PROJECT LOCATION CITY OF ROHNERT PARK MECHANICAL ENGINEER: TERRY WONG, PE GHD INC. 2235 MERCURY WAY, SUITE 150 SANTA ROSA, CA 95407 (707) 523-1010 ELECTRICAL ENGINEER: ERIC PENN, PE GHD INC. 2235 MERCURY WAY, SUITE 150 SANTA ROSA, CA 95407 (707) 523-1010 SHEET INDEX VICINITY MAP SCALE: NONE 1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AT THE PROJECT SITE BEFORE ORDERING OR FABRICATION OF ANY MATERIALS OR EQUIPMENT. 2. ALL MATERIALS, REQUIRED FOR THE COMPLETE EXECUTION OF THE PROJECT, SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE NOTED. 3. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC AND STAFF SAFETY DURING THE CONSTRUCTION PERIOD. 4. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE ANY EXISTING IMPROVEMENTS OR UNDERGROUND FACILITIES DAMAGED DURING THE CONSTRUCTION PERIOD. 5. CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. 6. CONTRACTOR SHALL PROTECT AND MAINTAIN EXISTING IMPROVEMENTS. 7. ALL CONSTRUCTION AS APPLICABLE, SHALL BE DONE IN ACCORDANCE TO THE CITY OF ROHNERT PARK STANDARDS AND MUNICIPAL CODE. PROJECT SUMMARY GENERAL NOTES N PROJECT DIRECTORY REPLACEMENT OF THE EXISTING HVAC CONTROL SYSTEM WITH A NEW ENERGY MANAGEMENT SYSTEM. CITY ENGINEER APPROVED BY: GENERAL NOTES AND LEGENDS G-001 S. SCHULMEYER S. SCHULMEYER S. SCHULMEYER AS SHOWN CODE ANALYSIS This document shall not be used for construction unless signed and sealed for construction. Sheet No. Original Size Title Project Client Designer Drawn Scale Plot Date: Filename: 23 May 2018 - 1:59 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 G-001.dwg Arch E1 Date Plotted By: Scott Schulmeyer Project No. Sheet of Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2018 GHD Drafting Check 0 1" Bar is one inch on original size sheet Design Check Issue No. Drawn Approved Date Project Manager CITY OF ROHNERT PARK CALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT 05/09/2018 2235 Mercury Way Suite 150 Santa Rosa California 95407 USA T 1 707 523 1010 F 1 707 527 8679 W www.ghd.com GHD Inc. M29562 6/30/19 No. Exp. R E G I S T E R E D P R O F E S S I O N A L E N G I N E ER S T A T E O F C A L I F O R N I A T E R R Y W O N G M E C H A N I C A L PLAN CHECK 1 5-9-18 G-001 GENERAL TITLE SHEET M-001 MECHANICAL LEGEND, NOTES & ABBREVIATIONS MD-201 MECHANICAL DEMOLITION PLAN MD-401 ENLARGED MECHANICAL DEMOLITION PLANS M-201 MECHANICAL PLAN M-401 ENLARGED MECHANICAL PLANS M-501 MECHANICAL SCHEDULES M-601 MECHANICAL CONTROL DIAGRAMS M-602 MECHANICAL CONTROL DIAGRAMS M-603 MECHANICAL CONTROL DIAGRAMS M-604 MECHANICAL CONTROL DIAGRAMS M-605 MECHANICAL CONTROL DIAGRAM CALLINAN SPORTS AND FITNESS CENTER ENERGY MANAGEMENT SYSTEM REPLACEMENT PROJECT 5405 SNYDER LANE, ROHNERT PARK, CA 94928 OCCUPANCY: A-4 CONSTRUCTION TYPE: V-A SPRINKLERED: AUTOMATIC SPRINKLER SYSTEM THROUGHOUT BUILDING WHOLE BUILDING AREA: 33,042 SQUARE FEET STORIES: SINGLE SINGLE TENANT: YES PROJECT DESCRIPTION THE PROJECT SHALL COMPLY WITH ALL APPLICABLE CODES: 2016 CALIFORNIA STANDARD ADMINISTRATIVE CODE 2016 CALIFORNIA BUILDING CODE (CBC) 2016 CALIFORNIA ELECTRICAL CODE (CEC) 2016 CALIFORNIA MECHANICAL CODE (CMC) 2016 CALIFORNIA PLUMBING CODE (CPC) 2016 CALIFORNIA ENERGY CODE 2016 CALIFORNIA FIRE CODE (CFC) 2016 CALIFORNIA EXISTING BUILDING CODE 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSC) 2016 CALIFORNIA REFERENCE STANDARD CODE 1

A PROFESSIONL EDNE ERG T I S N I E G E R GHD Inc. IARN

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

PROJECT

LOCATION

CITY OF ROHNERT PARK

MECHANICAL ENGINEER:

TERRY WONG, PE

GHD INC.

2235 MERCURY WAY, SUITE 150

SANTA ROSA, CA 95407

(707) 523-1010

ELECTRICAL ENGINEER:

ERIC PENN, PE

GHD INC.

2235 MERCURY WAY, SUITE 150

SANTA ROSA, CA 95407

(707) 523-1010

SHEET INDEX

VICINITY MAPSCALE: NONE

1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AT THE PROJECT SITE BEFORE ORDERING OR FABRICATION OF ANYMATERIALS OR EQUIPMENT.

2. ALL MATERIALS, REQUIRED FOR THE COMPLETE EXECUTION OF THE PROJECT, SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTORUNLESS OTHERWISE NOTED.

3. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC ANDSTAFF SAFETY DURING THE CONSTRUCTION PERIOD.

4. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE ANY EXISTING IMPROVEMENTS OR UNDERGROUND FACILITIES DAMAGEDDURING THE CONSTRUCTION PERIOD.

5. CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE REQUIRED TOASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT,INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.

6. CONTRACTOR SHALL PROTECT AND MAINTAIN EXISTING IMPROVEMENTS.

7. ALL CONSTRUCTION AS APPLICABLE, SHALL BE DONE IN ACCORDANCE TO THE CITY OF ROHNERT PARK STANDARDS AND MUNICIPAL CODE.

PROJECT SUMMARYGENERAL NOTES

N

PROJECT DIRECTORY

REPLACEMENT OF THE EXISTING HVAC CONTROL SYSTEM WITH A NEW ENERGY MANAGEMENT SYSTEM.

CITY ENGINEERAPPROVED BY:

GENERAL NOTESAND LEGENDS

G-001

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

AS SHOWN

CODE ANALYSIS

This document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 1:59 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 G-001.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

G-001 GENERAL TITLE SHEET

M-001

MECHANICAL LEGEND, NOTES & ABBREVIATIONS

MD-201 MECHANICAL DEMOLITION PLAN

MD-401 ENLARGED MECHANICAL DEMOLITION PLANS

M-201 MECHANICAL PLAN

M-401 ENLARGED MECHANICAL PLANS

M-501 MECHANICAL SCHEDULES

M-601 MECHANICAL CONTROL DIAGRAMS

M-602 MECHANICAL CONTROL DIAGRAMS

M-603 MECHANICAL CONTROL DIAGRAMS

M-604 MECHANICAL CONTROL DIAGRAMS

M-605 MECHANICAL CONTROL DIAGRAM

CALLINAN SPORTS AND FITNESS CENTER

ENERGY MANAGEMENT SYSTEM REPLACEMENT PROJECT

5405 SNYDER LANE, ROHNERT PARK, CA 94928

OCCUPANCY: A-4

CONSTRUCTION TYPE: V-A

SPRINKLERED: AUTOMATIC SPRINKLER SYSTEM THROUGHOUT BUILDING

WHOLE BUILDING AREA: 33,042 SQUARE FEET

STORIES: SINGLE

SINGLE TENANT: YES

PROJECT DESCRIPTION

THE PROJECT SHALL COMPLY WITH ALL APPLICABLE CODES:

2016 CALIFORNIA STANDARD ADMINISTRATIVE CODE2016 CALIFORNIA BUILDING CODE (CBC)2016 CALIFORNIA ELECTRICAL CODE (CEC)2016 CALIFORNIA MECHANICAL CODE (CMC)2016 CALIFORNIA PLUMBING CODE (CPC)2016 CALIFORNIA ENERGY CODE2016 CALIFORNIA FIRE CODE (CFC)2016 CALIFORNIA EXISTING BUILDING CODE2016 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSC)2016 CALIFORNIA REFERENCE STANDARD CODE

1

CITY ENGINEERAPPROVED BY:

ABBREVIATIONS, LEGENDS, SYMBOLSAND NOTES

M-001

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

AS SHOWNThis document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 1:59 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 M-001.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

FD

FSD

DUCT SECTION, SUPPLY AIR UP

DUCT SECTION, RETURN AIR UP

DUCT SECTION, EXHAUST AIR UP

DUCT SECTION, SUPPLY AIR DN

DUCT SECTION, RETURN AIR DN

DUCT SECTION, EXHAUST AIR DN

FLEXIBLE DUCT

FIRE AND SMOKE DAMPER

FIRE DAMPER

DIRECTION OF FLOW

MANUAL VOLUME DAMPER

WALL SUPPLY OUTLET, RETURN GRILLE

CEILING DIFFUSER

CEILING RETURN

CEILING EXHAUST

DUCT SMOKE DETECTOR

THERMOSTAT

REMOTE SENSOR

MOTORIZED ACTUATOR

FOS

CWS

SYMBOL

FUEL OIL (SUPPLY)

FUEL OIL (RETURN)

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HEATING HOT WATER SUPPLY

HEATING HOT WATER RETURN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

REFRIGERANT LIQUID

REFRIGERANT SUCTION

AUTOMATIC AIR VENT

BLOW OFF STRAINER

FILTER AND STRAINER LINE

PRESSURE GAGE

PRESSURE GAGE AND COCK

PRESSURE REDUCING VALVE

RELIEF OR SAFETY VALVE

STRAINER

TEMPERATURE GAGE

PUMP (PLAN)

PUMP (SCHEMATIC)

EXPANSION LOOP

CAP

CONCENTRIC REDUCER

UNION

THREE-WAY MANUAL VALVE

BALL VALVE

BUTTERFLY VALVE

DIAPHRAGM VALVE

GATE VALVE

GLOBE VALVE

CHECK VALVE

POINT OF CONNECTION

FLEXIBLE CONNECTOR

THERMOMETER

PETE'S PLUG

AIR TERMINAL IDENTIFICATIONSHEET ANNOTATION

CARBON DIOXIDE SENSOR

DESCRIPTION

FOR

CWR

HHWS

HHWR

CS

CR

RL

RS

A AMPERES, AREA

ABS ACRYLONITRILE-BUTADIENE

-STYRENE

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG ABOVE GRADE

APPROX APPROXIMATE

AS AIR SEPARATOR

AVG AVERAGE

BD BALANCE DAMPER

BDD BACK DRAFT DAMPER

BFP BACK FLOW PREVENTER

BG BELOW GRADE

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT

PER HOUR

C CELSIUS

℄ CENTERLINE

CCW COUNTER CLOCKWISE

CD CEILING DIFFUSER,

CONDENSATE DRAIN

CFM CUBIC FEET PER MINUTE

CH CHILLER

CHWP CHILLED WATER PUMP

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CMPR COMPRESSOR

CONT CONTINUED

CT COOLING TOWER

CU COPPER

CU FT CUBIC FEET

CU IN CUBIC INCHES

CW COLD WATER, CLOCKWISE

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN,

CWS CONDENSER WATER SUPPLY

CWV COMBINATION WASTE & VENT

D DEPTH

DB DECIBEL, DRY BULB

DEG DEGREE(S)

DIA DIAMETER

DN DOWN

DPT DIFFERENTIAL PRESSURE

TRANSMITTER

DS DOWN SPOUT

DWG DRAWING

(E) EXISTING

EA EACH

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EF EXHAUST FAN

EFF EFFICIENCY

EG EXHAUST GRILLE

ELEV ELEVATION

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

F FLOW

FACP FIRE ALARM CONTROL PANEL

FC FAN COIL

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN, FIRE DAMPER

FDC FIRE DEPARTMENT

CONNECTION

FM FLOW METER

FP FIRE PROTECTION

FPI FINS PER INCH

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSD FIRE/SMOKE DAMPER

FSP FIRE SPRINKLER

FT FOOT, FEET

G GAS

GA GAUGE

GALV GALVANIZED

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPS GALLONS PER SECOND

HD HEAD

HG MERCURY

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

HP HORSEPOWER

HR HOSE REEL, HOUR

HT HEIGHT

HVAC HEATING, VENTILATION

&CONDITIONING

HW HOT WATER

HWR HOT WATER RETURN

HZ FREQUENCY

ID INSIDE DIAMETER

INVERT INVERT ELEVATION

IW INDIRECT WASTE

KW KILOWATTS

KWH KILOWATTS PER HOUR

L LENGTH

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LF LINEAR FEET

LPG LIQUID PETROLEUM GAS

LTG LIGHTING

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH 1,000 BTUH

MCC MOTOR CONTROL CENTER

MD MOTORIZED DAMPER

MFR MANUFACTURER

MIN MINIMUM, MINUTE

MTD MOUNTED

MUA MAKE UP AIR

(N) NEW

NC NORMALLY CLOSED, NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN, NUMBER

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

ORD OVERFLOW ROOF DRAIN

OWS OWNER'S WORK STATION

PB POLYBUTYLENE

PE POLYETHYLENE

PPM PARTS PER MILLION

POC POINT OF CONNECTION

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH,

ABSOLUTE

PSIG POUNDS PER SQUARE INCH, GAGE

PVC POLYVINYL CHLORIDE

RA RETURN AIR

RD ROOF DRAIN

REQ REQUIRED

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

RPS REVOLUTIONS PER SECOND

SAD SEE ARCHITECTURAL DRAWINGS

STD STANDARD

SOV SHUT OFF VALVE

SD SUPPLY DIFFUSER, STORM DRAIN

SF SQUARE FEET

SS SANITARY SEWER, STAINLESS STEEL

SR SUPPLY REGISTER

TD TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TOD TOP OF DUCT

TP TOTAL STATIC PRESSURE

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

V VENT, VOLT

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

VP VELOCITY PRESSURE

VTR VENT THROUGH ROOF

W WIDTH

W/ WITH

WB WET BULB

WG WATER GAGE, WALL GRILLE

W/O WITHOUT

WRG WALL RETURN GRILLE

WSR WALL SUPPLY REGISTER

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

XFMR TRANSFORMER

YR YEAR

Z ZONE

HVAC PIPING

MECHANICAL SYMBOLS LEGEND GENERAL MECHANICAL NOTESABBREVIATIONS

SYMBOLDESCRIPTION

1

KEYNOTE

DEMOLITION NOTE

ROOM NAME AND ROOM NUMBER

DETAIL INDICATOR SECTION INDICATOR

DETAIL NUMBER

SHEET NUMBER ON WHICH

DETAIL APPEARS

1

SECTION LETTER

SHEET NUMBER ON WHICH

SECTION APPEARS

1

E5.1

A

E3.1

26-TU-I-I

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

BUILDING NO. WHERE EQUIPMENT IS LOCATED

BALANCING VALVE

NOTE:

NO ARROWS INDICATE

4-WAY AIRFLOW

SUPPLY REGISTERS

RETURN REGISTERS

AIR TERMINAL MARK

AIRFLOW, CFM

CD-0130

AIR TERMINAL MARK

AIRFLOW, CFM

RD-0130

1. THESE DRAWINGS ARE BASED UPON AVAILABLE DOCUMENTS, WHICH MAY NOT

ACCURATELY PORTRAY AS-BUILT CONDITIONS. EXISTING EQUIPMENT AND

PIPING SIZES, LOCATIONS, AND DIMENSIONS SHALL BE VERIFIED IN THE FIELD

PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY THE ENGINEER

IMMEDIATELY OF ALL DISCREPANCIES AFFECTING THE REMOVAL OF EXISTING

EQUIPMENT AND PIPING, AND THE INSTALLATION OF NEW EQUIPMENT AND

PIPING.

2. INSTALL PIPING AND DUCTWORK TO BEST SUIT FIELD CONDITIONS AND

COORDINATE WITH THE INSTALLATION WORK OF OTHER TRADES. THESE

DRAWINGS ARE DIAGRAMMATIC, DO NOT SCALE TO DETERMINE EXACT

LOCATION OF PIPING.

3. PROTECT ALL EXISTING EQUIPMENT THAT IS TO REMAIN. VERIFY WITH OWNER

WHAT SYSTEMS WILL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.

NOTIFY THE OWNER 24 HOURS MINIMUM PRIOR TO SHUTTING DOWN ANCILLARY

SYSTEMS OR EQUIPMENT.

4. REPAIR AND/OR REPLACE ALL EXISTING UTILITIES, STRUCTURAL ELEMENTS,

EQUIPMENT, PIPING, CONDUIT, DUCTWORK, ETC. THAT IS DAMAGED OR

BECOMES INOPERABLE AS A RESULT OF THIS WORK.

5. COORDINATE MODIFICATIONS TO EXISTING SYSTEMS WITH OWNER TO MINIMIZE

SHUTDOWN TIME OF BUILDING SYSTEMS.

6. FOR ALL MECHANICAL SYSTEMS CONTROLS, PROVIDE CONDUIT AND WIRING IN

ACCORDANCE WITH ELECTRICAL SPECIFICATIONS AND MANUFACTURER'S

REQUIREMENTS.

7. ALL SANITARY AND SANITARY VENT PIPING SHALL SLOPE AT

1

4

" PER 12" UNLESS

OTHERWISE NOTED.

8. MERV 8 FILTER TO BE USED IN RETURN AIR DURING CONSTRUCTION.

9. DUCT OPENINGS AND MECHANICAL EQUIPMENT TO BE PROTECTED DURING

CONSTRUCTION.

M

DD

T

S

2

T

1

T1

2

1

2

2

22

2

T1

3

3

33

3

FC-6

FC-4

FC-5

FC-3

T1 FC-2

CITY ENGINEERAPPROVED BY:

MECHANICAL DEMOLITION PLAN

MD-201

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

1/16" = 1'-0"This document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 1:59 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 MD-201.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

G

F

E

D

C

B

A

987654321

SHEET KEYNOTES

1. EXISTING THERMOSTAT, CONTROL WIRING, AND ASSOCIATED APPURTENANCES TO BE

REMOVED.

2. EXISTING DAMPER ACTUATOR, CONTROL WIRING, AND ASSOCIATED APPURTENANCES

TO BE REMOVED.

3. EXISTING DDC CONTROLLER, CONTROL WIRING, AND ASSOCIATED APPURTENANCES TO

BE REMOVED. DISCONNECT FROM EXISTING POWER SOURCE.

SHEET GENERAL NOTES

1. REPAIR AND PAINT WALL AND CEILING FINISHES MATCH TO THE EXISTING.

2. REPLACE EXISTING DAMAGED CEILING TILES AS A RESULT OF WORK PERFORMED

UNDER THIS CONTRACT.

3. CONTRACTOR MAY MAKE USE OF EXISTING CONTROL WIRING WHERE POSSIBLE AND

SHALL BE RESPONSIBLE FOR THE COMPATIBILITY OF EXISTING CONTROL WIRING AND

NEW CONTROL DEVICES.

1 MECHANICAL DEMOLITION PLANSCALE 1/16" = 1'-0" 0 16'8'4'

PLANNORTH

3 D-23

3

1

1

3

VD-2

VD-3

4

5

5

5

CITY ENGINEERAPPROVED BY:

ENLARGED MECHANICAL DEMOLITION PLANS

MD-401

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

1/8" = 1'-0"This document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 1:59 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 MD-401.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

SHEET KEYNOTES

1. EXISTING ENERGY MANAGEMENT SYSTEM (EMS) CONTROL PANEL, CONTROL WIRING,

AND ASSOCIATED APPURTENANCES TO BE REMOVED. EXISTING MOUNTING HARDWARE

TO REMAIN. DISCONNECT TO EXISTING POWER SOURCE.

2. EXISTING CONTROL VALVE, CONTROL VALVE ACTUATOR, CONTROL WIRING, AND

ASSOCIATED APPURTENANCES TO BE REMOVED. EXISTING MOUNTING HARDWARE TO

REMAIN.

3. EXISTING DAMPER ACTUATOR, CONTROL WIRING, AND ASSOCIATED APPURTENANCES

TO BE REMOVED.

4. EXISTING DOMESTIC HOT WATER SWITCH TO BE RELOCATED TO NEW MAIN CONTROL

PANEL.

5. EXISTING ZONE TEMPERATURE SENSOR, CONTROL WIRING, AND ASSOCIATED

APPURTENANCES TO BE REMOVED.

SHEET GENERAL NOTES

1. REPAIR AND PAINT WALL AND CEILING FINISHES MATCH TO THE EXISTING.

2. CONTRACTOR MAY MAKE USE OF EXISTING CONTROL WIRING WHERE POSSIBLE AND

SHALL BE RESPONSIBLE FOR THE COMPATIBILITY OF EXISTING CONTROL WIRING AND

NEW CONTROL DEVICES.

2 SECTION - MEZANINESCALE 1/8" = 1'-0" 0 16'8'4'

1 MEZZANINE MECHANICAL PLANSCALE 1/8" = 1'-0" 0 16'8'4'

PLANNORTH

4

4

T1

3

T

1

FC-4

T

1

VD-2

T

1

VD-3

T

1VD-1

TFC-1

1

T1

FC-34

4 T1

FC-5

2

FC-6

2

22

4

222

CO2

5

CO2

5

CO2

5

6

6

6

6

6

6

6

6

6

7

1

1

1

1

1

1

1

1

1

1

CITY ENGINEERAPPROVED BY:

MECHANICAL PLAN

M-201

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

1/16" = 1'-0"This document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 2:00 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 M-201.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

G

F

E

D

C

B

A

987654321

SHEET KEYNOTES

1. NEW ROOM TEMPERATURE SENSOR. INSTALL NEW TEMPERATURE SENSOR MAXIMUM

48” ABOVE FINISHED FLOOR.

2. NEW DAMPER ACTUATOR.

3. NEW BAS WORKSTATION FURNISHED BY CONTRACTOR TO BE LOCATED IN STORAGE

ROOM. COORDINATE EXACT LOCATION IN ROOM WITH OWNER.

4. NEW DDC CONTROLLER. CONNECT TO EXISTING POWER SOURCE.

5. NEW CO2 SENSOR. INSTALL ADJACENT TO ROOM TEMPERATURE SENSOR.

6. EXISTING FIRE RATED WALLS.

7. EXISTING SHIPS LADDER TO MECHANICAL MEZZANINE.

SHEET GENERAL NOTES

1. REPAIR AND PAINT WALL AND CEILING FINISHES MATCH TO THE EXISTING.

2. REPLACE EXISTING DAMAGED CEILING TILES AS A RESULT OF WORK PERFORMED

UNDER THIS CONTRACT.

3. CONTRACTOR MAY MAKE USE OF EXISTING CONTROL WIRING WHERE POSSIBLE AND

SHALL BE RESPONSIBLE FOR THE COMPATIBILITY OF EXISTING CONTROL WIRING AND

NEW CONTROL DEVICES.

1 MECHANICAL PLANSCALE 1/16" = 1'-0" 0 16'8'4'

PLANNORTH

1

1

D-2

2

2

3

1

4

22

(E) VD

(E) VD-3

(E) VD-2FC-21 T

2

CITY ENGINEERAPPROVED BY:

ENLARGED MECHANICAL PLANS

M-401

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

AS SHOWNThis document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 2:00 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 M-401.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

2 SECTION - MEZANINESCALE 1/8" = 1'-0" 0 16'8'4'

1 MEZZANINE MECHANICAL PLANSCALE 1/8" = 1'-0" 0 16'8'4'

PLANNORTH

SHEET KEYNOTES

1. NEW ENERGY MANAGEMENT SYSTEM (EMS) CONTROL PANEL. CONNECT TO EXISTING

POWER SOURCE.

2. NEW DAMPER ACTUATOR.

3. NEW CONTROL VALVE AND CONTROL VALVE ACTUATOR.

4. NEW TANK STAT.

SHEET GENERAL NOTES

1. REPAIR AND PAINT WALL AND CEILING FINISHES MATCH TO THE EXISTING.

2. CONTRACTOR MAY MAKE USE OF EXISTING CONTROL WIRING WHERE POSSIBLE AND

SHALL BE RESPONSIBLE FOR THE COMPATIBILITY OF EXISTING CONTROL WIRING AND

NEW CONTROL DEVICES.

3 MEN'S ROOM - MECHANICAL PLANSCALE 1/4" = 1'-0" 0 8'4'2'

PLANNORTH

4 WOMEN'S ROOM - MECHANICAL PLANSCALE 1/4" = 1'-0" 0 8'4'2'

PLANNORTH

CITY ENGINEERAPPROVED BY:

DETAILS AND SCHEDULES

M-501

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

AS SHOWNThis document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 2:00 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 M-501.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

EXISTING FAN COIL SCHEDULE

MARK

AIRFLOW

(CFM)

HEATING WATER COIL

REMARKS

CAPACITY ENT. AIR LV. AIR ENT H2O FLOWRATE Cv SIZE

SF-1150,000 426, 060

55.7 82 140 31.4 21 1 1/2"

FC-12,000 50,328

66.7 90 140 3.8 2.2 1/2"

FC-23,600 161,352

53.5 95 140 15.9 8.6 3/4"

FC-31,200 50,285

51.2 90 140 3.7 2.2 1/2"

FC-42,000 58,752

62.8 90 140 7.5 4.4 1/2"

FC-5 3008,100

- - - - - -

FC-6 76014,300

- - - - - -

EXISTING PUMP SCHEDULE

MARK MANUFACTURER MODEL

FLOW HEAD ELECTRICAL WEIGHT

SERVICE REMARKS

(GPM) (FT)

HP VOLT PHASE RPM

(LBS)

P-2 BELL & GOSSETT SERIES 1531 60 40 1 208 3 1750 - HEATING HOT WATER

P-3 BELL & GOSSETT HD3 8 18 1 120 1 1750 - DOMESTIC HOT WATER

EXISTING EXHAUST/RETURN FAN SCHEDULE

MARK MODEL

AIRFLOW EXT. STATIC WEIGHT

(CFM) PRESS. (IN W.G.) (LBS)

RF-1 NO. 50 CABINET FAN28,800

0.4 -

EF-1 NO. 6 CABINET FAN2,400

0.5 -

EF-2 ACME PX100-6 500 0.5 -

EF-3 ACME PX171F62,000

0.625 -

EF-4 BSQ-80-5 520 1 100

EF-5 BSQ-80-5 380 1 100

EXISTING BOILER SCHEDULE

MARK MANUFACTURER

INPUT OUTPUT ELECTRICAL WEIGHT

SERVICE

(MBH) (MBH)

VOLTS PHASE HZ AMPS

(LBS)

B-1 BRYAN - 670 120 1 60 4 - DOMESTIC HOT WATER

B-2 BRYAN - 670 120 1 60 4 - HEATING HOT WATER

CITY ENGINEERAPPROVED BY:

CONTROL DIAGRAMS

M-601

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

AS SHOWNThis document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 2:00 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 M-601.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

120/24VAC

120VAC

TO NEXT DEVICEBAS BACNET MS/TP COMM.

FROM PREVIOUS DEVICEBAS BACNET MS/TP COMM.

24V

M

24V

SDR

TS

EXISTING SMOKE DETECTOR

TS24V

M

24V

M

P

EXISTING DUCT STATIC

DIFFERENTIAL PRESSURE

TRANSDUCER

(E) VFD W/ BACNET

INTERFACE (TYPICAL)

COMM. +

COMM. -

TO BAS

BACNET

MS/TP

NETWORK

START/STOP

SPEED

ALARM

COMM. +

COMM. -

TO BAS

BACNET

MS/TP

NETWORK

START/STOP

SPEED

ALARM

SUPPLY FAN/RETURN FAN (SF-1/RF-1) SYSTEM

1. UNIT SHALL BE CONTROLLED DIRECTLY BY ITS OWN DEDICATED EMS DDC CONTROLLER.

2. THE EMS GLOBAL CONTROLLER SHALL DETERMINE WHEN TO ACTIVATE THEUNIT BASED

UPON BUILDING OCCUPANCY OR, OPTIONALLY, SCHEDULE.

3. A DUCT STATIC PRESSURE TRANSDUCER SHALL BE PROVIDED WITH THE SENSOR

LOCATED AT IN THE SUPPLY DUCT LENGTH. SUPPLY FAN SPEED SHALL BE VARIED AS

REQUIRED VIA VFD INTERFACE TO MAINTAIN DUCT STATIC PRESSURE SETPOINT

(ADJUSTABLE) AS SET BY SYSTEM OPERATOR AT OWS.

4. RETURN FAN SHALL OPERATE WHENEVER SUPPLY FAN IS IN OPERATION. RETURN FAN

SPEED SHALL BE VARIED AS REQUIRED VIA VFD INTERFACE TO MAINTAIN BUILDING

STATIC PRESSURE SETPOINT (ADJUSTABLE) AS SET BY SYSTEM OPERATOR AT OWS.

5. SUPPLY AIR TEMPERATURE SENSOR SHALL BE DIRECTLY CONNECTED TO UNIT DDC

CONTROLLER. THE SUPPLY AIR SETPOINT SHALL BE SET BY SYSTEM OPERATOR AT OWS

OR AUTOMATICALLY RESET, BY SYSTEM OPERATOR'S CHOICE, TO OPTIMALLY ADJUST

SUPPLY TEMPERATURE BASED ON ACTUAL BUILDING LOAD AS DETERMINED BY EMS

ZONE CONTROLLERS. SUPPLY AIR TEMPERATURE SETPOINT SHALL BE 65°F IF ALL “NEED

COOLING” SIGNALS ARE AT ZERO. SETPOINT SHALL BE 55°F IF WORST-CASE ZONE HAS A

“NEED COOLING” SIGNAL OF 100%. VARY THE SETPOINT BETWEEN 65°F AND 55°F AS ANY

ONE SIGNAL VARIES BETWEEN 0 AND 100%.

6. THE SYSTEM WILL SENSE OUTSIDE AIR, RETURN AIR AND MIXED AIR TEMPERATURES

AND SHALL MODULATE ECONOMIZER DAMPERS TO USE OUTSIDE AIR FOR COOLING

WHENEVER AVAILABLE. WHEN OUTSIDE AIR CAN NO LONGER BE USED FOR SUFFICIENT

COOLING, POSITION OUTSIDE AIR DAMPER TO MINIMUM POSITION. LOCK OUT HEATING

VALVE IN COOLING MODE.

7. WHEN HEATING IS REQUIRED, POSITION OUTSIDE AIR DAMPER TO MINIMUM POSITION

AND MODULATE HOT WATER VALVE TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT.

8. PROVIDE A MORNING WARM-UP FEATURE TO MODULATE THE HOT WATER VALVE TO

MAINTAIN WARM-UP SUPPLY AIR TEMPERATURE SETPOINT UNTIL THE SPACE HAS

ACHIEVED SETPOINT.

9. PROVIDE FOR AUTOMATIC SHUTDOWN OF UNIT VIA HARDWIRE INTERLOCK UPON

DETECTION OF SMOKE IN THE MAIN SUPPLY AIR DUCT.

10.CO2 MONITORING: EMS CONTROLLER WILL BE CONNECTED TO WALL MOUNTED CO2

SENSORS TO MONITOR ZONE CO2 CONCNETRATION. DIRECT CONTROL OF OSA DAMPER

MINIMUM POSITION SHALL BE ACCOMPLISHED THROUGH EMS. THE MINIMUM OUTSIDE

AIR DAMPER POSITION WILL BE INCREASED TO PREVENT CO2 CONCENTRATION FROM

RISING ABOVE 800 PPM (ADJUSTABLE).

11.THE FOLLOWING COMMANDS/DISPLAYS SHALL BE AVAILABLE AT THE OWS FOR THE UNIT

SYSTEM:

a. SYSTEM GRAPHICS SHOWING DYNAMIC STATUS OF ALL POINTS.

b. AUTO/START/STOP.

c. BACNET VFD INTERFACE - SUPPLY & RETURN FANS.

d. OUTSIDE AIR (OSA) TEMPERATURE.

e. SUPPLY AIR TEMPERATURE.

f.RETURN AIR TEMPERATURE.

g. MIXED AIR TEMPERATURE.

h. CURRENT CFM.

i. SUPPLY AIR TEMPERATURE SETPOINT (ADJUSTABLE)

j. SA/RA VFD SPEED SETPOINT (ADJUSTABLE)

k.DUCT STATIC PRESSURE SETPOINT (ADJUSTABLE)

l. BUILDING STATIC PRESSURE SETPOINT (ADJUSTABLE)

m.DAMPER STATUS (% OPEN)

n. RUNTIME TOTAL FOR FAN OPERATION UP TO 64,000 HOURS

o. ALARMS (TEMPERATURE, AIR FLOW, DUCT STATIC PRESSURE, SYSTEM OFF)

p. HEATING MODE/NIGHT SETBACK - STATUS OF ZONE OPERATION.

q. HOT WATER VALVE POSITION.

1 RETURN/SUPPLY FAN SYSTEM CONTROL DIAGRAM

NOT TO SCALE

2 CONTROL ARCHITECTURE

NOT TO SCALE

NEW MODULATINGACTUATOR BY EMSCONTRACTOR(TYPICAL)

EXISTING MODULATING HW

VALVE & ACTUATOR.

(E)

(E) (E)

(E)

NEW WORKSTATION PROVIDED BYCONTRACTOR TO BE LOCATED IN

STORAGE, ROOM 182

OWNER-FURNISHED BUILDING SECURE INTERNET

BACNET/IPETHERNET WAN

- BAS CONTRACTOR SCOPE OF WORK -NEW BAS GRAPHICS AND SYSTEM INFORMATIONFOR CITY OF ROHNERT PARK CALLINAN SPORTS

FITNESS CENTER TO BE DEVELOPED ON NEWCONTRACTOR FURNISHED WORKSTATION USING

BACNET.

ETHERNET SWITCH

BACNET GLOBALCONTROLLER

2-WIRE BACNET MS/TP BY BAS CONTRACTOR

BCM

PWS

BCM

ETH

BCM

MS/T

PBC

M MS

/TP

BCM

MS/T

P

MS/TP NETWORK AMS/TP NETWORK B

MS/TP NETWORK DMS/TP NETWORK C

64 DDC CONTROLLERS MAX (TYPICAL)

BY DIV. 26120VAC

DDC CONTROLLERS(TYPICAL)

NEW WALL PLATETEMPERATURE SENSOR

(TYP. 3)

ROOM TEMP

EXISTING ZONE DAMPER AND

MODULATING ACTUATOR BY EMS

CONTRACTOR

(TYP. 3)

NEW CO2 SENSORMOUNTED ADJACENT TO

WALL PLATETEMPERATURE SENSOR

(TYP.3)

(E) SF-1

EXISTINGDAMPERS(TYPICAL)

(E) RF-1

CITY ENGINEERAPPROVED BY:

CONTROL DIAGRAMS

M-602

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

AS SHOWNThis document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 2:00 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 M-602.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

BOILER

120VAC FROM

120/24VAC

HWS

TS

HWR

TSTS

(E) B-2

TO NEXT DEVICE

BAS BACNET MS/TP COMM.

FROM PREVIOUS DEVICE

BAS BACNET MS/TP COMM.

TO BASBACNET

MS/TPNETWORK

ENABLECOMM. -COMM. +

ALARM

EXISTING BOILER CONTROLPANEL W/ BACNET

INTERFACE

(E) P-2

120VAC

ISOLATIONVALVE

HW SYSTEM

1. BOILER AND HOT WATER PUMP ARE CONTROLLED BY THE DDC SYSTEM. HOT

WATER SUPPLY SETPOINT IS SET AT OPERATOR'S WORKSTATION (OWS)

TERMINAL.

2. THE ISOLATION VALVE ASSOCIATED WITH THE BOILER WILL BE COMMANDED

OPEN WITH CORRESPONDING FEEDBACK STATUS CONFIRMED BEFORE BOILER

RECEIVES A START SIGNAL.

3. DDC SYSTEM SHALL MONITOR HOT WATER SUPPLY AND RETURN

TEMPERATURES AND STAGE ON BOILER TO MAINTAIN SETPOINT. RESET

HEATING HOT WATER TEMPERATURE BASED UPON BUILDING LOAD CONDITIONS

AS DETERMINED BY SYSTEM FEEDBACK FROM HOT WATER CONTROL VALVES

WITH MINIMUM AND MAXIMUM RANGES SET AT OWS TERMINAL.

4. UPON A CALL FOR HEATING, ENERGIZE HOT WATER PUMP. SHOULD PUMP FAIL

WHEN COMMANDED ON, SEND AN ALARM TO THE OWS.

5. THE BOILER IS ENABLED ONLY WHEN 1) THE TIME SCHEDULE IS ON, 2) THE OSA

TEMPERATURE IS LESS THAN THE HW SYSTEM OSA LOCKOUT TEMPERATURE,

AND 3) WHEN ANY OF THE HOT WATER VALVES DEMAND HEAT EITHER IN

OCCUPIED OR AFTER-HOURS MODE.

6. THE FOLLOWING DISPLAYS/COMMANDS TO BE AVAILABLE AT TERMINAL:

a. CURRENT HOT WATER SUPPLY TEMPERATURE SETPOINT (MIN. AND MAX.

RESET SETPOINTS)

b. CURRENT STATUS COMMANDED FOR BOILER, ISOLATION VALVE AND PUMP

c. HOT WATER SUPPLY TEMPERATURE

d. HOT WATER RETURN TEMPERATURE

e. CURRENT ALARM STATUS AT PUMP

f. CURRENT POSITION STATUS OF EACH ISOLATION VALVE

g. RUNTIME TOTALIZATION (UP TO 64,000 HOURS)

h. TREND LOGS

i. ALARM HISTORY

j. TEMPERATURE LEAVING BOILER

TS

OSA

TEMP

1 BOILER SYSTEM CONTROL DIAGRAM

NOT TO SCALE

24VSDR

TS

EXISTING SMOKE DETECTOR

24V

24V

TO NEXT DEVICEBAS BACNET MS/TP COMM.

FROM PREVIOUS DEVICEBAS BACNET MS/TP COMM.

START/STOP

C/T

MOTOR STARTER

EXISTING M/S

START/STOP

C/T

MOTOR STARTER

24V

HWR

HWS

B

ABA

FAN COIL UNIT (FC-1) SYSTEM

1. Fan coil unit shall be controlled directly by its own dedicated EMS DDC

controller.

2. The EMS Global Controller shall determine when to activate the fan coil unit

based upon building occupancy or, optionally, an schedule.

3. Supply fan and return fan shall be commanded to run when fan coil unit is

activated. EMS shall monitor fan operation via EMS current transducer and

send alarm to OWS when fan fails to operate as commanded.

4. Supply air temperature sensor shall be directly connected to the fan coil unit

DDC controller. The supply air setpoint shall be set by system operator at

OWS or automatically reset, by system operator's choice, to optimally adjust

supply temperature based on actual space load as determined by EMS.

Supply air temperature setpoint shall be 65°F if “need cooling” signal is at

zero. Setpoint shall be 55°F if there is a “need cooling” signal.

5. The system will sense outside air, return air and mixed air temperatures and

shall modulate dampers to use outside air for cooling whenever available.

6. When outside air can no longer be used for sufficient cooling, position outside

air damper to minimum position. Lock out heating valve in cooling mode.

7. When heating is required, position outside air damper to minimum positionand

modulate hot water valve to maintain supply air temperature setpoint.

8. Provide a morning warm-up feature to modulate the hot water valve to

maintain warm-up supply air temperature setpoint until the space has

achieved setpoint.

9. Provide for automatic shutdown of fan coil unit via hardwire interlock upon

detection of smoke in the main supply air duct.

10. The following commands/displays shall be available at the OWS for the

AHU system:

a. System graphics showing dynamic status of all points.

b. Start/Stop.

c. Current fan status (current transducer).

d. Outside air (OSA) temperature.

e. Supply air temperature.

f. Return air temperature.

g. Mixed air temperature.

h. Supply air temperature setpoint (adjustable)

i. Damper status (% open)

j. Runtime total for fan operation up to 64,000 hours

k. Alarms (temperature, air flow)

l. Warm up/Cooling mode/Night setback - Status of operation.

m.Hot Water Valve position

EXISTING M/S

EXISTING CONTROLVALVE AND ACTUATOR

EXISTING DAMPERSAND ACTUATORS

NEW WALL PLATESENSOR

ROOM TEMP

2 FC-1 CONTROL DIAGRAM

NOT TO SCALE

EXISTING M/S

START/STOP

C/T

MOTOR STARTER

(E) (E)

(E)

(E)

(N)

(N) (N)

(E) EF-3

CITY ENGINEERAPPROVED BY:

CONTROL DIAGRAMS

M-603

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

AS SHOWNThis document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 2:00 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 M-603.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

1 FC-2 CONTROL DIAGRAM

NOT TO SCALE

24V

120/24VAC

FAN COIL UNIT

SDR

EXISTING SMOKE DETECTOR

TO NEXT DEVICEBAS BACNET MS/TP COMM.

FROM PREVIOUS DEVICEBAS BACNET MS/TP COMM.

EXISTING M/S

START/STOP

C/T

MOTOR STARTER

24V

HWR

HWS

B

ABA

FAN COIL UNIT AND EXHAUST FANS (FC-2 AND EF-4/5) SYSTEM

1. FC-2 and EF-4 and 5 shall be controlled directly by its own dedicated EMS DDC controller.2. The EMS Global Controller shall determine when to activate the units based upon building

occupancy or, optionally, a schedule.3. Supply fan afan shall be commanded to run when exhaust fans are activated. EMS shall

monitor fan operation via EMS current transducer and send alarm to OWS when fan fails tooperate as commanded.

4. Supply air temperature sensor shall be directly connected to fan coil unit DDC controller. Thesupply air setpoint shall be set by system operator at OWS.

5. When cooling is required, engage mechanical DX operation. Lock out heating valve in coolingmode.

6. When heating is required, lock out mechanical DX cooling and modulate hot water valve tomaintain supply air temperature setpoint.

7. Provide a morning warm-up feature to modulate the hot water valve to maintain warm-up supplyair temperature setpoint until space has achieved setpoint.

8. Provide for automatic shutdown of fan coil unit via hardwire interlock upon detection of smoke inthe main supply air duct.

9. The following commands/displays shall be available at the OWS for the fan coil system:

a. System graphics showing dynamic status of all points.b. Start/Stop.c. Current fan statuses (current transducer).d. Supply air temperature.e. Supply air temperature setpoint (adjustable)f. Damper status (% open)g. Runtime total for fan operation up to 64,000 hoursh. Alarms (temperature, air flow)i. DX compressor status.j. Hot Water Valve position

EXISTING CONTROLVALVE AND ACTUATOR

SV

COOL

1

EXISTING CONDENSING UNIT

EXISTING DAMPERAND NEW ACTUATOR

VAC N

120 L

BY EMS CONTRACTOR(N) LOW VOLTAGE RELAY

C/T

EXISTING EXHAUST FAN (TYP .2)

NEW WALL PLATESENSOR

ROOM TEMP

EXISTING DX COIL

24V

TO NEXT DEVICEBAS BACNET MS/TP COMM.

FROM PREVIOUS DEVICEBAS BACNET MS/TP COMM.

24VM

HWR

HWS

B

ABA

FAN COIL UNIT AND EXHAUST FAN (FC-3 AND EF-1) SYSTEM

1. FC-3 and EF-1 shall be controlled directly by its own dedicated EMS DDC controller.2. The EMS Global Controller shall determine when to activate the units based upon building

occupancy or, optionally, a schedule.3. Supply fan shall be commanded to run when exhaust fan is activated. EMS shall monitor fan

operation via EMS current transducer and send alarm to OWS when fan fails to operate ascommanded.

4. Supply air temperature sensor shall be directly connected to fan coil unit DDC controller. Thesupply air setpoint shall be set by system operator at OWS.

5. When cooling is required, lock out heating valve in cooling mode.6. When heating is required, modulate hot water valve to maintain supply air temperature setpoint.7. Provide a morning warm-up feature to modulate the hot water valve to maintain warm-up supply

air temperature setpoint until space has achieved setpoint.8. The following commands/displays shall be available at the OWS for the fan coil system:

a. System graphics showing dynamic status of all points.b. Start/Stop.c. Current fan statuses (current transducer).d. Supply air temperature.e. Supply air temperature setpoint (adjustable)f. Damper status (% open)g. Runtime total for fan operation up to 64,000 hoursh. Hot Water Valve position

EXISTING CONTROLVALVE AND ACTUATOR

EXISTING DAMPERAND NEW ACTUATOR

VAC N

120 L

RBY EMS CONTRACTOR

(N) LOW VOLTAGE RELAYC/T

NEW WALL PLATESENSOR

ROOM TEMP

VAC N

120 L

RBY EMS CONTRACTOR

(E) LOW VOLTAGE RELAYC/T

2 FC-3 CONTROL DIAGRAM

NOT TO SCALE

CITY ENGINEERAPPROVED BY:

CONTROL DIAGRAMS

M-604

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

AS SHOWNThis document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 2:00 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 M-604.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

1 FC-4 CONTROL DIAGRAM

NOT TO SCALE

2 FC-5 CONTROL DIAGRAM

NOT TO SCALE

M24V

120/24VAC

120VAC FROMFAN COIL UNIT

SDR

EXISTING SMOKE DETECTOR

TS

TS

24V M

TO NEXT DEVICEBAS BACNET MS/TP COMM.

FROM PREVIOUS DEVICEBAS BACNET MS/TP COMM.

EXISTING M/S

START/STOP

C/T

MOTOR STARTER

24VM

H

C

HWR

HWS

B

ABA

FAN COIL UNIT (FC-4) SYSTEM

1. Fan coil unit shall be controlled directly by its own dedicated EMS DDC controller.2. The EMS Global Controller shall determine when to activate the fan coil unit based upon

building occupancy or, optionally, an schedule.3. Supply fan and return fan shall be commanded to run when fan coil unit is activated. EMS shall

monitor fan operation via EMS current transducer and send alarm to OWS when fan fails tooperate as commanded.

4. Supply air temperature sensor shall be directly connected to the fan coil unit DDC controller.The supply air setpoint shall be set by system operator at OWS or automatically reset, bysystem operator's choice, to optimally adjust supply temperature based on actual space load asdetermined by EMS. Supply air temperature setpoint shall be 65°F if “need cooling” signal isat zero. Setpoint shall be 55°F if there is a “need cooling” signal.

5. The system will sense outside air, return air and mixed air temperatures and shall modulatedampers to use outside air for cooling whenever available.

6. When outside air can no longer be used for sufficient cooling, position outside air damper tominimum position. Lock out heating valve in cooling mode.

7. When heating is required, position outside air damper to minimum positionand modulate hotwater valve to maintain supply air temperature setpoint.

8. Provide a morning warm-up feature to modulate the hot water valve to maintain warm-up supplyair temperature setpoint until the space has achieved setpoint.

9. Provide for automatic shutdown of fan coil unit via hardwire interlock upon detection of smoke inthe main supply air duct.

10.The following commands/displays shall be available at the OWS for the AHU system:

a. System graphics showing dynamic status of all points.b. Start/Stop.c. Current fan status (current transducer).d. Outside air (OSA) temperature.e. Supply air temperature.f. Return air temperature.g. Mixed air temperature.h. Supply air temperature setpoint (adjustable)i. Damper status (% open)j. Runtime total for fan operation up to 64,000 hoursk. Alarms (temperature, air flow)l. Warm up/Cooling mode/Night setback - Status of operation.m. Hot Water Valve position

EXISTING CONTROLVALVE AND ACTUATOR

EXISTING DAMPERSAND NEW ACTUATORS

NEW WALL PLATESENSOR

ROOM TEMP

M24V

120/24VAC

120VAC FROMFAN COIL UNIT

TS

TO NEXT DEVICEBAS BACNET MS/TP COMM.

FROM PREVIOUS DEVICEBAS BACNET MS/TP COMM.

FAN COIL UNIT (FC-5) SYSTEM

1. FC-5 shall be controlled directly by its own dedicated EMS DDC controller.2. The EMS Global Controller shall determine when to activate the unit based upon building

occupancy or, optionally, a schedule.3. EMS shall monitor fan operation via EMS current transducer and send alarm to OWS when fan

fails to operate as commanded.4. Supply air temperature sensor shall be directly connected to fan coil unit DDC controller. The

supply air setpoint shall be set by system operator at OWS.5. When cooling is required, electric strip heater is disabled.6. When heating is required, electric strip heater is enabled until supply air temperature has

achieved setpoint.7. Provide a morning warm-up feature to modulate the hot water valve to maintain warm-up supply

air temperature setpoint until space has achieved setpoint.8. The following commands/displays shall be available at the OWS for the fan coil system:

a. System graphics showing dynamic status of all points.b. Start/Stop.c. Current fan status (current transducer).d. Supply air temperature.e. Supply air temperature setpoint (adjustable)f. Damper status (% open)g. Runtime total for fan operation up to 64,000 hoursh. Hot Water Valve position

EXISTING DAMPERAND NEW ACTUATOR

VAC N

120 L

RBY EMS CONTRACTOR

(E) LOW VOLTAGE RELAYC/T

ROOM TEMP

AFTER HOUR TIMERROOM SET POINT

ESNI ID

PS

EUNAF O ST ID

(N)

(N) (N)

(N) THERMOSTAT

CITY ENGINEERAPPROVED BY:

DIAGRAMS

M-605

S. SCHULMEYER S. SCHULMEYER

S. SCHULMEYER

AS SHOWNThis document shall not be used forconstruction unless signed and sealed forconstruction. Sheet No.

Original Size

Title

Project

ClientDesignerDrawn

Scale

Plot Date: Filename:23 May 2018 - 2:00 PM G:\111\11152160 Callinan Sports Fitness Cntr-EMS\06-CAD\Sheets\11152160 M-605.dwg

Arch E1

Date

Plotted By: Scott Schulmeyer

Project No.

Sheet of

Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD and shall not be reused in whole or in partfor any other project without GHD's written authorization.© 2018 GHD

DraftingCheck

0 1"

Bar is one inch onoriginal size sheet

DesignCheck

IssueNo. Drawn Approved Date

ProjectManager

CITY OF ROHNERT PARKCALLINAN SPORTS AND FITNESS CENTER - EMS REPLACEMENT PROJECT

05/09/20182235 Mercury Way Suite 150Santa Rosa California 95407 USAT 1 707 523 1010 F 1 707 527 8679 W www.ghd.com

GHD Inc.M295626/30/19

No.Exp.

REG I

S TER

ED PRO FE S S I ON A L E NGI NEER

S TA T E O F C A L I F O R N I A

T E R R Y W O N G

M E C H A N I C A L

PLAN CHECK1 5-9-18

1 FC-6 CONTROL DIAGRAM

NOT TO SCALE

M24V

120/24VAC

120VAC FROMFAN COIL UNIT

TS

TO NEXT DEVICEBAS BACNET MS/TP COMM.

FROM PREVIOUS DEVICEBAS BACNET MS/TP COMM.

24V

H

C

HWR

HWS

B

ABA

FAN COIL UNIT (FC-6) SYSTEM

1. FC-6 shall be controlled directly by its own dedicated EMS DDC controller.2. The EMS Global Controller shall determine when to activate the unit based upon building

occupancy or, optionally, a schedule.3. EMS shall monitor fan operation via EMS current transducer and send alarm to OWS when fan

fails to operate as commanded.4. Supply air temperature sensor shall be directly connected to fan coil unit DDC controller. The

supply air setpoint shall be set by system operator at OWS.5. When cooling is required, lock out heating valve in cooling mode.6. When heating is required, modulate hot water valve to maintain supply air temperature setpoint.7. Provide a morning warm-up feature to modulate the hot water valve to maintain warm-up supply

air temperature setpoint until space has achieved setpoint.8. The following commands/displays shall be available at the OWS for the fan coil system:

a. System graphics showing dynamic status of all points.b. Start/Stop.c. Current fan status (current transducer).d. Supply air temperature.e. Supply air temperature setpoint (adjustable)f. Damper status (% open)g. Runtime total for fan operation up to 64,000 hoursh. Hot Water Valve position

EXISTING CONTROLVALVE AND ACTUATOR

EXISTING DAMPERAND NEW ACTUATOR

VAC N

120 L

RBY EMS CONTRACTOR

(E) LOW VOLTAGE RELAYC/T

ROOM TEMP

AFTER HOUR TIMERROOM SET POINT

ESNI ID

PS

EUNAF O ST ID

DIV 26

120/24VAC

FROM PREVIOUS TUXEMS COMM. LINE

TO NEXT TUXEMS COMM. LINE

P-1

S/S

EXISTING CSNEW TANKTHERMOSTAT

EXISTINGDOMESTIC

HOT WATERSTORAGE

TANK

NEW CONTROLVALVE AND NEW

ACTUATOR

(E) B-1

TO BASBACNET

MS/TPNETWORK

ENABLECOMM. -COMM. +

ALARM

EXISTING BOILER CONTROLPANEL W/ BACNET

INTERFACE

M120VAC

ISOLATIONVALVE

DOMESTIC HW SYSTEM

1. DOMESTIC HOT WATER BOILER AND PUMP ARE CONTROLLED BY THE DDC

SYSTEM. HOT WATER SUPPLY SETPOINT IS SET AT OPERATOR'S WORKSTATION

(OWS) TERMINAL.

2. THE ISOLATION VALVE ASSOCIATED WITH THE BOILER WILL BE COMMANDED

OPEN WITH CORRESPONDING FEEDBACK STATUS CONFIRMED BEFORE BOILER

RECEIVES A START SIGNAL.

3. DDC SYSTEM SHALL MONITOR DOMESTIC HOT WATER TANK TEMPERATURE

AND STAGE ON BOILER TO MAINTAIN SETPOINT.

4. UPON A CALL FOR HEATING, ENERGIZE HOT WATER PUMP. SHOULD PUMP FAIL

WHEN COMMANDED ON, SEND AN ALARM TO THE OWS.

5. THE BOILER IS ENABLED ONLY WHEN 1) THE TIME SCHEDULE IS ON, 2) THE OSA

TEMPERATURE IS LESS THAN THE HW SYSTEM OSA LOCKOUT TEMPERATURE,

AND 3) WHEN ANY OF THE HOT WATER VALVES DEMAND HEAT EITHER IN

OCCUPIED OR AFTER-HOURS MODE.

6. THE FOLLOWING DISPLAYS/COMMANDS TO BE AVAILABLE AT TERMINAL:

a. CURRENT HOT WATER TANK TEMPERATURE SETPOINT

b. CURRENT STATUS COMMANDED FOR BOILER, ISOLATION VALVE AND PUMP

c. HOT WATER SUPPLY TEMPERATURE

d. HOT WATER RETURN TEMPERATURE

e. CURRENT ALARM STATUS AT PUMP

f. CURRENT POSITION STATUS OF ISOLATION VALVE

g. RUNTIME TOTALIZATION (UP TO 64,000 HOURS)

h. TREND LOGS

i. ALARM HISTORY

j. TEMPERATURE LEAVING BOILER

2 DHW CONTROL DIAGRAM

NOT TO SCALE

(N) THERMOSTAT

(N)