32
architecture + interior design Company Profile

ABC profile1

Embed Size (px)

Citation preview

architecture + interior design

Company Profile

1.0 Services Offered

2.0 Company Establishment History

I. Architectural Design and Supervision of building Projects2. Interior Design 3. Project Management4. Master Planning5. Coordination of the activities of professionals involved in building and construction projects where we are the lead consultants6. Obtaining local authority and statutory approvals for building construction projects

Architecture by Cedar is a young Architectural firm that was founded and established in 2012. Since itsinception, Architecture by Cedar has grown significantly in its expertise and service provision.

The company was founded on the principle of FUNCTIONAL SPACE. This principle forms the basis of our designs. The founding directors of Architecture by Cedar at the time agreed that there wasneed for architecture that directly responds to the needs of the people rather than creation of a master piecefor the architect’s glory.

The company was also established on strong philosophies of EFFICIENCY and SUSTAIN ABILITY indesign. We believe in conserving the environment by fostering green buildings.

3.0 Company Identification and Registration

1. Company identification:

Legal Name of Firm: Architecture by Cedar Limited.Post office address: P.O. Box 51207 - 00100, NairobiCity: NairobiCountry: KenyaTelephone No.: +254 721 321721/729 376999Website: www.designcedar.co.keE-mail address: [email protected]

Person to contact: Mr. Kelvin Bwamu KisienyaTitle: Managing Director / Principal Architect

2. Company Registration:

Company registration number CPR/2012?76633Current PIN certificate number P051392204P

5.0 Principal’s Registration

1. Registration with BORAQS Registration No. A1339

2. Registration with Architectural Association of Kenya Registration No. A3221

4.0 Principal’s Curriculum Vitae

Name of the Professional staff: Kelvin Bwamu KisienyaProfessional discipline: ArchitectRegistration by:Board of Registration of Architects and Quantity Surveyors (BORAQS)Architectural Association of Kenya (AAK)

Proficiency:

• Architectural design in Arc hi CAD, and Artlantis• Design presentations via Photoshop• Preparation of scheme and construction drawings and details Preparation of Site inspection reports and minutes• Supervision of the construction sites according to proposed design• Periodic inspection during defect liability period.

Education:

Jomo Kenyatta University of Agriculture and Technology: Bachelor of ArchitectureUpper Second Class Honours (Graduated 2008)Chebisaas Boys High School Certificate of Secondary Education A- (minus)Uasin Gishu Primary School Certificate of Primary Education B (Plain)

Work Experience Record:

Work experience of 5 years as an Architect, specializing in the following areas:

1. Architectural Design in Arc hi CAD and Artlantis2. Interior Design and detailing3. Preparation of scheme and construction drawings with relevant details4. Supervision of the construction sites according to proposed designs 5. Preparation of Site inspection reports and minutes6. Acquisition of occupation certificates7. Periodic inspection during defect liability period.

Projects undertaken under Previous Employment: (Images courtesy of Edon Consultants Int. Ltd)

1. Toyotsu Auto mart ltd – Used car business complex in South C, Nairobi 2. Hino Trucks Center, Toyota Central Parts Depot and Vehicle logistics Center in South C, Nairobi Kenya3. Cold Springs Hotel Homabay - 70 Room Hotel in Homabay 4. Trent Villas (5 No. Town houses) in Karen Nairobi5. Oasis Park Apartments (30 No. Apartments) in Valley Arcade, Nairobi, Kenya6. Renovations of 7th and 8th Floors executive wings at Stima Plaza, Parklands, Nairobi7. Staff welfare building for The Kenya Sugar Board in Westlands, Nairobi, Kenya8. Kenya Railways Relocation programme (ongoing) in Mukuru slums Nairobi, Kenya9. Interior Renovations of the Central Bank of Kenya building

Previous Employer (References)Edon Consultants International Ltd. | P.O. Box 19684 - 00202 Nairobi, Kenya | Tel: +254-20 3874901/3878345 | Email: [email protected]

Principal Architect: Jerry Ndong

5.0 Projects undertaken under previous Employment

Oasis Park Apartments(30 No. 3 Bedroom Apartments)

Client: Peers Oasis Park Ltd

Project Cost: KES 150,000,000

Areas Handled: Architectural design Interior Design Detailed/Construction Layouts Construction Supervision Contract Management

Location: Gitanga rd. - Nairobi, Kenya

Trent Villas(4 No. 5 Bedroom Town houses with DSQs)

Client: Peers Oasis Park Ltd

Project Cost: KES 120,000,000

Areas Handled: Architectural design Interior Design Detailed/Construction Layouts Construction Supervision Contract Management

Location: Karen - Nairobi, Kenya

2 No. Townhouses in Syokimau(1 No. 4 bedroom townhouse with DSQ and 2 No.2 Bedroom apartments)

Project Cost: KES 30,000,000

Areas Handled: Architectural design Interior Design Detailed/Construction Layouts Construction Supervision Contract Management

Location: Syokimau, Kenya

(Courtesy of Edon Consultants Int. Ltd)

(Courtesy of Edon Consultants Int. Ltd)

(Courtesy of Edon Consultants Int. Ltd)

5.0 Projects undertaken under previous Employment

Toyotsu Automart Kenya Building

Client: Toyotsu Automart Kenya Ltd

Project Cost: KES 120,000,000

Areas Handled: Architectural design

Interior Design Detailed/Construction Layouts

Construction Supervision Contract Management

Location: South C - Nairobi, Kenya

Hino Truck Center,Toyota Central Parts Depot and

Vehicle Logistics Center

Client: Toyota Kenya Ltd

Project Cost: KES 700,000,000

Areas Handled: Architectural design

Interior Design Detailed/Construction Layouts

Construction Supervision Contract Management

Location: South C - Nairobi, Kenya

Cold Springs Hotel(70 Bed Hotel with conferencing facilities)

Client: Cold Springs Hotels Ltd

Areas Handled: Architectural design

Interior Design Detailed/Construction Layouts

Construction Supervision

Location: Homa Bay, Kenya

(Courtesy of Edon Consultants Int. Ltd)

(Courtesy of Edon Consultants Int. Ltd)

(Courtesy of Edon Consultants Int. Ltd)

5.0 Projects undertaken under previous Employment

Renovations of 7th and 8th Floors (executive wings)of the Stima Plaza

Project Cost: KES 20,000,000

Areas Handled: Interior Design Detailed/Construction Layouts Construction Supervision Contract Management

Location: Stima Plaza - Parklands, Nairobi, Kenya

(Courtesy of Edon Consultants Int. Ltd)

(Courtesy of Edon Consultants Int. Ltd)

(Courtesy of Edon Consultants Int. Ltd)

5.0 Projects undertaken under previous Employment

Interior Renovations at the Central Bankof Kenya Building

Client: Central Bank of Kenya

Project Cost: KES 950,000,000

Areas Handled: Reconassiance study

Design Report formulation Interior Design

Location: CBD - Nairobi, Kenya

Status: Construction Ongoing

Kenya Sugar Board Staff Welfare Building

Client: Kenya Sugar Board

Project Cost: KES 70,000,000

Areas Handled: Architectural Design

Interior DesignDetailed/Construction Layouts

Construction SupervisionContract Management

Location: Westlands - Nairobi, Kenya

Status: Complete

(Courtesy of Edon Consultants Int. Ltd)

(Courtesy of Edon Consultants Int. Ltd)

(Courtesy of Edon Consultants Int. Ltd)

Architecture by Cedar has to date been involved in various types of projects. These are at different stages ofdesign. We have taken part in the design of residential and commercial facilities of different kinds in variousparts of the country.We have selected a few of them to highlight the works carried out by Architecture by Cedar.

6.0 Project Gallery

6.1 Proposed Nyabantu Villas

Proposed 76No. 4 Bedroommaisonettes with common

grounds/facilities

Estimated Project Cost: KES 500M

Design Stage: Financing

Location: Kitengela, Kenya

!"##

#$"##

#%&

"###

%&"###

%"'#

#!"##

#$"##

#

%#"###

%&"###

%%("##

#

%!%"###)#"#'# )"### *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' %#"###

!"#$%&'()$

)$*"!$%#+$"#,$-#

+$.+$"#/'-"0%!"+1$-)

&'()$%#23$%%4,"/)'-##$5

!($)#%3"+6/-!

)$+7/.$%!"#$

,"/-%!"#$

!"#$%&'()$

#(+6%)&'3

!"#$%&#'()*#+,-*((.#./01($,22,3024#5#6),12#+,-*((.#($#6*()$-

'7((*#/$-#8#+,-*((.1#($#'0*12#'7((*3024#./12,*#,$1)02,9#(:,$#:7/$#7()$6,

-0$0$6#/$-#;02<4,$9#</*#:/*;9'*($2#/$-#+/<;#=/*-1

80''+%"+$"%9%:;<=>

)$-,*6*()$-#1,3/6,2*,/2.,$2#:7/$2#</:/+7,

('#*,<=<70$6#3/2,*'(*#6/*-,$0$6#:)*:(1,1

>?$(&#:/*;0$6#17(21#'(*6),121

:7/=#6*()$-1#/$-#*,<*,/20($/7:/*;

6.3 Proposed Apartments in Nanyuki

Proposed Residential Apartments (3 Bedroom)

Estimated Project Cost: KES 110,000,000

Design Stage: Submission to Council

Location: Nanyuki, Kenya

Concept Designs for Proposed 200 Bed Hoteland conference center with all relevant hotel and

conferencing facilities

Estimated Project Cost: Not yet estimated

Location: Mombasa, Kenya

6.5 Proposed Hotel in Mombasa, Kenya

A modern center for visual Arts thataccommodates a large art gallery and variousartist studios among other facilities

Estimated Project Cost: KES 100,000,000

Design Stage: Presentation to potential donors for funding

Location: Nairobi, Kenya

6.4 The Proposed Kuona Arts Center

Proposed Tamani Children’s CenterA children’s home and rescue center

to host a primary school, multi purpose hall,children’s hostels, staff residence, health

center, agriculture training and playgrounds.

Estimated Project Cost: Not yet estimated

Design Stage: Preliminary Design

Location: Isinya, Kenya

6.2 Proposed Tamani Children’s Center

!"#$%&'"(')*+&,-##

'(%!-(.&*/,))#

,+-#$,&/+0$+(

*$-11&2"-($+(*

3%(#*4&,)*$+#*

5).*4&,)*$+#*

*+6-3+&$(+-$!+0$

(+/(+-$%)0

-7!%0&5#)/8

3"+*$&,)"*+

3-$+&,)"*+

(-%*+7&6-$+(&$-08

'(%0/%'-#4*&(+*%7+0/+

!""#$%&&'()#*+

,-)..)/0'(""&'-)#+*+%/0)/0'1"".,

#2//),'*"31#

4"&&25'$%&&'*"31#

$%,62#'$%&&'*"31#

7'/31,215'*&%,,1"".,(89(:'*&%,,1"".,

&)$1%15,#%!!'1"".,,#"12'1"".,

,#%!!'%/;'*+)&;12/'#")&2#,"(2/'01"3/;,

<=='(%>',#3;2/#,

?==@7'A=='(%>'*%(%*)#512&%#2;',3(("1#'!%*)&)#)2,(1%*#)*2'1"".,77B@7'*"..21*)%&',)C2'6)#*+2/$12%6'%-%5'1"".,

02/21%&'#12%#.2/#'1"".,*"3/,2&&)/0'1"".,(+%1.%*5#2.("1%15',#%5'-%1;,*"/,3&#%#)"/'1"".,&%$"1%#"15#")&2#,

A'/"D'$&"*6,'"!'7'$2;1"".%(%1#.2/#,'E:'%(%1#.2/#,)/'2%*+'$&"*6F

(%16)/0<8'*%1,

B==@7

.%)/',*+""&'%;.)/),#1%#)"/'"!!)*2,.%)/'*+)&;12/G,'+".2'%;.)/),#1%#)"/

,+%12;'!%*)&)#)2,

8'/"D'$&"*6'"!';"3$&2'1"".,2%*+'$&"*6'#"'+%42'7='1"".,

(21'!&""1'%/;'A'/"D'!&""1,#"#%&'/"'D'"!'1"".,'H'A=''#"

%**".";%#2'?='(%>,+%12;'-2#'%12%,

"(2/'01"3/;,

3/;2101"3/;';)02,#"1,%/#)*)(%#2;'#"'+%42'*%(%*)#5'#"12*5*&2'-%#21

8='$2;1"".'+"3,2'"!B'(%>'(21'1"".I'-)#+

.%#1"/G,'1"".I'*".."/&"3/02I';)/)/0'%/;'6)#*+2/

/()'&1-(!

.%)/0%#2

,214)*20%#2

&"%;)/0$%5

"(2/01"3/;,

$"#%/)*%&0%1;2/

(",)#)"/'"!'2&24%#2;'-%#21'#%/6'-)#+,3/6'$"12+"&2 %**2,,'1"%;

-0%!-#&1-(!

A'$2;1"".'$3/0%&"-'-)#+.%,#21'2/,3)#2I'7'$2;1"".

,+%1)/0'%'$%#+I'&"3/02I6)#*+2/I';)/)/0'%/;'+".2

"!!)*2I'"3#;""1'$21$2J32'%12%

8'/"D'$&"*6'"!';"3$&2'1"".,2%*+'$&"*6'#"'+%42'7='1"".,

(21'!&""1'%/;'A'/"D'!&""1,#"#%&'/"'D'"!'1"".,'H'A=''#"

%**".";%#2'?='(%>,+%12;'-2#'%12%,

"(2/'01"3/;,

"(2/01"3/;,

"(2/01"3/;,

"(2/01"3/;,

Proposed 3 No. 2 Bedroom and 3 No. 3Bedroom serviced cottages in the secludedserene area of Karamaini complete withrelated hotel facilities for in-stay guests.

Estimated Project Cost: Not yet estimated

Design Stage: Preliminary design

Location: Juja, Kenya

6.6 Proposed Cottages in Karamaini, Juja.

11

Proposed Residential Estate with an 8 bedroom main house, 3 bedroom guesthouse, gazebo, staff housing and parkings

Estimated Project Cost: KES 80,000,000

Design Stage: Preliminary Design

Location: Kajiado, Kenya

6.7 Proposed Presidential Villa in Kajiado, Kenya

Proposed 6 No. 2 Bedroom affordableapartments.

Estimated Project Cost: KES 24,000,000

Design Stage: Preliminary design

Location: Syokimau, Kenya

6.8 Proposed Residential Apartments in Syokimau

Proposed 2 No. 4 Bedroom townhouses with DSQ and indoor 2-car garage.

Estimated Project Cost: KES 48,000,000

Design Stage: Scheme design (Submission to council)

Location: Ridge ways, Nairobi Kenya

6.9 Proposed Town Houses in Ridge ways

Proposed 2 No. 4 Bedroom town houses

Estimated Project Cost: KES 30,000,000

Design Stage: Council Approvals

Location: Syokimau, Mavoko, Kenya

6.10 2 No. Town Houses in Syokimau

6.11 Proposed 2 Bedroom Cottage in Karamaini

Proposed 2 Bedroom Cottagewith en-suite rooms and overflow

front and back porches in Karamaini.

Estimated Project Cost: KES 8,000,000

Design Stage: Scheme design (Submission to council)

Location: Ridge ways, Nairobi Kenya

Proposed 4 Bedroom Town house with master en suite, family room and an open livingarea.

Project Cost: KES 15,000,000

Stage: Under Construction

Location: Machakos, Kenya

6.12 Proposed Residential Dwelling, Machakos, Kenya

17

6.13 Proposed Renovation of a Country Home

Renovations of an old countryhome into a 2 Bedroom Cottage

Project Cost: KES 2,000,000

Stage: Under construction

Location: Kitale, Kenya

Courtyard Monument comemorating 90years sinceKapsabet boys High School was founded

Stage: Complete

Location: Kapsabet, Kenya

6.14 Courtyard Monument in Kapsabet Boys High School

Proposed 3 Bedroom villa with openplan lounge, kitchen and dining and

a prayer room

Estimated Project Cost: KES 18,000,000

Design Stage: Scheme design

Location: Kisumu, Kenya

6.14 Proposed Residential House in Kisumu

Interior Design Profile

Design and constructionsupervision of Nyadhi House of Fashion

Store at Lavington Mall, Nairobi

Project Cost: KES 4,000,000

Project Complete

Location: Nairobi, Kenya.

6.15 Fashion Store Interior Design

6.14 Salon and Beauty shop Interior

Design of Pam Hair and Beauty Salonat Capital Center Mall, Nairobi

Estimated Project Cost: KES 3,000,000

Design Stage: Under construction

Location: Nairobi, Kenya.

6.15 Proposed Renovation of Jamaa Mission Hospital, Buru Buru.

Proposed Renovation of Jamaa Mission HospitalMaternity Wing

Estimated Project Cost: KES 14,000,000

Design Stage: Financing

Location: Buruburu, Nairobi, Kenya.

Nyayo estate Embakasi, court 263 unit 75P.O. Box 51207 - 00100,

Nairobi, Kenya.Tel: +254 721 321721/729376999/ 734859376

Website: www.designcedar.co.keemail: [email protected]