จัดโดย กรมพัฒนาพลังงานทดแทนและอนุรักษ์พลังงาน (พพ.) ร่วมกับคณะผู้แทนสหภาพยุโรป (EU Delegation ) ประจ าประเทศไทย
วันอังคารท่ี 27 พฤศจิกายน 2555
ณ ห้องแลนด์มาร์ค โรงแรมแลนด์มาร์ค กรุงเทพฯ
Solar cell
Biodiesel Ethanol Biogas
Biomass Wind
Waste to Energy
7 Businesses
*Notice: Special Adders for -Facilities in 3 Southern Provinces - Diesel – Gen. replacement on PEA system -** 1 USD = 30.844 Baht (2 April 2012)
ADDER
Energy Type
(VSPP)
New Adder Rate
Baht/ kWh
Former Rate Support
Time
Biomass
Fuel Available 1
≤ 1.0 MW 1.00 0.50 7 years
> 1.0 MW 0.50 0.30 7 years
Fuel Unavailable 2
≤ 1.0 MW 2.00 - 7 years
> 1.0 MW 1.00 - 7 years
Biogas
Waste water – Food Industry Waste 3
≤ 1.0 MW 1.00 0.50 7 years
> 1.0 MW 0.50 0.30 7 years
Power plants – Agriculture Waste 4
≤ 1.0 MW 4.00 - 7 years
> 1.0 MW 2.50 - 7 years
Waste to Energy Municipal Solid Waste Industrial Waste (Except Hazardous Waste)
Landfill Gas/ Biogas 5
≤ 1.5 MW 3.50 2.50 7 years
> 1.5 MW 2.50 2.50 7 years
Thermal Process/ RDF 6
≤ 1.5 MW 4.50 3.50 7 years
> 1.5 MW 3.50 3.50 7 years
F.T.I. ADDER
Biogas and Waste to Energy consist of Biomass Biogas and Waste to Energy from Municipal Solid Waste (MSW) Industrial Waste (Non-Hazardous) should b used Adder system in properly. Since the price of Feed-Stock is increased by energy price and economic circumstance. The problems of Waste to Energy are transportation cost, waste collection cost and local politics etc. These are the cause of the price increase during the project.
ADDER
* Note : Biomass 1. Available Fuel such as husk, bagasse, palm fiber, palm shell, sawdust 1 2. Unavailable Fuel such as wood chips, straw, trunk and sugar crane leaves, stump and cob, palm bunch 2 Biogas 1. Waste water – Food Industry Waste such as fruits peel 3 2. Power plants – Agriculture Waste such as King grass, weed 4 Waste to Energy 1. Landfill Gas/ Biogas: Landfill waste, Municipal Solid Waste, Waste from the market and restaurant 5 2. Thermal Process/ RDF such as Gasification Technology, Steam Turbine 6 SPP It’s huge project. Adder will be considerate in appropriate by Ministry of Energy.
Current Situations and Targets in June 2012
Current Situations and Targets
AEDP: Alternative Energy Development Plan 25% in 2021 Source: Energy Regulatory Commission (ERC), August 2012
All in One Renewable Energy
The Federation of Thai Industries