TELEVISION ASSOCIATES OF INDIANA, INC.
A SUBSIDIARY OF ',lELPAR, INC.
H::lME OFFICE - i',iICHIGAN CITYINDIANA, U.S.A.
BOlTE POSTALE 204V I ENT lANE, LAOS
V-663/P20.6
15 I.UY 1962
TO:
SUBJECT:
THE DIRECTOR, USA IO/l.Aos
rJONTHLY REPORT OF ENGINEERS, CONTRACT AIOC-1305
REG JONAl TELECOMMUN ICAT IONS PROJECT
FORWARDED HEREWITH IS THE REPORT OF THE ENGINEERS'
LAOS OFfiCE FOR THE MONTH OF APRIL 1962.
TELEVISION ASSOCIATES OF INDIANA, INC.
/) IJ ~ .' .I ~-HI--(~// -1...-y1-~
THOMAS F. O~RESTER
PROJECT MANAGER-LAOS
ANNEX A.
MONTHLY REPORT
TELEVISION ASSOCIATES OF INDIANA, INC.
A SUBS 10 IARY OF" MELPAR, INC.
VIENTIANE, l.AOS
CONTRACT AIOC-1305
GENERAL & AD1,!iINISTRATION:
V-663/P20.6
PAGE I
I. THE TELEVISION ASSOCIATES OF" INDIANA, INC. OF"F"ICE IN
BANGKOK HAS BEEN DIRECTED TO DISPOSE OF" ITS TWO GMC
CARRYALLS (OR IG INALLY PROCURED BY HYCON-PAGE). THE
LAO S PRO J E C T 0 F" F" ICE HAS 0 N E S I fA I L A R G MC CAR R Y ALL, WH I C H
IT NEEDS TO KEEP IN OPERAT ION BUT F"OR WHICH SPARE PARTS
ARE 0 IF"F" ICULT TO OBTA IN. WE HAVE REQUESTED TRANSF"ER OF"
THE TWO GMCS F"ROM BANGKOK IN ORDER THAT WE MAy KEEP AT
LEAST ONE IN OPERAT ION HERE. BOTH USAIDs CONCERNED
HAVE INDICATED APPROVAL AND ARE ARRANGING THE TRANSF"ER.
2. USAID AUDIT WAS COMPLETED AND A REPORT IS EXPECTED
SHORTLY.
3. ENGINEERING COSTS
A. ENGINEERING COSTS TO DATE ;"RE
EST IMATED AS APPROX IMATELY
OR
108 % OF" THE CONTRACT LIMITATION OF"
8 353,000
~ 328,361
13 • DETAIL OF" COSTS IS IN ApPENDIX
THIS COVERS EXPENDITURES OF":
TO THIS ANNEX.
APPENDIX
FIELD OF"F"ICE TO 30 APRIL 1962
REGIONAL OF"F"ICE TO 31 MARCH 1962
HOME OF"F"ICE TO 31 MARCH 1962.
MONTHLY REPORT
TELEVISION ASSOCIATES OF INDIANA, INC.A SUB SiD I ARY 0 F" ME LPAR, INC.
VIENTIANE, LAOS
CONTRACT AIDc-1305
V-663/P20.6PAGE 2
APPENDIX 1 TO ANNEX A: ENGINEER'S COST AS OP 30 APRIL 1962
TOTAL
17,258.4017,466.4456,638• 61~t057.064,465.16
11,844.496,863.752,442,30
.174.781~608.92
11,092.561,526 ,323,673.12
60.171~842.26
1,638,64: 456.07
1,070,39359.42308.98359.41
18,977.6016,209.399,545. 664,801.058,583.51
569.324~668,42
14,574.0722, 605. 2166,363. 422~273.93
19,580.383,000.002,G46.98
.6,422.69, - , I
$ 3~4,037.889,000.00
DESCRIPTION
FIXED FEESALARIES: HOME OFFICE PERSONNELSALARIES: RESiDENT FIELD STAFFSALARIES: POOL FIELD STAFPSALARIES: POOL PILOTS & CO-PILOTOVERSEAS DIFFERENTIALTRAVEL ENROUTE DUTY POSTTRANS. OF PERSONAL BELONGINGSPER DIEM ALLOW. ENROUTE O.S.RETURN TRAVEL - TRANS. & PER DIEMPER DIEM IN DUTY COUNTRYTRAVEL & PER DIEM IN U.S.A.FREIGHT, PACKING, CRATINGTRAVEL & PER DIEM: EMP. TO MICH. CITYTRAVEL & PER DIEM: H.O. STAFF O.S.VACATIONS & SICK LEAVE: H.O.SICK LEAVE: FIELD STAFFHOLIDAYS: FIELD STAFPVACATIONS & SIOK LEAVE: H.O.HOLIDAYS: HOME OFFICE STAFF.TRA1N1NG & EXPENDABLE SUPPLIES & Exp.EQUIP., INSTRUMENTS & SUPPLIESAIRCRAFT OPERATIONSTRAVEL EXPENSEVEHICLE OPERATIONS & MAINTENANCEQUARTERS ALLOWANOESUBCONTRACTS & PURCHASE ORDERSINSURANCE - PREMIUMSDIRECT OUT-OF-POCKETOVERHEAD - HOME OFFICESALARIES: LOCAL NON U.S. PERS.HOUSEHOLD FURNISHINGSOPFICE & STORAGE RENTAL & FURNISHINGSPERFORMANCE & PAYMENT BONDSINTERCHANGE OP PERSONNELEMERGENCY EVACUATION
TOTAL REPORTEn COSTSESTIMATED UNREPORTED COSTS
XXXX
CONTRACTARTICLE No.
VI-1VI-3-(A)VI-3-(B)VI-3-(c)VI-3-(D)V1-3-( r)VI-3-(F)(\)VI- 3- ( F) ( I ()V1-3- ( p)( 1 I I )VI-3-(p)(IV)V(- 3- ( F )( V)
VI-3-(r)(VI)VI-3-(p)(vl I)VI- 3- ( F) (V I I I )VI-3-(F)(IX)VI-3-(G)(I)VI- 3- (G ) ( lJ )V I - 3- ( G) ( I I I)VI-3-(a)(IV)VII - 3- (G) (V)VI-3-(I:l)V1-3-( r)VI-3-(J)VI-3-(K)
VI-3-(L)Vl-3-(o)VI-3-(p)V1-3- (Q)VI-3-(s)VI-4XXXII-4-(B)XXX 11-4- (0)XXXIV-3
ESTIMATED TOTAL COSTSI .
~=~~~:!~~Z~~~
5
ANNEX B.
MONTHLY REPORT
TELEVISION ASSOCIATES OF INDIANA, INC.A SUBSIDIARY OF MELPAR, INC.
V I ENT lANE, LAOS
CONTRACT A I DC-1305
ENG INEER ING &: OPERAT IONS:
V-663!P20.6PAGE 3
I. I.Y ITH THE ARR IVAL OF THE BULK OF THE CONSTRUCT ION
MATERIAL, TOOLS, ~ND EQUIPMENT NECESSARY FOR ST~RT
OF WORK ON THE INTERIM SYSTEM, ONLY THE LACK OF
TECHN IC IANS PREVENTS A START OF" WORK. IT IS HOPED
THE. T· E C H N I C I A N S W ILL A R R I V E I N MAY AND T HAT W0 R K
M/"Y START.
2. THE P&T REPORTS A HIGH TROUBLE RATE ON THE VIENTIANE
MANUAL SYSTEM. THEY SUGGESTED USE OF" PROJECT MATERIAL
TO REDUCE THIS RATE. WE HAVE REQUESTED THEM TO SUBMIT
A PROPOSAL FOR USE OF" PROJECT MATERIAL TO REPLACE UN-
SERVICEABLE LINES. HOWEVER, SUCH USAGE COULD LEAD
RAP IDLY T 0 AN U N DES I R A B LEO E P LET I ON OF MATER I A L • I T
IS CONS IDERED THAT THE WORK ON THE INTER 1M SYSTEM, IF
STARTED SOON AND V \GOROUSLV PROSECUTED, W ILL ITSELF
PROVIDE CONSIDERABLE RELIEF TO THE MANUAL SYSTEMS.
3. PROCUREMENT
A. THE RLG FINALLY AGREED TO S IMPL fFY ING PROCEDURES
FOR RECEPT ION OF PROJECT MATER IAL.
HAD, HOWEVER, ALREADY ARRIVED.
MOST SHIPMENTS
B. ALL MilTER IAL WH ICH ARR (VED IN BANGKOK PR lOR TO
MARCH SAVE ONE CASE, SUBSEQUENTLY LOCATED, AND
!"OUR TRUCKS HAVE ARRIVED IN VIENTIANE, ALSO
DELAYED IN THAILAND IS ONE ORDER OF MAINF"RAME
TERM INALS DEL IVERED BY BANGKOK VENDOR EARLY IN
FEBRUARY.
MONTHLY REPORT
TELEVISION ASSOCIATES Of INDIANA, INC.
A SUBS 10 IARY Of MEl.PAR, INC.
VIENTIANE, LAOS
CONTRAot AIDC-1305
ANNEX B. ENGINEERING & OPERATIONS (CONTrO)
V-663!P20.6PAGE 4
C. MATERIAl. HAS BEEN SORTED OUT AND \S READY fOR
ISSUE.
D. DAMAGE HAS BEEN fAIRl.Y LIGHT IN SPITE Of INADEQUATE
PACKING Of MANY ITEMS. DA/.1AGE AND LOSS WAS PRINCI-
PALLY CONfiNED TO CASES THAT HAD BROKEN OPEN WHEN
UNLOADED AT LAOS CUSTOMS. fRONTIER CUSTOMS GUARDS
HAD OPENED CASES BUT HAD NOT SECUREl.Y CLOSED THEM
AfTERWARD.
CRITICAL.
SOME Of THE LOSS IS SER 10US BUT NOT
E. ALL OUTSTAND ING REQU IS IT IONS ON THE HOME Off ICE
HAVE BEEN fiLLED. PURCHASE ORDER fOR THE POLE
PRESERVAT ION PLANT WAS PLACED ON 30 APR IL. LOCAL
PURCHASES YET TO BE Pl.ACED ARE fOR ROAD REPAIR
MATERIAL AND DIESEL OIL (AMOUNTING TO ABOUT $3,000).
f. THE VENDOR HAS INO ICATED THE Mi<NUFACTURER W ILL NOT
MEET ORIGINAL SHIPPING SCHEDULES fOR THE SU8TER-
RANEAN CABLE. THIS FORCASTS fURTHER SERIOUS DELAYS,
ALTHOUGH THE VENDOR IS ATTEMPT ING TO OBTAIN SOME
IMPROVEMENT.
G. ALSO BECOMING ALARMING IS THE INABILITY TO OBTAIN
ANY NEWS Of THE SHIPPING, ACTUAL OR SCHEDULED, OF
THE POLE-MOUNTED CABLE TERMINAl.S WHICH WERE ORIGI-
NALLY SCHEDULED TO BE SHIPPED l.AST NOVEM8ER.
H. SEE ApPENDIX TO TH IS ANNEX fOR DETA It. OF PRO-
CUREMENT STATUS. THIS DOES NOT INCLUDE THE PURCHASE
OROER fOR THE POLE PLANT FOR WHICH LETTERS OF" CREDIT
HAVE NOT YET BEEN ISSUED.
ANNEX B.
MONTHLY REPORT
TELEVISION ASSOCIATES OF INDIANA, INC.
A SUOS 10 IARY Of MELPAR, INC.
VIENTIANE, LAOS
CONTRACT AIDC-1305
ENG INEERING & OPERATIONS (CONTID)
V-663/P20.6
PAGE 5
4. POLES
A. ONE Of THE PRINC IPAL INDUCEMENTS TO ACCEPTANCE OF
JOINT USE WAS THE PROSPECTIVE CONTRIBUTION BY THE
P&T OF E~UIPMENT AND M~TERJAL FOR PRESERVAT ION OF
POLES.
O. OUR I NG THE MONTH SPEC IF ICAT IONS WERE APPROVED,
TENDERS WERE EVALUATED, AND AN ORDER WAS PLACED
FOR E~U/PMENT FOR A WOOD PRESERVAT ION PLANT AND
FOR AN IN IT IAL LOT OF PRESERVAT IVE.
C. THE PLANT WILL CONSIST OF AN ASSEMOLAGE FOR IMPREG-
NAT ION OF POLES WITH A SALT' PRESERVAT IVE OY THE
VACUUM PRESSURE PROCESS, SOAKING OF POLE BUTTS IN
OIL (TO REDUCE SPLITTING) AND A MINIMUM OF HANDLING
EQU IPMENT (L 1FT ING DEV ICES AND MANUALLY-OPERATED
RA ILWAY).
D. THE PRESSURE CHAMOER ASSEMBLAGE IS OF A DESIGN
CRE~TED fOR WORK IN THIS AREA ~ND ALREADY IN USE
IN ~ALAYA AND THAILAND. THE PRESSURE CVL INDER
HAS AN EFFECTIVE LENGTH OF 46 FEET AND INSIDE
DIAMETER OF 3 1/2 FEET.
E. THE VENDOR \'JILL PROVIDE ONE ENGINEER FOR THIRTY
DAYS TO SUPERVISE ASSEMOLY AND TRAIN OPERATORS
FOR THE VACUUM PRESSURE PROCESS. HE HAS VERBALLY
PROMISED TO PROVIDE ADDITIONAL THEORETICAL TRAIN-
ING AT HIS BANGKOK OFFICE AT NO EXTRA COST.
MONTHLY REPORT
TELEVISION ASSOCIATES OF' INDIANA, INC.
A SUBSIDIARY OF" MELPAR, INC.
VIENTIANE, LAOS
CONTRACT AIDC-1305
ANNEX B. ENGINEERING & OPERATIONS (CONTID)
V-663/P20.6
PAGE 6
F". THE RLG WILL PROVIDE A GRADED SITE F"OR THE PLANT
AND F"OR STORAGE OF POLES, UT ILITIES, ALL FOUNDATIONS,
LOAD ING PLATFORMS "NO SHELTER, A WATER-SUPPl.Y
STORAGE AND SETTLING TANK, AND LAOOR FOR INSTAL-
LAT ION AND OPERAT ION OF" THE PLANT.
5. THE P&T HAS APPROVED ENGINEERS' PROPOSED DIAL LINE
ASSIGNMENTS, AND PREPARATION OF SERVICE ORDERS HAS
COMMENCED.
6. 3 \5,000 IN LOCAL CURRENCY HAs BEEN MADE AVA ILABLE FOR
LOCAL PROCUREMENT OF" L.ABOR, SERVICES, AND COMMODITIES.
THIS IS INDICATED IN THE DOLl.AR COST SUMMARY OF PARA-
GRAPH 10.
7. USA ID/LAOS HAS ADV ISED THAT A CENTRAL OF"F ICE TECHN IC IAN
F"ROM THE MANUF"ACTURER WILL BE MADE AVAILABLE UNDER AID
AUSPICES TO ASSIST IN THE CUT-OVER.
JUNE AND WILl. REMAIN ABOUT 4! MONTHS.
HE IS EXPECTED IN
8 • THE MAN U F ACT U R E RS 0 F' THE V lEN T I A N E PEN T A CON A AUT 0 MAT I C
SYSTEM HAVE BEEN REQUESTED TO SUPPLY NEW BUDGETARY
TENDERS OF PR ICES ANO OEL IVERY TIMES F"OR EXPANS ION OF"
THE CENTRAl. OF'F"ICE. TENDERS ARE TO DE FOR INCREASES
IN LINE CAPACITY IN INCREMENTS OF 200 LINES.
ANNEX B.
MONTHLY REPORT
TELEVISION ASSOCIATES OF INDIANA, INC.
A SUBS 10 IARY Of MELPAR, INC.
V lENT lANE, LAOS
CONTRACT AIDC-1305
ENGINEERING & OPERATIONS(CONTlD)
V-663/P20.6
PAGE 7
9. A PLAN fOR AN OPEN-WIRE TOLL LINE BETWEEN VIENTIANE AND
THE PR INC IPAL PORT Of ENTRY, THADEUA (THANALENG) HAS BEEN
PROPOSED. DESIGN CRITERIA AND MATERIAL LISTS HAVE BEEN
SENT TO THE HOME Off ICE fOR REV lEW. A PRELIMINARY SUB-
STANTIATION REPORT WILL BE SUBMITTED TO USAID/LAOS THE
fiRST WEEK IN MAY. THIS IS ONE Of THE COMPONENTS PRE-
VIOUSLy APPROVED BUT SUSPENDED. ITS ACT IVAT ION \S CON-
SIDERED DESIRABLE IN VIEW Of THE NEW ROAD NOW UNDER
CONSTRUCT ION ON THAT ROUTE, COMPLETION Of WHICH WILL
INCREASE THE IMPORT~NCE Of THE THANALENG fERRY CROSS ING
FROM THE NONGKHAI RAILHEAD.
10. DOLLAR COST SUMMARY
ApPROVED
OR SPENT
COMPONENT ALLOCATIlD SUB-OaL IGAT ION TO-DATE DESCRIPTION.VIENTIANE 1\ 365,000 PIO/C 80 136 $270,040 ALL IMPORTED.:,TELEPHONE S 300,000 COMMODITIES
(APPENDIX I )
P 10/ T 80159 TECHNICIAN
S 40,000 CONTRACT
PRO-AG 2029 LOCAL CURRENCy
S 15.000 EXPEND ITURliS
ENGINEERING S 328.361 P lofT 801 J 0 $353,038 DETA IL IN
~3 328,361 ANNEX A
SUSPENDED ~2,563,639
COMPONENT &ADDED ENG I-
NEE R I N G C O.;;.S...;T _
$3,257.000 683,361 $623,078
/D
CONTRACT AtDc-1305
VIENTIANE TELEPHONE OUTSIDE PLANTSTATUS OF PROCUREMENT-PIO!C 80136 30 APR IL 1962
90% ORDERED 48% OF ORDERS DELIVERED
IX I TO ANN EX B
PIO/C $300,000.
TELEVISION A~SOCIATES OF INDIANA, INC.VIENTIANE, LAOS.
V-663/P20.6PAGE 8 --
$ 9~000-.00
TOTAL DELIVERED $128;683~02.3 PARTIAL ITEMS.ON BACK ORDER.
LETTER OF CREQIT 9R FINA~ ~OST
E = ETA; A = ARRJVEQW/O FREIGHT BANGKOK '- VIENTIANE
**•••
CO"~LETE ITEMS,*
It 8$ 270,oIio~3b
.,vv9...~7$ 12~430.49$ 9,,000-.00
STEEL ADVOOATEDSTI;:EL ADMIR~L
ST.EL TRAVELERROBIN HOOD.. , - .
TOTAL AMOUNT COMMITTED
(3)(4)(5)(6:)
,PURCHASE ORDER SHIPMENT
No. SHIPPING ARRIVAL BANGI(OK DELIVERY VIENTIANEDATE VENDO R CosT· OF FROM NO.OF SH IP- NO.OF
ITEMS FINAL DATE DATE·· ITEMS PED DATE ITEMS VALUE***. I
29/6/61 AUTOMATIC ELECTRIC $ 18,843.08 181 USA 13/4/62 181 $ 18,834.08I ·20/7/61 " " $ 47.540.59 185 USA 13/4/62 177' $ 41.295.60. ; ,
22/7/61 " " $ 52,664.25 11 USA 13/4/62 11 $ 52,664.25, I 31/3/THRU I
22/7/61 INTER. STD. ELECTRiC .'t 96~540.03 15 ENG.il' 31/8/62. I ·24/7/61 J.S. OPPENHEIMER $ 4,238.29 27 31/12/61 USA A5/3/62 27 (3)I . I I I I
I. 24/7/61 INTER. STD. ELECTRIC $ 1.749.80 25 USA 20/3/62 25 $ 1.749.80
I I
- 3/8/61 " " " $ 2,820.62 28 25/2/62 USA A17/4/62 I (5)I : .
t 13/9/61 PRAJAYONTRA Co. $ 6~795.00 4 1/12/61 GER. A15/1/62 4I . I I , I
1. 30/10/61 THE SERVICE GARAGE, LTD. $ 5,139.29 2 SING. 18/1/62 2 $ 5.139.29I
6/12/61 AUTOMATiC ELECTRiC ~ 364.50 1 2/3/62 USA A2/Lr/62 1 (6 )·20/12/61 INTER. STD. ELECTRIC $ 2,241.70 28 26/1/62 USA E28/4/62 28 ( 4)
t,
26/12/62 ANGLO-THAI CORP. ," ·215.00 2 23/1/62 BKK E11/3/62 2..,I
19/1/62 INTER. STD. ELECTRIC $ 3.964.49 32 1l?/5/62 USA
19/1/62 AUTOMATIC ELECTRIC ~ 1.206.40 15 1/6/62 USAI
6/3/62 " " $ 1.995.77 28 1/6/62 USA,23/4/62 INTER. STD. ELECTRiC ~ 1.937.22 28/6/62 USA
,
23/4/62 " " " ~ : 362-.84 . 9/7/62 USA- u ~ ~
I OTES:
1 5% COMMIssION'ED FOR FREIGHT - BANGKOK - VIENTIANE
ANNEX C.
MONTHLY REPORT
TELEVISION ASSOCIATES OF INDIANA, INC.
A SUI3S 10 IARY OF MELPAR, INC.
V I ENT I ANE, LAOS
CONTRACT AIOC-1305
PERSONNEL:
V-663/P20.6
PAGE 9
I •
TOTAL U.S. STAFF REQUIREMENT
ON STATION"
IN PROCESS OR SCHEDULE
OPEN - UNFILLED
PREV)OUS PRESENT
P!RMANENT TEMPORARY
6 3
3 3
0 0
3 3
NOTE: .INCLUOES ONE TELEPHONE ENG INEER ASS IGNEO
TO THE BANGKOK OFF ICE BUT COVER ING THE
LAOS WORK WITH TOY IN LAOS AS RE·~UIRED.
2. ON JOs FORCE
MANAGEMENT
ENGINEERING
ADM IN ISTRAT ION
LOCAL
o
3
9
12
U. S.
3
\1/