A Lessons Learned Discussion of Digital Control Upgrades

How to Make Sure Your Digital

Upgrade is Over-Budget, Over -

Schedule, and Everyone’s Vacation

Gets Cancelled

Page 3: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

Major Topics

• The Phases of a Digital Control Project

• Examples of How things can go Wrong

• Discussion

3

Page 4: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

Slide 4

Major Phases of a DCS ProjectSales/Proposal

Phase ManagementPhase Design

Phase

ImplementationPhase Testing

Phase Startup/Commissioning

Page 5: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

What is…..

5

Page 6: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

6

The Sales/Proposal Phase

• Request For Quote• Competitive Bid

Process• Proposals• Awarding of Contract• Purchase Order

Page 7: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

The Management Phase

7

• Assemble Project Team• Hold Kickoff Meeting• Develop Schedule• Project Specification

Finalized; Requirements Created

• Develop Plans

Project Management Plan

Quality Assurance Plan Etc, etc, etc

AND……

Page 8: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

The Management Phase (cont…)

Slide 8

DESIGN INPUTExamples:• Process Description• P&ID Drawings• Existing Logic and Function Drawings• Procedures• Alarms, setpoint, scaling information• I/O Database

Page 9: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

Project I/O Database

Slide 9

Page 10: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

Project I/O Database

Slide 10

Database

I/O Load (Drawings) Wiring Diagrams

Control Database New Control Drawings Software Design Description

Hardware Test Procedure Site Testing

Process Graphics Graphic Documentation

Historian

Reporting

Other Systems Documentation

Software Test Procedure Site Testing Site Procedures

Page 11: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

The Design Phase

11

BEGIN

DESIGNFREEZE

• Design Input continues

END

• Design Calculations• System Design Drawings• I/O Database• Failure Modes and Effects

Analysis• Testing Plans• Traceability Matrix

Page 12: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

The Implementation Phase

12

• Application Software Control/Graphics/Historian/Reports

• Test Cases and Procedures

• Updated Design Drawings Possible

• Dry Run Testing

Page 13: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

The Testing Phase

13

• Pre-Testing (Vendor Test)• Factory Acceptance

Testing (Customer Test)• Corrections and Retest• Changes

Page 14: A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation

The Startup/Commissioning Phase

14

• YOUR system now