A Study of Proton-ProtonCollisions at the LHC
The Ohio State University - Task A.2
B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore,J.H. Gu, D. Larson, D. Herman, T.Y.Ling,
C.L. Kim, P. Nylander, V.J. Sehgal, M. Studer,C. Rush
LHC Physics
1 LHC Year = 105 pb-1
Collecting and Analyzing the Physics will be difficult ...
Muon Chambers will clearly play amajor role in LHC experiments
H -> ZZ ->
CMS Detector
U.S. Endcap Muon System
Alabama, UC Davis, UCLA, UC Riverside,Carnegie Mellon, Fermilab, Florida,
Stoney Brook, Northwestern, Ohio State,Purdue, UT Dallas, Wisconsin
Endcap Cathode Strip Chambers
Electronics Overview
-Cathode Strip Chambers•6 layer modules•anode wire hits in azimuth direction•induced cathode strips in radial direction
Environment is Demanding•Singles Rate ~100 KHz/strip•Track Rate 300 KHz/chamber
- Main Functions of Electronics• generate trigger primatives for Level-1 - identify local charged track segments using both cathode and anode info• acquire precise muon information for offline analysis - cathode strips: precision azimuthal position from interpolation of induced strip charges - anode wires: precision timing; course radial position from ganged wires.
Momentum Resolution BMU/EMU Only
Momentum Resolution FULL CMS
CSC Electronics Organization
• Cathode Preamp/Shaper Asic - Ohio State• SCA ASIC - U.C. Davis• Cathode Readout Control - Ohio State• Comparitor ASIC - UCLA/CERN• Cathode PC Board - Ohio State• Anode Preamp Shaper Disc ASIC - CMU/PNPI• Anode LCT ASIC - UCLA• Anode PC Board - UCLA/CMU/PNPI• Motherboard DAQ - Ohio State• Motherboard Trigger - UCLA• DDU Board - Ohio State• Low Voltage Distribution - Wisconsin
Front-End ElectronicsOrganization
2268 cathode boards1980 anode boards480 motherboards
Cathode Preamp/Shaper ASIC
•5 pole semi-gaussian shaper•100 nsec peaking time•1 pole/1 zero tail cancellation•return to baseline in 400 nsec
4 channel prototype - AMI 1.8 u
Noise
• 1 % at Landau Peak -> 150m Resolution• kT limited FET amplifier, 7000 e’s at 250 pF
12 Bit Dynamic Range
• 8 bits for Landau peak• 2 bits for Landau tail• 2 bits for gas gain variation
Good Linearity
• < 1% from 0 to 15 MIPs
BUCKEYE RADIATION TEST
EMU Radiationand Charged
Track Backrounds
Front back
Figure 4. Latest prototype of 96-ch Cathode Front-End Board designed and producedat Ohio State in June 1999.
Buckeye
SCA
Comparator
Control FPGA
MUX
ADC
Channel Li nks
Cathode FE Board (July 1999)
• Buckeye Preamp/Shaper• Analog Storage + Controller• 12 bit ADC’s• Digital Trigger Primitives• 40 Mhz Word Transfer to Motherboard
Cathode FE Board Status
BUCKEYE Preamp/Shaper Finalized
• Improvements for 1999: rate sensitivity 15X better latchup fixed
• Final Prototype due from AMI late August• Preproduction run September/October
UC Davis SCA ASIC
• Improvements for 1999:
• New design with LVDS signals due AMI late Aug.• Preproduction run September/October
Much faster
400 nsec digitization
150 nsec digitization
Trigger 1/2 Strip Generator • 2nd Iteration Completed• Presently testing
• Hopefully Complete
OSU SCA Controller
• Uses XLINX FPGA• Design Completed
Board Layout
• Third Iteration works well• One more board before production
Analog Storage
Switch Capacitor Array (SCA)
•Free Running 50 nsec Samples•Charge stored in capacitor array•sample baseline (2 samples)•2-track resolution (3 samples)
Chambers are self triggered
• trigger logic determines good track in 500 nsec
Optical transceiver
DAQ Motherboard 1999
• Buffer/Event Builder/optical readout for all boards: cathode, anode, trigger• 8 16K Fifos, FPGA controllers• 75 MHz Optical Link
Control FPGAs
GLINKs FIFOs (16K,75 MHz)
CFEBconnectors
JTAG
CCB
TMB
ALCTB
CLCTB
CC TM
CLCT
ALCT
Counting House ElectronicsDDU Board
• Prototype, Final System with onboard pentium• HP GLINK (1.5 Gbit/s, 75 Mword/s)• 33 MHz PCI into Personal Computer
Cathode Integration Test
Results from Integration Test
Same noise at 40 MHZ as at 2.5 MHZ !
• Chamber and Electronics shipped to CERN this morning• Test Beam should start Mid August
CERN Test Beam 1998First Test of FE Electronics
System: 3 96 channel anode FE Boards 3 96 channel cathode FE Boards 3 48 channel LCT trigger boards 1 trigger motherboard 1 DAQ motherboard
Slow Control/JTAG
Test at CERN H2 and X5 Beamlines
10-225 GeV Beam 740 GBq Cs 137 Source
CERN H2 - 100 GeV , No Source
CERN H2 - 100 GeV , No Source
Cathode Offline Resolution
Spacial Resolution: -Single Layer
- 6 layer chamber ~ 100 m
Time Resolution:
Strip Position (cm)
- single layer ~ 7 nsec
CERN X5 - 100 GeV , Expected LHC Rate
Conclusion
Schedule is Tight
US CMS Master L-1 Schedule -Start EMU installation 1/16/03 - Finish 8/29/04 EMU Electronics Schedule - Finish R&D by 12/1999 - Full pilot system 2/2000 - Construction 6/2000
Cathode Board on Schedule !
Realistic DAQ Motherboard built/tested !
Control Room DAQ boards in second design stage !
FE Board and ASIC ProductionShould Start on Time !