2005-03-04 Substation Automation Products Training
Substation
Automation Products
Training
Control IED
REC 670
Synchrocheck
8/10/2019 ABB REC 670 Synchrocheck
2/21
2
AB
B
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Contents
Synchrocheck and energizing check
Application Functionality
Voltage selection
Function block
Settings
Interaction with apparatus control
8/10/2019 ABB REC 670 Synchrocheck
3/21
3
ABB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
The main purpose of the SCfunction is to provide control
of the CB closing in order toprevent closing if conditionsfor synchronism are not
detected.
Synchrocheck (SC/VC) Application
8/10/2019 ABB REC 670 Synchrocheck
4/21
4
ABB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchronism Check
, f, U and Uhigh
are within set values
SC/VC
25
AB
ILoad
UA UB
UAL
d
dU
Icap
8/10/2019 ABB REC 670 Synchrocheck
5/21
5
ABB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
The main purpose of the ECfunction is to facilitate the
controlled re-connection ofdisconnected lines andbusses to energized lines and
busses.
Energizing Check Application
8/10/2019 ABB REC 670 Synchrocheck
6/21
6
ABB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Energizing Check
The dead line and Live
bus conditions arechecked.
Uhigh and Ulow areverified
SC/VC
27
AB
ILoad
UA UB
Ulow
Uhigh
Inductive and Capacitive
charging of dead line
8/10/2019 ABB REC 670 Synchrocheck
7/217
ABB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck Voltage selection
SYN1SYN1 SYN2
1 U 1 U1 U
IED
3 U
1 U
3 U
B2QB1Q
UB1 UB2
ULN1
ULN1
UB1 UB2
LN1Q
Single Breaker Double Breaker
IED
8/10/2019 ABB REC 670 Synchrocheck
8/218
ABB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck Voltage selection
SYN1
IED 1
SYN1
IED 2
SYN1
IED 3
1 U
1 U3 U
3 U
SYN1
IED
SYN2
3 U
1 U
1 U
1 U
1 U
1 U
1 U
1 U
B2Q
UB1UB2
ULN1
LN1Q
LN2Q
ULN2 UB2
B1Q
8/10/2019 ABB REC 670 Synchrocheck
9/219
ABB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck Voltage selection
SYN1
REC670
SYN2
SYN3
3 U
3 U
1 U
1 U
8/10/2019 ABB REC 670 Synchrocheck
10/2110
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck Function block
Fuse fail on sel fuse
Information that the voltageis included in the
synchrocheck
Information that the
conditions for voltage, diff
voltage phase angle diff etc
are out of limit
Conditions for AR
Conditions for Man close
Test conditions fulfilled
DS Bus 1 at DB arrangement
DS Bus 2 at DB arrangement
DS Line at 1 1/2 arrangement
DS alt Line at 1 1/2 arrangement
Bus1 VT Fuse fail alt. OK
Bus2 VT Fuse fail alt. OK
Line 1 VT Fuse fail alt. OK
Line 2 VT Fuse fail alt. OK
Block inputs
Analogue inputs
Test mode inputs
8/10/2019 ABB REC 670 Synchrocheck
11/2111
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck CAP-config
8/10/2019 ABB REC 670 Synchrocheck
12/2112
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck CAP-config
8/10/2019 ABB REC 670 Synchrocheck
13/2113
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck CAP-config
8/10/2019 ABB REC 670 Synchrocheck
14/2114
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck CAP-config
8/10/2019 ABB REC 670 Synchrocheck
15/2115
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck PST
Selection of measuring phase, wich can be a
single-phase or phase-phase voltage
Type of voltage selection
Base voltage
Compensation for a phase shift caused by a
line transformer between the twomeasurement points for bus voltage and line
voltage.
Uratio=bus voltage/l ine voltage
Compensation for voltage difference
8/10/2019 ABB REC 670 Synchrocheck
16/2116
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck - PST
Setting for voltage difference between line andbus
The frequency difference level
The phase angle difference level
Voltage level in relation to bus/line network
voltage
Timer delay settings is to ensure that the
synchro check conditions remains constant
8/10/2019 ABB REC 670 Synchrocheck
17/2117
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck - PST
Energizing directions
Voltage level in relation to bus/line network
voltage
Timer delay settings is to ensure that the
energ. check conditions remains constant
Manual closing is enabled when DBDL
conditions are detected
Block the closing when the voltage is above
the set value
8/10/2019 ABB REC 670 Synchrocheck
18/2118
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
REC670 can handle up to6 SC functions!
Synchrocheck
8/10/2019 ABB REC 670 Synchrocheck
19/2119
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Synchrocheck & Apparatus Control
SynchroCheck
OR
SCSWI SXCBR
CLOSE
SYNC_OK
EXE_CL
Synchronizingfunction
.
SY_INPRO
START_SY
CLOSE CB
SECRSYN
Interaction with synchrocheck and synchronizing functions
8/10/2019 ABB REC 670 Synchrocheck
20/2120
A
BB
PowerTechnologiesAB,
2005
2005-03-04 Substation Automation Products Training
Exercise time
Exercise 10
Synchrocheck and energizing check
8/10/2019 ABB REC 670 Synchrocheck
21/21