As-Submitted Results Report v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78 Engineer Estimate: $5,112,604.70 Project: NH 65041-201106 , ETC Local Agreement: Pct Over/Under Estimate: -3.46 % Start Date: May 6, 2019 Completion Date: July 2, 2019 Description: 8.48 mi of hot mix asphalt cold milling and resurfacing, joint repairs, shoulder corrugations and pavement markings on I-75 from Cook Road to west of the Ogemaw county line, Ogemaw County. This project includes a 3 year and 5 year materials and workmanship pavement warranty. 3.00 % DBE participation required Bidder As-Submittted Rieth-Riley Construction Co., Inc. $4,935,780.78 Pyramid Paving and Contracting Co. $5,619,700.08 Total Number of Bidders : 2

A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

As-Submitted Results Report v1

Letting of March 01, 2019

Letting Call: 1903 001 Low Bid: $4,935,780.78

Engineer Estimate: $5,112,604.70Project: NH 65041-201106 , ETC

Local Agreement: Pct Over/Under Estimate: -3.46 %

Start Date: May 6, 2019 Completion Date: July 2, 2019

Description:

8.48 mi of hot mix asphalt cold milling and resurfacing, joint repairs, shoulder corrugations and pavement markingson I-75 from Cook Road to west of the Ogemaw county line, Ogemaw County. This project includes a 3 year and 5year materials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $4,935,780.78Pyramid Paving and Contracting Co. $5,619,700.08

Total Number of Bidders: 2

Page 2: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 002 Low Bid: $598,269.13

Engineer Estimate: $771,051.13Project: NH 83013-119807

Local Agreement: Pct Over/Under Estimate: -22.41 %

Start Date: April 15, 2019 Completion Date: September 19, 2020

Description:

Culvert replacement with Polymer-Precoated Galvanized Culvert, concrete curb and gutter, guardrail reconstructand pavement markings on M-37 over Burkett Creek, Wexford County.

3.00 % DBE participation required

Bidder As-SubmitttedElmer's Crane and Dozer, Inc. $598,269.13J & N Construction, LLC $646,692.62Milbocker and Sons, Inc. $729,993.11

Total Number of Bidders: 3

Page 3: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 003 Low Bid: $5,617,088.52

Engineer Estimate: $6,043,077.32Project: GF19 73091-116069

Local Agreement: 19-5010 Pct Over/Under Estimate: -7.05 %

Start Date: June 3, 2019 Completion Date: May 29, 2020

Description:

5.61 mi of hot mix asphalt cold milling and resurfacing, detail 7 & 8 joint repairs, culvert repairs, concrete barrier,curb and gutter, guardrail and pavement markings on M-13 from the Zilwaukee Bridge north to McGraw Street inthe city of Bay City, Bay and Saginaw Counties.

No DBE participation required

Bidder As-SubmitttedPyramid Paving and Contracting Co. $5,617,088.52Ace-Saginaw Paving Company $5,636,324.39

Total Number of Bidders: 2

Page 4: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 004 Low Bid: $1,830,514.01

Engineer Estimate: $1,483,672.20Project: TA 63000-200805

Local Agreement: 19-5007 Pct Over/Under Estimate: 23.38 %

Start Date: April 15, 2019 Completion Date: September 20, 2021

Description:

1.63 mi of shared use path, sidewalk ramps, drainage, signing and pavement markings on West 9 Mile Road fromPinecrest Drive to McClain Drive in the city of Oak Park, Oakland County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedWarren Contractors & Development, Inc. $1,830,514.01

Total Number of Bidders: 1

Page 5: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 005 Low Bid: $375,820.25

Engineer Estimate: $489,211.00Project: HRRR 54000-203486

Local Agreement: 18-5569 Pct Over/Under Estimate: -23.18 %

Start Date: 10 days after award Completion Date: September 27, 2019

Description:

16.10 mi of tree removal and clearing on various routes, Mecosta County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedKivisto Tree Service, LLC $375,820.25Treeworks, Inc. $426,515.00Helsel's Tree Service, Inc. $430,669.50Heinz Tree Service, Inc. $480,345.25Wonsey Tree Service, Inc. $481,094.00Alpine Tree Service, LLC $541,129.00

Total Number of Bidders: 6

Page 6: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 006 Low Bid: $1,121,218.36

Engineer Estimate: $1,193,669.16Project: HSIP 76000-203457

Local Agreement: 18-5568 Pct Over/Under Estimate: -6.07 %

Start Date: June 10, 2019 Completion Date: October 11, 2019

Description:

0.34 mi of hot mix asphalt resurfacing, curb and gutter, watermain, storm sewer, signing and pavement markingson South Washington Street from Gute Street northerly to M-71 in the city of Owosso, Shiawassee County. This isa Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedCrawford Contracting, Inc. $1,121,218.36McGuirk Sand-Gravel, Inc. $1,144,547.10L. A. Construction, Corp. $1,181,644.44Champagne and Marx Excavating, Inc. $1,240,413.44Malley Construction, Inc. $1,242,400.00Zito Construction $1,256,554.00Rohde Bros. Excavating, Inc. $1,262,203.00Tri-City Groundbreakers, Inc. $1,280,326.00C & D Hughes, Inc. $1,287,066.07

Total Number of Bidders: 9

Page 7: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 007 Low Bid: $1,022,309.72

Engineer Estimate: $861,703.50Project: BHT 82000-204746

Local Agreement: 18-5554 Pct Over/Under Estimate: 18.64 %

Start Date: 10 days after award Completion Date: August 30, 2019

Description:

Deck patching, epoxy deck overlay, concrete deck overlay, bridge railing repair and approach work on Ann ArborTrail over Middle River Rouge and Newburgh Road over Tonquish Creek, Wayne County. This is a Local Agencyproject.

3.00 % DBE participation required

Bidder As-SubmitttedCipparrone Contracting, Inc. $1,022,309.72Anlaan Corporation $1,036,698.42Grand River Construction, Inc. $1,099,891.29C. A. Hull Co., Inc. $1,110,216.48Major Cement Co. $1,114,438.30

Total Number of Bidders: 5

Page 8: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 008 Low Bid: $557,092.28

Engineer Estimate: $524,288.06Project: STU 41000-200863

Local Agreement: 18-5553 Pct Over/Under Estimate: 6.26 %

Start Date: 10 days after award Completion Date: October 18, 2019

Description:

Bridge surface and partial beam removal and replacement, deck joint replacement and approach work on 10 MileRoad (West Division Street NE) over Rogue River, Kent County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedAnlaan Corporation $557,092.28Grand River Construction, Inc. $769,992.25Davis Construction, Inc. $926,754.19

Total Number of Bidders: 3

Page 9: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 009 Low Bid: $324,683.40

Engineer Estimate: $320,432.60Project: STL 49555-130394

Local Agreement: 19-5015 Pct Over/Under Estimate: 1.33 %

Start Date: June 17, 2019 Completion Date: September 13, 2019

Description:

2.36 mi of hot mix asphalt resurfacing, shoulders and pavement markings on H-40 from M-117 to the LowerMillecoquins River bridge, Mackinac County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedPayne & Dolan Inc. $324,683.40Rieth-Riley Construction Co., Inc. $356,664.40Bacco Construction Company $406,237.16

Total Number of Bidders: 3

Page 10: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 010 Low Bid: $259,545.25

Engineer Estimate: $270,637.50Project: HSIP 35022-203271

Local Agreement: 18-5570 Pct Over/Under Estimate: -4.10 %

Start Date: May 6, 2019 Completion Date: June 28, 2019

Description:

Guardrail removal and replacement on various routes, Iosco County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedDale Dukes & Sons, Inc. $259,545.25Action Traffic Maintenance, Inc. $262,050.88Nashville Construction Company $285,735.00RMD Holdings, Ltd. $307,963.64

Total Number of Bidders: 4

Page 11: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 011 Low Bid: $155,362.81

Engineer Estimate: $149,422.00Project: EMRP 50000-203253-2

Local Agreement: 18-5392 Pct Over/Under Estimate: 3.98 %

Start Date: May 5, 2019 Completion Date: July 26, 2019

Description:

0.61 mi of shared-use path rehabilitation including hot mix asphalt base crushing, shaping and resurfacing on theMacomb Orchard Trail from northeast of 32 Mile Road to west of Powell Road, Macomb County. This is a LocalAgency project.

No DBE participation required

Bidder As-SubmitttedAstec Asphalt, Inc. $155,362.81James P Contracting, Inc. $157,596.01Florence Cement Company $166,115.00

Total Number of Bidders: 3

Page 12: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 012 Low Bid: $731,500.00

Engineer Estimate: $745,716.15Project: STU 81000-203554

Local Agreement: 18-5547 Pct Over/Under Estimate: -1.91 %

Start Date: June 15, 2019 Completion Date: August 31, 2019

Description:

1.04 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, drainage andpavement markings on Industrial Drive from Bemis Road to Woodland Drive, Washtenaw County. This is a LocalAgency project.

3.00 % DBE participation required

Bidder As-SubmitttedCadillac Asphalt, L.L.C. $731,500.00Florence Cement Company $751,959.00Ajax Paving Industries, Inc. $827,278.12

Total Number of Bidders: 3

Page 13: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 013 Low Bid: $649,670.29

Engineer Estimate: $635,719.00Project: HSIP 41000-203331

Local Agreement: 18-5565 Pct Over/Under Estimate: 2.19 %

Start Date: 10 days after award Completion Date: August 16, 2019

Description:

Signal modernization including signal head, backplates, pedestrian signal, controller and cabinet, sidewalk andpavement markings at several intersections along Division Avenue and Leonard Street in the city of Grand Rapids,Kent County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedJ. Ranck Electric, Inc. $649,670.29Severance Electric Co., Inc. $649,799.75Strain Electric Company $649,986.50Wright Electric Company, Inc. $757,475.50

Total Number of Bidders: 4

Page 14: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 014 Low Bid: $470,720.30

Engineer Estimate: $428,288.00Project: STL 35141-130274

Local Agreement: 19-5001 Pct Over/Under Estimate: 9.91 %

Start Date: May 27, 2019 Completion Date: October 18, 2019

Description:

2.06 mi of hot mix asphalt resurfacing, aggregate shoulders, signing and pavement markings on Long Lake Roadfrom Sherwood Drive north to Rose City Road, Iosco County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedBolen Asphalt Paving, Inc. $470,720.30Pyramid Paving and Contracting Co. $563,382.10Rieth-Riley Construction Co., Inc. $630,938.40

Total Number of Bidders: 3

Page 15: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 015 Low Bid: $248,132.20

Engineer Estimate: $226,397.00Project: EDD 04555-130315

Local Agreement: 18-5544 Pct Over/Under Estimate: 9.60 %

Start Date: 10 days after award Completion Date: August 2, 2019

Description:

2.47 mi of hot mix asphalt overlay, aggregate shoulders and pavement markings on French Road from south ofBloom Road north to Lacomb Road, Alpena County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedBolen Asphalt Paving, Inc. $248,132.20Rieth-Riley Construction Co., Inc. $339,094.60

Total Number of Bidders: 2

Page 16: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 016 Low Bid: $1,897,044.56

Engineer Estimate: $1,919,270.00Project: STU 63000-203459

Local Agreement: 19-5003 Pct Over/Under Estimate: -1.16 %

Start Date: April 15, 2019 Completion Date: December 20, 2019

Description:

0.95 mi of hot mix asphalt cold milling and resurfacing, concrete driveway, curb and gutter, drainage, signing,structure adjustments, traffic signal and pavement markings on Pinecrest Drive from 8 Mile Road to 9 Mile Road inthe city of Ferndale, Oakland County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedFlorence Cement Company $1,897,044.56Pro-Line Asphalt Paving Corp. $1,914,835.56Cadillac Asphalt, L.L.C. $2,061,416.06Ajax Paving Industries, Inc. $2,316,177.06

Total Number of Bidders: 4

Page 17: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 017 Low Bid: $2,080,282.92

Engineer Estimate: $2,534,234.59Project: GF19 77111-204176

Local Agreement: Pct Over/Under Estimate: -17.91 %

Start Date: May 6, 2019 Completion Date: September 7, 2019

Description:

Bridge rehabilitation including deck patching, epoxy overlay, expansion joint replacement and pavement markingson 32 structures along I-94 from Meisner Road to Water Street in the city of Port Huron, St. Clair County. Thisproject includes a 5 year thin epoxy overlay performance warranty.

No DBE participation required

Bidder As-SubmitttedC. A. Hull Co., Inc. $2,080,282.92Anlaan Corporation $2,175,967.11Z Contractors, Inc. $2,234,726.75

Total Number of Bidders: 3

Page 18: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 018 Low Bid: $19,228,126.09

Engineer Estimate: $17,711,376.46Project: M 82023-79788 , ETC

Local Agreement: Pct Over/Under Estimate: 8.56 %

Start Date: April 15, 2019 Completion Date: November 15, 2019

Description:

5.20 mi of concrete and hot mix asphalt pavement repairs, cold milling and resurfacing, concrete pavement, curband gutter, and bridge rehabilitation of 6 structures including concrete deck replacement and patching, concreteoverlay, epoxy overlay, beam repair, heat straightening, cleaning and coating, and pavement markings on 24thStreet over I-94, on CSX Railroad over I-94, on Conrail Railroad over I-94, on GTW and Conrail Railroad over I-94,on I-94 eastbound ramp to M-10 over I-94 westbound and M-10 and on Warren Avenue over I-94 in the city ofDetroit, Wayne County. This project includes a 5 year materials and workmanship pavement warranty and a 2 yearconcrete surface coating warranty.

2.00 % DBE participation required

Bidder As-SubmitttedAjax Paving Industries, Inc. $19,228,126.09Cadillac Asphalt, L.L.C. $21,104,134.64

Total Number of Bidders: 2

Page 19: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 019 Low Bid: $8,240,656.38

Engineer Estimate: $9,668,879.41Project: ST 34031-119006 , ETC

Local Agreement: Pct Over/Under Estimate: -14.77 %

Start Date: May 28, 2019 Completion Date: June 15, 2020

Description:

7.02 mi of hot mix asphalt resurfacing, asphalt stabilized crack relief layer, concrete curb, gutter, joint replacement,culverts, drainage, guardrail, precast concrete box culvert, sinusoidal corrugations and pavement markings on M-66 from south of the south Ionia county line to north of Portland Road, Ionia County. This project includes a 5 yearmaterials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-SubmitttedC & D Hughes, Inc. $8,240,656.38Rieth-Riley Construction Co., Inc. $8,665,571.08Michigan Paving and Materials Company $9,069,171.28

Total Number of Bidders: 3

Page 20: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 020 Low Bid: $5,842,487.73

Engineer Estimate: $7,578,669.56Project: IM 76024-201422

Local Agreement: Pct Over/Under Estimate: -22.91 %

Start Date: June 3, 2019 Completion Date: September 21, 2019

Description:

4.45 mi of concrete pavement repairs and reconstruction, hot mix asphalt paving, earthwork, drainage, andpavement markings on I-69 from Bath Road to east of M-52, Shiawassee County. This project includes a 5 yearmaterials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-SubmitttedCipparrone Contracting, Inc. $5,842,487.73C & D Hughes, Inc. $6,135,801.39Florence Cement Company $7,091,000.25Major Cement Co. $7,208,563.99

Total Number of Bidders: 4

Page 21: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 021 Low Bid: $358,258.20

Engineer Estimate: $348,073.55Project: MRR 07012-132299

Local Agreement: Pct Over/Under Estimate: 2.93 %

Start Date: 10 days after award Completion Date: August 8, 2019

Description:

0.11 mi of temporary road construction for railroad track upgrades, concrete curb and gutter, drainage, guardrailand pavement markings on US-41 at Wisconsin Central Ltd. Railroad crossings in the village of L'Anse, BaragaCounty.

No DBE participation required

Bidder As-SubmitttedBacco Construction Company $358,258.20Payne & Dolan Inc. $391,450.35

Total Number of Bidders: 2

Page 22: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 022 Low Bid: $123,487.60

Engineer Estimate: $112,943.17Project: ST 22042-202544

Local Agreement: Pct Over/Under Estimate: 9.34 %

Start Date: June 3, 2019 Completion Date: June 28, 2019

Description:

0.21 mi of portable intermittent truck weigh station trench (PITWS) construction, concrete pavement, hot mixasphalt surfacing and pavement markings on M-69 at M-95, Dickinson County.

No DBE participation required

Bidder As-SubmitttedBacco Construction Company $123,487.60Payne & Dolan Inc. $156,916.00

Total Number of Bidders: 2

Page 23: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 023 Low Bid: $5,992,088.00

Engineer Estimate: $5,307,463.25Project: GF19 82061-204005

Local Agreement: Pct Over/Under Estimate: 12.90 %

Start Date: May 1, 2019 Completion Date: September 15, 2019

Description:

5.76 mi of joint and crack repairs, full depth concrete pavement repairs, hot mix asphalt longitudinal joint repairs,cold milling both the existing concrete and hot mix asphalt surface and a one course hot mix asphalt overlay onUS-12 (Michigan Avenue) from Pershing Street to Gulley Road in the cities of Wayne, Westland, Inkster andDearborn Heights, Wayne County. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-SubmitttedAjax Paving Industries, Inc. $5,992,088.00Cadillac Asphalt, L.L.C. $6,145,400.00

Total Number of Bidders: 2

Page 24: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 024 Low Bid: $1,808,668.50

Engineer Estimate: $2,428,551.74Project: ST 82023-132942

Local Agreement: Pct Over/Under Estimate: -25.52 %

Start Date: 10 days after award Completion Date: March 31, 2020

Description:

Pump station rehabilitation of 3 pump stations including removal and replacement of mechanical and electricalcomponents and structure upgrades and repairs on I-94 at Hecla Street, Brush Street and 14th Street in the city ofDetroit, Wayne County. See special provision for Determination of Lowest Successful Bidder for more information.

No DBE participation required

Bidder As-SubmitttedDan's Excavating, Inc. $1,808,668.50Z Contractors, Inc. $2,019,044.37Trojan Development Company, Inc. $2,820,260.04

Total Number of Bidders: 3

Page 25: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 025 Low Bid: $1,204,680.25

Engineer Estimate: $1,109,977.81Project: HSIP 63000-203021

Local Agreement: Pct Over/Under Estimate: 8.53 %

Start Date: May 13, 2019 Completion Date: December 1, 2019

Description:

Application of special pavement markings on various routes, Macomb, Oakland and Wayne Counties.

No DBE participation required

Bidder As-SubmitttedP.K. Contracting, Inc. $1,204,680.25

Total Number of Bidders: 1

Page 26: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 026 Low Bid: $208,582.32

Engineer Estimate: $211,980.13Project: HSIP 41027-123922

Local Agreement: Pct Over/Under Estimate: -1.60 %

Start Date: April 29, 2019 Completion Date: October 5, 2019

Description:

0.35 mi of bridge deck patching, concrete pavement repairs and application of high friction surface treatment onthe I-196 westbound ramp to US-131 northbound and on the US-131 southbound ramp to I-196 westbound in thecity of Grand Rapids, Kent County.

No DBE participation required

Bidder As-SubmitttedAnlaan Corporation $208,582.32Grand River Construction, Inc. $314,984.05C. A. Hull Co., Inc. $324,898.19

Total Number of Bidders: 3

Page 27: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 027 Low Bid: $2,936,365.75

Engineer Estimate: $2,704,561.39Project: IM 70063-131775

Local Agreement: Pct Over/Under Estimate: 8.57 %

Start Date: April 10, 2019 Completion Date: August 12, 2019

Description:

14.95 mi of concrete pavement repairs, hot mix asphalt ramp cold milling and resurfacing, longitudinal joint repairs,sidewalk and ADA ramps on I-96 from west of 68th Avenue east to west of Bristol Avenue in the cities ofCoopersville and Walker, Ottawa and Kent Counties. This project includes a 3 year materials and workmanshippavement warranty.

3.00 % DBE participation required

Bidder As-SubmitttedC & D Hughes, Inc. $2,936,365.75Cipparrone Contracting, Inc. $3,134,413.47Major Cement Co. $3,714,762.71

Total Number of Bidders: 3

Page 28: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 028 Low Bid: $436,467.55

Engineer Estimate: $300,779.28Project: BO 49000-133089 , ETC

Local Agreement: 18-5543 Pct Over/Under Estimate: 45.11 %

Start Date: 10 days after award Completion Date: October 1, 2019

Description:

Hot mix asphalt removal and replace wearing surface and waterproofing membrane, replace deck joints andapproach work at 6 structures on various routes, Mackinac County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedArrow Constructions $436,467.55Anlaan Corporation $496,259.00Grand River Construction, Inc. $536,843.55Hebert Construction Co. $542,343.81

Total Number of Bidders: 4

Page 29: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 029 Low Bid: $1,304,924.22

Engineer Estimate: $1,479,276.00Project: STU 41000-130540 , ETC

Local Agreement: 18-5557 Pct Over/Under Estimate: -11.79 %19-4014

Start Date: 10 days after award Completion Date: September 6, 2019

Description:

0.90 mi of hot mix asphalt resurfacing and widening, drainage, concrete pavement, curb, gutter, sidewalk andramps, signals and pavement markings on Sparks Drive/Forest Hill Avenue from East Paris Avenue to BurtonStreet in the city of Kentwood, Kent County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedMichigan Paving and Materials Company $1,304,924.22Kamminga & Roodvoets, Inc. $1,390,253.45Nagel Construction, Inc. $1,484,327.70Schippers Excavating, Inc. $1,945,271.50

Total Number of Bidders: 4

Page 30: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 030 Low Bid: $1,452,182.75

Engineer Estimate: $1,325,720.00Project: STU 39000-130999

Local Agreement: 19-5031 Pct Over/Under Estimate: 9.54 %

Start Date: May 6, 2019 Completion Date: July 29, 2019

Description:

0.60 mi of hot mix asphalt cold milling and resurfacing, pavement removal, aggregate base, concrete driveway,curb, gutter, sidewalk and ramps, drainage, watermain and pavement markings on Romence Road from OaklandDrive to Constitution Boulevard in the city of Portage, Kalamazoo County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedBrenner Excavating, Inc. $1,452,182.75Peters Construction Co. $1,507,950.70Milbocker and Sons, Inc. $1,610,864.00Kamminga & Roodvoets, Inc. $1,639,509.50Epic Excavating, Inc. $1,724,658.25Hoffman Bros., Inc. $1,729,731.00

Total Number of Bidders: 6

Page 31: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 031 Low Bid: $1,025,436.43

Engineer Estimate: $1,262,055.00Project: TAU 25402-130836

Local Agreement: 19-5011 Pct Over/Under Estimate: -18.75 %

Start Date: April 1, 2019 Completion Date: September 30, 2019

Description:

1.39 mi of hot mix asphalt shared use path, ADA ramps, signing and pavement markings on Flint River Trail fromVassar Road to Irish Road, Genesee County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedKennedy Excavating, Inc. $1,025,436.43Tri-City Groundbreakers, Inc. $1,118,287.00Zito Construction $1,132,554.00L. A. Construction, Corp. $1,206,294.72Rohde Bros. Excavating, Inc. $1,211,367.00Mead Bros. Excavating Inc. $1,321,629.25Champagne and Marx Excavating, Inc. $1,539,187.65

Total Number of Bidders: 7

Page 32: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 032 Low Bid: $1,009,662.27

Engineer Estimate: $1,017,338.00Project: MCS 33000-129375

Local Agreement: 19-5019 Pct Over/Under Estimate: -0.75 %

Start Date: 10 days after award Completion Date: October 31, 2019

Description:

Bridge removals and replacements with a precast 4-sided concrete box culvert and approach work on Olds Roadover Perry Creek, Ingham County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedDavis Construction, Inc. $1,009,662.27E.T. MacKenzie Company $1,030,978.57Z Contractors, Inc. $1,086,931.03J. E. Kloote Contracting, Inc. $1,126,813.14Anlaan Corporation $1,128,852.53Grand River Construction, Inc. $1,198,890.09Jackson Dirt Works, Inc. $1,271,264.82Nashville Construction Company $1,293,850.96Milbocker and Sons, Inc. $1,298,415.22

Total Number of Bidders: 9

Page 33: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 033 Low Bid: $730,581.50

Engineer Estimate: $759,055.63Project: CM 41000-130599

Local Agreement: 18-5563 Pct Over/Under Estimate: -3.75 %

Start Date: 10 days after award Completion Date: August 30, 2019

Description:

0.11 mi of concrete pavement, curb, gutter, sidewalk and ramps, drainage, signals and pavement markings onPatterson Avenue at 44th Street in the city of Kentwood, Kent County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedKamminga & Roodvoets, Inc. $730,581.50Diversco Construction Company, Inc. $769,700.15

Total Number of Bidders: 2

Page 34: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 034 Low Bid: $842,531.78

Engineer Estimate: $711,655.10Project: STU 41000-130695

Local Agreement: 18-5559 Pct Over/Under Estimate: 18.39 %

Start Date: April 15, 2019 Completion Date: June 28, 2019

Description:

2.02 mi of hot mix asphalt base crushing, shaping and resurfacing and pavement markings on 6 Mile Road fromwest of Walker Avenue to Alpine Avenue, Kent County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $842,531.78Superior Asphalt, Inc. $875,555.00Michigan Paving and Materials Company $932,362.52

Total Number of Bidders: 3

Page 35: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 035 Low Bid: $613,537.00

Engineer Estimate: $607,168.30Project: STU 41000-130688

Local Agreement: 19-5024 Pct Over/Under Estimate: 1.05 %

Start Date: June 10, 2019 Completion Date: August 23, 2019

Description:

1.00 mi of hot mix asphalt resurfacing, concrete curb, gutter and sidewalk ramps, roadway grading and pavementmarkings on Byron Center Avenue from 92nd Street to 84th Street, Kent County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $613,537.00Superior Asphalt, Inc. $625,255.00Michigan Paving and Materials Company $683,635.93

Total Number of Bidders: 3

Page 36: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 036 Low Bid: $321,218.25

Engineer Estimate: $308,827.97Project: EDF 22000-203214

Local Agreement: 19-5013 Pct Over/Under Estimate: 4.01 %

Start Date: 10 days after award Completion Date: October 1, 2019

Description:

0.51 mi of hot mix asphalt crushing, shaping and resurfacing, aggregate base, replace culvert and pavementmarkings on Campbell Street from East Breitung Avenue to the south city limits of Iron Mountain, DickinsonCounty. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedBacco Construction Company $321,218.25Payne & Dolan Inc. $363,813.95

Total Number of Bidders: 2

Page 37: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 037 Low Bid: $285,404.60

Engineer Estimate: $278,657.65Project: BHT 01000-133066

Local Agreement: 19-5012 Pct Over/Under Estimate: 2.42 %

Start Date: April 1, 2019 Completion Date: May 24, 2019

Description:

Remove and replace hot mix asphalt bridge wearing surface, replace waterproofing membrane, concrete beamend repairs, substructure patching and guardrail on West Bamfield Road over the AuSable River, Alcona County.This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedMacArthur Construction, Inc. $285,404.60John Henry Excavating Inc. $326,742.00Milbocker and Sons, Inc. $388,889.16Anlaan Corporation $393,007.17Grand River Construction, Inc. $479,484.00C. A. Hull Co., Inc. $523,246.17

Total Number of Bidders: 6

Page 38: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 038 Low Bid: $6,158,521.85

Engineer Estimate: $5,528,654.40Project: STU 61000-130796

Local Agreement: 19-5041 Pct Over/Under Estimate: 11.39 %

Start Date: 10 days after award Completion Date: September 13, 2019

Description:

0.88 mi of concrete pavement reconstruction, storm sewer, concrete curb, gutter and sidewalk, streetscape andpavement markings on Lakeshore Drive from McCracken Street to Laketon Avenue in the city of Muskegon,Muskegon County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedJackson-Merkey Contractors, Inc. $6,158,521.85Kamminga & Roodvoets, Inc. $6,532,344.32Schippers Excavating, Inc. $7,337,737.00

Total Number of Bidders: 3

Page 39: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 039 Low Bid: $945,762.20

Engineer Estimate: $1,076,727.50Project: STL 55141-129717

Local Agreement: 19-5030 Pct Over/Under Estimate: -12.16 %

Start Date: May 15, 2019 Completion Date: August 30, 2019

Description:

2.57 mi of hot mix asphalt reconstruction and pavement markings on County Road 400 north of US-2, MenomineeCounty. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedPayne & Dolan Inc. $945,762.20Bacco Construction Company $996,344.40

Total Number of Bidders: 2

Page 40: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 040 Low Bid: $730,009.39

Engineer Estimate: $904,550.60Project: CM 44000-130853

Local Agreement: 19-5038 Pct Over/Under Estimate: -19.30 %

Start Date: June 10, 2019 Completion Date: October 31, 2019

Description:

0.60 mi of hot mix asphalt base crushing, shaping and resurfacing, concrete curb and gutter, embankment, earthexcavation, aggregate base, aggregate shoulder, arch culvert, storm sewer, guardrail and pavement markings onMillville Road at Davis Lake Road, Lapeer County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedKennedy Excavating, Inc. $730,009.39Superior Contracting Group L.L.C. $784,786.23Astec Asphalt, Inc. $785,284.67Nicol & Sons, Inc. $813,647.22Nashville Construction Company $838,541.35L. A. Construction, Corp. $866,847.49Boddy Construction Company, Inc. $877,025.00Tri-City Groundbreakers, Inc. $878,675.00Rohde Bros. Excavating, Inc. $893,913.00DiPonio Contracting, Inc. $930,128.17

Total Number of Bidders: 10

Page 41: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 041 Low Bid: $821,971.57

Engineer Estimate: $825,048.13Project: STU 82000-203502

Local Agreement: 19-5034 Pct Over/Under Estimate: -0.37 %

Start Date: July 17, 2019 Completion Date: September 6, 2019

Description:

0.94 mi of hot mix asphalt cold milling and resurfacing, concrete pavement repair, concrete curb, gutter, sidewalkand driveway and pavement markings on Ann Arbor Trail from Eckles Road to Newburgh Road in the city ofLivonia, Wayne County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedCadillac Asphalt, L.L.C. $821,971.57Florence Cement Company $848,142.22Ajax Paving Industries, Inc. $983,288.00

Total Number of Bidders: 3

Page 42: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 042

Project: STL 20000-119504-2

Local Agreement: 18-5389

Start Date: June 24, 2019

Completion Date: August 31, 2019

2.35 mi of hot mix asphalt resurfacing on South Wakeley Bridge Road from the Ausable River north to East NorthDown River Road, Crawford County. This is a Local Agency project.

No DBE participation required

All Bids Rejected

03/13/2019

Page 43: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 043 Low Bid: $365,009.80

Engineer Estimate: $333,446.00Project: STUL 35069-133181

Local Agreement: 18-5562 Pct Over/Under Estimate: 9.47 %

Start Date: July 1, 2019 Completion Date: October 18, 2019

Description:

1.21 mi of hot mix asphalt crushing, shaping and resurfacing, aggregate base and pavement markings onBissonette Drive from Lodge Road to Mission Drive and on Mission Drive from Bissonette Drive to PerimeterRoad, Iosco County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedBolen Asphalt Paving, Inc. $365,009.80Pyramid Paving and Contracting Co. $449,783.80Rieth-Riley Construction Co., Inc. $472,775.00

Total Number of Bidders: 3

Page 44: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 044 Low Bid: $1,057,815.90

Engineer Estimate: $968,308.50Project: TA 11051-131063-2

Local Agreement: 18-5242 Pct Over/Under Estimate: 9.24 %

Start Date: 10 days after award Completion Date: October 28, 2021

Description:

1.05 mi of hot mix asphalt shared use path, steel pedestrian bridge, cofferdams, concrete sidewalk ramps, culvertand signing on Indiana-Michigan River Valley Trail from the Brandywine Creek Nature Preserve to Fort Street,Berrien County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedAnlaan Corporation $1,057,815.90Davis Construction, Inc. $1,065,290.80Riverworks Construction, Inc. $1,101,364.20Milbocker and Sons, Inc. $1,165,669.30Kalin Construction Co., Inc. $1,183,285.40Grand River Construction, Inc. $1,195,330.35

Total Number of Bidders: 6

Page 45: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 045 Low Bid: $1,686,618.56

Engineer Estimate: $1,620,748.00Project: CMG 82000-202825

Local Agreement: 19-5036 Pct Over/Under Estimate: 4.06 %

Start Date: 10 days after award Completion Date: June 30, 2020

Description:

Traffic signal modernization at 18 locations along Rosa Parks Boulevard from Lafayette Street to OakmanBoulevard and on Russell Street from Ferry Street to Chrysler Freeway Service Drive/Holbrook Road in the city ofDetroit, Wayne County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedMotor City Electric Utilities Company $1,686,618.56J. Ranck Electric, Inc. $1,694,147.82Rauhorn Electric, Inc. $1,707,313.00Dan's Excavating, Inc. $1,924,654.86

Total Number of Bidders: 4

Page 46: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 046 Low Bid: $639,168.75

Engineer Estimate: $553,110.00Project: EDF 61000-203221

Local Agreement: 19-5035 Pct Over/Under Estimate: 15.56 %

Start Date: July 8, 2019 Completion Date: September 6, 2019

Description:

0.46 mi of hot mix asphalt cold milling and resurfacing and concrete pavement repair on Whitehall Road fromHolton Road (M-120) to the north city limits of North Muskegon in the city of North Muskegon, Muskegon County.This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedMichigan Paving and Materials Company $639,168.75Rieth-Riley Construction Co., Inc. $919,444.00

Total Number of Bidders: 2

Page 47: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 047

Project: MRR 82144-204008 , ETC

Local Agreement:

Start Date: April 15, 2019

Completion Date: October 11, 2019

10.50 mi of hot mix asphalt cold milling and resurfacing, concrete pavement repairs, curb, gutter and sidewalkramps, drainage, 2 railroad crossing improvements and pavement markings on 8 Mile Road from Woodward Aveto I-94 in the cities of Detroit, Harper Woods, Ferndale, Hazel Park, Warren and Eastpointe, Macomb, Wayne andOakland Counties. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

All Bids Rejected

03/13/2019

Page 48: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 048 Low Bid: $2,320,894.77

Engineer Estimate: $2,665,666.75Project: NH 50022-201387

Local Agreement: Pct Over/Under Estimate: -12.93 %

Start Date: July 22, 2019 Completion Date: October 18, 2019

Description:

2.38 mi of concrete pavement repairs, curb, and gutter and pavement markings on M-59 from Romeo Plank Roadto Elizabeth Street, Macomb County.

5.00 % DBE participation required

Bidder As-SubmitttedCipparrone Contracting, Inc. $2,320,894.77Florence Cement Company $2,501,401.27Major Cement Co. $2,834,269.77

Total Number of Bidders: 3

Page 49: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 049 Low Bid: $2,696,657.67

Engineer Estimate: $2,623,493.20Project: HSIP 33084-203028

Local Agreement: Pct Over/Under Estimate: 2.79 %

Start Date: April 15, 2019 Completion Date: December 1, 2019

Description:

Application of longitudinal pavement markings on various state trunklines, Clinton, Eaton, Ingham, Livingston,Jackson, Washtenaw, Hillsdale, Lenawee and Monroe Counties.

No DBE participation required

Bidder As-SubmitttedP.K. Contracting, Inc. $2,696,657.67JV Contracting, Inc. $2,878,864.14

Total Number of Bidders: 2

Page 50: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 050 Low Bid: $2,167,304.18

Engineer Estimate: $2,536,424.47Project: NH 21051-201221

Local Agreement: Pct Over/Under Estimate: -14.55 %

Start Date: July 29, 2019 Completion Date: October 11, 2019

Description:

16.11 mi of micro-cold milling, overband crack fill, paver placed surface seal and aggregate shoulder andpavement markings on US-41 from US-2 to the south Alger county line, Delta County. This project includes a 3year pavement performance warranty.

No DBE participation required

Bidder As-SubmitttedPayne & Dolan Inc. $2,167,304.18Bacco Construction Company $2,414,270.82

Total Number of Bidders: 2

Page 51: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 051 Low Bid: $1,814,451.40

Engineer Estimate: $1,570,655.59Project: M 60011-200988

Local Agreement: Pct Over/Under Estimate: 15.52 %

Start Date: September 23, 2019 Completion Date: November 8, 2019

Description:

7.04 mi of hot mix asphalt cold milling and single course resurfacing, shoulders and pavement markings on M-33from south of Greasy Creek Road to south of M-32, Montmorency County. This project includes a 3 year materialsand workmanship pavement warranty.

No DBE participation required

Bidder As-SubmitttedPayne & Dolan Inc. $1,814,451.40Rieth-Riley Construction Co., Inc. $1,880,377.90

Total Number of Bidders: 2

Page 52: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 052 Low Bid: $1,048,465.94

Engineer Estimate: $962,881.37Project: CM 50072-120387 , ETC

Local Agreement: 19-5016 Pct Over/Under Estimate: 8.89 %

Start Date: April 29, 2019 Completion Date: August 31, 2019

Description:

1.69 mi of construction of right turn lanes, signal upgrades, pavement markings and hot mix asphalt overlay on acarpool lot on M-29 at Donner Road, Seadon Drive and Sass Road, Macomb County.

5.00 % DBE participation required

Bidder As-SubmitttedBoddy Construction Company, Inc. $1,048,465.94M. L. Chartier Excavating, Inc. $1,198,418.61

Total Number of Bidders: 2

Page 53: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 053 Low Bid: $342,082.95

Engineer Estimate: $461,769.60Project: HSIP 39022-203025

Local Agreement: Pct Over/Under Estimate: -25.92 %

Start Date: May 1, 2019 Completion Date: November 27, 2019

Description:

Application of special pavement markings on various routes, Berrien, Branch, Calhoun, Cass, Kalamazoo, St.Joseph and Van Buren Counties.

No DBE participation required

Bidder As-SubmitttedJV Contracting, Inc. $342,082.95P.K. Contracting, Inc. $391,318.25

Total Number of Bidders: 2

Page 54: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 054 Low Bid: $496,405.80

Engineer Estimate: $459,767.85Project: HSIP 21000-203027

Local Agreement: Pct Over/Under Estimate: 7.97 %

Start Date: April 15, 2019 Completion Date: October 31, 2019

Description:

Application of special pavement markings on trunkline routes, Delta, Dickinson, Gogebic, Iron, Mackinac,Menominee and Schoolcraft Counties.

No DBE participation required

Bidder As-SubmitttedP.K. Contracting, Inc. $496,405.80

Total Number of Bidders: 1

Page 55: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 055 Low Bid: $177,861.00

Engineer Estimate: $154,147.29Project: NH 59012-202194

Local Agreement: Pct Over/Under Estimate: 15.38 %

Start Date: April 22, 2019 Completion Date: May 11, 2019

Description:

0.23 mi of partial reconstruction of Morley Rest Area for Portable Intermittent Weigh Station relocation on US-131at the Morley Rest Area, Montcalm County.

No DBE participation required

Bidder As-SubmitttedC & D Hughes, Inc. $177,861.00Kamminga & Roodvoets, Inc. $182,566.90The Isabella Corporation $187,534.00Nashville Construction Company $188,902.47D. J. McQuestion & Sons, Inc. $189,801.83Epic Excavating, Inc. $201,847.02J. Ranck Electric, Inc. $231,331.62

Total Number of Bidders: 7

Page 56: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 056 Low Bid: $109,217.90

Engineer Estimate: $130,514.20Project: HSIP 37000-202012

Local Agreement: Pct Over/Under Estimate: -16.32 %

Start Date: July 8, 2019 Completion Date: October 4, 2019

Description:

Delineation upgrades at 6 locations on various routes in the village of Lexington, city of Croswell, Clare, Gladwin,Gratiot, Isabella, Midland and Sanilac Counties.

No DBE participation required

Bidder As-SubmitttedGive 'em A Brake Safety, LLC $109,217.90J. Ranck Electric, Inc. $112,215.00

Total Number of Bidders: 2

Page 57: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 057 Low Bid: $46,444.00

Engineer Estimate: $65,952.36Project: ST 76023-110719

Local Agreement: Pct Over/Under Estimate: -29.58 %

Start Date: June 7, 2019 Completion Date: June 23, 2019

Description:

Carpool parking lot overlay on I-69 at Grand River Road, Shiawassee County.

No DBE participation required

Bidder As-SubmitttedAmerican Asphalt, Inc. $46,444.00Rieth-Riley Construction Co., Inc. $57,978.20T. G. Priehs, LLC $73,211.60Michigan Paving and Materials Company $88,821.20

Total Number of Bidders: 4

Page 58: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 058 Low Bid: $2,186,281.57

Engineer Estimate: $2,353,789.74Project: GF19 45041-204228

Local Agreement: Pct Over/Under Estimate: -7.12 %

Start Date: August 12, 2019 Completion Date: November 15, 2019

Description:

8.89 mi of hot mix asphalt cold milling and resurfacing, crack, chip and fog sealing, concrete curb, gutter, sidewalkand ramps, trenching and pavement markings on M-22 from M-204 to Reynolds Street and on M-204 from M-22(west junction) to M-22 (east junction) in the village of Suttons Bay, Leelanau County. This project includes two 3year materials and workmanship pavement warranties and a 2 year pavement performance warranty.

No DBE participation required

Bidder As-SubmitttedElmer's Crane and Dozer, Inc. $2,186,281.57Rieth-Riley Construction Co., Inc. $2,227,855.47

Total Number of Bidders: 2

Page 59: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 059 Low Bid: $715,691.61

Engineer Estimate: $742,152.07Project: NH 39041-113129

Local Agreement: Pct Over/Under Estimate: -3.57 %

Start Date: May 6, 2019 Completion Date: July 19, 2019

Description:

1.15 mi of concrete pavement repairs, hot mix asphalt cold milling and resurfacing, ADA ramp upgrades andpavement markings on I-94BL (Stadium Drive) from east of Seneca Lane to Howard Street in the city ofKalamazoo, Kalamazoo County.

3.00 % DBE participation required

Bidder As-SubmitttedCipparrone Contracting, Inc. $715,691.61C & D Hughes, Inc. $748,493.73Rieth-Riley Construction Co., Inc. $750,751.46Michigan Paving and Materials Company $837,328.98

Total Number of Bidders: 4

Page 60: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 060 Low Bid: $809,437.25

Engineer Estimate: $690,902.44Project: M 82111-205946

Local Agreement: Pct Over/Under Estimate: 17.16 %

Start Date: May 29, 2019 Completion Date: September 15, 2019

Description:

Bridge rehabilitation including structural steel repairs, substructure patching and carbon fiber wrap on WarrenAvenue, Glendale Avenue and Wyoming Avenue over M-10 and on CSX over I-96 eastbound and westbound inthe city of Detroit, Wayne County.

No DBE participation required

Bidder As-SubmitttedZ Contractors, Inc. $809,437.25Anlaan Corporation $897,537.85C. A. Hull Co., Inc. $938,679.39

Total Number of Bidders: 3

Page 61: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 061 Low Bid: $335,683.90

Engineer Estimate: $434,363.00Project: GF19 20032-200685

Local Agreement: Pct Over/Under Estimate: -22.72 %

Start Date: May 6, 2019 Completion Date: June 13, 2019

Description:

4.84 mi of overband crack sealing, single course chip sealing, and fog sealing on M-93 from east of Old-27northeasterly to Bobcat Trail, Crawford County. This project includes a 2 year pavement performance warranty.

No DBE participation required

Bidder As-SubmitttedPavement Maintenance Systems, LLC $335,683.90Fahrner Asphalt Sealers, L.L.C. $350,137.11Highway Maintenance and Construction Company $364,970.46

Total Number of Bidders: 3

Page 62: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 062 Low Bid: $1,697,944.74

Engineer Estimate: $1,887,652.96Project: M 75052-201148

Local Agreement: Pct Over/Under Estimate: -10.05 %

Start Date: 10 days after award Completion Date: October 15, 2019

Description:

11.90 mi of hot mix asphalt cold milling and single course overlay, shoulder gravel and pavement markings on M-77 from M-28 to the Alger/Schoolcraft county line, Schoolcraft County. This project includes a 3 year materials andworkmanship pavement warranty.

No DBE participation required

Bidder As-SubmitttedPayne & Dolan Inc. $1,697,944.74Bacco Construction Company $1,817,390.19

Total Number of Bidders: 2

Page 63: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 063 Low Bid: $868,925.14

Engineer Estimate: $858,122.20Project: GF19 49023-203833

Local Agreement: Pct Over/Under Estimate: 1.26 %

Start Date: 10 days after award Completion Date: August 30, 2019

Description:

4.44 mi of mIcro-cold milling and hot mix asphalt ultra-thin overlay, aggregate shoulders, pavement markings, andcenterline and shoulder corrugations on US-2 from east of Worth Road to east of Wildwood Lane, MackinacCounty. This project includes a 2 year pavement performance warranty.

No DBE participation required

Bidder As-SubmitttedPayne & Dolan Inc. $868,925.14Bacco Construction Company $935,170.31Rieth-Riley Construction Co., Inc. $1,049,484.64

Total Number of Bidders: 3

Page 64: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 064 Low Bid: $718,441.27

Engineer Estimate: $739,210.64Project: M 03071-201203

Local Agreement: Pct Over/Under Estimate: -2.81 %

Start Date: August 5, 2019 Completion Date: October 11, 2019

Description:

3.78 mi of hot mix asphalt cold milling, single course overlay, concrete curb, gutter and driveway and pavementmarkings on M-40 from the Van Buren/Allegan county line north to 32nd Street, Allegan County. This projectincludes two 3 year materials and workmanship pavement warranties.

No DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $718,441.27Michigan Paving and Materials Company $761,327.32

Total Number of Bidders: 2

Page 65: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 065 Low Bid: $193,395.70

Engineer Estimate: $145,303.39Project: M 63101-204615

Local Agreement: Pct Over/Under Estimate: 33.10 %

Start Date: April 16, 2019 Completion Date: May 24, 2019

Description:

Substructure repairs on US-24 northbound to M-10 westbound over I-696 in the city of Southfield, Oakland County.

No DBE participation required

Bidder As-SubmitttedZ Contractors, Inc. $193,395.70C. A. Hull Co., Inc. $249,049.90

Total Number of Bidders: 2

Page 66: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 066 Low Bid: $1,051,954.90

Engineer Estimate: $1,123,052.20Project: STUL 23439-133065

Local Agreement: 19-5023 Pct Over/Under Estimate: -6.33 %

Start Date: May 2, 2019 Completion Date: September 27, 2019

Description:

0.20 mi of hot mix asphalt reconstruction with concrete curb and gutter, concrete curb, gutter, sidewalk and ADAramps, storm and sanitary sewer, watermain, signing and pavement markings on West Lovett Street from CochranAvenue (M-50) to Clinton Street in the city of Charlotte, Eaton County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-SubmitttedKamminga & Roodvoets, Inc. $1,051,954.90Hoffman Bros., Inc. $1,053,086.00Mead Bros. Excavating Inc. $1,065,038.36Milbocker and Sons, Inc. $1,065,642.50C & D Hughes, Inc. $1,082,968.79TCI, Inc. of Michigan $1,105,244.24Dunigan Bros, Inc. $1,182,272.58

Total Number of Bidders: 7

Page 67: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 067 Low Bid: $969,908.75

Engineer Estimate: $1,011,688.50Project: STUL 13000-204636

Local Agreement: 19-5026 Pct Over/Under Estimate: -4.13 %

Start Date: 10 days after award Completion Date: August 23, 2019

Description:

0.67 mi of hot mix asphalt reconstruction, aggregate base, concrete curb, gutter and ADA ramps, watermain,signing and pavement markings on North Street from North Eaton Street to Burr Oak Street in the city of Albion,Calhoun County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedMead Bros. Excavating Inc. $969,908.75Hoffman Bros., Inc. $1,058,301.37Bailey Excavating, Inc. $1,069,128.39Concord Excavating & Grading, Inc. $1,074,270.25C & D Hughes, Inc. $1,115,690.00

Total Number of Bidders: 5

Page 68: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 068 Low Bid: $858,146.00

Engineer Estimate: $909,267.10Project: STU 50000-202968-2

Local Agreement: 18-5477 Pct Over/Under Estimate: -5.62 %

Start Date: July 8, 2019 Completion Date: October 15, 2019

Description:

0.98 mi of hot mix asphalt cold milling and resurfacing, concrete curb and gutter, base repair, drainage, signing andpavement markings on Masonic Boulevard from Utica Road to Kelly Road, Macomb County. This is a LocalAgency project.

4.00 % DBE participation required

Bidder As-SubmitttedFlorence Cement Company $858,146.00Pro-Line Asphalt Paving Corp. $907,645.06Cadillac Asphalt, L.L.C. $998,347.28Ajax Paving Industries, Inc. $1,188,875.06

Total Number of Bidders: 4

Page 69: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 069 Low Bid: $819,817.15

Engineer Estimate: $871,213.30Project: STUL 51000-200761

Local Agreement: 19-5033 Pct Over/Under Estimate: -5.90 %

Start Date: June 3, 2019 Completion Date: September 28, 2019

Description:

0.45 mi of hot mix asphalt reconstruction including pavement removal, concrete curb, gutter, sidewalks, sewer,drainage, signing and pavement markings on 12th Street from Maple Street to US-31 in the city of Manistee,Manistee County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedElmer's Crane and Dozer, Inc. $819,817.15J & N Construction, LLC $837,125.44C & D Hughes, Inc. $839,738.44Milbocker and Sons, Inc. $862,114.00Hallack Contracting, Inc. $992,066.20

Total Number of Bidders: 5

Page 70: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 070 Low Bid: $557,953.50

Engineer Estimate: $617,965.00Project: BO 56000-133017

Local Agreement: 19-5020 Pct Over/Under Estimate: -9.71 %

Start Date: May 1, 2019 Completion Date: August 23, 2019

Description:

Replace wearing surface and waterproofing membrane, concrete box beam patching, replace expansion joint andheavy riprap on Magrudder Road over Pine River and North Saginaw Road over Big Salt River, Midland County.This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedC. A. Hull Co., Inc. $557,953.50Anlaan Corporation $619,283.45Grand River Construction, Inc. $629,339.90Milbocker and Sons, Inc. $732,507.20Z Contractors, Inc. $755,972.70

Total Number of Bidders: 5

Page 71: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 071 Low Bid: $445,879.27

Engineer Estimate: $486,850.40Project: ER 56000-203302

Local Agreement: 19-5002 Pct Over/Under Estimate: -8.42 %

Start Date: 10 days after award Completion Date: July 31, 2019

Description:

0.15 mi of hot mix asphalt reconstruction, subbase, aggregate base, drainage and pavement markings on NorthColeman Road from the south junction of West School Road north to the north junction of West School Road,Midland County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedThe Isabella Corporation $445,879.27Malley Construction, Inc. $458,000.00Wonsey Tree Service, Inc. $461,891.69Crawford Contracting, Inc. $468,579.11Mid-State Earthworks, Inc. $472,744.75McGuirk Sand-Gravel, Inc. $477,936.73Rohde Bros. Excavating, Inc. $523,311.00Tri-City Groundbreakers, Inc. $531,777.00

Total Number of Bidders: 8

Page 72: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 072 Low Bid: $172,597.80

Engineer Estimate: $157,144.00Project: STUL 35069-133183

Local Agreement: 19-5032 Pct Over/Under Estimate: 9.83 %

Start Date: August 12, 2019 Completion Date: October 18, 2019

Description:

0.78 mi of hot mix asphalt widening and surfacing, trenching, aggregate shoulders and pavement markings onKings Corner Road from Birch Acres Road to Cedar Lake Road, Iosco County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedBolen Asphalt Paving, Inc. $172,597.80Pyramid Paving and Contracting Co. $200,262.26Rieth-Riley Construction Co., Inc. $277,862.50

Total Number of Bidders: 3

Page 73: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 073 Low Bid: $739,014.00

Engineer Estimate: $660,897.62Project: BRT 52000-133092

Local Agreement: 19-5027 Pct Over/Under Estimate: 11.82 %

Start Date: 10 days after award Completion Date: October 15, 2019

Description:

Bridge replacement with precast three-sided culvert, cofferdams, drainage, approach work and pavementmarkings on County Road 478 over Black River, Marquette County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedA. Lindberg & Sons, Inc. $739,014.00Bacco Construction Company $850,397.40FA Industrial Services, Inc. $960,673.30Hebert Construction Co. $1,221,683.84

Total Number of Bidders: 4

Page 74: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 074 Low Bid: $679,252.90

Engineer Estimate: $568,044.00Project: TAU 41401-127069

Local Agreement: 19-5008 Pct Over/Under Estimate: 19.58 %

Start Date: 10 days after award Completion Date: August 31, 2019

Description:

2.90 mi of hot mix asphalt shared use path, concrete sidewalks, ramps and pavement markings on Interurban Trailfrom Kelloggsville Park to 32nd Street in the city of Wyoming, Kent County. This is a Local Agency project.

4.00 % DBE participation required

Bidder As-SubmitttedEpic Excavating, Inc. $679,252.90Kamminga & Roodvoets, Inc. $749,007.79C L Trucking & Excavating, LLC $756,121.25Al's Excavating, Inc. $763,764.00Schippers Excavating, Inc. $777,777.00

Total Number of Bidders: 5

Page 75: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 075 Low Bid: $967,667.45

Engineer Estimate: $1,124,419.46Project: STL 40555-130367

Local Agreement: 19-5029 Pct Over/Under Estimate: -13.94 %

Start Date: May 6, 2019 Completion Date: November 1, 2019

Description:

2.83 mi of hot mix asphalt base crushing, shaping, and resurfacing, signing and pavement markings on Lund RoadSW from Good Road east to M-66, Kalkaska County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedElmer's Crane and Dozer, Inc. $967,667.45J & N Construction, LLC $990,237.56Rieth-Riley Construction Co., Inc. $1,085,286.85Payne & Dolan Inc. $1,110,638.85

Total Number of Bidders: 4

Page 76: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 076 Low Bid: $979,865.43

Engineer Estimate: $1,019,945.25Project: MCS 13000-133087

Local Agreement: 19-5047 Pct Over/Under Estimate: -3.93 %

Start Date: 10 days after award Completion Date: August 30, 2019

Description:

Bridge replacement with precast three sided culvert, concrete sidewalk, curb, gutter, driveway, sewer, drainage,guardrail, cofferdams, steel piles and approach work on Monroe Street over Rice Creek in the city of Marshall,Calhoun County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedDavis Construction, Inc. $979,865.43Grand River Construction, Inc. $1,056,075.15Milbocker and Sons, Inc. $1,240,655.03E.T. MacKenzie Company $1,416,244.77Anlaan Corporation $1,523,151.90

Total Number of Bidders: 5

Page 77: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 077 Low Bid: $613,933.82

Engineer Estimate: $515,042.52Project: STL 19555-130121

Local Agreement: 19-5028 Pct Over/Under Estimate: 19.20 %

Start Date: April 15, 2019 Completion Date: May 24, 2019

Description:

2.54 mi of hot mix asphalt base crushing, shaping, and resurfacing, trenching and aggregate shoulders on DewittRoad from Cutler Road north to Alward Road, Clinton County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $613,933.82Michigan Paving and Materials Company $646,941.99

Total Number of Bidders: 2

Page 78: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 078 Low Bid: $151,818.85

Engineer Estimate: $123,390.50Project: STL 76555-129923-2

Local Agreement: 18-5253 Pct Over/Under Estimate: 23.04 %

Start Date: 10 days after award Completion Date: July 26, 2019

Description:

0.21 mi of hot mix asphalt base crushing, shaping, and resurfacing, trenching, aggregate shoulders and pavementmarkings on Grand River Road from North Shiawassee Street to Grand River Avenue in the village of Bancroft,Shiawassee County. This is a Local Agency project.

No DBE participation required

Bidder As-SubmitttedRieth-Riley Construction Co., Inc. $151,818.85American Asphalt, Inc. $157,372.00T. G. Priehs, LLC $161,800.60Michigan Paving and Materials Company $167,173.12C & D Hughes, Inc. $168,829.72

Total Number of Bidders: 5

Page 79: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 079 Low Bid: $1,261,599.84

Engineer Estimate: $1,009,956.50Project: FM 12231-125536-2

Local Agreement: Pct Over/Under Estimate: 24.92 %

Start Date: July 1, 2019 Completion Date: 29 Calendar Days

Description:

Rehab of Runway 4/22 & Electrical Improvements at the Branch County Memorial Airport, city of Coldwater,Branch County.

4.00 % DBE participation required

Bidder As-SubmitttedMichigan Paving and Materials Company $1,261,599.84Rieth-Riley Construction Co., Inc. $1,740,687.85

Total Number of Bidders: 2

Page 80: A s -S u b m itte d R e s u lts R e p o rt v1...2019/03/01  · A s -S u b m itte d R e s u lts R e p o rt v1 Letting of March 01, 2019 Letting Call: 1903 001 Low Bid: $4,935,780.78

Letting of March 01, 2019

Letting Call: 1903 080 Low Bid: $855,882.47

Engineer Estimate: $1,170,296.00Project: CTF 28000-205495

Local Agreement: Pct Over/Under Estimate: -26.87 %

Start Date: May 28, 2019 Completion Date: October 11, 2019

Description:

11.00 mi of tie replacement and track surfacing work on the Great Lakes Central Railroad between WaltonJunction and Traverse City, Grand Traverse County.

No DBE participation required

Bidder As-SubmitttedArmond Cassil Railroad Construction, Inc $855,882.47CR Construction Company of Michigan LLC $917,120.00Timiny R/R Construction, Inc. $958,725.00

Total Number of Bidders: 3