A51L-6438-250-GA

Embed Size (px)

Citation preview

  • 8/22/2019 A51L-6438-250-GA

    1/2

    0

    0

    268.000

    0

    32.103

    38.813

    54.228

    96.000

    9.000

    24.000

    65.688

    264.000

    288.000

    80.000

    99.375

    0

    14.375

    26.375

    54.375

    0

    16.375

    132.563

    System Design Data

    Components/Materials Of Co

    S k id B as e As sy W 1 2 X 3 5 Wi d e F la n g

    F il te r/ Se pa ra to r 1 2" N PS x 8 2" S

    F il te r/ Se pa ra to r 1 2" N PS x 8 2" S

    Heater 10" N

    Heat Exchanger 8" N

    Surface Preparatio

    Surface Treatrment:

    Internal Surfaces: S

    External Surfaces: S

    Paint Requirements:

    Internal Surfaces:

    External Surfaces:

    P ri me r: I AW PD VS A S ta nd

    T op Co at : I AW PD VS A S ta nd

    General Notes

    1. All Dimensions Shown with Inches Unless Noted Otherwise.

    2. Bolt Holes to Straddle Vessel Centerlines Unless Noted Otherwise

    3. All Welds to be Visually Inspected

    4. Unless otherwise Noted Tolerances Are Per Clark-Reliance Standa

    5. Inlet and Outlet to be Permanently Identified.

    6. Vessels - Design and Fa brication IAW ASME Section VIII Divisio

    7. Piping - Design and Fabrication IAW ASME B31.1.

    8. Structural - Design and Fabricatin IAW AWS D1.1

    9. System - Design IAW SWPC Specification

    10.Use a 4 Point Lifting Arrangement when Lifting the Assembled Ski

    16633 FOL

    DRAWN:

    STRONGSVIL

    21SHEET OF

    FABRICATEDORASSEMBLEDFROMTHISDRAWINGWITHOUTCONSENTOFTHECLARK- RELIANCECORPORATION.

    REVISION: 0 PER CD

    PART NO.:

    SCALE:

    DRAWING NUMBER:

    NTS

    GKOE

    51L6438

    DRAWN: CMN

    BECOPIED, EXHIBITEDORFURNISHEDTOOTHERSNORMAYPHOTOGRAPHSBETAKENOFANY ARTICLEREQUEST.NEITHER THISDRAWINGNORANYPARTOFIT NORANYINFORMATIONCONCERNINGIT MAYITISCONFIDENTIALANDISGIVENTOYOUFORALIMITEDPURPOSEANDMUSTBERETURNEDONTHISDRAWINGANDALLINFORMATIONON ITIS THEPROPERTYOFTHECLARK-RELIANCECORPORATION.

    PHONE: 440-572-150

    ANDERSON

    FUEL GAS SARRANGME

    FI-2113103

    EH-2113102

    E-2113102

    FLOW

    FLOW

    FLOW

    FLOW

    FLOW

    A

    B

    C

    F

    G

    D

    FLOWE

    FI-2113104

    F

    FLOW C

    G

    D E

    A B

    MaxHeight

    Customer: JantesaCorparat ion

    ProjectName: GasAnacoProject- SantaRosaVenezuela

    P.O. No.: 7662-03-M-995-PO-800-E

    Serv ice: FuelGasCondi tioningSkid

    T ag N o. : X 21 13 15 2

    Document Tag

    Mark Service Size Material Schedule Flange Rating Remarks Line Type

    A MainInlet 3" SA-106-B 80 300# CarbonSteel 30A2

    B Main Inlet 3" SA-106-B 80 300# Carbon Steel 30A2

    C Main Outlet 3" SA-312-304/3104L 80 300# Stainless Steel 30M0

    D Hot Gas Inlet 3" SA-106-B 80 300# Carbon Steel 30A2

    E Hot Gas Outlet 3" SA-106-B 80 300# Carbon Steel 30A2

    F Drain 2" SA-106-B 80 150# Carbon Steel 15A2

    G Instrument Air 1" SA-106-B 80 150# Carbon Steel NA

    ClientTie-in Schedule

    Elect r ic Heater EH-2113102/202/302/402/502/60

    De scripti on 1 65 kW Cir culati

    480 V, 3 Phas e -

    Desig n P re ss ure 550 PSIG

    De sig n T em pe ra tu re + 20 F / 3 00 F

    Op era ti ng Flo w R ate 4 mm sc fd

    C orr osi on A llo wa nc e 0 .0 62 5"

    M a te r ia l s o f Co n st r uc t io n C a rb o n St e e l

    Si ze 1 0 " N P S X 94 " O

    Heat Exchanger E-2113102/202/302/402/502/60

    De scripti on She ll and Tu be

    D es ig n P re ss ur e S he ll 55 0 P SI G /

    D es ig n T em pe ra tu re S h el l / Tu b e + 20

    Op era ti ng Flo w R ate 4 mm sc fd

    C orr osi on A llo wa nc e 0 .0 62 5"

    M a te r ia l s o f Co n st r uc t io n C a rb o n St e e l

    Si ze 8 " NP S X 9 6 " O

    De scripti on Co alescing

    Desig n P re ss ure 550 PSIG

    De sign Temperature 3 00 F

    O pe ra ti ng F lo w Ra te s 4 m m sc fd @ 3 2C orr osi on A llo wa nc e 0 .0 62 5"

    M a te r ia l s o f Co n st r uc t io n C a rb o n St e e l

    Si ze 1 2" NP S x 8 2 Se

    Fi l t er s 2710E2 (qt y 1)

    R e mo v al E ff i ci e nc y 1 0 0 % S o li d s & L

    Code of Cons t ruc t i on ASME s ec t i on VI I I Di v . I - 2

    Code of Cons t ruc t i on ASME s ec t i on VI I I Di v . I an

    Code of Cons t ruc t i on ASME s ec t i on VI I I Di v . I - 2

    Coalescer - FI - 2113103/FI -2113104

    Train Coalescer Electric

    T ra in 1 F I- 21 13 10 3/ 21 13 10 4 E H- 21

    T ra in 2 F I- 21 13 20 3/ 21 13 20 4 E H- 21

    T ra in 3 F I- 21 13 30 3/ 21 13 30 4 E H- 21

    T ra in 4 F I- 21 13 40 3/ 21 13 40 4 E H- 21

    T ra in 5 F I- 21 13 50 3/ 21 13 50 4 E H- 21

    T ra in 6 F I- 21 13 60 3/ 21 13 60 4 E H- 21

    PackageTagging- X-21131152/2

    Description Drawing Number

    Piping & Instrument Diagram 51L6438-250-PNID

    General Arrangement Drawing51L6438-250-GA

    Foundation Loading Diagram 51L6438-250-SBFL

    Electrical Wiring Diagram 51L6438-250-EWD

    Drawing Schedule

  • 8/22/2019 A51L-6438-250-GA

    2/2

    DRAWN:

    THISDRAWINGANDALLINFORMATIONON ITIS THEPROPERTYOFTHECLARK-RELIANCECORPORATION.ITISCONFIDENTIALANDISGIVENTOYOUFORALIMITEDPURPOSEANDMUSTBERETURNEDONREQUEST.NEITHER THISDRAWINGNORANYPARTOFIT NORANYINFORMATIONCONCERNINGIT MAYBECOPIED, EXHIBITEDORFURNISHEDTOOTHERSNORMAYPHOTOGRAPHSBETAKENOFANY ARTICLEFABRICATEDORASSEMBLEDFROMTHISDRAWINGWITHOUTCONSENTOFTHECLARK- RELIANCECORPORATION.

    REVISION: 0 PER CD

    PART NO.:

    SCALE:

    DRAWING NUMBER:

    NTS

    GKOE

    51L6438

    DRAWN: CMN

    ANDERSON16633 FOL

    STRONGSVILPHONE: 440-572-150

    SHEET OF2 2

    FUEL GAS SARRANGME

    FI-211310312"NPSFuel GasFilter/Separator

    FI-211310412"NPSFuel GasFilter/Separator

    Vent 1"300#RFBall Valve

    3"300# ButterflyValve- SS

    Client Tie-inCFuel GasOutlet - 304SS3" 300#RF

    SkidBaseW8X35 WideFlangewith1/2" ThickDeckplate

    Client Tie-in - FDrain2"150#

    Client Tie-in - DHot GasInlet3" 300#RF CS

    Client Tie-in - EHot GasOutlet3" 300#RF CS

    Client Tie-in - AMainGasInlet3" 300#RF CSButteflyValveManual Operation

    Client Tie-in - BMainGasInlet3" 300#RF CSButteflyValveManual Operation

    E-2113102

    Shell andTube Heat ExchangerAPI Basco1435-08-096-005

    EH-2113102ChromolaxElectric HeaterGCHI-36-165P-E4XX480V, 165KW, 3-3PH

    LiftingLug(Typical 4places)

    GroundPad

    Client Tie-in - GInstrument Air1" 150#RF

    3" 300#ButterflyValveWithActuator/Limit SwitchesandSolenoidValve

    Thermal Relief Valve1"300#X1"150#

    RestrictionOrifice2"150#

    3"300#Level Control Valve

    3"300#Globel Valve

    3"300#FlowmeterwithThermowell - SS

    3"300#RFButteflyValveManual Operation

    JunctionBox

    Mark Service Size Material Schedule Flange Rating Remarks Line Type

    A Main Inlet 3" SA-106-B 80 300# Carbon Steel 30A2

    B Main Inlet 3" SA-106-B 80 300# Carbon Steel 30A2

    C Main Outlet 3" SA-312-304/3104L 80 300# Stainless Steel 30M0

    D Hot Gas Inlet 3" SA-106-B 80 300# Carbon Steel 30A2

    E Hot Gas Outlet 3" SA-106-B 80 300# Carbon Steel 30A2F Drain 2" SA-106-B 80 150# Carbon Steel 15A2

    G Instrument Air 1" SA-106-B 80 150# Carbon Steel NA

    Client Tie-in Schedule

    Customer: JantesaCorparat ion

    Project Name: Gas Anaco Project - Santa Rosa Venezuela

    P.O. No.: 7662-03-M-995-PO-800-E

    Serv ice: Fuel Gas Condi tioning Skid

    T ag N o. : X 21 13 15 2

    Document Tag

    Train Coalescer Electr

    T ra in 1 F I- 21 13 10 3/ 21 13 10 4 E H-

    T ra in 2 F I- 21 13 20 3/ 21 13 20 4 E H-

    T ra in 3 F I- 21 13 30 3/ 21 13 30 4 E H-

    T ra in 4 F I- 21 13 40 3/ 21 13 40 4 E H-

    T ra in 5 F I- 21 13 50 3/ 21 13 50 4 E H-

    T ra in 6 F I- 21 13 60 3/ 21 13 60 4 E H-

    PackageTagging- X-21131152/