73

· PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant

Embed Size (px)

Citation preview

Page 1: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 2: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 3: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 4: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 5: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 6: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 7: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 8: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 9: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 10: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 11: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 12: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 13: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 14: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 15: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 16: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 17: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 18: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 19: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 20: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 21: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 22: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 23: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 24: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 25: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 26: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 27: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 28: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 29: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 30: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 31: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 32: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 33: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 34: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 35: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 36: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 37: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 38: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 39: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 40: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 41: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 42: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 43: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 44: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 45: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 46: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 47: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 48: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 49: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 50: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 51: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 52: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 53: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 54: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 55: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 56: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 57: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 58: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 59: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 60: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 61: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 62: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 63: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 64: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant

BFEW is distinguished by its boldness of vision, courage and confidence it displays in taking on the toughest challenges. The ability to take on challenges has enabled us to successfully execute projects that have been new to our experience.

MAJOR PROJECT COMPLETED

SL. # Client Scope of WorkYear of

Completion

GOLDENBERG LLC GROUP OF COMPANIES3 Bolshoy Koptevskiy Proezd, Bld. 1, Moscow-125135, RussiaContractor to Rooppur Nuclear Power Plant

Essential Drugs Company LimitedMinistry of Health, Govt. of Bangladesh

HQ Border Guard Bangladesh,Peelkhana, Dhaka.

BSRM Steels LimitedAli mension, SadarghatChittagong

ORGENERGOSTROYBld., 7/10, Derbenevskaya nab., Moscow, Russian Federation, 115114Contractor to Rooppur Nuclear Power Plant

Abul Khair Steel Melting Ltd. Sitakunda, Chittagong, Bangladesh.

Goungdong PowerEngineering Corporation, China - Main ContractorOwner - BPDBBangladesh Re Rolling Mills Ltd., Nasirabad Industrial Area,Chittagong, Bangladesh.

Hyundai Engineering Co. Ltd., Korea-Contractor, BD Gas Transmission Co Ltd.- Owner

Meghna Petroleum Ltd, Bangladesh

Gas Transmission Company Limited, Bangladesh

Bangladesh Gas Fields Company Limited, Birashar, Brahmanbaria, Bangladesh.

Works on the construction of the Pilot Base's Facilities of the Rooppur 2 x 1000 MW Nuclear Power Plant. Value of work is BDT 220.00 million.

Civil Construction & Plumbing Work of Gopalganj 3rd Plant, Bangladesh. Value of work is BDT 970.00 million. Construction of 1 x Ware House for Works Branch at BGB Headquarters, Peelkhana, Dhaka. Value of work is BDT 18.00 million.

Fabrication & Erection of Rolling Mill Furnace Machinery and Equipment. Value of work is BDT 8.00 million.

Works on the construction of the Pilot Base's Facilities of the Rooppur 2 x 1000 MW Nuclear Power Plant. Value of work is BDT 70.00 million.

Fabrication of Steel Structure, Erection of Pre-fabricated Steel Structure, Fabrication & Erection of Steel Silo. Value of work is BDT 80.31 million.

Site improvement work of Shahjibazar 300MW±20% Combined Cycle Power Plant Project, Bangladesh. Value of work is BDT 55.00 million.

Erection of Hot Rolling Mill Machinery and Supply, Fabrication & Erection of Furnace Chimney & Duct, Diesel Tank etc. Total value of work is BDT 53.00 million.

Civil, Building & Steel Structure works of Compressor Station Project at Ashuganj & Elenga, Bangladesh. Value of work is BDT 585.00 million.

Construction of 02 (two) nos POL Storage Fixed Roof Vertical Steel Tanks Appx. capacity 10000 MT each at main installation at Chittagong. Value of work is BDT 162.00 million.Construction of 36" OD x 1000 psig Gas Transmission Pipeline from North Bank of Kalni River to East Bank of Dhanu River. Value of work is BDT 600.00 million.Procurement, supply, construction & commissioning of Gas Gathering Pipeline 6" DN x 3000 PSIG x 4.0 KM (Approx.) of Titas gas Field. Value of work is BDT 109.00 million.

Ongoing

Ongoing

Ongoing

Ongoing

2015

2015

2015

2014

2014

2014

2014

2014

01

02

03

04

05

06

07

08

09

10

11

12

63

Page 65: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant

SL. # Client Scope of Work Year ofCompletion

Abul Khair Steel Melting Ltd., Sitakunda, Chittagong.

Abul Khair Steel Melting Ltd., Sitakunda, Chittagong.

Gas Transmission Co. Ltd. (GTCL)

Hyundai Engineering & Construction Co. Ltd., Korea- EPC Contractor, Owner - EGCB

TESPL-CIPL-JV, IndiaGas Transmission Co. Ltd.-Owner

CSR Ziyang Co. Ltd, China - EPC Contractor, Bangladesh Power Development Board - Owner,

Gerico Bangladesh Ltd.

CCC Engineering Limited, China - Main Contractor, Bangladesh Power Development Board - Owner

Abul Khair Steel Ltd, Chittagong, Bangladesh

Marubeni Corporation,Japan (Bangladesh Project Office) - Main Contractor, Bangladesh Power Development Board -Owner,

CCC Engineering Limited China - EPC Contractor Bangladesh Power Development Board - Owner

Shah Cement industries Limited, Mukterpur, Bangladesh

Sylhet Gas Fields Limited, Sylhet, Bangladesh

Fabrication & Erection of Steel Silo. Value of work is BDT 14.50 million.

Fabrication of Steel Structure, Erection of Pre-fabricated Steel Structure. Value of work is BDT 50.31 million.

Construction of natural gas pipeline by HDD river crossing Project. Value of work is BDT 110.00 million.

Civil Works of Power Block of New Haripur 360 MW Power Plant Project, Bangladesh. Value of work is BDT 276.00 million.

Pipe spool fabrication & test for HDD 20” dia river crossing Gas pipeline work at 6 rivers. Value of work is BDT 45.00 million.

Complete Construction of Civil & Building works including Cast-in-situ RCC Piles and Mechanical & Electrical erection work of Katakhali 50MW HFO Power Plant. Value of Work is BDT 331.00 million

Fabrication of Hoppers, Bins & Pipes, Electro Mechanical erection works, instrumentation etc. of 200 TPD Animal Feed Mill. Value of work is BDT 80.00 million

Complete construction of civil, building, architectural works, construction of fuel storage tanks of 5000 ton capacity, erection of mechanical, electrical, firefighting and telecommunication works of Baghabari 50 MW HFO Peaking Power Plant, Bangladesh. Value of work is BDT 323.00 million.

Fabrication, erection, insulation and installation of steel structures and equipment of Color Coating Plant

Rehabilitation work of Karnaphuli Hydro Electric Power Station Unit 4 & 5 (each 50 MW). Value of work is BDT 37.40 million

Complete construction of above ground fuel storage steel tanks up to 5000 ton capacity including testing, calibration and commosioning at Daudkandi 50MW HFO Plant.

Fabrication and Erection of Steel Structures, Installation of Plant Equipment. Value of work is BDT 30.00 million

Procurement, Supply, Construction and Commissioning of 4" DN High Pressure Natural Gas Gathering Pipeline in Rashidpur Wellhead, Bangladesh. Value of work is BDT 57.00 million

2014

2014

2013

2013

2012

2012

2012

2011

2011

2011

2011

2011

2011

13

14

15

16

17

18

19

20

21

22

23

24

25

64

Page 66: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant

SL. # Client Scope of Work Year ofCompletion

Bashundhara Industrial Complex Limited, Madanganj, Bangladesh

Cemex Cement Bangladesh Ltd.

CSR Ziyang Co. Ltd, China - EPC Contractor, Bangladesh Power Development Board - Owner

Jahangirnagar University, Savar, Dhaka.

Gas Transmission Company Ltd (GTCL)

Sylhet Gas Fields Limited (SGFL)

MARUBENI CORPORATION, Japan

INDIAN OIL CORPORATION LIMITED

Chevron Bangladesh Block Twelve Ltd

BSRM Steels Limited

Bangladesh Inland Water Transport Authority

CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd.

Lafarge Surma Cement plant (Main contractor Larsen & Toubro (ECC Division of India)

Fabrication and erection of steel structures, ducts and chutes; erection of plant equipment of 6000 TPD Cement Grinding Plant. Value of work is BDT 25.00 million

Construction of Jetty & Apron Feeder and Fly Ash Unloading system. Value of work is BDT 63.50 million

Construction of Cast-in-Situ RCC Piles at Katakhali and Shantahar 50 MW HFO Peaking Power Plant Projects, Bangladesh. Value of work is BDT 22.45 million

Procurement, Supply & Construction of 5-storeyed Students’ Dormitory complete with all Civil, Electrical, Mechanical, Sanitary & Plumbing Works. Value of work is BDT 120.00 million.

Installation of cross country 30" Gas Pipe line with all valves and appurtenances, Tie-ins, testing and commissioning. Value of work is BDT 230.00 million.

Procurement, Supply, Installation, Testing and Commission of 4" Gas Gathering Pipeline. Value of work is BDT 60.00 million.

Erection Work of Exhaust Duct System for 100MW BPDB Haripur Power Station.

Laying of 98 km long 8.625" ATF Pipeline from CPCL Manali Refinery to Chennai Airport Fuel Station at INDIA along with Combined Station Works.

Construction of three roads and surface drains at Bibiyana Gas Plant & Surroundings. Value of work is BDT 70.00 million.

Erection Installation and Commissioning of Hot Rolling Mill Machineries and Equipment complete with all supporting accessories for BSRM at Chittagong. Value of work is BDT 30.00 million.

Construction & Placement of 30 numbers 30.5m X 7.62m X 1.83m Terminal Pontoons. Value of work is BDT 270.00 million

Fabrication, Erection & Testing of 9 Steel Storage Tanks for Condensate, Clean Produced Water, Dirty Produced Water and Fire Water. Value of work is BDT 130.00 million.

Construction of a 10 Km Cross- Country Long Belt Conveyor (which is a part of 17.5 km conveyor from Meghalaya in India up to Chhatak in Bangladesh). Value of work is BDT 130.00 million.

2011

2011

2011

2010

2010

2010

2009

2008

2008

2008

2007

2007

2006

26

27

28

29

30

31

32

33

34

35

36

37

38

65

Page 67: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant

SL. # Client Scope of Work Year ofCompletion

CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd.

Mobil- Jamuna Lubricants Ltd.

Tullow Bangladesh Ltd.

Titas Gas Transmission & Distribution Co. Ltd of Petrobangla.

Holcim Cement Plant (Holder bank group)

Heidelberg Cement Co. Ltd (Main Contractor - Doosh on heavy Industries Ltd of Korea.

Cemex Cement (BD) Ltd.

Petrobangla - Bangladesh Gas Fields Co. Ltd (Main Contractor - Hyundai Engineering & Construction Co. Ltd.

BCIC -Owner, Main Contractor - Hyundai Engineering & Construction Co. Ltd.

Kvaerner Process System Asia Pacific.

Construction of a 22 km 30" dia cross country gas pipeline, 6" dia condensate pipeline and 14” dia 23 KM sales gas pipeline in the Bibiyana gas pipeline construction project. Value of work is BDT 160.00 million.

Procurement & Construction of civil & building works, fabrication & erection of process tanks, erection of plant mechanical, electrical & instrumentation works at Lubricant Blending Plant of Mobil Jamuna at Patenga, Chittagong. Value of work is BDT 216.00 million.

Construction of drill pad at Kashimpur Bangora and Lalmai Prospects including site preparation, dredging, filling of the area by carrying dredge sand from Daudkandi Ghat, compaction, Access Road & Base camp etc. Value of work US Dollar 9 million

Construction of 9 Km long 16" dia cross country pipe line, near Dhaka including Water crossing, Railway & Highway crossing & construction of valve station. Value of work is BDT 9.00 million

Fabrication and erection of extension project of Holcim Cement plant at Meghnaghat. Value of work is BDT 25.50 million.

Complete Mechanical, Fabrication and Erection of plant equipment including ball mill of capacity 1600 ton/day cement grindng plant at Rupganj. Value of work is BDT 50.00 million

Construction work of the cement plant including structural steel warehouse, Fabrication of mechanical equipment, Bin, Hopper, bag fitter, Air slides, Steel structures, conveyor system, and erection of all mechanical & electrical items including instrumentation and commissioning. Value of work is BDT 300.00 million.

Construction of a 2 numbers LTS type Gas Treatment plant at Brahmanberia including Civil, Piling, Foundation, generator building, piping, mechanical erection, electrification, instrumentation and commissioning. The work also included 5 km 4" cross country piping work for condensate.

Complete construction of gas based 8MW steam turbine power plant for Chhatak Cement Factory Ltd., including civil, mechanical, electrical, instrumentation, testing & commissioning and gas connection pipeline. Value of work is BDT 40.00 million.

Mechanical construction of a Gas Treatment Plant at Lakatura - Sylhet for Jalalabad Gas Treatment plant including electrical instrumentation and commissioning works. Value of work is BDT 60.00 million.

39

40

41

42

43

44

45

46

47

48

2006

2004

2003

2003

2002

2001

2001

2000

2000

1999

66

Page 68: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant

SL. # Client Scope of Work Year ofCompletion

Petrobangla - RPGCL ( Main Contractor - Hyundai Engineering Co. Ltd- Korea.

Occidental Oil Co. Ltd (a U.S Oil company Operating in Bangladesh)

Occidental Oil Co. Ltd (a U.S Oil company Operating in Bangladesh)

Jahangirnagar University, Savar, Dhaka.

Petrobangla Sylhet Gas Fields Co. Ltd (Main Contractor - Press Construction Ltd, Darlington - UK.)

Chittagong Port Authority (Main Contractor - China Harbour Engineering Co. Ltd of China)

Chhatak Cement Co. Ltd (Bangladesh chemical industries Ltd) & Korea heavy Industries & Construction Co. Ltd.)

Jamuna Fertilizer Co. Ltd (Bangladesh Chemical Industry Corporation).

Bangladesh Railway (Main Contractor - Daewoo Corporation, Korea)

Roads and Highways Dept (Main contractor - Joint venture Interbeton HCG of Holland.

Chittagong Port Authority (Main Contractor - Interbeton of Holland )

Construction work including civil work sand piling, piping structural fabrication, erection electrification instrumentation and commissioning of all mechanical & electrical equipment for 5000 TPA LPG Plant at Kailashtilla - Sylhet District. Value of work is BDT 35.00 million.

Construction of a 4.5 Km X 5.2 M heavy Duty all weather road through forest and hill at Sylhet including 17 R.C.C. Box culverts.

Land developent for jalalabad Gas Plant, Camp Site and Drill Site by cutting and grading of hills.

Construction of 2 nos Women students Hall, Capacity 500 Nos in each, 4 storied including electrical, sanitary etc.

Fabrication, erection, electrification and instrumentation work of a Molecular Sieve Turbo Expander type Gas Treatment Plant 90 mm cfd at Kailashtilla in Sylhet district.

Fabrication, erection and cladding works of container freight station, workshop and garage at the Backup Facility of the Multipurpose Berth A & B.

Erection of Machinery for expansion of Chhatak Cement plant including Cement Mill, Electrostatic Precipitator, kiln and other equipment and accessories.

Construction - 2 nos 5 storied Hostel building for the expatriates, one 4- storied Bachelors officers Hostel, one bachelor employees Hostel, one 60m high overhead water Tank and river bank protection work at Tarakandi, Jamalpur district.

For construction of Parbatipur Railway Backshop, fabrication of 1200 Mt of steel structure at the premises of Chittagong Dry Dock and fabrication and erection work of mechanical and electrical equipment and utility services at Parbatipur.

Construction of 2nd Karnafuli Bridge ( Shah Amanat Bridge) at Chittagong over Karnafuli river measuring 922m long. The work included pier installation (2 m dia steel piers) fabrication and erection of entire steel structure , sand blasting & painting, construction of R.C.C abutment, installation and surface treatment to the wooden deck.

Construction of heavy pavement on a area of 20,000 Sq meter on top of a R.C.C suspended deck system and earth jelling works for the projects hard standing area 10,000 square meter.

1998

1998

1998

1997

1994

1992

1992

1991

1990

1988

1986

49

50

51

52

53

54

55

56

57

58

59

67

Page 69: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant

SL. # Client Scope of Work Year ofCompletion

Chittagong Urea Fertilizer Ltd.

Bangladesh Power Development Board (Main contractor - Marubeni Corporation, Japan)

TSP Complex Ltd Bangladesh Chemical Industries Corporation, Chittagong.

TSP Complex Ltd Bangladesh Chemical Industries Corporation, Chittagong.

Chittagong Dry Dock Ltd, Bangladesh Steel and Engineering Corporation.

Construction of including fabrication and erection of 9 nos. Steel Vertical Tank ( Total Weight of the Steel used - 2100 MT) for the Water Treatment Plant under Kurita Water Industries Ltd of Japan.

Erection of 2 nos water Turbine with generator, 52 MW each for the Kaptai Hydro power station ( Unit no 4 and 5).

Dismantling & reconstruction of a 500 ton/day Sulpheric Acid plant including fabrication of Absorbing Tower, Drying Tower and 60 m high main stack including all internals, acid resistant bricks pumps, pipings and other accessories.

Construction including civil works, fabrication of structures & vessels and erection including electrification and instrumentation of a granulation plant and Phosphoric Acid Handling system in association with a Dutch company, Hollandse Construction group.

Construction of a 10,000 Sq meter Workshop Complex Building, water treatment Plant and control building including all piling, foundation, R.C.C Column, office blocks, structural fabrication, cladding, erection of Overhead cranes (9 nos) etc.

1986

1986

1985

1983

1982

60

61

62

63

64

68

Page 70: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 71: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 72: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant
Page 73: · PDF fileTwelve Ltd BSRM Steels Limited Bangladesh Inland Water Transport Authority CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd. Lafarge Surma Cement plant