12
a SS90 ™HD TMA a Product Bulletin Pump Conversion (SS90 Frame using SS90 HD Pump) Instructional Manual Created October 2013 Part No. 619182B

a SS90™HD TMA - Trinity Highway...a SS90 HD TMA a Product Bulletin Pump Conversion (SS90 Frame using SS90 HD Pump) Instructional Manual Part No. 619182B Created October 2013 2525

  • Upload
    others

  • View
    19

  • Download
    0

Embed Size (px)

Citation preview

  • a

    SS90™HD TMAa

    Product BulletinPump Conversion

    (SS90™ Frame using SS90™ HD Pump)Instructional Manual

    Created October 2013Part No. 619182B

  • Part No. 619182B www.energyabsorption.com Created October 2013 www.highwayguardrail.com 1 All rights in copyright reserved

    SS90™ HD TMA

    Product Bulletin Pump Conversion

    (SS90™ Frame using SS90™ HD Pump) Instructional Manual

    2525 Stemmons Freeway

    Dallas, Texas 75207

    Important: These instructions are to be used only in conjunction with the assembly, maintenance, and repair of the SS90™ HD TMA® system. These instructions are for standard assembly specified by the appropriate highway authority only. In the event the specified system assembly, maintenance, or repair would require a deviation from standard assembly parameters, contact the appropriate highway authority engineer. This system has been accepted for use by the Federal Highway Administration for use on the national highway system under strict criteria utilized by that agency. Energy Absorption Systems representatives are available for consultation if required.

    This Manual must be available to the worker overseeing and/or assembling the product at all times. For additional copies, contact Energy Absorption Systems at (888) 323-6374 or download from websites below.

    The instructions contained in this Manual supersede all previous information and Manuals. All information, illustrations, and specifications in this Manual are based on the latest SS90™ HD TMA system information available to Energy Absorption Systems at the time of printing. We reserve the right to make changes at any time. Please contact Energy Absorption Systems to confirm that you are referring to the most current instructions.

  • www.energyabsorption.com Created October 2013 www.highwayguardrail.com 2 All rights in copyright reserved

    Customer Service Contacts Energy Absorption Systems and Trinity Highway Products are committed to the highest level of customer service. Feedback regarding the SS90™ HD TMA system, its assembly procedures, supporting documentation, and performance is always welcome. Additional information can be obtained from the contact information below:

    Energy Absorption Systems: Telephone: (888) 323-6374 (USA Only)

    (214) 589-8140 (International) E-mail: [email protected] Internet: Energy Absorption Systems Trinity Highway Products, LLC

    http://www.energyabsorption.com http://www.highwayguardrail.com

  • www.energyabsorption.com Created October 2013 www.highwayguardrail.com 3 All rights in copyright reserved

    Pump Conversion Instructions: 1) Remove electrical box cover and disconnect solenoid wires.

  • www.energyabsorption.com Created October 2013 www.highwayguardrail.com 4 All rights in copyright reserved

    2) Remove electrical box, proximity sensor, and brackets.

    3) Disconnect hydraulic hoses going to the pump at the tee fittings and remove hydraulic pump.

  • www.energyabsorption.com Created October 2013 www.highwayguardrail.com 5 All rights in copyright reserved

    4) Assemble new hydraulic pump. This will require 2 – 7/16” drill holes to mount the pump as shown on the drawings. Use the existing pump for hole pattern.

  • www.energyabsorption.com Created October 2013 www.highwayguardrail.com 6 All rights in copyright reserved

    5) Connect 36” hydraulic hoses from the pump to the tee fittings as shown on the drawings.

  • www.energyabsorption.com Created October 2013 www.highwayguardrail.com 7 All rights in copyright reserved

    6) Field drill 2 – 5/16” holes in the electrical box bracket as shown on the drawings. Keep holes approximately 1” from the edge.

    1” m

    in.

  • www.energyabsorption.com Created October 2013 www.highwayguardrail.com 8 All rights in copyright reserved

    7) Mount the new electrical box bracket to the SS90™ HD frame using self-drilling and tap screws along with flat washers.

    8) Assemble pump power cables as shown.

  • www.energyabsorption.com Created October 2013 www.highwayguardrail.com 9 All rights in copyright reserved

    9) Weld limit switch brackets as shown in the drawings to the Lower Support Bracket

    Frame.

    Side view

  • www.energyabsorption.com Created October 2013 www.highwayguardrail.com 10 All rights in copyright reserved

    10) Assemble limit switches and adjust so that the switches are depressed when the

    system is in the raised or lowered position.

    11) Crimp connectors to the solenoid wires as shown below. Connect them as shown in the electrical schematic.

    12) Adjust limit switches by sliding the limit switch towards the hard stop just until you hear a click. This is the correct position for the limit switch. Tighten the bolts. This needs to be done for both the “Lowered” and “Raised” positions.

  • 2525 Stemmons FreewayDallas, Texas 75207

    888-323-6374 (USA only)214-589-8140 (International)

    www.energyabsorption.comwww.highwayguardrail.com