2 Copyright TWI Network, Inc. II. Current Situation April May June A. Start up Results – Production** Plan Actual •Daily Production Output Normal 100 200 300 400 500 April May June TMM Actual Target Rate 10 20 30 40 50 B. Downtime Results** •July Target is 500 Units per shift •Daily downtime level is high at 40 min. •Need to reduce to support production **Source: Daily Production Reports & Maintenance Logs

A3 Thinking

  • Upload
    ashok

  • View
    18

  • Download
    0

Embed Size (px)

DESCRIPTION

A3 Thinking Present Situation understanding via trends and charts

Citation preview

Page 1: A3 Thinking

2Copyright TWI Network, Inc.

II. Current Situation

April May June

A. Start up Results – Production**

PlanActual

•Daily Production Output Normal

100

200

300

400

500

April May June

TMM ActualTarget Rate

10

20

30

40

50

B. Downtime Results**

•July Target is 500 Units per shift

•Daily downtime level is high at 40 min.

•Need to reduce to support production

**Source: Daily Production Reports & Maintenance Logs