44
Technical Guide AGILIA™ SCREED A: A PUMP-APPLIED FREE-FLOWING FLOOR SCREED LAFARGE RMX EASTERN CANADA ARCHITECTS ENGINEERS DEVELOPERS CONTRACTORS ’17

’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

Tec

hnic

al G

uid

e

AGILIA™ SCREED A:A PUMP-APPLIED

FREE-FLOWINGFLOOR SCREED

LAFARGE RMX EASTERN CANADA

ARCHITECTS ENGINEERS

DEVELOPERS CONTRACTORS

’17

Page 2: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap
Page 3: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

2 P A G E | LAFARGE CONCRETE

INTRODUCTION

Introducing:Agilia™ Screed A

Lafarge is proud to introduce the innovative technology of Agilia™ Screed A, a pump-applied, free-flowing, self-consolidating synth-etic anhydrite screed.

This guide has been developed by Lafarge to provide both practical and technical knowledge on Agilia™ Screed A, including direction for the application of this easily placed floor topping, and insight to the unique characteristics of this newly developed concrete product.

The following material is compiled with the intention of acting as a resourceful tool when working with the product, Agilia™ Screed A, or simply just learning about it’s advantages in the world of ready mix concrete.

Page 4: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

LAFARGE GROUP

A company of more than 170 years of tradition and experience, Lafarge is the world’s leader in building materials, extracting resources from the heart of the earth and bringing them to life. Present in 78 countries, Lafarge responds to the world’s demands driven by the needs of the customer, the shareholder and the local communities.

SUSTAINABLE DEVELOPMENT

At a global level, Lafarge is:

n° 1 in Cement, n° 2 in Aggregates, n° 3 in Concrete, n° 3 in Gypsum.

Lafarge is dedicated to developing advanced solutions for our customer’schallenges. On major leap in the ready mix concrete sector is the develop-ment of our innovative, value-added products.

Agilia, the self-consolidating concrete, Chronolia, a high-early strength concrete, Extensia, a low shrinkage concrete, Artevia architectural concrete collection, and Hydromedia, permeable concrete. These products work to revolutionize concrete construction by simplifying the work effort, improving placement methods, and providing durable, flex-ible materials.

Most recently introduced to the family of Agilia products, is Agilia ScreedA. While Screed does share several characteristics of Agilia, such as the impressive leveling and self-consolidating cabilities, the main purposeof the Screed is as a floor topping. Similar to the other concrete products within the Lafarge portfolio, Agilia Screed A is designed to meet the sus-tainable building demand.

Lafarge has a strong commitment to sustainable construction, which is is understood as an endless company evolution.The Group has been working in partnership with the Wold Wildlife Fund for over 10 years and was ranked among the 100-best-performing multinationals in terms of sustainable development. Lafarge also works closely with the Canadian Green Building Council on localized solutions and the United Nations Environment Program to develop an international standard for sustain-able development

The Lafarge strategy also extends to providing a safe and healthy work-place. We are proud of the efforts of our employees, particularly in East-ern Canada Ready Mix, where we make reducing lost time incidents a priority every day.

Page 5: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

4 P A G E | LAFARGE CONCRETE

TABLE OF CONTENTS

CHAPTER I

Introduction 2

CHAPTER II

Applications and floor systems of Agilia™ Screed A 8

CHAPTER III

The production and quality control of Agilia™ Screed A 29

Machinery and accessories used in the application of Agilia™ Screed A 32

CONTACTS 41

Bonded 10 Unbonded/Floating 12Insulation/Thermal 15Radiant/Hydronic 18 Electrical 23Special/Cavity 28

Lafarge Group 3What is it? 5 10 Advantages 6

Advantages 29Manufacturing/ Quality 30Machinery/Accessories 31

CHAPTER IV

Workability 32 Mix Consistency/Test Method 33Site Preparation 34Installation Techniques 35Construction Joints 36Maintenance 37Considerations/Precautions 38Characteristics 39Technical Datasheet 40

Page 6: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

CHAPTER I

Agilia™ Screed A: What is it?

Lafarge offers the innovative flooring solution, Agilia™ Screed A, composed of a synthetic anhydrite binder used as a composite reactive filler in this pump-applied, free-flowing, self- consolidating floor screed. For this among many other advantages, Agilia™ Screed A has been developed as a ready mix product alternative to traditionally bagged floor toppings.

No project is complete without level or flat floors. Before the final layers of a floor can be installed,a smooth, surface must be present in order to accept floor finishes such as tiling, hardwood, lamin-ate, resin or carpet.

5 P A G E | LAFARGE CONCRETE

Page 7: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

6 P A G E | LAFARGE CONCRETE

CHAPTER I

10 Advantages of Agilia™ Screed A

1 PROPERTIES

2

FASTER FINISHING TIMES3

4 SURFACE AESTHETICS

The high flexibility of Agilia Screed A reduces the need for construction joints (up to 10,000 sq.ft without joints) and eliminates the need for reinforcement.

5 REDUCED THICKNESS

EASE OF PLACEMENT

Typically a crew of 3 or 4 can pump up to 40,000 sq.ft per day.

Agilia™ Screed A is ready within 24 hours and suitable forfoot traffic usually within 24 to 48 hours. Partitions can be erected seven days after placing. Typical compressivestrengths are 16, 20, 25, 30, 35 and 40 MPa.

Agilia™ Screed A provides a smooth, flat surface for the application of most floor coverings with minimal or no crack-ing and no curling.

There are significant material weight savings due to reduced design thickness. Agilia Screed A is well-suited for radiant floor heating applications as it is typically applied and with only 25mm required above the pipes.

Application overradiant heating requires only 25 mm cover over the pipes.

Page 8: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

7 P A G E | LAFARGE CONCRETE

6 IMPROVED HEAT EFFICIENCY

7 HEALTHIER MATERIALS

8 SAFER SITE CONDITIONS

9

SUSTAINABLE DEVELOPMENT

10 QUALITY CONTROL

Reduced thickness enables the system to release the heatquicker and more efficiently. The full consolidation around the heating pipes is tight, due to the flowing nature of the screed which eliminates voids and air pockets. The thermal conduc-tivity of Agilia Screed A is up to 3 times more than that of cement-based screeds.

This anhydrite binder is composed of 99% recycled materials which is protein free and will not harbour bacteria.

Agilia Screed A is exclusively installed by authorized contractors. The self-consolidating and fluid properties greatly reduces the labour required to place abd finish, and minimizes the number of crew required on site. The pumpability and fluid nature of the product also improves the physical erogonomics required to place and finish the product.

There are LEED® credits available when using Agilia Screed A under the Materials and Resources and the Indoor Environ-mental Quality sections of the Canadian Green Building Coun-cil (CaGBC) LEED Certification Guide.

The production and quality of Agilia Screed A are monitoredregularly based on internal quality control which is in accor-dance with the requirements of the CSA A23.1-09 standard.

Page 9: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

8 P A G E | LAFARGE CONCRETE

CHAPTER II

Applications and Floor Systems with Agilia™ Screed A

3. SCREED A PLACED ON INSULATION THERMAL SYSTEMS

1. SCREED A PLACED ON BONDED FLOOR SYSTEMS

2. SCREED A PLACED ON UNBONDED/FLOATING FLOOR SYSTEMS

4. SCREED A PLACED ON RADIANT/ HYDRONIC FLOOR

Page 10: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

9 P A G E | LAFARGE CONCRETE

CHAPTER II

Applications and Floor Systems withAgilia™ Screed A

7. AGILIA SCREED A FINA/ FEATHER-EDGED

5. SCREED PLACED ON ELECTRICAL FLOOR SYSTEMS

6. SCREED FOR SPECIAL/CAVITY FLOOR SYSTEMS

Page 11: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

10 P A G E | LAFARGE CONCRETE

BONDED FLOOR SYSTEMS

APPLICATION

CONCRETE FLOOR PREPARATION

Agilia Screed A is bonded directly to existing supporting concrete substrate. Screed can only be bonded to concrete. Consideration should be given to moisture transmission in slab-on-grade application

The surface area where screed is placed must be clean and dry, eliminating any contaminantsthat may be mixed in with the screed topping, altering the mix of damaging the quality of the surface finish. Mechanically preparing the concrete surface is recommended to increase the mechanical bond.

CHAPTER II

Polythene expansion foamA layer of Agilia Screed A

Page 12: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

11 P A G E | LAFARGE CONCRETE

CHAPTER II

The surface area where screed is to be placed and bonded to must be clear of dirt and any other contaminants to ensure there is no damage to the screed topping and screed surface.Large cracks or voids in the substrate should be filled to prevent large variances in the depth of the screed topping.

Perimeter expansion foam or plastic may be required around the perimeter of the pour area where protection to the existing wall is required. This will prevent water absorption from the screed into the wall which may affect the screed properties and cause damage to drywall or other absorbent wall finishes.

The concrete substrate must be primed with the appropriate bonding/primer. The manufacturers instruction for the application of the bonding/priming agent must be followed.The primer acts to seal the concrete surface against out-gassing and to minimize the waterabsorbed from the screed into the dry concrete slab.

SCREED THICKNESSThe nominal thickness for screed placed bonded on a concrete slab should be:

• Agilia Screed A FINA = 1mm – 20mm • Agilia Screed A = 18mm – 60mm

Page 13: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

12 P A G E | LAFARGE CONCRETE

UNBONDED/FLOATING FLOOR SYSTEMS

APPLICATION

SUPPORTING SUBSTRATE PREPARATION

Screed placed in an unbonded/ floating floor system is separated from the supporting substratewith a thin, damp-proof polythene sheet. The unbonded/ floating floor system prevents the screed from direct contact with the supporting ground. This system prevents the creation of stress between the screed and the substrate, and between the screed and the vertical building elements, such as walls or columns. The thickness of the polythene sheet should be min 6 mil.

The surface where the screed is to be placed must be kept clean and dry, eliminating any im-purities that may get mixed in with the screed, altering the mix or damaging the quality of the surface finish.

CHAPTER II

A layer of Agilia Screed A™ Polythene 6 mil

Polythene expansion foam

Page 14: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

13 P A G E | LAFARGE CONCRETE

CHAPTER II

Expansion foam must be restrained with sta-ples or tuck tape along the perimeter of the room and around pipes or columns protrud-ing vertically from the floor.

Properly assembled expansion foam.

The surface where screed is to be placed on mustbe clean and free of dirt, lightweight part-icles and contaminants which may mix with the screed during placement to ensure there is no damage to the screed. Large cracks or voids in the floor must be filled prior to the installation of the 6 mil poly to prevent large variances in the depth of the screed topping.

Tightly fit the perimeter expansion foam tothe wall and corners to prevent unrestrained movement or creases.

*Recommended perimeter expansion foam thickness:Thickness > 8 mm for spatial expansion; thickness > 16 mm for around columns, pipes, re-entry corners etc.

Page 15: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

14 P A G E | LAFARGE CONCRETE

CHAPTER II

The 6 mil poly is installed over or underneath the expansion foam, tightly fitted to the perimet-er of the room to prevent bending and creases in the poly. The poly joints should be overlap by10mm and sealed with tuck tape. The 6 mil poly will also help reduce the transmission of moist-ure vapour from the substrate.

Poly must to be carefully fitted in the corners in line with the expansion foam.

Tightly fit the poly to the walls and corners against perimeter expansion foam. An alternativeprocedure is to install the poly before the perimeter foam, raising the poly up the wall tucked in behind the perimeter expansion foam.

SCREED THICKNESSThe nominal thickness for screed placed in an unbonded system is between: • 25mm – 60mm.

Page 16: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

15 P A G E | LAFARGE CONCRETE

CHAPTER II

SCREED PLACED ON INSULATION THERMAL SYSTEMS

APPLICATION

Screed placed in a thermal floor system is separated from the substrate with a layer of thermal and/or acoustic material. This composite screed system creates a floor with excellent thermal and acoustic properties. Perimeter expansion foam of 8 mm to 16 mm in thickness must be applied between the screed layer and any structural elements, such as walls or beams to elimi-nate significant stresses in the screed layer.

SUPPORTING SUBSTRATE PREPARATION

The surface where the screed is to be placed must be kept clean and dry, eliminating any impurities that may get mixed in with the screed, altering the mix or damaging the quality of the surface finish.

A layer of Agilia Screed A™ Polythene 6 mil Insulation Board Polythene expansion foam

Page 17: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

16 P A G E | LAFARGE CONCRETE

Recommended perimeter expansion foam thickness:Thickness > 8 mm for spatial expansion; Thickness > 16 mm for around columns, pipes, re-entry corners etc.

The surface where insulation is to be installed mustbe clear of impurities and objects that can lead to punctures, damages, and uneven panels.

Tighly fit the perimeter expansion foam to thewall and corners to prevent unrestrained move-ment or creases.

Perimeter expansion foam installation.

Lay the insulation panels in a way that will mini-mize gaps between adjacent panels and walls, and reduce movements.

Page 18: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

17 P A G E | LAFARGE CONCRETE

CHAPTER II

Install poly with the same procedure outlined for unbonded/floating floor systems.

Tightly fit the poly to the walls and corners against perimeter expansion foam. (An alter-native procedure is to install the poly before the perimeter foam, raising the poly on the wall tucked in behind the expansion foam).

SCREED THICKNESS The nominal thickness for screed placed on insulation is between 35mm - 50mm.

Page 19: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

APPLICATION

Agilia™Screed is poured directly over the radiant tubing and therefore, specific details must be considered in the design and installation phase; Such as the area size, heating zones, type of construction, and type of heating installation. The screed topping must be placed at the required depth of 25mm clear cover over the tubes to resist loads and to minimize the risk of cracking.

Agilia™ Screed A has many advantages inradiant floor heating systems:• High thermal conductivity• The fluidity and self consolidating proper-ties of screed allows for tight encapsulation of the heating tubes. Therefore, resulting in rapid transfer of heat from the system to thesurrounding environment.

CHAPTER II

18 P A G E | LAFARGE CONCRETE

SCREED PLACED ON RADIANT / HYDRONIC FLOOR

A layer of Agilia Screed A Insulation Board Heating Tube Polythene (6 mil) Polythene expansion foam

Joint spacing:• Radiant heated unbonded floors up to 3000 sq.ft.• Non-heated unbonded floors up to 10,000 sq.ft.

Page 20: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

19 P A G E | LAFARGE CONCRETE

CHAPTER II

The surface area where screed is placed must be clean, free of dirt, lightweight partic-les and contaminants which can mix with the screed during placement. Large cracks or voids in the floor must be filled to prevent large variances in the depth of the screed topping.

Tightly fit the perimeter expansion foam to the wall and corners to prevent unrestrained movement or creases.

Perimeter expansion foam installation.

*Recommended perimeter expansion foam thickness:Thickness > 8 mm for spatial expansion; Thickness > 16 mm for around columns, pipes, re-entry corners etc.

Page 21: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

20 P A G E | LAFARGE CONCRETE

Lay styrofoam as close to the wall as possiblein an effort to reduce gaps, and reduce move-ment.

The poly should be placed without creasing orfolding edges.

The poly should be tightly fitted in the corners with the application of the expansion foam.

CHAPTER II

Page 22: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

21 P A G E | LAFARGE CONCRETE

CHAPTER II

The floor heating tubes should be fastened to the supporting floor prior to pouring screed. Use clips or staples every 2-3 ft to prevent thetubesfrom floating to screed surface.

Following the tube/pipe installation, the floor heating system must be checked for working order before pouring screed. Begin by filling the pipes with water the pressure required by regulation standards and maintain this for 24 hrs. When the system is confirmed to be in working order without leaks, the pour can com-mence. When pouring, it is important to remain cautious of the system, ensuring that the team pouring the screed do not disrupt the place-ment of or damage the tubing in any way.

SCREED THICKNESSThe minimum thickness for screed poured over the floor heating elements should be:

Cover over pipes = 25mmTotal depth = 38mm - 44mm (depending on pipe diameter)

Page 23: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

22 P A G E | LAFARGE CONCRETE

CHAPTER II

FLOOR HEATING SYSTEM START-UP 1. The floor heating cycle can commence after 5 - 7 days

2. The initial temperature of the heating cycle should be 20°C

3. Increase the temperature by 5°C daily until the maximum temperature of 45°C is reached and maintain it for 3-5 days.

4. Decrease the temperature by 5°C daily until returning to a comfortable temperature of 18 - 20°C.

5. The maximum temperature of the heating pipes shall not exceed 50°C.

NOTEFollowing placement, su�cient ventilation of the surrounding area is required to prop-erly cure the Screed.

Page 24: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

23 P A G E | LAFARGE CONCRETE

SCREED PLACED ON ELECTRICAL FLOOR SYSTEMS

APPLICATION

Agilia™ Screed A is poured directly over the radiant heating wires and therefore, specific de-tails must be considered in the design and installation phase; Such as the area size, heating zones, type of construction, and type of heating installation. The screed topping must be plac-ed at the required depth of 25mm over the heating wires to resist loads and to minimize the risk of cracking.

Agilia™ Screed A has many advantages in radiant floor heating systems:• High thermal conductivity• The fluidity and self consolidating properties of screed allows for tight encapsulation of the heating wires. Therefore, resulting in rapid transfer of heat from the system to the surround- ing environment.

Joint spacing:• Radiant heated unbonded floors: up to 3000 sq.ft.• Non-heated unbonded floors: up to 10,000 sq.ft.

CHAPTER II

A layer of Agilia Screed A™ Polythene 6 mil Polythene expansion foam

Insulation BoardElectrical Mat

Page 25: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

24 P A G E | LAFARGE CONCRETE

CHAPTER II

The surface area where screed is placed must be clean, free of dirt, lightweight partic-les and contaminants which can mix with the screed during placement. Large cracks or voids in the floor must be filled to prevent large variances in the depth of the screed topping.

Tightly fit the perimeter expansion foam to the wall and corners to prevent unrestrained movement or creases.

Perimeter expansion foam installation.

*Recommended perimeter expansion foam thickness:Thickness > 8 mm for spatial expansion; Thickness > 16 mm for around columns, pipes, re-entry corners etc.

Page 26: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

25 P A G E | LAFARGE CONCRETE

Lay styrofoam as close to the wall as possibleIn an effort to reduce gaps, and reduce move-ment.

The poly should be placed without creasing orfolding edges.

The poly should be tightly fitted in the corners with the application of the expansion foam.

CHAPTER II

Page 27: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

26 P A G E | LAFARGE CONCRETE

CHAPTER II

The floor heating wires should be tightly fast-ened to the supporting floor prior to pouring screed. Use glue or the appropriate fasteners every 2-3 ft to prevent the wires from floating to screed surface.

Following the wire installation, the floor heatingsystem must be checked for working order be-fore pouring screed. When the system is con-firmed to be in working order, the pour can commence. When pouring, it is important to re-main cautious of the system, ensuring that the team pouring the screed do not disrupt the placement of or damage the heating wires in any way.

SCREED THICKNESSThe minimum thickness for screed poured over the floor heating elements should be:

Cover over pipes = 25mmTotal depth = 25mm

Page 28: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

27 P A G E | LAFARGE CONCRETE

CHAPTER II

FLOOR HEATING START-UP The floor heating cycle can commence after 5-7 days

The initial temperature of the heating cycle should be 20°C

Increase the temperature by 5°C daily until the maximum temperature of 45°C is reached and maintain it for 3-5 days.

Decrease the temperature by 5°C daily until returning to a comfortable temp-erature of 18-20°C.

The maximum temperature of the heating pipes shall not exceed 50°C.

The total time cycle required to run the heating pipes is between 18-24 days

NOTEFollowing placement, su�cient ventilation of the surrounding area is required to prop-erly cure the Screed.

Page 29: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

28 P A G E | LAFARGE CONCRETE

SCREED FOR SPECIAL/CAVITY FLOOR SYSTEMS

APPLICATION

CHAPTER II

A layer of Agilia Screed A™ Polythene 6 mil Polythene expansion foam

Cavity Floor Structure

Installations and early loading of cavity �oor system. Agilia™ Screed A characteristics include high ear-ly strength and �exibility, allowing for easyconstant and centred loads - useful for storage or manufac-turing spaces require ventilation such as workshops or laboratories. This type of �oor also withstands of application is often recommended for places such as o�ce buildings or open areas that elevated cavity also leaves space for ventilation, air conditioning or heating systems. This type the screed layer, it is possible to have additional installations or adjust existing systems. This such as electrical, wiring, piping, etc. Because there are revision �aps already placed within ground and the anhydrite screed layer. The cavity is used to install all types of installations, The cavity �oor system is a special structure which creates a space between the supporting.

Agilia™ Screed A characteristics include high early strength and �exibility, allowing for easy installa-tions and early loading of cavity �oor system.

Page 30: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

29 P A G E | LAFARGE CONCRETE

CHAPTER III The Advantages of Agilia™ Screed A:

No shrinkage or curling, Level and flat floors, with no patching or grinding required,

No reinforcement required,

Jointless floors up to 10, 000 sq. ft. Radiant Floor applications up to 3000 sq. ft.,

Quick and easy placement – simply pump into place,

Improved acoustic properties and high performance systems to improve STS and IIC ratings,

High mechanical and fire resistance,

Improved heating efficiency in radiant floor heating systems, with superior thermal conductivity.

Page 31: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

30 P A G E | LAFARGE CONCRETE

The Production and Quality Control ofAgilia™ Screed A

MANUFACTURING AGILIA™ SCREED A

Agilia™ Screed A is manufactured at the concrete plant where the constituents, dosage and mixing is controlled by a computer system, ensuring a consistent and high quality product. The processes from mixing to pouring is subject to constant laboratory control which regulates the consistency of the product right to the construction site.

The ready anhydrite screed mix is delivered to the construction site is delivered in a ready mix truck and placed with a screed pumping system. Agilia ™ Screed A eliminates the challenges associated with storing materials onsite and the safety hazards associated in doing so.

CHAPTER III

Constituent mixing and dosage is a computer controlled process where all parameters of the production process are stored within a database. Laboratory and plant employees sample anhydrite screed batches, confirming the product meets all requirements and standards of CSA A23.1-09.

QUALITY CONTROL

Page 32: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

31 P A G E | LAFARGE CONCRETE

CHAPTER IV

The Machinery and Accessories used forAgilia™ Screed A

PUMP machine SLUMP boards

SCREED dubbing bar 0, 30 mm, 150, 220, 300 cm, 2 handles

LEVELING with Laser or Tripod

SPONGE rubber balls FLEXIBLE rods, nom. diam. 50; 40 bar

Page 33: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

32 P A G E | LAFARGE CONCRETE

CHAPTER V

Workability of Agilia™ Screed A

TEMPERATURE REQUIREMENTS FOR AGILIA SCREED A

emit gnissecorP erutarepmeT

sruoh 5.4 C°02 - C°0

sruoh 4 C°52 - C°02

sruoh .5.3 C°82 - C°52

Table 1. The temperature shown below influences the processing time of Agilia Screed A:

Agilia™ Screed A must be placed in internal ambient temperatures above 5 degrees

APPLICATION AND CURING TIME FOR AGILIA SCREED AAgilia™ Screed A must be placed in internal ambient temperatures above 5 degrees

The open time for Agilia Screed A is 4hrs from time of batch in which the placing and finishing must be completed in.

The following processes should be followed within the specific open time: o Pumping and evenly spreading the screed on the floor surface, o Barring to finish the Screed, o Confirming level with a laser.

Ideal temperature is between 23 +/- 3*C which allows for the proper curing and setting time. Lower or higher temperatures will result in a slower or faster curing rate. The pump lines should be kept out of direct sunlight, as the heat may affect the mixture consistency and slump when pumping.

Page 34: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

33 P A G E | LAFARGE CONCRETE

CHAPTER V

Slump FlowScreed A Fina Air Temperature Pipeline Length

240 - 250 mm Up to 25°C max 2 hoses

260 - 270 mm 25 - 28°C max 2 hoses

250 - 260 mm Up to 25°C 3-4 hoses

260 - 270 mm 25 - 28°C 3-4 hoses

Table 2. Recommended slump flow consistency for temperature and pipe length

320 - 360 mm

340 - 370 mm

350 - 370 mm

360 - 380 mm

Addition of water that exceeds the maximum specified limit of the slump flow can lead to segre-gation and uneven surfaces, as well as reduced mechanical properties. A slump flow below the lowest specified limit can lead to difficulty in placing and irregular, uneven surface finishes.

The slump cone is positioned on the slump board, filled to the top with screed, and then the cone is rapidly pulled up off the board allowing the Screed to spread. The flow is measured by taking the average of two perpendicular lengths of the spread.

Mix Consistency and Test Method ofAgilia™ Screed A

Page 35: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

34 P A G E | LAFARGE CONCRETE

Preparation of the supporting floor for the installation of Agilia Screed A is one of the most im-portant steps to ensuring a successfully placed floor. The following conditions apply to every application of screed:

The surface must be clean and dry of any dampness or debris, especially Styrofoam or light weight pieces which are often left behind on job sites. These particles will mix in with the screed and float to the surface, resulting in surface defects.

The surface poly separating layer must also be cleared and dried to avoid mechanical de- fects.

The appropriate primer must be used in bonded applications.

Large cracks and voids on the supporting floor should be filled to avoid large variability in the screed topping thickness.

Recommended thickness for perimeter expansion foam: o Thickness along walls = 5 - 8mm along walls o Thickness around columns and re-entry points = 16 mm

Laying styrofoam should be installed in a manner that limits the openings between the ad- jacent boards and walls, limiting the movement of the boards.

Poly should be placed flat, avoiding any unnecessary folds and creases. All joints must be sealed with 10mm overlaps and tuck tape to prevent leaking.

The poly should be tightly fitted and to the walls and the perimeter foam in a manner that will prevent leaking or screed from flowing underneath the poly.

Other points to consider: o Lines and hoses should always be primed with the appropriate slurry prior to pumping screed. o Eliminate drafts in areas where screed is placed o Cover windows to prevent direct sunlight on the screed surface o Eliminate direct sources of heat: forced air, radiant, natural gas/propane heaters.

Site Preparation for Agilia™ Screed A CHAPTER V

Page 36: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

35 P A G E | LAFARGE CONCRETE

CHAPTER V

BAR TYPE FINISHING

Installation Techniques for Agilia™ Screed A

The shortest pouring point should be used to minimize the risk of bending or kinking the hose at any point.

Prior to pouring screed, the hoses should be primed with anhydrite, calcium carbonate slurry or other suitable methods. About 5 kilograms of primer should be used per single hose section. This proce-dure must be followed especially when the hose will be in a vertical position.

The hose elements must to be thoroughly washed out after each use.

Placement should be done by moving the pump line in a circular motion. The barring �nishing pro-cess can begin after the screed has been placed to the required depth.

The �rst pass with the bar is moved creating waves along the screed surface in one direction only. The second pass is completed in the perpendicular direction to the �rst pass.

Page 37: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

36 P A G E | LAFARGE CONCRETE

CHAPTER V

Types of joints:

Structural Joints

Construction Joints

Structural joints are installed within the load bearing structure elements. These joints must to be retained and mirrored within the screed layer in the exact location and identical in width.

Screed control joints within surface area surpassing 10, 000 sq. ft.

They are installed in order to compensate for deformations caused by stress and temper-ature differences.

Screed control joints in radiant floor heatingInstalled in locations where different screed systems connect, heated and non-heated floors.

Page 38: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

37 P A G E | LAFARGE CONCRETE

CHAPTER V

The intended use of the product is for interior applications only, where there is no direct con-tact to water.

Average dampness [%] after the period of __ days Layer thickness [cm]

7 10 14 21 28 35

%5,0 %5,0 %0,1 %5,1 %0,3 %3,3 53

Freshly laid screed should be protected against the following conditions for the first two days:

• Not meeting these requirements may result in early age cracking.• Accelerated drying and ventilating the areas where screed was placed can begin 72 hours from placement.• The radiant floor heating cycle can begin between 5-7 days from screed placement.

DRYING TIME

Table 3. Supporting ground moisture level for various surrounding temperature 16±2°C and air dampness condi-tions 65±5%

The presented results are based upon laboratory assumptions and may be applied to the approx. determination of construction site conditions therefore, a moisture test is recom-mended for accurate site or insitu moisture reading.

RECOMMENDATIONS FOR AGILIA SCREED A, FINISH FLOOR SUPPORTING LAYER

Any loose laitance should be removed from the screed surface prior to applying tiles, wood floor or any other glue down floor finish. The laitance can be removed by sanding or grinding or stiff broom 4-8 days after placement. An appropriate priming/ bonding agent should be app-lied prior to installing glues and mortars as per manufacturers instructions.

strong winds, wind gushes

direct sunlight

cold flooding

Agilia™ Screed A Maintenance

Page 39: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

38 P A G E | LAFARGE CONCRETE

Considerations and Precautions

CHAPTER V

Surface laitance - The degree of laitance is increased when the surface is subjected to draughts. Rapid drying out of the surface can create a weak surface layer.

Plastic shrinkage cracking - Rapid drying of the surface increases the risk of plastic shrinkage cracking.

Variable surface finish - Wind tunnel syndrome will cause a variable surface finish in the screed due to different areas being subjected to different degrees of drying.

Remedial work - All of the problems listed above lead to remedial work having to be undertaken in order to remedy the defects.

Improper installation of expansion material results in the screed cracking. Expansion ma-terial should be instlled around the perimeter of the area to be poured with screed . It should also be placed around all columns and vertical extrusions within the floor area. It may be ne-cessary to place a double layer of the material around corners and re-entry points in order to resiste the increses strees in those areas. This is essential as the screed initially expands; if it cannot expand it will crack.

Holes in the polythene membrane allowing the ingress of water. This is predominantly a problem on the ground floors of buildings where the polythene membrane is actins as damp-proof or moisture suppression membrane and holes can lead to the ingress of water into the screed layer. This can result in aa increased vapour transmition for the ground through the floor and de-bonding of the finish floor surface from the screed.

Incorrect screed depth that lead to decreased strength. Setting the accurate level on site is critical in placing screed and the appropriate minimum depth. Not doing so may results in crack-ing. This is more likely to occur if the substrate is not of a uniform depth. Resistence to stresses and cracking decreases as the cross-sectional area of the screed is reduced.

Creases in the polythene membrane causing cracks. The poly should be laid flat with an overlap of 100mm (4”) between adjacent sheets, sealed with 50mm width tuck tape. Creasesshould be taped flat without creases.

Page 40: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

39 P A G E | LAFARGE CONCRETE

Agilia Screed A Characteristics

Lafarge’s Screed A binder is used as a composite reactive �ller in this pump-applied, free- �owing, self-consolidating, self-leveling synthetic anhydrite �oor screed.

Provides a smooth surface for the application of most �oor coverings.

Provides a high-quality surface �nish, with minimal to no cracking and no curling.

Reduced the need for construction joints.

No reinforcement required.

Ideal for use in radiant �oor heating applications

Organic/protein free and will not harbour bacteria

CHAPTER V

SPECIFICATIONSFlow range: Agilia™ Screed A 240-270mm Agilia™ Screed A Fina 340-380mm

Maintenance of fluidity 4 hours

Compressive strength: Agilia™ Screed A 16-35 MPa Agilia™ Screed A Fina 25-40 MPa

Flexural strength: 4 - 10 MPa

Density: Agilia™ Screed A 2000 -2200 kg /m Agilia™ Screed A Fina 1700-1900 kg /m

3

Thickness: Agilia™ Screed A

Bonded 20mm min. Unbonded 25mm min. Over thermal /sound insulation 35mm min. Over radiant pipes 44mm min.

Agilia™ Screed A Fina

Bonded 0-25mm.

Drying time at 20 °C 60% RH: Up to 40 mm thickness 1 mm/day Over 40 mm thickness 0.5 mm/day

3

Page 41: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

40 P A G E | LAFARGE CONCRETE

1. Compressive strength 16 - 40 MPa

2. Flexural strength 4 - 10 MPa

The possibility for application of final flooring layer with thedampness at the level of (in accordance to the indication ofhygrometer)- for floor finishing layers which do not allow for the passage of water steam ex. wooden parquet 0.5%- for floor finishing layers which allow for the passage of water steam ex. floor carpet 1.0%

0.5% 1.0%

]Km/W[ 0,2 - A tneiciffeoc refsnart taeH .4

1A elbammalf-noN ytilibammalF .5

enilakla ylthgilS epocs Hp deercs teW .6

enilakla ylthgilS epocs Hp deercs yrD .7

m/gk 001 ± 0022 ytisneD .8 3

]K-m/mm[ 210.0 tneiciffeoc ytilibisnapxe taeH .9

ssendrah ecafruS .01 BB/150/08 the result of 67,2 [N/mm2] has been obtained

11.

Stress and swelling Swelling after 28 days of solidification 0,19[mm/m] in accordance with IMMB research report no BB/150/08

gnillews dna ssertS

13.

The time for plasticity processing (from the moment of loading in the concrete plant)

Max. 4,5 h, in accordance with the data from Table 1

14.

After minimum 24-48 hours depending on the temperature and the level of surrounding dampness

15.

The possibility for supporting ground weightening/load application (with conditions present on the construction site)

After minimum 5 days

3 elbaT morf atad eht htiw ecnadrocca ni skeew 3 retfA ytirutam reyal - ssenyrd lamrehT .61

17.

Initiation of floor heating in case of the presence of the floor heating system

After min. 7 days

Technical Datasheet

Foot Traffic

CHAPTER V

3.

Page 42: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

41 P A G E | LAFARGE CONCRETE

CONTACTS

TECHNICAL SALES SPECALIST

Luciana Gonsalves Innocon - Greater Toronto Area 50 Newkirk Road Richmond Hill, Ontario L4C 3G3 (416) 796 - 1112 [email protected] Taras Saplywyj Lafarge - Hamilton Niagara Tri-Cities 525 Victoria Avenue North Hamilton, Ontario L8L 7V1 [email protected] Darren Wright Lafarge - Northern Ontario 92 Industrial Court A Sault St. Marie, Ontario P6B 5W6 (705) 942 - 0627 [email protected] Maranda Bennett Lafarge - Eastern Ontario 1651 Bearbrook Road Ottawa, Ontario K1G 3K2 (613) 408 - 2933 [email protected] Manon Martineau Lafarge - Quebec 334 avenue Avro Pointe-Claire, Quebec H9R 5W5 (514) 434 - 1788 [email protected] Adam Bender Lafarge - Southwest Ontario 1200 Trafalgar Street London, Ontario N5Z 1H5 (226) 378 - 6853 [email protected]

PRODUCT MANAGER

Adam Boddy Lafarge - Eastern Canada 6509 Airport Road Mississauga, Ontario L4V 1S7 (416) 986 - 5171 [email protected]

Page 43: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap
Page 44: ’17 Technical Guide - Lafarge Canada · n° 3 in Concrete, n° 3 in Gypsum. Lafarge is dedicated to developing advanced solutions for our customer’s challenges. On major leap

LAFARGE CANADA INC.Eastern Canada - Head Office

Mississauga, Ontario, L4V 1S7

1-800-LAFARGE

6509 Airport Road

www.buildingbettercities.ca