1 MITEI Sep 2016 A proposed energy conversion process for making solar energy a major player in global power generation Jacob Karni The Weizmann Institute of Science Rehovot, Israel

A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

1MITEISep2016

A proposed energy conversion process for making solar energy a major player in global

power generation

Jacob Karni

The Weizmann Institute of ScienceRehovot, Israel

Page 2: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

2MITEISep2016

General Objective of Renewable Power Generation and Fuel Production

Have an energy conversion method, which can gradually replace fossil fuel combustion on a worldwide scale,

Page 3: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

3MITEISep2016

General Objective of Renewable Power Generation and Fuel Production

Have an energy conversion method, which can gradually replace fossil fuel combustion on a worldwide scale, eventually leading to a renewable-dominant global energy supply.

Page 4: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

4MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 5: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

5MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 6: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

6MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 7: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

7MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 8: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

8MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 9: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

9MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 10: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

10MITEISep2016

Levelized Energy Cost

Page 11: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

11MITEISep2016

• The LEC defines the breakeven cost of thesystem.

• It is the basic cost/performance parameter ofpower generation systems

The acronym LCOE (Levelized Cost of Energy) is often used instead of LEC

The Levelized Energy Cost

Page 12: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

12MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Annual fuel costs

Net annual electricity production

LEC =fcr ⋅ Cinvest + CO&M + C fuel

Eelec,yr

Cinvest

CO&M

C fuel

Eelec,yr

fcr =kd 1+ kd( )N

1+ kd( )N −1+ kinsurance Annualized Fixed Charge Rate

(or Annuity Factor) Real debt interest rate

Depreciation period in years (system design life)

Annual insurance cost rate

kd

kinsuranceN

Page 13: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

13MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Annual fuel costs

Net annual electricity production

LEC =fcr ⋅ Cinvest + CO&M + C fuel

Eelec,yr

Cinvest

CO&M

C fuel

Eelec,yr

fcr =kd 1+ kd( )N

1+ kd( )N −1+ kinsurance Annualized Fixed Charge Rate

(or Annuity Factor) Real debt interest rate

Depreciation period in years (system design life)

Annual insurance cost rate

kd

kinsuranceN

HereweareonlyinterestedinthesolarLEC

Page 14: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

14MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Annual fuel costs

Net annual electricity production

LEC = fcr ⋅ Cinvest + CO&M

Eelec,yr

Cinvest

CO&M

Eelec,yr

fcr =kd 1+ kd( )N

1+ kd( )N −1+ kinsurance Annualized Fixed Charge Rate

(or Annuity Factor) Real debt interest rate

Depreciation period in years (system design life)

Annual insurance cost rate

kd

kinsuranceN

Page 15: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

15MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Net annual solar electricity production

Annual-average system efficiency

Sunlight collection aperture area

Direct annual solar irradiation energy

Cinvest

CO&M

Esolar−elec,yr

LECsolar =fcr ⋅ Cinvest + CO&M

Esolar−elec,yr

=fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

ηsys,yr−avg

Acollector  apertureIincident dt

tyear ,sun

Page 16: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

16MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Net annual solar electricity production

Annual-average system efficiency

Sunlight collection aperture area

Direct annual solar irradiation energy

Cinvest

CO&M

Esolar−elec,yr

LECsolar =fcr ⋅ Cinvest + CO&M

Esolar−elec,yr

=fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

ηsys,yr−avg

Acollector  apertureIincident dt

tyear ,sun

Page 17: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

17MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

Page 18: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

18MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditionsNot unique to any technology

Page 19: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

19MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcrNot unique to any technology

Page 20: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

20MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcr.

3. Lower production, installation and operation costsNot really unique to any technology

Page 21: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

21MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcr.

3. Lower production, installation and operation costs

4. Increase the overall annual system efficiency.

Page 22: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

22MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcr.

3. Lower production, installation and operation costs

4. Increase the overall annual system efficiency. Increasing the collector area causes an increase in costs and generally does not reduce the LEC.

Page 23: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

23MITEISep2016

LEC Reduction

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcr.

3. Lower production, installation and operation costs

4. Increase the overall annual system efficiency.

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

Page 24: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

24MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

• Increasing the overall annual system efficiencyis usually combined with reduction of production, installation and operation costs.

Page 25: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

25MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

• Increasing the overall annual system efficiencyis usually combined with reduction of production, installation and operation costs.

• We must develop systems with a potential for higher annual-average system efficiency than possible in present solar systems.

Page 26: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

26MITEISep2016

General Features of Solar-Thermal Systems

Page 27: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

27MITEISep2016

General Features of Solar-Thermal Systems

• There is an energy loss in each step

• The overall annual-average system efficiency is

Where ηi are the annual-average component efficiencies.

!!!

!!!

Annual-averageefficiency≠ “DesignEfficiency”

Page 28: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

28MITEISep2016

Now we are ready to deal with theFundamental Requirements

1. Use clean, renewable energy, with benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 29: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

29MITEISep2016

Solar System are Modular by Nature

Page 30: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

30MITEISep2016

Large Scale, Modular Design

~375 MWe Plant near Ivanpah, CA, with 3 Solar Towers

Page 31: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

31MITEISep2016

Large Scale, Modular Design

~150 MWe Trough Plant near Ouarzazate, Morocco with a single Power Conversion Unit [Relatively long heat transmission lines]

Page 32: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

32MITEISep2016

Large Scale, Modular Design

~150 MWe Trough Plant near Ouarzazate, Morocco with a single Power Conversion Unit [Relatively long heat transmission lines]

Firstof3CSPmodules

Page 33: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

33MITEISep2016

Solar System are Modular by Nature

But what should be the size of each module?

Page 34: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

34MITEISep2016

Primary Optics of Solar Tower

Page 35: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

35MITEISep2016

PS10 – Abengoa’s~10MWe plant near Seville, Spain

Size – Optics Relation in Solar Tower Systems

Page 36: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

36MITEISep2016

Size – Optics Relation in Solar Tower Systems PS10 – Abengoa’s~10MWe plant near Seville, Spain. 624 x 120m2 heliostats

115m high tower

PS20 – Abengoa’s~20MWe plant near Seville, Spain 1255 x 120m2 heliostats;

165m high tower

Page 37: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

37MITEISep2016

Size – Optics Relation in Solar Tower Systems PS10 – Abengoa’s~10MWe plant near Seville, Spain. 624 x 120m2 heliostats

115m high tower

PS20 – Abengoa’s~20MWe plant near Seville, Spain 1255 x 120m2 heliostats;

165m high tower

Page 38: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

38MITEISep2016

Size – Optics Relation in Solar Tower Systems PS10 – Abengoa’s~10MWe plant near Seville, Spain. 624 x 120m2 heliostats

115m high tower

PS20 – Abengoa’s~20MWe plant near Seville, Spain 1255 x 120m2 heliostats;

165m high tower

As good as possible 2:1 scale up

Page 39: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

39MITEISep2016

Size – Optics Relation in Solar Tower Systems PS10 – Abengoa’s~10MWe plant near Seville, Spain. 624 x 120m2 heliostats

115m high tower

PS20 – Abengoa’s~20MWe plant near Seville, Spain 1255 x 120m2 heliostats;

165m high tower

As good as possible 2:1 scale upReceiver aperture diameter is increased by ~ !

Page 40: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

40MITEISep2016

Gemasolar – Torresol’s ~20 MWe plant with 15 hours of thermal storage, covering nearly 2 km2. 2,650 x 120m2 heliostats; 140m high tower

Size – Optics Relation in Solar Tower Systems

Page 41: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

41MITEISep2016

Gemasolar – Torresol’s ~20 MWe plant with 15 hours of thermal storage, covering nearly 2 km2. 2,650 x 120m2 heliostats; 140m high tower

Size – Optics Relation in Solar Tower Systems

Page 42: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

42MITEISep2016

Gemasolar – Torresol’s ~20 MWe plant with 15 hours of thermal storage, covering nearly 2 km2. 2,650 x 120m2 heliostats; 140m high tower

Size – Optics Relation in Solar Tower Systems

Forcedtouse360° radiation’scollectionandexternalreceiver

Page 43: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

43MITEISep2016

Size – Optics Relation in Solar Tower Systems

BrightSource’s solar power generation plants near Ivanpah, CA; 3 solar towers, totaling ~375MWe, covering ~16 km2. 173,500 x 15m2 heliostats; 140m high tower

Page 44: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

44MITEISep2016

Size – Optics Relation in Solar Tower Systems

ReceiverAperture

SpilledRadiation

Concentrating Dish

– Spillage Losses –

Page 45: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

45MITEISep2016

Size – Optics Relation in Solar Tower Systems

ReceiverAperture

SpilledRadiation

ReceiverAperture

SpilledRadiation

Concentrating Dish

Solar Tower ~10MWe

– Spillage Losses –

Page 46: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

46MITEISep2016

Size – Optics Relation in Solar Tower Systems

Solar Tower > 20MWe

Receiver

SpilledRadiation

ReceiverAperture

SpilledRadiation

ReceiverAperture

SpilledRadiation

Concentrating Dish

Solar Tower ~10MWe

– Spillage Losses –

Page 47: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

47MITEISep2016

ReceiverAperture

SpilledRadiation

Solar Tower > 20MWeEfficiency of External Receiver < Efficiency of Cavity Receiver

Size – Optics Relation in Solar Tower Systems

Receiver

SpilledRadiation

ReceiverAperture

SpilledRadiation

Concentrating Dish

Solar Tower ~10MWe

– Spillage Losses –

Page 48: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

48MITEISep2016

Energy Storage in Solar Systems

Page 49: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

49MITEISep2016

Wind Output

Load Required

The TXU (Arizona) Load Requirement

Electrical Power Generation and Distribution

Page 50: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

50MITEISep2016

Solar Output

Wind Output

Load Required

Electrical Power Generation and Distribution The TXU (Arizona) Load Requirement

Page 51: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

51MITEISep2016

Electrical Power Generation and Distribution

Electricity demand and load distribution between Coal (Steam Turbines), Nat. Gas (Combined Cycle, Gas Turbines), Nuclear and Wind in the UK.

Demand

CoalGas(CC) Nuclear

Wind

Page 52: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

52MITEISep2016

Electrical Power Generation and Distribution

Electricity demand and load distribution between Coal (Steam Turbines), Nat. Gas (Combined Cycle, Gas Turbines), Nuclear and Wind in the UK.

Demand

Coal Gas Nuclear

Wind

Page 53: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

53MITEISep2016

Electrical Power Generation and Distribution

Electricity demand and load distribution between Coal (Steam Turbines), Nat. Gas (Combined Cycle, Gas Turbines), Nuclear and Wind in the UK.

Demand

Coal Gas Nuclear

Wind

Page 54: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

54MITEISep2016

Electrical Power Generation and Distribution

Electricity demand and load distribution between Coal (Steam Turbines), Nat. Gas (Combined Cycle, Gas Turbines), Nuclear and Wind in the UK.

Demand

Coal Gas Nuclear

Wind

Page 55: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

55MITEISep2016

Large scale intermittent renewable solutions must include enough

storage to assure power supply per demand

Page 56: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

56MITEISep2016

Supply solar energy year-round, 24/7 1. Adding storage to a solar power system requires an

increase of the power input during solar hours, meaning larger collection area.But the size of the power conversion unit does not increase

2. Larger collection area means• lower optical and receiver efficiencies in Solar

Tower systems• lower heat transmission efficiency in Trough

systems.

3. The optical and transmission efficiency of small solar towers is least affected by an increase of collection area

Page 57: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

57MITEISep2016

Supply solar energy year-round, 24/7 1. Adding storage to a solar power system requires an

increase of the power input during solar hours, meaning larger collection area.But the size of the power conversion unit does not increase

2. Larger collection area means• lower optical and receiver efficiencies in Solar

Tower systems• lower heat transmission efficiency in Trough

systems.

3. The optical and transmission efficiency of small solar towers is least affected by an increase of collection area

Page 58: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

58MITEISep2016

Supply solar energy year-round, 24/7 1. Adding storage to a solar power system requires an

increase of the power input during solar hours, meaning larger collection area.But the size of the power conversion unit does not increase

2. Larger collection area means• lower optical and receiver efficiencies in Solar

Tower systems• lower heat transmission efficiency in Trough

systems.

3. The optical and transmission efficiency of small solar towers is least affected by an increase of collection area

Page 59: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

59MITEISep2016

Supply solar energy year-round, 24/7 1. Adding storage to a solar power system requires an

increase of the power input during solar hours, meaning larger collection area.But the size of the power conversion unit does not increase

2. Larger collection area means• lower optical and receiver efficiencies in Solar

Tower systems• lower heat transmission efficiency in Trough

systems.

3. The optical and transmission efficiency of small solar towers is least affected by an increase of collection area

Page 60: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

60MITEISep2016

Supply solar energy year-round, 24/7 1. Adding storage to a solar power system requires an

increase of the power input during solar hours, meaning larger collection area.But the size of the power conversion unit does not increase

2. Larger collection area means• lower optical and receiver efficiencies in Solar

Tower systems• lower heat transmission efficiency in Trough

systems.

3. The optical and transmission efficiency of small solar towers is least affected by an increase of collection area

Page 61: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

61MITEISep2016

Requirements for having storage without increasing the LEC, relative to a solar system of the same size, without storage:

1. Increasing collection area does not cause efficiency reduction of other system components

2. The added storage cost does not exceed the eliminated cost of increasing the power conversion unit.

Supply solar energy year-round, 24/7

Page 62: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

62MITEISep2016

Requirements for having storage without increasing the LEC, relative to a solar system of the same size, without storage:

1. Increasing collection area does not cause efficiency reduction of other system components

2. The added storage cost does not exceed the eliminated cost of increasing the power conversion unit.

Supply solar energy year-round, 24/7

Page 63: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

63MITEISep2016

Requirements for having storage without increasing the LEC, relative to a solar system of the same size, without storage:

1. Increasing collection area does not cause efficiency reduction of other system components

2. The added storage cost does not exceed the eliminated cost of increasing the power conversion unit.

Supply solar energy year-round, 24/7

Page 64: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

64MITEISep2016

Power Conversion Units for Solar-Thermal Systems

Page 65: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

65MITEISep2016

Power Conversion Units Options for Solar Systems

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

0 200 400 600 800 1000 1200 1400 1600

PC

U E

ffic

ienc

y

T_high (engine)

Carnot Efficiency

C-N Efficiency

Free-Piston StirlingSteam-Rankine

Brayton

Combined Cycle

sCO2 Brayton

Page 66: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

66MITEISep2016

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

0 200 400 600 800 1000 1200 1400 1600

PC

U E

ffic

ienc

y

T_high (engine)

Carnot Efficiency

C-N Efficiency

Free-Piston StirlingSteam-Rankine

Brayton

Combined Cycle

sCO2 Brayton

Power Conversion Units Options for Solar Systems

Page 67: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

67MITEISep2016

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

0 200 400 600 800 1000 1200 1400 1600

PC

U E

ffic

ienc

y

T_high (engine)

Carnot Efficiency

C-N Efficiency

Free-Piston StirlingSteam-Rankine

Brayton

Combined Cycle

sCO2 Brayton

• Available at the optimum temperature range for solar-thermal• Available at relatively small sizes (1MWe and larger)

Supercritical CO2 turbine advantages:

Power Conversion Units Options for Solar Systems

Page 68: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

68MITEISep2016

Use of Solar Energy for Fuel Production from CO2 and Water

Enable Long Distance Energy Transportation

Page 69: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

69MITEISep2016

Dissociation of CO2 using concentrated solar energy

CourtesyofNewCO2Fuels(NCF)andtheWeizmannInstituteofScience

Page 70: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

70MITEISep2016

Dissociation of CO2 using concentrated solar energy

CourtesyofNewCO2Fuels(NCF)andtheWeizmannInstituteofScience

To be discussed in a future talk…

Page 71: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

71MITEISep2016

The Proposed System

Page 72: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

72MITEISep2016

System ConfigurationSolar Power Generation

Heliostats

Receiver

Power Conversion

Unit

Sloping Ground

ConcentratedSunlight

Secondary Reflector

1

3

6

5

4

Storage

Electricity Output

2

Page 73: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

73MITEISep2016

System ConfigurationSolar Power Generation

Heliostats

Receiver

Power Conversion

Unit

Sloping Ground

ConcentratedSunlight

Secondary Reflector

1

3

6

5

4

Storage

Electricity Output

Primary Optics[MIT]

2

Page 74: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

74MITEISep2016

Large Scale, Modular Design

• Our Design: Relatively small (~10-15 MWt), high-efficiency module. • Increase system efficiency translates to smaller collection area.

Page 75: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

75MITEISep2016

Large Scale, Modular Design

2.5 MWt Solar Tower near Pentakomo CyprusCourtesy of the Cyprus Institute

Page 76: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

76MITEISep2016

System ConfigurationSolar Power Generation

Receiver

Power Conversion

Unit

Sloping Ground

ConcentratedSunlight

Secondary Reflector

1

3

6

5

4

Storage

Electricity Output

2

Heliostats

Secondary Optics and Receiver[Weizmann]

Page 77: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

77MITEISep2016

System ConfigurationSolar Power Generation

Receiver

Power Conversion

Unit

Sloping Ground

ConcentratedSunlight

Secondary Reflector

1

3

6

5

4

Storage

Electricity Output

2

Heliostats

Storage[Alumina Energy]

Page 78: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

78MITEISep2016

System ConfigurationSolar Power Generation

Receiver

Power Conversion

Unit

Sloping Ground

ConcentratedSunlight

Secondary Reflector

1

3

6

5

4

Storage

Electricity Output

2

Heliostats

Page 79: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

79MITEISep2016

System ConfigurationSolar Power Generation

Receiver

Power Conversion

Unit

Sloping Ground

ConcentratedSunlight

Secondary Reflector

1

3

6

5

4

Storage

Electricity Output

2

Heliostats

Page 80: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

80MITEISep2016

System ConfigurationSolar Power Generation

Receiver

Power Conversion

Unit

Sloping Ground

ConcentratedSunlight

Secondary Reflector

1

3

6

5

4

Storage

Electricity Output

2

Heliostats

sCO2 turbine[Southwest Research

Institute]

Page 81: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

81MITEISep2016

System ConfigurationFuel Production

HeliostatsReceiver

Power Conversion

Unit

Sloping Ground

ConcentratedSunlight

Secondary Reflector

1

3

6

5

4

Storage 2

78

CO2 & H2O Dissociation

Reactor

Fuel Production

Page 82: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

82MITEISep2016

System ConfigurationFuel Production

Receiver

Power Conversion

Unit

Sloping Ground

ConcentratedSunlight

Secondary Reflector

1

3

6

5

4

Storage 2

78

CO2 & H2O Dissociation

Reactor

Heliostats

Fuel Production

Syngas production from CO2 & H2O

[NCF & Weizmann]

Page 83: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

83MITEISep2016

Compliance with the Fundamental Requirements

Page 84: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

84MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 85: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

85MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 86: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

86MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 87: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

87MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 88: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

88MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 89: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

89MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost

Page 90: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

90MITEISep2016

Fundamental Requirements1. Use clean, renewable energy, with

benign environmental effects

2. Large-scale (hence, modular)

3. Supply energy year-round, 24/7 Get me what I want, when I want it !!!

4. Transport energy over long distances

5. Affordable cost – check efficiency and LEC

Page 91: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

91MITEISep2016

Efficiency Comparison

SolarThermalSystems

LinearFresnel

Trough

SolarTower>20MWe

SolarTower~5-20MWe

SolarTower<5MWe

Dish-Concentrator

31%

30%

AchievableAnnualAvgerageSystemefficiency

18%

20%

18%

26%

Page 92: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

92MITEISep2016

Efficiency Comparison

Each module of our system is 10-15 MWt (~3.0-4.7 MWe)

SolarThermalSystems

LinearFresnel

Trough

SolarTower>20MWe

SolarTower~5-20MWe

SolarTower<5MWe

Dish-Concentrator

31%

30%

AchievableAnnualAvgerageSystemefficiency

18%

20%

18%

26%

Page 93: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

93MITEISep2016

Levelized Energy Cost

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

4.00% 5.00% 6.00% 7.00% 8.00% 9.00% 10.00%

NewS-TSysyem

PVw/oStorage

PVwithStorage

CC,[email protected]$/MMBtu

CC,[email protected]$/MMBtu

LEC($/MWh)

fcr

Direct Radiation Energy = 5.6 kWh/m2/day (2040 kWh/m2/year)

Page 94: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

94MITEISep2016

Levelized Energy Cost

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

4.00% 5.00% 6.00% 7.00% 8.00% 9.00% 10.00%

NewS-TSysyem

PVw/oStorage

PVwithStorage

CC,[email protected]$/MMBtu

CC,[email protected]$/MMBtu

LEC($/MWh)

fcr

Direct Radiation Energy = 5.6 kWh/m2/day (2040 kWh/m2/year)

Page 95: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

95MITEISep2016

Levelized Energy Cost

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

4.00% 5.00% 6.00% 7.00% 8.00% 9.00% 10.00%

NewS-TSysyem

PVw/oStorage

PVwithStorage

CC,[email protected]$/MMBtu

CC,[email protected]$/MMBtu

LEC($/MWh)

fcr

Direct Radiation Energy = 5.6 kWh/m2/day (2040 kWh/m2/year)

Page 96: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

96MITEISep2016

Levelized Energy Cost

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

4.00% 5.00% 6.00% 7.00% 8.00% 9.00% 10.00%

NewS-TSysyem

PVw/oStorage

PVwithStorage

CC,[email protected]$/MMBtu

CC,[email protected]$/MMBtu

LEC($/MWh)

fcr

Direct Radiation Energy = 5.6 kWh/m2/day (2040 kWh/m2/year)

Page 97: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

97MITEISep2016

Levelized Energy Cost

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

4.00% 5.00% 6.00% 7.00% 8.00% 9.00% 10.00%

NewS-TSysyem

PVw/oStorage

PVwithStorage

CC,[email protected]$/MMBtu

CC,[email protected]$/MMBtu

LEC($/MWh)

fcr

Direct Radiation Energy = 5.6 kWh/m2/day (2040 kWh/m2/year)Direct Radiation Energy = 6.8 kWh/m2/day (2500 kWh/m2/year)

Page 98: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

98MITEISep2016

Levelized Fuel (Syngas) Cost

0

100

200

300

400

500

600

4.00% 5.00% 6.00% 7.00% 8.00% 9.00% 10.00%

LFC[$/ton]@5.6kWh/m2/day

LFC[$/ton]@6.8kWh/m2/day

LEC($/ton)

fcr

Direct Radiation Energy = 5.6 kWh/m2/day (2040 kWh/m2/year)Direct Radiation Energy = 6.8 kWh/m2/day (2500 kWh/m2/year)

Page 99: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

99MITEISep2016

Development Status• The proposed process combines developments

by a group of collaborators working together and separately over 25 years.

• The main system components have been tested and proven on a small scale, but must still be,• designed for the operating conditions of the

proposed system• scaled up • integrated and operated together

Page 100: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

100MITEISep2016

Development Status• The proposed process combines developments

by a group of collaborators working together and separately over 25 years.

• The main system components have been tested and proven on a small scale, but must still be,• designed for the operating conditions of the

proposed system• scaled up • integrated and operated together

Page 101: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

101MITEISep2016

Development Status• The proposed process combines developments

by a group of collaborators working together and separately over 25 years.

• The main system components have been tested and proven on a small scale, but must still be,• designed for the operating conditions of the

proposed system• scaled up • integrated and operated together

Page 102: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

102MITEISep2016

Development Status• The proposed process combines developments

by a group of collaborators working together and separately over 25 years.

• The main system components have been tested and proven on a small scale, but must still be,• designed for the operating conditions of the

proposed system• scaled up • integrated and operated together

Page 103: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

103MITEISep2016

Development Status• The proposed process combines developments

by a group of collaborators working together and separately over 25 years.

• The main system components have been tested and proven on a small scale, but must still be,• designed for the operating conditions of the

proposed system• scaled up • integrated and operated together

Page 104: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

104MITEISep2016

Main Conclusions1. The proposed solar power-generation system enables

• very large-scale installation

• Year-round, 24/7 power supply per demand

At competitive Levelized Energy Cost (LEC)

2. The system can be modified for syngas production from CO2 and water by the addition of a chemical reactor, with minor changes of other system components.

Page 105: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

105MITEISep2016

Main Conclusions1. The proposed solar power-generation system enables

• very large-scale installation

• Year-round, 24/7 power supply per demand

At competitive Levelized Energy Cost (LEC)

2. The system can be modified for syngas production from CO2 and water by the addition of a chemical reactor, with minor changes of other system components.

Page 106: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

106MITEISep2016

Last Comment…

Page 107: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

107MITEISep2016

From talk at MIT on Oct. 2009

Page 108: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

108MITEISep2016

The ‘Real World’ Problem of Solar Thermal

Page 109: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

109MITEISep2016

The ‘Real World’ Problem of Solar Thermal • Facts:

– There are unprecedented opportunities for solar power “here and now”

Page 110: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

110MITEISep2016

The ‘Real World’ Problem of Solar Thermal • Facts:

– There are unprecedented opportunities for solar power “here and now”

– Trough is the only mature solar technology

Page 111: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

111MITEISep2016

The ‘Real World’ Problem of Solar Thermal • Facts:

– There are unprecedented opportunities for solar power “here and now”

– Trough is the only mature solar technology

• Developers are faced with few options:

Page 112: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

112MITEISep2016

The ‘Real World’ Problem of Solar Thermal • Facts:

– There are unprecedented opportunities for solar power “here and now”

– Trough is the only mature solar technology

• Developers are faced with few options: – Grab the opportunity and build trough systems (low risk, short-

term payback)

Page 113: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

113MITEISep2016

The ‘Real World’ Problem of Solar Thermal • Facts:

– There are unprecedented opportunities for solar power “here and now”

– Trough is the only mature solar technology

• Developers are faced with few options: – Grab the opportunity and build trough systems (low risk, short-

term payback) – Develop a new technology that can be cheaper than trough and

commercially ready in 1-2 years (medium risk, possibly longer payback)

Page 114: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

114MITEISep2016

The ‘Real World’ Problem of Solar Thermal • Facts:

– There are unprecedented opportunities for solar power “here and now”

– Trough is the only mature solar technology

• Developers are faced with few options: – Grab the opportunity and build trough systems (low risk, short-

term payback) – Develop a new technology that can be cheaper than trough and

commercially ready in 1-2 years (medium risk, possibly longer payback)

– Develop a breakthrough technology that can reach cost parity with conventional plants but takes 4-5 years to matures (high risk, long term payback)

Page 115: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

115MITEISep2016

The ‘Real World’ Problem of Solar Thermal • Facts:

– There are unprecedented opportunities for solar power “here and now”

– Trough is the only mature solar technology

• Developers are faced with few options: – Grab the opportunity and build trough systems (low risk, short-

term payback) – Develop a new technology that can be cheaper than trough and

commercially ready in 1-2 years (medium risk, possibly longer payback)

– Develop a breakthrough technology that can reach cost parity with conventional plants but takes 4-5 years to mature (high risk, long term payback)

Page 116: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

116MITEISep2016

Our Approach

1. Strive for a long term, lowest cost solar power solution

2. Develop a storage solution

Page 117: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

117MITEISep2016

Our Approach

1. Strive for a long term, lowest cost solar power solution

2. Develop a storage solution

3. Fast to market approach is acceptable if it leads to the long term solution

Page 118: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

118MITEISep2016

Thank You!

Page 119: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

119MITEISep2016

*** Supplement slides ***

Page 120: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

120MITEISep2016

The price of Money (GE)Sep. 25, 2016

Short answer:GE are currently able to get loans for around 1% (less with a floating rate, more with a fixed rate).

Longer answer:GE floating rate note issued in 2007 pays interest (coupon) of 0.694%.GE note issued in 2015 (also floating rate) pays 0.287%In 2012 GE issued fixed rate 10 year debt for 2.7% (link)In 2015 GE issued fixed rate 12 year Euro denominated debt for 1.875% (link)In 2015 GE issued fixed rate 8 year Euro denominated debt for 1.25% (link)In 2015 GE issued fixed rate 7 year Euro denominated debt for 0.80% (link)

This page (http://quicktake.morningstar.com/stocknet/bonds.aspx?symbol=ge) lists many more GE bonds and has a nice graphic of yields and maturities. While these yields aren't interest rates paid by GE (GE pays more in general) they indicate the rates that the market is willing to accept for GE debt.

Page 121: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

121MITEISep2016

The price of MoneyNuclear Power Plants

The modernization of Generation II and III Nuclear Reactors for power generation typically includes improved safety system and 60 years design life.

Generation II reactor designs generally had an original design life of 30 or 40 years. This date was set as the period over which loans taken out for the plant would be paid off.

However, many generation II reactor are being life-extended to 50 or 60 years, and a second life-extension to 80 years may also be economic in many cases.

Page 122: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

122MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Annual fuel costs

Net annual electricity production

LEC =fcr ⋅ Cinvest + CO&M + C fuel

Eelec,yr

Cinvest

CO&M

C fuel

Eelec,yr

fcr =kd 1+ kd( )N

1+ kd( )N −1+ kinsurance Annualized Fixed Charge Rate

(or Annuity Factor)

Page 123: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

123MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Annual fuel costs

Net annual electricity production

LEC =fcr ⋅ Cinvest + CO&M + C fuel

Eelec,yr

Cinvest

CO&M

C fuel

Eelec,yr

fcr =kd 1+ kd( )N

1+ kd( )N −1+ kinsurance Annualized Fixed Charge Rate

(or Annuity Factor)

HereweareonlyinterestedinthesolarLEC

Page 124: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

124MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Net annual solar electricity production

Cinvest

CO&M

fcr =kd 1+ kd( )N

1+ kd( )N −1+ kinsurance Annualized Fixed Charge Rate

(or Annuity Factor)

LECsolar =fcr ⋅ Cinvest + CO&M

Esolar−elec,yr

Esolar−elec,yr

Page 125: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

125MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Net annual solar electricity production

Annual-averaged system efficiency

Sunlight collection aperture area

Direct annual solar irradiation energy

Cinvest

CO&M

Esolar−elec,yr

LECsolar =fcr ⋅ Cinvest + CO&M

Esolar−elec,yr

=fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

ηsys,yr−avg

Acollector  apertureIincident dt

tyear ,sun

Page 126: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

126MITEISep2016

The Levelized Energy Cost

Total capital invested in construction and installation

Annual operation and maintenance

Net annual solar electricity production

Overall annual-averaged system efficiency

Sunlight collection aperture area

Direct annual solar irradiation energy

Cinvest

CO&M

Esolar−elec,yr

LECsolar =fcr ⋅ Cinvest + CO&M

Esolar−elec,yr

=fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

ηsys,yr−avg

Acollector  apertureIincident dt

tyear ,sun

Page 127: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

127MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

Page 128: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

128MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditionsNot unique to any technology

Page 129: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

129MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcrNot unique to any technology

Page 130: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

130MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcr.

3. Lower production, installation and operation costsNot really unique to any technology

Page 131: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

131MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcr.

3. Lower production, installation and operation costs

4. Increase the overall annual system efficiency.

Page 132: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

132MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcr.

3. Lower production, installation and operation costs

4. Increase the overall annual system efficiency. Increasing the collector area causes an increase in costs and generally does not reduce the LEC.

Page 133: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

133MITEISep2016

LEC Reduction

1. Select a site with good solar conditions

2. Obtain favorable financing to minimize fcr.

3. Lower production, installation and operation costs

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

Page 134: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

134MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

• Increasing the overall annual system efficiencyis usually combined with reduction of production, installation and operation costs.

Page 135: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

135MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

• Increasing the overall annual system efficiencyis usually combined with reduction of production, installation and operation costs.

• It is the most effective way to decrease LEC.

Page 136: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

136MITEISep2016

LEC Reduction

LECsolar =fcr ⋅ Cinvest + CO&M

ηsys,yr−avgAcollector  aperture Iincident dttyear ,sun

• Increasing the overall annual system efficiencyis usually combined with reduction of production, installation and operation costs.

• It is the most effective way to decrease LEC.• We must develop systems with a potential for

higher annual system efficiency than possible in present solar systems.

Page 137: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

137MITEISep2016

The Difficult Issues of Solar Thermal

Page 138: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

138MITEISep2016

The Fundamental Problem of Solar Thermal

Page 139: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

139MITEISep2016

The Fundamental Problem of Solar Thermal • The the most efficient and lowest cost Heat Engines

are large – typically over 100MWe units

Page 140: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

140MITEISep2016

The Fundamental Problem of Solar Thermal • The the most efficient and lowest cost Heat Engines

are large – typically over 100MWe units

• Whereas:– Optimum engine size for Parabolic Trough ~50-100MWe– Optimum engine size for Central Receiver <15MWe– Optimum engine size for parabolic dish ~0.1MWe

Page 141: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

141MITEISep2016

The Fundamental Problem of Solar Thermal • The the most efficient and lowest cost Heat Engines

are large – typically over 100MWe units

• Whereas:– Optimum engine size for Parabolic Trough ~50-100MWe– Optimum engine size for Central Receiver <15MWe– Optimum engine size for parabolic dish ~0.1MWe

• The optical efficiency is far better for small solar systems

Page 142: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

142MITEISep2016

The Fundamental Problem of Solar Thermal • The the most efficient and lowest cost Heat Engines

are large – typically over 100MWe units

• Whereas:– Optimum engine size for Parabolic Trough ~50-100MWe– Optimum engine size for Central Receiver <15MWe– Optimum engine size for parabolic dish ~0.1MWe

• The optical efficiency is far better for small solar systems

• Next Generation solar thermal systems must address this problem to reach cost parity with conventional power plants

Page 143: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

143MITEISep2016

Optical Characteristics – Dish and Ideal Central Receiver

Parabolic Dish Concentrator

Fresnel Reflectors

Page 144: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

144MITEISep2016

Optical Characteristics – Real Central Receiver

• Focal image increases by 1m per 100m distance due to sun-shape• Focal image increases further as the rays angle of attack increases with distance from tower• Heliostat spacings must increase with distance from target to avoid light blocking

Page 145: A proposed energy conversion process for making solar ...energy.mit.edu/wp-content/uploads/2016/09/A-proposed-energy-conv… · MITEI Sep 2016 6 Fundamental Requirements 1. Use clean,

145MITEISep2016145

%

Total electricity demand and wind power input to the grid in the E.ON TSO area (Germany)

Electrical Power Generation and Distribution