ABP – Hadron Sources & Linacs. R Scrivens ABP Group Meeting 19/06/2013. Personnel. REX ISOLDE. Excellent performance, with 15 new isotopes delivered including the lightest so far – 6He – and polarized 8Li. Pear shaped nucleus discovered. - PowerPoint PPT Presentation
Citation preview
ABP – Hadron Sources & Linacs
R ScrivensABP Group Meeting 19/06/2013
Personnel
Staff Fellows,Students,Visitors
Patrik Andersson Veliko Dimov
Giulia Bellodi Hugo Estevao Pereira
Sebastien Bertolo Jaime Gil Flores
Detlef Kuchler Everton Granneman
Jean-Baptiste Lallement Stefano Mattei
Alessandra Lombardi Robert Mertzig
Jacques Lettry Oystein Midttun
Christian Mastrostefano Andrey Shornikov
Michael O’Neil Joshua Stafford-Haworth
Richard Scrivens Cristhian Valerio
Fredrik Wenander Masoomeh Yarmohammadi
Linac4 Linac2/3
REX
REX ISOLDE
• Excellent performance, with 15 new isotopes delivered including the lightest so far – 6He – and polarized 8Li.
• Pear shaped nucleus discovered.
• Study underway for an EBIS charge breeder with a higher electron current and voltage. Includes tests on a BNL high current gun design in Brookhaven.
L. P. Gaffney, P. A. Butler, M. Scheck, A. B. Hayes, F. Wenander, et al, Nature.
REX ISOLDE - future
• Repair work and some tests for different EBIS cathodes.
• HIE-ISOLDE is under construction, meaning no beam to “REX” until 2015!
• TSR – Study is being made to bring this Heidelberg Storage ring to CERN (to be installed after HIE-ISOLDE).
Linac4 - source• New source and extraction system was installed at the 3MeV
test-stand.
• Once recoupled to the DESY designed plasma generator, H- could be extracted at 45keV for the first time.
• So new extraction system and pulsed HT shown to work even for very high electron currents.
Linac4 - source
• Cesiation of the new source to be commissioned at the test stand.
• Second source to be made operational in the Linac4 tunnel.
Linac4 – Beam Commissioning• Beam though the RFQ on 13/03/2013.
• Validation of RFQ, diagnostics and chopping.
150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.00
102030405060708090
P=5E-7 mbar
P=1E-6 mbar
P=3E-6 mbar
simulation
RF power in the RFQ (kW)Tran
smiss
ion
thro
ugh
the
RFQ
(%) TRANSMISSION vs RFQ RF POWER
First beam through the RFQ: 10mA H- accelerated at first shot
3 MeV beam slit-SEMgrid emittance measurement
Beam chopper tests
Beam deflection on wire-scanner
Chopped beam
Linac4 – Beam Commissioning• Drift Tube Linac Permenant Quadrupoles up to 25 T/m
– All now delivered to CERN.
• Moveable test bench for beam measurements at 50 and 100 MeV has been defined. Includes emittance measurement with multiple profiles.
Linac4 – Overall Planning
Linac2+3• Linac2 worked like a Swiss Watch.
• Both Linacs serving p->Pb LHC run, L3 for Pb NA61.
• Linac3 startup was very difficult, a lot of controls renovation lessons learned.
• Linac3 has been tested with argon, NAr~6e9 / pulse ~ 10xNPb.
• A lot of information e.g. neutrons produced in Linac3, Ar plasma aggressive in the source.
Linac2+3• Both Linacs now in LS1. Restart planning to be done.
• Linac2
• New access system.
• A lot of critical controls being renovated.
• Instrumentation being changed for Linac4 versions.
• New source controls to be implemented.
• Restart of source in April 2014.
• Linac3
• New stripper.
• Low energy emittance measurement.
• Restart beam in 2014 for a long Ar injector setup and physics run (into 2015).
• Its been a good year, and the last 6 months in particular have seen a lot of highlights -> thanks to great spirit and determination.
• The low energy machines have produced new beams and new physics, and there are plenty of facilities to create.
• Ion for BioLEIR
• H- / p+ source for ELENA