

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 16: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

WALKING EXCITATION ANALYSIS:•DESIGN GUIDE 11:

•BEAM/ JOIST PANEL MODE

SUMMARY OF VIBRATION ANALYSIS RESULTS

EPICORE 3.5 EPICORE 450 LIMIT

SLAB THICKNESS (IN.) 5.5 8.5BEAM SIZE W30X108 W21X44GIRDER SIZE W24X84 W18X40

SUMMARY OF VIBRATION ANALYSIS RESULTS

EXISTING

SYSTEM

REDESIGNED

SYSTEM

SLAB DEPTH (IN) 5.5 6.25GIRDER DEPTH (IN) 17.9 17.9B D ( ) 17 7 17 7

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

16 REDESIGN OF GRAVITY SYSTEM

•GIRDER PANEL MODE

•DR. HANAGAN:•SLAB PANEL MODE

FINAL DESIGN:•USE EXISTING FRAMING WITH L.W. CONCRETE

GIRDER SIZE W24X84 W18X40FRAMING WEIGHT (PSF) 62.45 59.43SLAB FREQ. (HZ) 5.88 12.23BEAM FREQ. (HZ) 8.70 5.75GIRDER FREQ. (HZ) 7.28 5.31COMBINED WEIGHT (LBS) 107093 119710COMBINED FREQ (HZ) 4 05 3 72

BEAM DEPTH (IN) 17.7 17.7TOTAL STRUCTURAL DEPTH (IN) 23.4 24.15BEAM SIZE W18X35 W18X35GIRDER SIZE W18X40 W18X40DECK SPAN (FT) 10'-0" 10'-0"BEAM WEIGHTS (PSF) 4.50 4.50DECK WEIGHT (PSF) 53 46

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

•IMPACTS LATERAL SYSTEM AND FOUNDATIONS

STEEL TO CONCRETE CONNECTION:•SINGLE ANGLE WITH SLOTTED BOLT HOLES WELDEDTO AN EMBEDDED PLATE

COMBINED FREQ. (HZ) 4.05 3.72AP/G WITH B = 0.03 0.005 0.005 0.005AP/G WITH B = 0.05 0.003 0.003 0.003AVG. RELATIVE COST ($/SF) 34.84 28.66

DECK WEIGHT (PSF) 53 46STRUCTURAL WEIGHT (PSF) 57.50 50.50AVG. RELATIVE COST ($/SF) 22.88 24.38AP/G WITH B = 0.03 0.005 0.005AP/G WITH B = 0.05 0.003 0.003

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 17: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

17 INTERIOR LIGHTING DESIGN

DESIGN CRITERIA

30 FC

1.1W/FT2

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 18: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

18 INTERIOR LIGHTING DESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 19: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

19 INTERIOR LIGHTING DESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 20: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

20 INTERIOR LIGHTING DESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 21: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

21 INTERIOR LIGHTING DESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 22: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

22 INTERIOR LIGHTING DESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 23: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

23 INTERIOR LIGHTING DESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 24: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

24 INTERIOR LIGHTING DESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 25: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

25 INTERIOR LIGHTING DESIGN SUMMARY

DESIGN SUMMARY ORIGINAL DESIGN DESIGN CRITERIAPROPOSEDREDESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

REDESIGN

TARGETILLUMINANCE (FC) 50 30 30

LIGHTING POWERDENSITY (W/FT2) 1.07 1.1 0.469

ENERGY SAVINGS($/FT2/YEAR) $0.02 - $0.41

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN TOTAL SAVINGS($/YEAR) $21,976.65 - $462,242.21

Page 26: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

OBJECTIVES:

IMPROVE UPON INDOOR ENVIRONMENTAL QUALITY

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

26 AIR DISTRIBUTION REDESIGN

IMPROVE UPON INDOOR ENVIRONMENTAL QUALITY

FOR BUILDING OCCUPANTS

ACCESS BIM TOOLS FOR MECHANICAL SYSTEM

DESIGN AND COORDINATION

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 27: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

27 AIR DISTRIBUTION REDESIGN

EXISTING UNDERFLOOR AIR DISTRIBUTION SYSTEM (UFAD)ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 28: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PROPOSED DISPLACEMENT VENTILATION (DV) SYSTEM

TEMPERATURE PROFILE COMPARISON

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

28 AIR DISTRIBUTION REDESIGN

DUCTED SYSTEM

MORE EFFECTIVE STRATIFICATION

ORIGINAL DESIGN INTENT SATISFIED

HIGH-PROFILE SUSTAINABILITY

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

COST-EFFECTIVENESS

RAISED-FLOORUFAD DV

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

SOURCE: PRICE SOURCE: HALTON

Page 29: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

DESIGN OF DV SYSTEM

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

29 AIR DISTRIBUTION REDESIGN

IES VE COOLING LOAD DETERMINATION - TYPICAL OFFICE FLOOR LOADS

APPLICATION OF ASHRAE LOAD FACTORS FOR A DV SYSTEM

DIFFUSER SELECTION – PRICE HVAC FLOOR MOUNTED THREE-WAYDIFFUSER

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

ARCHITECTURAL INTEGRATION

LAYOUT, SIZING & DESIGN

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 30: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

L d

DESIGN OF DV SYSTEM

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

30 AIR DISTRIBUTION REDESIGN

Load Factors Load Type

Qoe (Btu/h) 0.295 Occupants, Desk Lamps & Equipment

Ql (Btu/h) 0.132 Overhead Lighting

Qex (Btu/h) 0.185 Heat Conduction through the Room Envelope and Transmitted Solar Radiation

IES VE COOLING LOAD DETERMINATION - TYPICAL OFFICE FLOOR LOADS

APPLICATION OF ASHRAE LOAD FACTORS FOR A DV SYSTEM

DIFFUSER SELECTION – PRICE HVAC FLOOR MOUNTED THREE-WAYDIFFUSER

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

Qtotal (Btu/h) Total Cooling Load

Load factors determined by ASHRAE RP-949ARCHITECTURAL INTEGRATION

LAYOUT, SIZING & DESIGN

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 31: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

L d

DESIGN OF DV SYSTEM

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

31 AIR DISTRIBUTION REDESIGN

Load Factors Load Type

Qoe (Btu/h) 0.295 Occupants, Desk Lamps & Equipment

Ql (Btu/h) 0.132 Overhead Lighting

Qex (Btu/h) 0.185 Heat Conduction through the Room Envelope and Transmitted Solar Radiation

IES VE COOLING LOAD DETERMINATION - TYPICAL OFFICE FLOOR LOADS

APPLICATION OF ASHRAE LOAD FACTORS FOR A DV SYSTEM

DIFFUSER SELECTION – PRICE HVAC FLOOR MOUNTED THREE-WAYDIFFUSER

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

Qtotal (Btu/h) Total Cooling Load

Load factors determined by ASHRAE RP-949ARCHITECTURAL INTEGRATION

LAYOUT, SIZING & DESIGN

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 32: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

DESIGN OF DV SYSTEM

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

32 AIR DISTRIBUTION REDESIGN

IES VE COOLING LOAD DETERMINATION - TYPICAL OFFICE FLOOR LOADS

APPLICATION OF ASHRAE LOAD FACTORS FOR A DV SYSTEM

DIFFUSER SELECTION – PRICE HVAC FLOOR MOUNTED THREE-WAYDIFFUSER

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

ARCHITECTURAL INTEGRATION

LAYOUT, SIZING & DESIGN

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 33: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

DESIGN OF DV SYSTEM

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

33 AIR DISTRIBUTION REDESIGN

IES VE COOLING LOAD DETERMINATION - TYPICAL OFFICE FLOOR LOADS

APPLICATION OF ASHRAE LOAD FACTORS FOR A DV SYSTEM

DIFFUSER SELECTION – PRICE HVAC FLOOR MOUNTED THREE-WAYDIFFUSER

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

ARCHITECTURAL INTEGRATION

LAYOUT, SIZING & DESIGN

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 34: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

DESIGN OF DV SYSTEM

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

34 AIR DISTRIBUTION REDESIGN

IES VE COOLING LOAD DETERMINATION - TYPICAL OFFICE FLOOR LOADS

APPLICATION OF ASHRAE LOAD FACTORS FOR A DV SYSTEM

DIFFUSER SELECTION – PRICE HVAC FLOOR MOUNTED THREE-WAYDIFFUSER

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

ARCHITECTURAL INTEGRATION

LAYOUT, SIZING & DESIGN

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 35: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

35 AIR DISTRIBUTION REDESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 36: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

36 AIR DISTRIBUTION REDESIGN

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 37: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

37 TENANT CONCLUSIONS

ARCHITECTURAL LAYOUT

GRAVITY SYSTEM

INTERIOR LIGHTINGCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

UFAD DVCONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 38: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

•CHANGED FROM STEEL BRACED FRAME TO CONCRETESHEAR WALLS

•MODELS:LATERAL BASE SHEAR DESIGN SUMMARY

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

38 REDESIGN OF CORE

•ETABS•REVIT

•LATERAL LOADS DETERMINED FROM:•WIND:

•TT WIND TUNNEL TEST

•1968 NYC BUILDING CODE

LATERAL BASE SHEAR DESIGN SUMMARY

VARIABLETT WIND

TUNNEL TEST1968

NYCBC ASCE 7-05 THESIS “WINDTUNNEL TEST”

VNS 3450 KIPS 4075 KIPS 8995 KIPS 3968 KIPS

VWE 2850 KIPS 3297 KIPS 7001 KIPS 3278 KIPS

I 1.0 1.0 1.15 1.15

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

•METHOD 2 OF ASCE 7-05•SEISMIC:

•ELF METHOD OF ASCE 7-05•WIND GOVERNED FOR STRENGTH ANDSERVICEABILITY

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 39: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

FINAL DESIGN:•1ST – 30TH FLOOR:

•10,000 PSI

DRIFT & DYNAMIC ANALYSIS SUMMARY

TARGET

MEAN HOURLY ROOF WIND SPEED 63.3 MPH

H/B 4.63

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

39 REDESIGN OF CORE

•30” THICK SHEAR WALLS

•30X44 COUPLING BEAMS, 10FT LONG (TYP.)•31ST – 40TH FLOOR:

•8,000 PSI

•24” THICK SHEAR WALLS

•24X44 COUPLING BEAMS, 10FT LONG (TYP.)

TL (WE) 6.46 SEC 6.25 SEC

TD (NS) 6.64 SEC 6.75 SEC

TΘ 4.41 SEC

GP 3.75

AD(Z) 1.86 MILLI-G

AL(Z) 2.72 MILLI-G2 09

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

•41ST – 52ND FLOOR:•6,000 PSI

•18” THICK SHEAR WALLS

•18X44 COUPLING BEAMS, 10FT LONG (TYP.)

BAΘ/SQRT(2) 2.09 MILLI-G

AR 3.90 MILLI-G

APEAK 14.6 MILLI-G 15 – 27 MILLI-G *

ROOF TO BASE DISPL. RATIO H/690 H/450

* GRIFFIS LAWRENCE G., "SERVICEABILITY LIMIT STATES UNDER WIND LOAD" ENGINEERING JOURNAL/ AMERICAN INSTITUTEOF STEEL CONSTRUCTION, 1993

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 40: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

FINAL DESIGN:•PROVIDES:

•MEP ACCESS BETWEEN THE CORE AND

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

40 REDESIGN OF CORE

TENANT SPACE

•ELIMINATES:•OUTRIGGERS

•X-BRACING RODS

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 41: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

FINAL DESIGN:•MAINTAINS:

•ARCHITECTURAL DESIRES:

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

41 REDESIGN OF CORE

•OPENNESS

•TRANSPARENCY

•STRUCTURAL NEEDS:•LATERAL STRENGTH

SHEARWALLS

COUPLINGBEAMSSTRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 42: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

42 REDESIGN OF CORE

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

ORIGINAL PROPOSED

Page 43: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

ORIGINAL PROPOSED

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

43 REDESIGN OF CORE

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

ELECTRICAL ROOMSMECHANICAL ROOMEMERGENCY STAIRSFCRC RISERSACCESS TO CORE SPACES

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 44: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

44 BUS DUCT ANALYSIS

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 45: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

45 BUS DUCT ANALYSIS

(4) 500 MCM CONDUCTORS PER 3.5” CONDUIT

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

( )(6) FEEDERS TO MECHANICAL ROOMS

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 46: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

(4) 500 MCM CONDUCTORS PER 3.5” CONDUIT

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

46 BUS DUCT ANALYSIS

$57,170.10

$64,880.21

$70,662.80

( )(6) FEEDERS TO MECHANICAL ROOMS

MECHANICAL TOTAL=$344,292.37

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

$34,039.76

$41,749.87

$49,749.87

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

$26,329.64

$ ,

Page 47: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

47 BUS DUCT ANALYSIS

(4) 500 MCM CONDUCTORS PER 3.5” CONDUIT

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

( )(9) FEEDERS TO ELECTRICAL ROOMS/SIDE

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 48: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

48 BUS DUCT ANALYSIS

(4) 500 MCM CONDUCTORS PER 3.5” CONDUIT$118,195.26

$129,760.43

$141,325.60

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

( )(9) FEEDERS TO ELECTRICAL ROOMS/SIDE

ELECTRICAL TOTAL=$855,548.23

$71,934.57

$83,499.74

$95,064.91

$106,630.09

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

$48,804.23

$60,369.40

Page 49: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

49 BUS DUCT ANALYSIS

TOTAL ORIGINAL CONDUIT FEEDER COST

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

$1,199,876.60

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 50: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

50 BUS DUCT ANALYSIS

MECHANICAL ROOMS ELECTRICAL ROOMS

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 51: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

51 BUS DUCT ANALYSIS

TOTAL PROPOSED BUS DUCT COST

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

$1,754,285.00

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 52: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

52 BUS DUCT ANALYSIS

NEGATIVES

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

NEGATIVES

INCREASED COST

$1,200,000 $1,800,000

BENEFITS

FUTURE EXPANSION CAPABILITIES

DECREASED SPACE REQUIRED PER FLOOR

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 53: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

OBJECTIVES

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

53 MECHANICAL COORDINATION

MAINTAIN ADEQUATE SPACE FOR THE AIR HIGHWAYRUNNING THROUGH CORE

INSERT AIR DISTRIBUTION DUCTWORK INTO BIM MODEL, RUN CLASH DETECTION

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

REVIT MEP NAVISWORKS

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 54: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

OBJECTIVES

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

54 MECHANICAL COORDINATION

MAINTAIN ADEQUATE SPACE FOR THE AIR HIGHWAYRUNNING THROUGH CORE

INSERT AIR DISTRIBUTION DUCTWORK INTO BIM MODEL, RUN CLASH DETECTION

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

REVIT MEP NAVISWORKS

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 55: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

STEEL

BUILT UP COLUMNS

LARGE FRAMING MEMBERS

OUTRIGGER SYSTEM IN PLACE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

55 CONSTRUCTION IMPLICATIONS

OUTRIGGER SYSTEM IN PLACE

CONCRETE

30’’ – 24’’ – 18’’ THICKNESS

44’’ DEEP COUPLING BEAMS

DIFFERENCE

CONCRETE TAKES UP PLACE OF FRAMING

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CONCRETE TAKES UP PLACE OF FRAMING

ADDITIONAL SAVINGS FROM OTHER REDUCTIONS

EXTERIOR COLUMN “KNUCKLES” ELIMINATED

X-BRACING ELIMINATED

OUTRIGGERS ELIMINATED

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 56: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

USING MODEL

ACQUIRE STRUCTURAL MODEL

MODEL GENERATED AND ANALYZED

UPDATED IN REVIT STRUCTURES

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

56 CONSTRUCTION IMPLICATIONS

UPDATED IN REVIT STRUCTURES

GENERATE SCHEDULES OF STRUCTURE

“MARK” STEEL MEMBERS DISPLACED BY CONCRETE

STRUCTURAL FRAMING AND COLUMN SCHEDULES

APPLY COST DATAR.S.MEANS CONSTRUCTION DATA APPLIED TO TAKE-OFFS

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

COULD BE UPDATED WITH CHANGES TO STRUCTURE

UPDATE AND COMPARE SCHEDULESCONSTRUCTION SCHEDULE CHANGES UPDATED FOR NEW CORE SYSTEM

COMPARED TO ORIGINAL TO REMAIN ON SCHEDULE

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 57: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

SCHEDULE CHANGES2 MONTH EARLIER START FOR TOWER

2 MONTH LONGER CRANE DURATION

APPROX. $60,000.00 FOR CRANES AND CREW INCREASE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

57 CONSTRUCTION IMPLICATIONS

TEMPORARY HEAT FOR CORE DURING WINTER MONTHS

ADDITIONAL $3,000,000.00 FOR TEMPORARY HEAT

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 58: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

58 CONCLUSIONS

STRUCTURE

ARCHITECTURE

MEP COORDINATIONCORE REDESIGN

TENANT REDESIGN

INTRODUCTION

CONSTRUCTION IMPLICATIONS

CONCLUSIONSIPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 59: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

•EXPOSED STRUCTURAL STEEL:•DISENGAGED FROM THE LATERAL SYSTEM

•MOVED INSIDE THE BUILDING ENVELOPE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

59 ARCHITECTURAL PRECEDENTS

•ELIMINATES:•THERMAL DIFFERENTIALS

•THE NEED OF THERMAL TRUSSES

•BUILT-UP SECTIONS ARE REQUIRED TO MAINTAINARCHITECT’S VISION AT CANTILEVERED BAYSDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

DEBIS HEADQUARTERS BUILDINGIN BERLIN, GERMANY

AURORA PLACEIN SYDNEY, AUSTRALIA

NEW YORK TIMES BUILDINGIN NEW YORK CITY

•INTEGRATION OF OPERABLE WINDOWS AND LOUVERSPV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 60: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

60 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 61: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

61 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 62: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

62 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 63: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

63 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 64: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

64 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 65: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

65 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 66: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

66 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 67: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

67 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 68: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

68 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 69: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

69 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 70: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

70 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 71: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

71 DAYLIGHTING ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 72: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

72 DAYLIGHTING SUMMARY SAVINGS PER FLOOR PER YEAR

TOTAL ENERGY SAVINGS PER YEAR

$140.70 (12) FIXTURES

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

$422.10(36) FIXTURES

$422.10(36) FIXTURES

$56,280.00

NEW YORK TIMES BALLAST QUOTES

NORMAL $15/PERPV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS $140.70 (12) FIXTURES

NORMAL $15/PER

DIMMING $30-$75/PER WITH WILLINGNESS TO DECREASE

NEW YORK STATE ENERGY RESEARCH AND DEVELOPMENT AUTHORITY

Page 73: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

73 BIM FOR PERFORMANCE MODELING

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 74: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

REVIT IES<VE>REVIT ECOTECT ANALYSIS

SOFTWARE INTEROPERABILITY

REVIT SIMPLIFIED MODEL IES <VE>

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

74 BIM FOR PERFORMANCE MODELING

GREEN BUILDING XML (GBXML) INFORMATION TRANSFER

BUILDING GEOMETRY

WALL CONSTRUCTIONS

SHADING DEVICES

ADVANTAGES

VISUALIZATION

INFLUENCE EARLY DESIGN DECISIONS

DISADVANTAGES

CAREFUL MODEL INSPECTION

TIME-CONSUMING TO ELIMINATE ERRORS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

WORKFLOW “BEST PRACTICES”ROOM-BASED MODELING

SIMPLIFICATION

PARAMETERS

CUSTOM FAMILIES DID NOT EXPORT

SHADING SYSTEM DID NOT EXPORT

NO REVERSE TRANSFER TO BIM MODEL

REVIT COMPLEX MODEL ANALYTICAL VOLUMES ECOTECT ANALYSIS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 75: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

75 THERMAL ANALYSIS

OBJECTIVE

AMBIENT LOAD REDUCTION

ENERGY & COST ANALYSISDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 76: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

MODEL INPUT PARAMETER BASELINE DESIGN INPUT PROPOSED DESIGN INPUT

SPANDREL PANEL

RECESSED 3/16" ALUMINUMSPANDREL PANEL:

UVALUE: 0.08 BTU/FT^2-F-HR2 1/2" RIGID INSULATION BEHIND

RECESSED 3/16" ALUMINUMSPANDREL PANEL:

UVALUE: 0.08 BTU/FT^2-F-HR2 1/2" RIGID INSULATION BEHIND

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

76 ENVELOPE CONSTRUCTION

2-1/2" RIGID INSULATION BEHIND 2-1/2" RIGID INSULATION BEHIND

FENESTRATION TYPE1" IGU VISION LITE - CLEAR W/

LOW E DOUBLE PANE - ALUMINUMFRAME

1.1" COLTLITE DOUBLE GLAZEDPANEL

FENESTRATION U-VALUEUVALUE FOR GLAZING: 0.625

BTU/FT^2-F-HRUVALUE FOR GLAZING: 0.405

BTU/FT^2-F-HR

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

FENESTRATION VISIBLELIGHT TRANSMITTANCE

0.96 (96% TRANSMITTANCE) 0.79 (96% TRANSMITTANCE)

SHADING DEVICE 1-5/8" DIAMETER CERAMIC TUBES COLT SHADING LOUVRES

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 77: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

77 LIGHTING POWER DENSITY REDUCTION

MODEL INPUTPARAMETER BASELINE DESIGN INPUT PROPOSED DESIGN INPUT

INTERIOR LIGHTINGPOWER DENSITY

1.1 W/M2 .46 W/M2

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 78: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PEAK LOAD BASELINEDESIGN

PROPOSEDDESIGN

% REDUCTIONDUE TO GLAZING /

SHADING

PROPOSED WITHREDUCED LIGHTING

POWER DENSITY

% REDUCTIONDUE TO REDUCED

LIGHTING

PEAK COOLINGTOTAL LOAD 21,554.50 19,442.50 9.80 17,090.20 20.71

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

78 SIMULATION RESULTS

(KBTU/H), , ,

PEAK HEATING LOAD(KBTU/H) 22,196.00 16,460.20 25.84 16,460.20 ----

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

20,000.00

25,000.00

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS0.00

5,000.00

10,000.00

15,000.00

kBTU/hPeak Cooling Load

Peak Heating Load

Baseline Shading Reduced LPD

Page 79: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

79 PV ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 80: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

80 PV ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 81: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

81 PV ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 82: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

82 PV ANALYSIS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 83: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

83 PV ANALYSIS SUMMARY

FAÇADE SECTIONCOVERAGE AREA

(FT2)PRODUCTION

KWH/YEARCOST

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

Ç (FT2) KWH/YEAR

EAST FAÇADEFLOORS:5-17 3,575 10,216.53 $214,500

EAST FAÇADEFLOORS:18-54 10,175 207,971.7 $610,500

SOUTH FAÇADEFLOORS:18-54 10,175 381,281.5 $610,500

PRODUCTION CALCULATION INPUT

COST/FT2 $60.00

CONVERSIONEFFICIENCY

16%

INVERTINGPV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

WEST FAÇADEFLOORS:8-54 12,925 484,330.5 $775,500

INVERTINGEFFICIENCY

95%

Page 84: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

84 PV ANALYSIS SUMMARY

FAÇADE SECTIONCOVERAGE AREA

(FT2)PRODUCTION

KWH/YEARCOST

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

Ç (FT2) KWH/YEAR

EAST FAÇADEFLOORS:5-17 3,575 10,216.53 $214,500

EAST FAÇADEFLOORS:18-54 10,175 207,971.7 $610,500

SOUTH FAÇADEFLOORS:18-54 10,175 381,281.5 $610,500

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

WEST FAÇADEFLOORS:8-54 12,925 484,330.5 $775,500

Page 85: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

85 PV ANALYSIS SUMMARY

FAÇADE SECTIONCOVERAGE AREA

(FT2)PRODUCTION

KWH/YEARCOST

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

Ç (FT2) KWH/YEAR

EAST FAÇADEFLOORS:5-17 3,575 10,216.53 $214,500

EAST FAÇADEFLOORS:18-54 10,175 207,971.7 $610,500

SOUTH FAÇADEFLOORS:18-54 10,175 381,281.5 $610,500

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

WEST FAÇADEFLOORS:8-54 12,925 484,330.5 $775,500

Page 86: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

86 PV ANALYSIS SUMMARY

FAÇADE SECTIONCOVERAGE AREA

(FT2)PRODUCTION

KWH/YEARCOST

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

Ç (FT2) KWH/YEAR

EAST FAÇADEFLOORS:5-17 3,575 10,216.53 $214,500

EAST FAÇADEFLOORS:18-54 10,175 207,971.7 $610,500

SOUTH FAÇADEFLOORS:18-54 10,175 381,281.5 $610,500

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

WEST FAÇADEFLOORS:8-54 12,925 484,330.5 $775,500

Page 87: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

87 PV ANALYSIS SUMMARY

FAÇADE SECTIONCOVERAGE AREA

(FT2)PRODUCTION

KWH/YEARCOST

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

Ç (FT2) KWH/YEAR

EAST FAÇADEFLOORS:5-17 3,575 10,216.53 $214,500

EAST FAÇADEFLOORS:18-54 10,175 207,971.7 $610,500

SOUTH FAÇADEFLOORS:18-54 10,175 381,281.5 $610,500

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

WEST FAÇADEFLOORS:8-54 12,925 484,330.5 $775,500

Page 88: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

OBJECTIVE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

88 HYBRID VENTILATION

INVESTIGATE FEASIBILITY AND DESIGN PROCESS OFIMPLEMENTING HYBRID VENTILATION IN THE NEW YORKTIMES BUILDING

DETERMINE IMPACT OF BIM AND ANALYSIS SOFTWARE

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

FOR MIXED-MODE DESIGNPV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 89: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PROCESS

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

89 HYBRID VENTILATION

LITERATURE REVIEW

CASE-STUDIES

BUILDING CODES & STANDARDS

SINGLE – ZONE MODEL

CURTAIN WALL SELECTION

CONTROL STRATEGY

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

CONTROL STRATEGY

ENERGY SAVINGS & PAYBACK ANALYSIS

CONTROL STRATEGY

BIM IES <VE> MACROFLO INVESTIGATION

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 90: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PROCESS

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

90 HYBRID VENTILATION

LITERATURE REVIEW

CASE-STUDIES

BUILDING CODES & STANDARDS

SINGLE – ZONE MODEL

CURTAIN WALL SELECTION

CONTROL STRATEGY

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

CONTROL STRATEGY

ENERGY SAVINGS & PAYBACK ANALYSIS

BIM IES <VE> MACROFLO INVESTIGATION

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 91: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PROCESS

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

91 HYBRID VENTILATION1st January to 31st December

10 10

20 20

30 30

40 40

°C °CDRY BULB TEMPERATURE - New York City, New York - USA

LITERATURE REVIEW

CASE-STUDIES

BUILDING CODES & STANDARDS

SINGLE – ZONE MODEL

CURTAIN WALL SELECTION

CONTROL STRATEGY

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

N OR T H 15°

30°

45°

60°

75°

EASTW EST

285°

300°

315°

330°

345°

10 km/ h

20 km/ h

30 km/ h

40 km/ h

50 km/ h hrs316+2842522211891581269463<31

© W eather T ool

Jan14th28th

Feb14th28th

Mar14th28th

Apr14th28th

May14th28th

Jun14th28th

Jul14th28th

Aug14th28th

Sep14th28th

Oct14th28th

Nov14th28th

Dec14th28th

-10 -10

0 0

10 10

CONTROL STRATEGY

ENERGY SAVINGS & PAYBACK ANALYSIS

BIM IES <VE> MACROFLO INVESTIGATION

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

105°

120°

135°

150°

165°SOU T H195°

210°

225°

240°

255°

Page 92: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PROCESS

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

92 HYBRID VENTILATION

LITERATURE REVIEW

CASE-STUDIES

BUILDING CODES & STANDARDS

SINGLE – ZONE MODEL

CURTAIN WALL SELECTION

CONTROL STRATEGY

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

CONTROL STRATEGY

ENERGY SAVINGS & PAYBACK ANALYSIS

BIM IES <VE> MACROFLO INVESTIGATION

COLT COLTLITE LWI VENTILATOR, TYPE LWI

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 93: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PROCESS

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

93 HYBRID VENTILATION

LITERATURE REVIEW

CASE-STUDIES

BUILDING CODES & STANDARDS

SINGLE – ZONE MODEL

CURTAIN WALL SELECTION

CONTROL STRATEGY

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

CONTROL STRATEGY

ENERGY SAVINGS & PAYBACK ANALYSIS

BIM IES <VE> MACROFLO INVESTIGATION

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 94: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PROCESS

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

94 HYBRID VENTILATION

LITERATURE REVIEW

CASE-STUDIES

BUILDING CODES & STANDARDS

SINGLE – ZONE MODEL

CURTAIN WALL SELECTION

CONTROL STRATEGY

38

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

CONTROL STRATEGY

ENERGY SAVINGS & PAYBACK ANALYSIS

BIM IES <VE> MACROFLO INVESTIGATION10

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 95: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PROCESS

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

95 HYBRID VENTILATION

LITERATURE REVIEW

CASE-STUDIES

BUILDING CODES & STANDARDS

SINGLE – ZONE MODEL

CURTAIN WALL SELECTION

CONTROL STRATEGY

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

CONTROL STRATEGY

ENERGY SAVINGS & PAYBACK ANALYSIS

BIM IES <VE> MACROFLO INVESTIGATION

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 96: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

PROCESS

SINGLE ZONE MODEL

HOURLY TMY-2 WEATHER DATA

LOCAL WIND SPEED DETERMINED

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

96 HYBRID VENTILATION

LITERATURE REVIEW

CASE-STUDIES

BUILDING CODES & STANDARDS

SINGLE – ZONE MODEL

CURTAIN WALL SELECTION

CONTROL STRATEGY

BUOYANCY (STACK EFFECT) AND WIND FLOW RATES

COOLING AND VENTILATION LOADS MET

RESULT

TOTAL OF 18 OPERABLE GLAZING PANELS PER FLOOR

350+ HOURS FEASIBLE

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

CONTROL STRATEGY

ENERGY SAVINGS & PAYBACK ANALYSIS

BIM IES <VE> MACROFLO INVESTIGATION10% REDUCTION IN COOLING LOAD

ANNUAL COST SAVINGS OF $41,548

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 97: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

32W IN-GROUND UPLIGHT

51W WIDE FLOOD

50W AREA LUMINAIRE

ENTRANCE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

97 ENTRANCE LIGHTING DESIGN

ENTRANCE

STREETDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

N

W

SE

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 98: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

A C S U

32W IN-GROUND UPLIGHT

51W WIDE FLOOD

50W AREA LUMINAIRE

ENTRANCE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

98

A CASE STUDY FOR THE USE OF

BIM / IPD FOR THE ANALYSIS AND DESIGN OF

THE NEW YORK TIMES BUILDING

NEW YORK, NY

ENTRANCE

STREETDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

Page 99: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

32W IN-GROUND UPLIGHT

51W WIDE FLOOD

50W AREA LUMINAIRE

ENTRANCE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

99 ENTRANCE LIGHTING DESIGN

ENTRANCE

STREETDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

Page 100: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

32W IN-GROUND UPLIGHT

51W WIDE FLOOD

50W AREA LUMINAIRE

ENTRANCE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

100 ENTRANCE LIGHTING DESIGN

ENTRANCE

STREETDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

Page 101: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

32W IN-GROUND UPLIGHT

51W WIDE FLOOD

50W AREA LUMINAIRE

ENTRANCE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

101

ENTRANCE

STREETDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

Page 102: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

32W IN-GROUND UPLIGHT

51W WIDE FLOOD

50W AREA LUMINAIRE

ENTRANCE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

102

ENTRANCE

STREETDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

Page 103: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

32W IN-GROUND UPLIGHT

51W WIDE FLOOD

50W AREA LUMINAIRE

ENTRANCE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

103

ENTRANCE

STREETDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

Page 104: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

32W IN-GROUND UPLIGHT

51W WIDE FLOOD

50W AREA LUMINAIRE

ENTRANCE

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

104 ENTRANCE LIGHTING DESIGN

ENTRANCE

STREETDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

Page 105: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

105 FAÇADE LIGHTING DESIGN

51W SPOT FLOOD OR WIDE FLOOD

ENTRANCE

STREETDAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

51W SPOT, FLOOD, OR WIDE FLOODPV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

Page 106: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

106 FAÇADE LIGHTING DESIGN

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS ENTRANCE

STREET

51W SPOT FLOOD OR WIDE FLOODPV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

51W SPOT, FLOOD, OR WIDE FLOOD

Page 107: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

107 FAÇADE LIGHTING DESIGN

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS ENTRANCE

STREET

51W SPOT FLOOD OR WIDE FLOODPV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

51W SPOT, FLOOD, OR WIDE FLOOD

Page 108: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

108 FAÇADE LIGHTING DESIGN

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS ENTRANCE

STREET

51W SPOT FLOOD OR WIDE FLOODPV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

51W SPOT, FLOOD, OR WIDE FLOOD

Page 109: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

109 FAÇADE LIGHTING DESIGN

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS ENTRANCE

STREET

51W SPOT FLOOD OR WIDE FLOODPV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

N

W

SE

51W SPOT, FLOOD, OR WIDE FLOOD

Page 110: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

110 EXTERIOR LIGHTING DESIGN SUMMARY

DESIGN SUMMARY ORIGINAL DESIGNASHRAE

ALLOWABLEPROPOSEDREDESIGN

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

ALLOWABLE REDESIGN

WATTAGE 15,710 24,390 3,898

REDUCTION FROMALLOWABLE

35.59% - 84.02%

ENERGY SAVINGS($/YEAR) $6,082.94 - $14,360.79

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

ASSUMING 8 HOURS OF USE PER NIGHT

Page 111: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

111 CONSTRUCTION IMPLICATIONS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 112: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

TAKE OFFSENVELOPE AREA TAKE-OFFS FROM MODEL

ORIGINAL

APPLY COST DATA TO MODELED FAÇADE FAMILIES

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

112 CONSTRUCTION IMPLICATIONS

CALCULATE NUMBER OF RODS

PROPOSED LOUVERS AND OPERABLE WINDOWS

APPLY COST DATA TO MODELED LOUVERS AND OPERABLEWINDOW FAMILIES

DIFFERENCES

ORIGINAL CURTAIN WALL: $80,509,220.00

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

CERAMIC RODS: $3,023,640.00

NON-OPERABLE PANELS: $77,156,312.50OPERABLE PANELS: $7,715,812.50

LOUVERS: $11,563,300.00

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 113: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

113 FAÇADE CONCLUSIONS

DAYLIGHTING

THERMAL ANALYSISCORE REDESIGN

TENANT REDESIGN

INTRODUCTION ARCHITECTURAL PRECEDENTS

PV ANALYSIS

HYBRID VENTILATION

FAÇADE LIGHTING

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CONSTRUCTION IMPLICATIONS

CONCLUSIONS

Page 114: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

114 IPD/BIM LESSONS LEARNED

FACADE

CORE REDESIGN

TENANT REDESIGN

INTRODUCTION

TENANT

WORK

FLOW

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

CORE

Page 115: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

115 CONCLUSIONS

CORE REDESIGN

TENANT REDESIGN

INTRODUCTION

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN

Page 116: AC S U A CASE TUDY FOR THE SE OF FOR THE … Team 1 Final...51 cooling 6250 ton chilled water system (5) 1,200 ton centrifugal chillers (1) 250 ton single stage absorption chiller

AE DEPARTMENT & FACULTY

THE NEW YORK TIMES BUILDINGBENJAMIN R. BARBEN | CRAIG A. CASEY | NICOLE L. DUBOWSKI | JUSTIN M. MILLER

116 QUESTIONS

FRIENDS & FAMILY

IPD/BIM TEAM 2IPD/BIM TEAM 3

CORE REDESIGN

TENANT REDESIGN

INTRODUCTION

IPD/BIM LESSONS

CONCLUSIONS

QUESTIONS

FAÇADE REDESIGN