17
About Pattern Development October 7, 2015

About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

Embed Size (px)

Citation preview

Page 1: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

About Pattern Development

October 7, 2015

Page 2: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

Disclaimer

This confidential presentation contains material non-public information. By accepting this confidential presentation, the recipient agrees to use any such information in accordance with its compliance policies, contractual obligations, and applicable Laws including Federal, State, and local jurisdiction securities laws.

These presentation materials may neither be reproduced nor used in whole or in part for any other purpose, nor furnished to any person without our express written permission. While the information included herein is believed to be accurate and reliable, by delivery of this presentation, we do not make any representations or warranties, express or implied, as to the accuracy or completeness of such information. By accepting this presentation, the recipient agrees that we shall not have any liability for any representation (express or implied) contained in, or for any omissions from, this presentation or any other written or oral communications transmitted to the recipient.

The delivery of this presentation shall not, under any circumstances, create the implication that there has been no change in our affairs after such date. Certain provisions of various agreements may be summarized in this presentation, but it should not be assumed that the summaries are complete. Such summaries are qualified in their entirety by reference to the texts of the original documents.

© 2015

Page 3: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

Company Overview

Page 4: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

4

About Pattern Development

Pattern Energy Group LP (Pattern Development) is a leading independent wind, solar and transmission development company

We develop and construct renewable energy and transmission assets in the United States, Canada, Mexico, Chile, and Japan

Our current development pipeline includes 5,900 MW of wind and solar power projects in addition to transmission projects

By combining creativity, focus, and a scientific approach, we have advanced our position as an industry leader and shown consistent, groundbreaking work

Our experience includes many industry firsts, such as the first to successfully develop utility-scale wind energy projects on the Gulf Coast of Texas, within the State of Nevada, and within the Commonwealth of Puerto Rico

Page 5: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

5

About Pattern Development

Our highly-experienced team has brought more than 4,000 MW of wind power to market

We have expertise in all project stages: resource analysis, site development, finance, construction, and asset management

Pattern Development’s affiliate company, Pattern Energy Group Inc. (Pattern Energy), is an independent power company listed on the NASDAQ (“PEGI”) and Toronto Stock Exchange (“PEG”)

– Pattern Energy has a portfolio of 16 wind power facilities with a total owned interest of 2,282 MW in the United States, Puerto Rico, Canada, and Chile

We have a strong commitment to delivering the highest value for our partners and the communities where we work while promoting environmental stewardship and corporate responsibility

Offices in San Francisco, Houston, San Diego, New York, Toronto, Mexico City, Santiago, and Tokyo

Page 6: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

6

Our Values

Commitment to Innovation

– Utilize the latest science and technology in our development, construction, and operations processes

– Deploy new technology to mitigate environmental impacts

Commitment to Quality

– Focus on quality at every step of the development process to build projects that maximize production and last for the long-term

– Use sophisticated engineering techniques, hire industry leading contractors, and procure state-of-the-art equipment from vendors

Commitment to Safety

– Implement industry leading safety protocols that strive to ensure safe work environments and project sites

– Incorporate safety into our decision making processes and consider it throughout all stages of our projects’ lifecycles

Page 7: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

Cohesive Management Team Since 2002

Financed and managed

7

Cumulative Megawatts (financed and managed by Pattern Development management)

4,500 MW+of capacity

30+wind projects completed

$12 billion+energy infrastructure assets financed

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

PATTERN DEVELOPMENT

34%Compounded annual growth rate

2003–2015

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Page 8: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

Core Competencies

8

Finance & Permitting Contract negotiation Project finance Permits / Real estate finalization Insurance Third party verification Hedging

Origination & Development Greenfield / Acquisition Meteorology and analytics Community relations Utility and supplier relationships Transmission /

Interconnection planning

Construction Engineering Construction management Project administration Site Biological and Archeological

monitoring and mitigation Environmental, Health and

Safety management

Page 9: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

Ownership in Pattern Energy Group Inc.

Publicly traded company

Public Shareholders

Ownership

(1) Represents shares held by the public shareholders as well as certain directors and certain members of management

~77%(1)

~23%

9

NASDAQ listing: PEGI

TSX listing: PEG

IPO on October 2, 2013

Page 10: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

10

International Portfolio of Developed Projects

Chile

KS

JapanCanada / United States / Mexico

FS

EAW

MW

SJW

AWGRWK2W

SKW

AWF

SIW

GW

LGW

PW1PW2

OW

HRWSVW

CS

Pattern Development Pattern Energy

Page 11: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

Conejo Solar

Page 12: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

12

Chile Vision: Conejo Solar

Pattern Chile Development Holdings SpA, a subsidiary of Pattern Energy Group LP, is constructing the first phase of its Conejo Solar PV project (Conejo Solar)

Located approximately 30 kilometers east of Taltal in the Atacama Desert

The 122 megawatts (MW) Conejo Solar project is one of the largest solar projects in Latin America

Funded with an investment of USD $205 million in project financing

Conejo Solar is located on public lands owned by the government of Chile, under a long-term concession by the National Assets Ministry

Page 13: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

13

Chile Vision: Conejo Solar

Construction of the project is expected to be complete during the summer of 2016

The project  will connect to the Sistema Interconectado Central (SIC) transmission system

Conejo Solar has a 22-year power purchase agreement with Minera Los Pelambres, an affiliate of Antofagasta Minerals, for approximately 65% of the project’s output over the term of the agreement

Page 14: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

14

Chile Vision: El Arrayán Wind

Pattern Development built Chile’s largest wind power facility: 115 MW El Arrayán Wind

Located 400 km north of Santiago on the Chilean coast

Completed in the summer of 2014

Generates clean, renewable power equal to the needs of approximately 200,000 Chilean homes each year

El Arrayán Wind is owned and operated by Pattern Development’s affiliate company, Pattern Energy Group Inc. (Pattern Energy)

Page 15: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

15

Chile Vision: Moving Forward

Chilean market has shown the potential for development without subsidies

Distribution companies have now become a new area for energy offtakes

Mining industry continues to incorporate renewable energy as part of their energy supply

Grid is in the process of being upgraded in order to support the development of the market

Robust economy, a dollar denominated energy market, and ability to sign long term power supply agreements will continue to support investments in wind and solar

Page 16: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

16

Chile Vision: Moving Forward

Important that market participants have a long term view

Need of sustainable market development

Awareness of market size and current limitations on transmission

Combination of the latter will allow for a robust, increasing share of renewable energy in Chile’s energy mix

Page 17: About Pattern Development October 7, 2015. Disclaimer This confidential presentation contains material non-public information. By accepting this confidential

17

Chile Vision: Moving Forward

Pattern Development is proud to lead the way to broaden deployment of renewable energy for the Chilean mining industry

Our projects with AMSA demonstrate that a global mining company and a leading renewable energy developer can succesfully work together

We were able to create a successful partnership through understanding the needs of our mining partner and being flexible in how we meet those needs

We aim to enhance our position as one of the leading contributors to Chile´s renewable energy market by continuing to establish partnerships with the mining industry