A project on report ocb switching

Embed Size (px)

Citation preview

  • 8/12/2019 A project on report ocb switching

    1/29

  • 8/12/2019 A project on report ocb switching

    2/29

    SUMMER TRAINING REPORTHELDAT

    BSNL

  • 8/12/2019 A project on report ocb switching

    3/29

    INDEX

    1. COMPANY PROFILE

    2. INTRODUCTION

    3. ABOUT THE EXCHANGE

    4. MDF

    >TYPES OF FAULTS

    >PROTECTIVE DEVICES

    5. OCB

    6. GSM

    7. MEDIA

    8. PROCEDURE FOR HANDLING COMPLAINTS

  • 8/12/2019 A project on report ocb switching

    4/29

    INTRODUCTION

    Today, BSNL is the No. 1 telecommunication company and thelargest public sector undertaking of India and its responsibilitiesincludes improvement of the already impeccable quality oftelecom services, expansion of telecom services in all villages andinstilling confidence among its customers.

    EXCHANGE:

    Equipment which effects interconnected of telephones is knownas switching equipment.

    The switching centre, which houses the terminating and switchingequipment is called telephone exchange.

  • 8/12/2019 A project on report ocb switching

    5/29

    EXCHANGE LAYOUT

    Typical exchange consist of :

    Switch Room

    Operations and Maintenance (OMC) RoomInput Output processor (IOP) Room

    Power Plant Room

    Battery Room

    Main Distribution Frame (MDF) Room

  • 8/12/2019 A project on report ocb switching

    6/29

    ABOUT THE EXCHANGE

    1. All telephone subscribers are served by automaticexchanges.

    2. Todays automatic exchanges uses a pair of computers.

    One, running the program that provides services.

    Second, monitoring the operation of the first, ready totake over in a few seconds in the event of equipmentfailure.

    Various exchanges present in BSNL are:

    > C-DOT> OCB> EWSD

  • 8/12/2019 A project on report ocb switching

    7/29

    MAIN SECTIONS OF EXCHANGE:

    There are three components of exchange:

    MDF

    Power plant

    Switching Room.

  • 8/12/2019 A project on report ocb switching

    8/29

    MAINDISTRIBUTIONFRAME(M.D.F) :

    INTRODUCTION:

    - MDF means Main Distribution Frame. Local cablecontact at MDF .

    - All types of cables out to the door contactconnection at MDF .

  • 8/12/2019 A project on report ocb switching

    9/29

    THEMAINPARTSOFTHEPOWERROOMARE:

    1. BATTERIES

    2. UPS (UNINTERRUPTEDPOWERSUPPLY)

    3. CHARGING- DISCHARGINGUNIT

    4. INVERTERANDCONVERTERUNIT:

    POWER PLANT :

  • 8/12/2019 A project on report ocb switching

    10/29

    SWITCHING ROOM :

    Switch room consists of BM and CMcabinets mounted in standard switch.

    These cabinets are fastened to a switchRoom and interconnected by cables.

  • 8/12/2019 A project on report ocb switching

    11/29

    .

    MAIN DISTRIBUTION FRAME

    > The primary function of MDF is to remove fault. It

    is also known as Fault Remove Section.

    > The telephone numbers are also disconnected inthe MDF because of some specific reason.

    ORGANISATION OF THE MDF

    Vertical sideHorizontal side

  • 8/12/2019 A project on report ocb switching

    12/29

    VERTICAL SIDE

    RACK: -On the rack, the tags are situated. One rack is having eight tags.The counting is done from up (0) to down (7).

    TAGS: -Each rack consists of eight tags.

    1 tag = 4 core1 core = 4 bunch

    1 bunch = 2 line

    N.E.:-The word NE stands for the NUMBER OF EQUIPMENT.

    It is used for testing number and

    WEDGE: Wedge is used as a device for checking the ring. Wedge isplaced in jack strips, which is connected to telephone for checking.

  • 8/12/2019 A project on report ocb switching

    13/29

    HORIZONTAL SIDE:

    The horizontal side connected to the underground cable.This cable is having 100 pairs. These pair is distributed

    when we allot the telephone number to the subscriber.

    Horizontal side is again subdivided in two parts:

    One part is connected with the vertical side.Another with the subscriber line by using 100 pair

    underground cable.

  • 8/12/2019 A project on report ocb switching

    14/29

    CONSTRUCTION OF M.D.F:-

    Main distribution frame is mainly divided intwo parts.

    (1) Vertical Side or Line side.

    (2) LEN side or Exchange side.

  • 8/12/2019 A project on report ocb switching

    15/29

    VERTICAL SIDE:

    All the part from vertical side to the subscriber are generallycalled outdoor section.:

    1. One vertical has 10 tag blocks.

    2. Each tag block has 10 rows and each row has 10 tags. So

    each tag block has 100 tags.

    3. Connection between vertical side & subscribers are

    provided by jelly filled cables.

    4. These wires are first terminated in cabinet box, then

    according to requirements the group of the wires (e.g. 200

    wires, 100 wires etc.) is terminated in pillar box

  • 8/12/2019 A project on report ocb switching

    16/29

    LEN SIDE:

    All the parts from LEN to the exchange is called indoorsection.

    The connection of subscriber from exchange is

    terminated on this side of MDF.

    In 1 tag block there are 128 tags. Each tag block is

    divided in 4 segments. That is 0, 1,2 & 3 and in each

    segments.

  • 8/12/2019 A project on report ocb switching

    17/29

    .DIFFERENT TYPES OF FAULTS:-

    LOOP FAULT:-IFTWOWIRESAREJOINEDTOGETHERBECAUSEOFIMPROPER

    CONNECTION,

    STORMINGAIRETC.

    EARTH FAULT:-IFTWOWIRESGETSCRAPEATSOMEPLACESANDIFTHIS

    WIRECOMESINCONTACTWITHTREE, PILLARORANYMETALOBJECTSTHENTHISTYPEOF

    FAULTOCCURS.

    CABLE FAULT:-FOROUTDOORCONNECTIONS, JELLYFILLEDWIRESARE

    USEDWHICHAREAFFECTEDBYNATURALCAUSESSUCHASRAIN, EARTHQUAKEETC. ATSUCHTIMETHISFAULTOCCURS.

    DISCONNECT FAULT:-THISTYPEOFFAULTOCCURSDUETOTHEBREAKING

    OFWIRESBETWEENTHEVERTICALSIDE& LEN SIDE.

  • 8/12/2019 A project on report ocb switching

    18/29

    PROTECTIVE DEVICES USED IN M.D.F

    .

    Fuses

    Gas Discharge Tube(G.D Tube)

    Insertion Tool

    Wires

  • 8/12/2019 A project on report ocb switching

    19/29

    OCB

    The new switching systems are based on Stored ProgramControl concept. The call processing programmers are

    distributed over different control organs of the system and are

    stored in ROM/RAM of the units Processor in the control units

    .

    Features:

    It is a digital switching system.

    The system supports all the existing signaling system .

    The system has auto recovery feature. When a

    serious fault occur in control unit, it gives a message to

    SMM (operation & maintenance unit).

  • 8/12/2019 A project on report ocb switching

    20/29

    GLOBAL SYSTEM FOR MOBILE COMMUNICATION

    GSM)

    Global system for mobile communication (GSM) is a globally

    accepted standard for digital cellular communication. GSM is

    the name of a standardization group established in 1982 to

    create a common European mobile telephone standard

    GSM is a cellular network which means that mobilephones connect to it by searching for cells in the immediate

    vicinity.GSM operates in the 900 MHz frequency band.

  • 8/12/2019 A project on report ocb switching

    21/29

    THEREAREFIVEDIFFERENTCELLSIZES INA

    GSM NETWORK-

    Macro CellsMicro CellsPico CellsFemto Cells

    Umbrella Cells

  • 8/12/2019 A project on report ocb switching

    22/29

  • 8/12/2019 A project on report ocb switching

    23/29

    GSM : (SYSTEM ARCHITECHTURE)

  • 8/12/2019 A project on report ocb switching

    24/29

    BASIC BUILDING BLOCKS:

    Mobile Station (MS)

    Base Station (BS)

    Mobile services Switching Center (MSC)

    Databases

    Operation and Maintenance Center (OMC)

  • 8/12/2019 A project on report ocb switching

    25/29

    SYSTEM CAPACITY

    Shannons Theory predicts the maximum amount of

    information that can be transmitted over a channel with

    given BW & SNR.

    The optimum usage of given BW is obtained when the

    signal are noiselike & min SNR.

    Hence for increased capacity the choice isCDMA.

  • 8/12/2019 A project on report ocb switching

    26/29

    MEDIA: -

    1.Carrier system

    2. Co-axial Cable

    3. Optical Fiber Cable(OFC).

    4. Satellite.

  • 8/12/2019 A project on report ocb switching

    27/29

    PROCEDURE FOR HANDLING

    SUBSCRIBER COMPLAINTS

    Telephone Dead:

    Case--I Problem concerns a particular subscriber.Case-II Quit a few numbers of telephone reported dead:

    Telephone Held-Up ( No Dial Tone ):

  • 8/12/2019 A project on report ocb switching

    28/29

    > PERMANENT RING

    > PERMANENT DIAL TONE

    > PERMANENT BUSY TONE

    > PERMANENT RINGTRIP

    > SPEECH QUALITY POOR

    > WRONG NUMBERS

    > ONE WAY SPEECH

    > RINGER CADENCE

  • 8/12/2019 A project on report ocb switching

    29/29

    THANK YOU