7
CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D. ARCHT. DANN PAULO C. LAYUG ARCHITECT I, PHYSICAL PLANT DIVISION PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013 A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. A1 1 of 30 Not Drawn to Scale LOCATION PLAN 3 this Site Not Drawn to Scale VICINITY MAP 3 this Site BUILDING OFFICIAL LAND USE AND ZONING LINE AND GRADE ARCHITECTURAL STRUCTURAL SANITARY ELECTRICAL MECHANICAL REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE BUILDING OFFICIAL CITY OF ILIGAN FIRE SAFETY A1 1. PERSPECTIVE VIEW 2. VICINITY MAP 3. LOCATION PLAN A2 1. GROUND FLOOR PLAN 2. SECOND FLOOR PLAN 3. THIRD FLOOR PLAN 4. LEFT ELEVATION 5. RIGHT ELEVATION' A3 1. ROOFDECK FLOOR PLAN 2. FRONT ELEVATION 3. REAR ELEVATION 4. SECTION THRU - C 5. SECTION THRU - D 6. SECTION THRU - L A4 1. SECTION THRU - A 2. SECTION THRU - B 3. GRND FLR REFLECTED CEILING PLAN 4. SECTION THRU - E 5. SECTION THRU - F A5 1. 2ND FLR REFLECTED CEILING PLAN 2. 3RD FLR REFLECTED CEILING PLAN 3. RFDCK REFLECTED CEILING PLAN 4. CEILING FRAME DETAIL 5. DRY WALL FRAME DETAIL A6 1. GLASS PARTITION DETAIL 2. SCHEDULE OF WINDOWS A7 1. SCHEDULE OF DOORS 2. POLYCARBONATE ENCLOSURE DETAIL 3. POLYCARBONATE CANOPY DET. 4. POLYCARBONATE CANOPY FRAMING DET. S1 1. FOUNDATION PLAN 2. SECOND FLOOR FRAMING PLAN 3. THIRD FLOOR FRAMING PLAN 4. COMBINED FOOTING 1 (CF-1) DETAIL 3. COMBINED FOOTING 4 (CF-4) DETAIL S2 1. ROOFDECK FRAING PLAN 2. ROOF BEAM PLAN 3. ROOF FRAMING PLAN 4. COMBINED FOOTING 2 (CF-2) DETAIL 5. COMBINED FOOTING 3 (CF-3) DETAIL S3 1. COMBINED FOOTING 5 (CF-5) DETAIL 2. WALL FOOTING DETAIL 3. COLUMN DETAIL 4. TIE BEAM TRANSVERSE STRUCTURE PROFILE 5. TIE BEAM DETAIL S4 1. SCHEDULE OF BEAMS - 1 S5 1. SCHEDULE OF BEAMS - 2 S6 1. SECOND FLOOR SLAB DETAIL 2. CONCRETE CANOPY DETAIL 3. CONCRETE GUTTER DETAIL S7 1. MAIN STAIR SECTION 2. MAIN STAIR DETAIL 3. MAIN STAIR PLAN 4. MAIN STAIR PROFILE 5. SIDE STAIR PROFILE 6. SIDE STAIR LANDING SECTION 7. SIDE STAIR LANDING PLAN 8. SIDE STAIR DETAIL 9. TYPICAL STEEL HAN DRAIL DETAIL S8 1. ELEVATOR SHAFT FOOTING PLAN 2. ELEVATOR SHAFT FOOTING SECTION 3. ELEVATOR SHAFT WALL DETAIL 4. ELEVATOR SHAFT LAYOUT PLAN 5. ELEVATOR SHAFT ROOF DETAIL 6. PLANTED COLUMN DETAIL 7. FOLDED SLAB DETAIL S9 1. STEEL STAIR DETAIL 2. WATER TANK PLATFORM DETAIL 3. STEEL TRUSS 1 (T-1) DETAIL 4. STEEL TRUSS 2 (T-2) DETAIL 5. STEEL TRUSS 3 (T-3) DETAIL 6. STEEL TRUSS 4 (T-4) DETAIL P1 1. GRND FLR DRAINAGE SYSTEM LAYOUT PLAN 2. 2ND FLR DRAINAGE SYSTEM LAYOUT PLAN 3. 3RD FLR DRAINAGE SYSTEM LAYOUT PLAN 4. RIGHT WING PIPING ISOMETRIC DIAGRAM P2 1. ROOFDECK DRAINAGE SYSTEM LAYOUT PLAN 2. GRND FLR WATER SUPPLY LAYOUT PLAN 3. 2ND FLR WATER SUPPLY LAYOUT PLAN 4. LEFT WING PIPING ISOMETRIC DIAGRAM P3 1. 3RD FLR WATER SUPPLY LAYOUT PLAN 2. ROOFDECK WATER SUPPLY LAYOUT PLAN 3. GRND FLR STORM DRAINAGE LAYOUT PLAN 4. DIRECTOR'S OFFICE PUMBING LAYOUT PLAN 5. FACULTY LOUNGE PLUMBING LAYOUT PLAN P4 1. BLOWN UP PLUMBING LAYOUT PLAN P5 1. CISTERN DETAIL 2. SEPTIC VAULT DETAIL 3. LOCATION PLAN M1 1. GRND FLR FIRE ALARM SYSTEM LAYOUT PLAN 2. 2ND FLR FIRE ALARM SYSTEM LAYOUT PLAN 3. 3RD FLR FIRE ALARM SYSTEM LAYOUT PLAN 4. FIRE ALARM SYSTEM RISER DIAGRAM 5. FIRE ALARM SYSTEM ELEMENTARY DIAGRAM M2 1. RFDCK FIRE ALARM SYSTEM LAYOUT PLAN 2. ELEVATOR HOISTWAY PIT PLAN 3. ELEVATOR HOISTWAY LANDING PLAN 4. ELEVATOR HOISTWAY OVERHEAD PLAN 5. ELEVATOR HOISTWAY SECTION E1 1. GRND FLR POWER CIRCUIT LAYOUT PLAN 2. 2ND FLR POWER CIRCUIT LAYOUT PLAN 3. 3RD FLR POWER CIRCUIT LAYOUT PLAN E2 1. RFDCK POWER CIRCUIT LAYOUT PLAN 2. GRND FLR LIGHTING CIRCUIT LAYOUT PLAN 3. 2ND FLR LIGHTING CIRCUIT LAYOUT PLAN 4. SCHEDULE OF POWER & LIGHTING LOADS E3 1. 3RD FLR LIGHTING CIRCUIT LAYOUT PLAN 2. RFDCK LIGHTING CIRCUIT LAYOUT PLAN 3. GRND FLR INTERCOM LINE LAYOUT PLAN 4. SCHEDULE OF ACU & SUBFEEDER LOADS E4 1. 2ND FLR INTERCOM LINE LAYOUT PLAN 2. 3RD FLR INTERCOM LINE LAYOUT PLAN 3. RFDCK INTERCOM LINE LAYOUT PLAN 4. GROUNDING PLAN 5. LIGHTNING ARRESTER PLAN 6. ELECTRICAL RISER DIAGRAM E5 1. GRND FLR ACU OUTLET LAYOUT PLAN 2. 2ND FLR ACU OUTLET LAYOUT PLAN 3. 3RD FLR ACU OUTLET LAYOUT PLAN 4. ELECTRICAL SINGLE LINE DIAGRAM 5. TELEPHONE LINE RISER DIAGRAM 6. INTERCOM LINE RISER DIAGRAM E6 1. TYPICAL CABLE TRAY LADDER LAYOUT PLAN 2. CABLE TRAY LADDER DETAIL 3. LOCATION PLAN

A-ICTC

Embed Size (px)

Citation preview

CERTIFIED BY:

PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

(ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUGARCHITECT I, PHYSICAL PLANT DIVISION

PRC No.:

PTR No.:

DATE ISSUED:

TIN No.:

PREPARED BY:

CHRISTIAN C. CAÑETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

SUKARNO D. TANGGOL, DPA

RECOMMENDING APPROVAL: APPROVED BY:

ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

SHEET No.:

DATE:

FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

A11 of 30

Not Drawn to Scale

LOCATION PLAN

3

this Site

Not Drawn to Scale

VICINITY MAP

3

this Site

BUILDING OFFICIAL

LAND USE AND ZONING

LINE AND GRADE

ARCHITECTURAL

STRUCTURAL

SANITARY

ELECTRICAL

MECHANICAL

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLICWORKS AND HIGHWAYS

OFFICE OF THE BUILDING OFFICIAL CITY OF ILIGAN

FIRE SAFETY

A11. PERSPECTIVE VIEW2. VICINITY MAP3. LOCATION PLAN

A21. GROUND FLOOR PLAN2. SECOND FLOOR PLAN3. THIRD FLOOR PLAN4. LEFT ELEVATION5. RIGHT ELEVATION'

A31. ROOFDECK FLOOR PLAN2. FRONT ELEVATION3. REAR ELEVATION4. SECTION THRU - C5. SECTION THRU - D6. SECTION THRU - L

A41. SECTION THRU - A2. SECTION THRU - B3. GRND FLR REFLECTED CEILING PLAN4. SECTION THRU - E5. SECTION THRU - F

A51. 2ND FLR REFLECTED CEILING PLAN2. 3RD FLR REFLECTED CEILING PLAN3. RFDCK REFLECTED CEILING PLAN4. CEILING FRAME DETAIL5. DRY WALL FRAME DETAIL

A61. GLASS PARTITION DETAIL2. SCHEDULE OF WINDOWS

A71. SCHEDULE OF DOORS2. POLYCARBONATE ENCLOSURE DETAIL3. POLYCARBONATE CANOPY DET.4. POLYCARBONATE CANOPY FRAMING DET.

S11. FOUNDATION PLAN2. SECOND FLOOR FRAMING PLAN3. THIRD FLOOR FRAMING PLAN4. COMBINED FOOTING 1 (CF-1) DETAIL3. COMBINED FOOTING 4 (CF-4) DETAIL

S21. ROOFDECK FRAING PLAN2. ROOF BEAM PLAN3. ROOF FRAMING PLAN4. COMBINED FOOTING 2 (CF-2) DETAIL5. COMBINED FOOTING 3 (CF-3) DETAIL

S31. COMBINED FOOTING 5 (CF-5) DETAIL2. WALL FOOTING DETAIL3. COLUMN DETAIL4. TIE BEAM TRANSVERSE STRUCTURE PROFILE5. TIE BEAM DETAIL

S41. SCHEDULE OF BEAMS - 1

S51. SCHEDULE OF BEAMS - 2

S61. SECOND FLOOR SLAB DETAIL2. CONCRETE CANOPY DETAIL3. CONCRETE GUTTER DETAIL

S71. MAIN STAIR SECTION2. MAIN STAIR DETAIL3. MAIN STAIR PLAN4. MAIN STAIR PROFILE5. SIDE STAIR PROFILE6. SIDE STAIR LANDING SECTION7. SIDE STAIR LANDING PLAN8. SIDE STAIR DETAIL9. TYPICAL STEEL HAN DRAIL DETAIL

S81. ELEVATOR SHAFT FOOTING PLAN2. ELEVATOR SHAFT FOOTING SECTION3. ELEVATOR SHAFT WALL DETAIL4. ELEVATOR SHAFT LAYOUT PLAN5. ELEVATOR SHAFT ROOF DETAIL6. PLANTED COLUMN DETAIL7. FOLDED SLAB DETAIL

S91. STEEL STAIR DETAIL2. WATER TANK PLATFORM DETAIL3. STEEL TRUSS 1 (T-1) DETAIL4. STEEL TRUSS 2 (T-2) DETAIL5. STEEL TRUSS 3 (T-3) DETAIL6. STEEL TRUSS 4 (T-4) DETAIL

P11. GRND FLR DRAINAGE SYSTEM LAYOUT PLAN2. 2ND FLR DRAINAGE SYSTEM LAYOUT PLAN3. 3RD FLR DRAINAGE SYSTEM LAYOUT PLAN4. RIGHT WING PIPING ISOMETRIC DIAGRAM

P21. ROOFDECK DRAINAGE SYSTEM LAYOUT PLAN2. GRND FLR WATER SUPPLY LAYOUT PLAN3. 2ND FLR WATER SUPPLY LAYOUT PLAN4. LEFT WING PIPING ISOMETRIC DIAGRAM

P31. 3RD FLR WATER SUPPLY LAYOUT PLAN2. ROOFDECK WATER SUPPLY LAYOUT PLAN3. GRND FLR STORM DRAINAGE LAYOUT PLAN4. DIRECTOR'S OFFICE PUMBING LAYOUT PLAN5. FACULTY LOUNGE PLUMBING LAYOUT PLAN

P41. BLOWN UP PLUMBING LAYOUT PLAN

P51. CISTERN DETAIL2. SEPTIC VAULT DETAIL3. LOCATION PLAN

M11. GRND FLR FIRE ALARM SYSTEM LAYOUT PLAN2. 2ND FLR FIRE ALARM SYSTEM LAYOUT PLAN3. 3RD FLR FIRE ALARM SYSTEM LAYOUT PLAN4. FIRE ALARM SYSTEM RISER DIAGRAM5. FIRE ALARM SYSTEM ELEMENTARY DIAGRAM

M21. RFDCK FIRE ALARM SYSTEM LAYOUT PLAN2. ELEVATOR HOISTWAY PIT PLAN3. ELEVATOR HOISTWAY LANDING PLAN4. ELEVATOR HOISTWAY OVERHEAD PLAN5. ELEVATOR HOISTWAY SECTION

E11. GRND FLR POWER CIRCUIT LAYOUT PLAN2. 2ND FLR POWER CIRCUIT LAYOUT PLAN3. 3RD FLR POWER CIRCUIT LAYOUT PLAN

E21. RFDCK POWER CIRCUIT LAYOUT PLAN2. GRND FLR LIGHTING CIRCUIT LAYOUT PLAN3. 2ND FLR LIGHTING CIRCUIT LAYOUT PLAN4. SCHEDULE OF POWER & LIGHTING LOADS

E31. 3RD FLR LIGHTING CIRCUIT LAYOUT PLAN2. RFDCK LIGHTING CIRCUIT LAYOUT PLAN3. GRND FLR INTERCOM LINE LAYOUT PLAN4. SCHEDULE OF ACU & SUBFEEDER LOADS

E41. 2ND FLR INTERCOM LINE LAYOUT PLAN2. 3RD FLR INTERCOM LINE LAYOUT PLAN3. RFDCK INTERCOM LINE LAYOUT PLAN4. GROUNDING PLAN5. LIGHTNING ARRESTER PLAN6. ELECTRICAL RISER DIAGRAM

E51. GRND FLR ACU OUTLET LAYOUT PLAN2. 2ND FLR ACU OUTLET LAYOUT PLAN3. 3RD FLR ACU OUTLET LAYOUT PLAN4. ELECTRICAL SINGLE LINE DIAGRAM5. TELEPHONE LINE RISER DIAGRAM6. INTERCOM LINE RISER DIAGRAM

E61. TYPICAL CABLE TRAY LADDER LAYOUT PLAN2. CABLE TRAY LADDER DETAIL3. LOCATION PLAN

Scale: 1:250 m

GROUND FLOOR PLAN

1

Scale: 1:250 m

SECOND FLOOR PLAN

2

Scale: 1:250 m

THIRD FLOOR PLAN

3

Scale: 1:100 m

LEFT ELEVATION

4

Scale: 1:100 m

RIGHT ELEVATION

5

CERTIFIED BY:

PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

(ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUGARCHITECT I, PHYSICAL PLANT DIVISION

PRC No.:

PTR No.:

DATE ISSUED:

TIN No.:

PREPARED BY:

CHRISTIAN C. CAÑETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

SUKARNO D. TANGGOL, DPA

RECOMMENDING APPROVAL: APPROVED BY:

ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

SHEET No.:

DATE:

FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY

DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

A22 of 30

Scale: 1:250 m

FRONT ELEVATION

2

Scale: 1:250 m

REAR ELEVATION

3

Scale: 1:100 m

SECTION THRU - L

6

Scale: 1:100 m

SECTION THRU - C

4

Scale: 1:100 m

SECTION THRU - D

5

CERTIFIED BY:

PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

(ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUGARCHITECT I, PHYSICAL PLANT DIVISION

PRC No.:

PTR No.:

DATE ISSUED:

TIN No.:

PREPARED BY:

CHRISTIAN C. CAÑETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

SUKARNO D. TANGGOL, DPA

RECOMMENDING APPROVAL: APPROVED BY:

ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

SHEET No.:

DATE:

FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY

DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

Scale: 1:250 m

ROOFDECK FLOOR PLAN

1

A33 of 30

Scale: 1:250 m

SECTION THRU - A

1

Scale: 1:250 m

SECTION THRU - B

2

Scale: 1:100 m

SECTION THRU - E

4

Scale: 1:100 m

SECTION THRU - F

5

Scale: 1:250 m

GRND FLR REF CEILING PLAN

3

CERTIFIED BY:

PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

(ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUGARCHITECT I, PHYSICAL PLANT DIVISION

PRC No.:

PTR No.:

DATE ISSUED:

TIN No.:

PREPARED BY:

CHRISTIAN C. CAÑETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

SUKARNO D. TANGGOL, DPA

RECOMMENDING APPROVAL: APPROVED BY:

ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

SHEET No.:

DATE:

FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY

DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

A44 of 30

CEILING FRAME ISOMETRIC VIEW

DRY WALL FRAME ISOMETRIC VIEW

Scale: 1:30 m

CEILING FRAME DETAIL

4

Scale: 1:30 m

DRY WALL FRAME DETAIL

5

CERTIFIED BY:

PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

(ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUGARCHITECT I, PHYSICAL PLANT DIVISION

PRC No.:

PTR No.:

DATE ISSUED:

TIN No.:

PREPARED BY:

CHRISTIAN C. CAÑETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

SUKARNO D. TANGGOL, DPA

RECOMMENDING APPROVAL: APPROVED BY:

ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

SHEET No.:

DATE:

FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY

DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

Scale: 1:250 m

2ND FLR. REF. CEILING PLAN

1

Scale: 1:250 m

3RD FLR. REF. CEILING PLAN

2

Scale: 1:250 m

RF.DCK. FLR. REF. CEILING PLAN

3

A55 of 30

CERTIFIED BY:

PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

(ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUGARCHITECT I, PHYSICAL PLANT DIVISION

PRC No.:

PTR No.:

DATE ISSUED:

TIN No.:

PREPARED BY:

CHRISTIAN C. CAÑETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

SUKARNO D. TANGGOL, DPA

RECOMMENDING APPROVAL: APPROVED BY:

ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

SHEET No.:

DATE:

FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY

DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

Scale: 1:30 m

GLASS PARTITION DETAIL

1

Scale: 1:25 m

SCHEDULE OF WINDOWS

2

A66 of 30

Scale: 1:50 m

POLYCARBONATE ENCLOSURE DETAIL

2

AT 2ND FLR. SIDE STAIR PLAN AT 3RD FLR. SIDE STAIR PLAN AT RF DECK SIDE STAIR PLAN

LOBBY ENCLOSURE PLAN

FASCIA FRAMESECTION

CT-2SECTION

CT-1 SECTION

CT-1TOP VIEWCT-1 SECTION

Scale: 1:25 m

POLYCARBONATE CANOPY FRAME DET.

3

FASCIA FRAMEDET.

PLYCARBONATE CANOPY FRAMING PLAN

PLYCARBONATE CANOPY FRAMING SECTION

CERTIFIED BY:

PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

(ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

EMMANUEL M. LAGARE, Ph.D.ARCHT. DANN PAULO C. LAYUGARCHITECT I, PHYSICAL PLANT DIVISION

PRC No.:

PTR No.:

DATE ISSUED:

TIN No.:

PREPARED BY:

CHRISTIAN C. CAÑETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

SUKARNO D. TANGGOL, DPA

RECOMMENDING APPROVAL: APPROVED BY:

ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

SHEET No.:

DATE:

FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA ILIGAN CITY

DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

Scale: 1:25 m

POLYCARBONATE CANOPY FRAMING DET.

4

Scale: 1:25 m

SCHEDULE OF DOORS

1

A77 of 30