LABORATORY TESTING OF INTEGRAL ABUTMENT BRIDGE DETAILS FOR ABC

PROJECTS

FIU Webinar By: Sam Redd

July 2016

1

Page 2: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Overview: Integral Abutment

Integral Abutment Jointed Abutment

2

Page 3: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Overview: Integral Abutment in ABC

3

Page 4: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Overview: Grouted Coupler

4

Page 5: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Edison Bridge in Florida

Overview: Grouted Couplers

5

Page 6: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

1) Cast-in-place (CIP) – Iowa DOT design

2) Grouted Rebar Coupler – Dayton Superior Sleeve-Lock Coupler

3) Pile Coupler – HP pile section using CMP voids and grout

Laboratory Specimen 6

Page 7: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

• Integral Connection - #8 bars @ ~12 in. O.C. along front and back face

Control: Cast-In-Place (CIP) Specimen Iowa DOT Design Detail

7

Page 8: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

• Splice the pile cap and integral diaphragm for ABC application

• Seventeen #8 Bars and Grouted Couplers

Grouted Coupler Specimen

8

Page 9: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Grouted Couplers: Conceptual

9

Page 10: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

24” CMP

Section A - A Section B - B

Pile Coupler Specimen 10

Page 11: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler Specimen

11

Page 12: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler Concept

12

Page 13: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Laboratory Specimen Construction

13

Page 14: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Typical dimensions for all specimens

Laboratory Specimens

8’

14

Page 15: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Control: Cast-In-Place (CIP) Specimen Iowa DOT Design Detail

15

Page 16: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Grouted Coupler – Pile Cap 16

Page 17: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Grouted Coupler - Template 17

Page 18: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Grouted Coupler – Integral Diaphragm

18

Page 19: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Grouted Coupler - Alignment 19

Page 20: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Grouted Coupler Specimen 20

Page 21: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler – Pile Cap 21

Page 22: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler – Integral Diaphragm 22

Page 23: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler – HP Guides and Lid

23

Page 24: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

• CMP Lid - 1/8” Sheet metal circle or octagon w/ #4 Rebar guides welded in place • U-bolt and aircraft cable to lower pile

CMP Lid and HP section 24

Page 25: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler – Grout Vent 25

Page 26: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler – 3” Grout Duct 26

Page 27: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Couplers Suspended

27

Page 28: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler Specimen – Construction Process

Step 2: Place grout bed dams

28

Page 29: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler Specimen – Construction Process

Step 3: Place grout bed; remove dams

29

Page 30: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Step 4: Lower HP Section

Pile Coupler Specimen – Construction Process 30

Page 31: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Step 5: Grout HP Voids

Pile Coupler Specimen – Construction Process 31

Page 32: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Testing Methodology

32

Page 33: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Strength • How strong is the pile cap /

integral diaphragm connection?

Durability • Does any cracking occur? • If so, what are the crack

widths under service level loads

Constructability • Ease of construction

Scope of Laboratory Testing 33

Page 34: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Test Philosophy

P vertical

P horizontal

Plastic moment of pile

34

Page 35: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Test Setup

A. 100 Kip horizontal B. 400 kip vertical

A

B

35

Page 36: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Test Results

36

Page 37: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Before and After – CIP

37

Page 38: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Before and After – Grouted Rebar Coupler

38

Page 39: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Coupler - After

39

Page 40: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

0.00

0.01

0.02

0.03

0.04

0.05

0.06

0 50 100 150 200 250 300

Cra

ck (i

n.)

Moment (k-ft)

Durability – Horizontal Load

Pile Coupler Grouted Rebar Coupler CIP

40

Page 41: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.18

0.20

0.22

0 200 400 600 800 1000 1200 1400 1600 1800 2000

Cra

ck (i

n.)

Moment (k-ft) Pile Coupler Grouted Rebar Coupler CIP

Durability – Vertical Load HP 14x117 Strong Axis

HP14x117 Weak Axis

HP 10x57 Strong Axis

HP 10x57 Weak Axis

41

Page 42: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

0

5

10

15

20

25

30

35

40

45

0 200 400 600 800 1000 1200 1400 1600 1800 2000

Reb

ar T

ensi

le S

tres

s (k

si)

Moment (ft-k) Grouted Rebar Coupler Cast-in-place

Strength – Vertical Load HP14x117 Weak Axis

HP 10x57 Strong Axis

HP 10x57 Weak Axis

HP 14x108 Strong Axis

42

Page 43: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Pile Type and Allowable Crack Width

Reasonable crack width ACI – 0.012 in (soil)

43

Page 44: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

1) Cast-in-place (CIP) – Iowa DOT design ▫ Strong in comparison to foundation piles

2) Grouted Rebar Coupler – Dayton Superior Sleeve-Lock Coupler ▫ Two grouted coupler failures ▫ Similar performance to CIP ▫ Template facilitated erection

3) Pile Coupler – HP pile section using CMP voids and grout ▫ Construction process was successful ▫ Structural performance less than ideal

Conclusions 44

Page 45: ABORATORY TESTING OF INTEGRAL BUTMENT BRIDGE DETAILS …

Questions?