ABRUZZO, 2009AN EARTHQUAKE DESTROYS THE CITY OF L’AQUILA, ITALY

During the G8 meeting the Great of the world discuss the necessity for new building technology that protect people from the fury of nature.

CATASTROPHIC EVENTS

Page 2: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

CATASTROPHIC EVENTS

HURRICANES -DESTROYED HOMES AND MILLIONS OF PEOPLE MADE HOMELESS

Almost all the wooden houses were lost.

Page 3: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

SOLUTIONS IN CONCRETE

NEW ZEALANDINDIA

EUROPE

MIDDLE EAST

AMERICAAFRICA

Page 4: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

EARTHQUAKE-PROOFSOLUTIONS IN CONCRETE

FROM FORMWORK1

Page 5: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

Formwork1 Systems

TUB column formwork:

- Very light

- Reusable about 100 times

- Easy and intuitive to use

- Few parts and common to all systems – a single handle works with all of them

Page 6: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

PANEL wall formwork

Standard panel size:

47.2’’ x 23.6’’ weight 24.2 lb

Compensation panels:

15.7’’ x 23.6’’ weight 8 lb

11.8’’ x 23.6’’ weight 6.4 lb

9.8’’ x 23.6’’ weight 5 lb

7.9’’ x 23.6’’ weight 4.9 lb

Wall thickness 3.9’’ to 17.7’’

Formwork1 Systems

Page 7: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

SKYRAIL - One-way ribbed slab

Formwork1 Systems

Page 8: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

• reusable at least 100 times• on centres between ribbing: 23.6’’• height of ribs: 6.3’’, 7.9’’ or 9.4’’• the investment is amortised in few pours

1.6“ / 1.9“

7.9“

6.5”

23.6”

3.5”

Formwork1 Systems

SKYRAIL - One-way ribbed slabs

SPACER

T-BEAM

Page 9: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

SKYDOME - Two-way slabs for large span

Formwork1 Systems

Page 10: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

SKYDOME - Two-way slabs for large spans

• reusable• form height: 7.9’’, 9.8’’, 11.8’’, 13.8’’ or 15.7’’• rib width: 4.7’’, 6.3’’ or 7.9’’• slab thickness: 9.8’’ min – 18.9’’ max

33.9”

6.3” 27.5”

27.5”

27.5”4.7”

32.3”

35.4”

7.9”

Formwork1 Systems

CUBE

BEAM

Page 11: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

Product: Skydome

Slab surface: 141 sqyd

Structure: waffle slab

Location: Italy

Formwork1 Systems

Page 12: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

Product: Skydome

Slab surface: 118 m2

Structure: waffle slab

Location: Italy

Formwork1 Systems

Page 13: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

Formwork1 Systems

Product: Geotub and Geotub Panel

Project: new hospital

Structure: concrete columns

Location: UK

Page 14: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

Formwork1 Systems

Product: Geotub and Geotub Panel

Project: office block

Structure: concrete columns

Location: UK

Page 15: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

The M50 motorway consists of two-lane dual carriageway, though auxiliary/weaving lanes are provided at several junctions. Plans are in progress under the National Development Plan to upgrade several of the roundabout junctions, including the Red Cow, to free-flowing grade-separated interchanges. The upgrade project also includes widening the surrounding motorway to three or four lanes each direction from the M1 to Sandyford with the extra driving lanes replacing the existing wide grass-covered median.

This is a major project that is bringing a certain degree of disruption to the trafic flow on the M50: as the road is extremely important for the daily commuting of the Irish capital, it is important that the level of disruption iskept minimal.

The new bridges are each carried by 12 round columns of dia 23.6 in.

Geotub 60 column formwork was chosen as it avoided the use of cranes,which would have forced the temporary closure of traffic lanes during installation and / or operation.

Dublin, IrelandM50 motorway extension, “Red Cow” Roundabout

Formwork1 Systems

Page 16: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

Formwork1 Systems

Product: Geotub

Project: M50 motorway bridge

Structure: concrete columns

Location: Ireland

Page 17: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

Product: Geotub

Project: M7 motorway bridge

Structure: concrete columns

Location: Ireland

Formwork1 Systems

Page 18: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

Product: Geotub

Project: University Campus

Structure: concrete columns

Location: Padova, Italy

Formwork1 Systems

Page 19: ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology

Product: Geopanel

Project: commercial building

Structure: blade columns

Location: Saudi Arabia