Yun YE Marija JANKOVIC Jean-Claude BOCQUET Ecole Centrale Paris A Framework for Performance Estimation to Support Early Negotiation in Complex System Design 1

A Framework for Performance Estimation to Support Early Negotiation in Complex System Design

  • Upload
    jun

  • View
    42

  • Download
    0

Embed Size (px)

DESCRIPTION

A Framework for Performance Estimation to Support Early Negotiation in Complex System Design. Yun YE Marija JANKOVIC Jean-Claude BOCQUET Ecole Centrale Paris. Index. Introduction Framework Definition of the early negotiation stage Main factors for early negotiation - PowerPoint PPT Presentation

Citation preview

Page 1: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Yun YE

Marija JANKOVIC

Jean-Claude BOCQUET

Ecole Centrale Paris

A Framework for Performance

Estimation to Support Early Negotiation

in Complex System Design

1

Page 2: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Index

Introduction

Framework

Definition of the early negotiation stage

Main factors for early negotiation

Estimation of specification satisfaction

Management of uncertainty

Future works

Conclusion

2

Page 3: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Introduction

3

Evaluating the compatibility among the design project, the buyer organization and the supplier organization

Estimating performances of possible architectures

Establishing system requirements in form of a contract

Early Negotiation

BuyerBusiness Engineer

Supplier

Page 4: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Definition of the Early Negotiation Stage

4

[1]

[1] Y.Ye, M. Jankovic and J. Bocquet, “Main Factor Identification for Early Negotiation in Complex System Design,“ Proceedings of the19th International Conference on Engineering Design (ICED13), draft submitted.

Page 5: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Main Factors for Early Negotiation

5

Buyer type

Buying situation

Product type

• Nature of supplier

• Nature of product

• Financial performance

• Supplier type

• Market type

• Nature of the product

• Market opportunity

• Project/company fit

• Societal factors

What to consider before signing the contract

- Supplier selection factors- Outsourcing decision factors

- Success factors for R&D projects - Success factors for new product development

[1]

[1] Y.Ye, M. Jankovic and J. Bocquet, “Main Factor Identification for Early Negotiation in Complex System Design,“ Proceedings of the19th International Conference on Engineering Design (ICED13), draft submitted.

Main factors

From the viewpoint of buyer

Contextual factors

Contextual factors

Decisional factors

Decisional factors

From the viewpoint of supplier

Page 6: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Main Factors for Early Negotiation

6

Contextual factors Decisional factors

Supplier type

Market type

Buyer type Product type

Buying situation

A B C D E F G H I J K L M N Supplier related

1-Flexibility*# 1 2-Research & Development*# 1 1 3-Technology & Equipment*# 1 1 1 1 1 4-Manufacturing capacity*# 1 1 1 1 1 5-Delivery efficiency*# 1 1 1 1 6-Service*# 1 1 1 1 1 7-Technology strategy tied to business strategy# 1 1 8-Training & experience of own people*# 1 1

Product related

9-Specification satisfaction*# 1 1 1 1 1 1 1 1 1 10-Product uniqueness*# 1 1 1 11-Unexpected attributes for customers*# 1 1 12-Possibility of patent# 1 13-Technological uncertainty*# 1 1 1 1 14-Production feasibility*# 1 1 1 15-Delivery time*# 1 1 1 16-Environmental impact*# 1 1 1 17-Production cost*# 1 1

Market related

18-Price for buyer*# 1 1 1 1 1 1 1 1 1 19-Market need*# 1 1 1 20-Market size*# 1 1 1 1 21-Competitiveness*# 1 1 1 1 1 22-Price for market*# 1 1 1 23-Payback period for supplier# 1 24-Return of investment for buyer* 1

A-Non-corporate B-Corporate C-Existing D-New E-Original Equipment Manufactures F-Users G-Dealers & Distributors H-Governmental organizations I-Institutions J-Fixed equipment K-Accessory equipment L-New task M-Modified rebuy N-Straight rebuy *-To be considered by buyer #-To be considered by supplier

[1]

[1] Y.Ye, M. Jankovic and J. Bocquet, “Main Factor Identification for Early Negotiation in Complex System Design,“ Proceedings of the19th International Conference on Engineering Design (ICED13), draft submitted.

Page 7: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Main Factors for Early Negotiation

7

[1]

[1] Y.Ye, M. Jankovic and J. Bocquet, “Main Factor Identification for Early Negotiation in Complex System Design,“ Proceedings of the19th International Conference on Engineering Design (ICED13), draft submitted.

Page 8: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Estimation of Specification Satisfaction

8

[2]

[2] Y.Ye, M. Jankovic and J. Bocquet, “A Framework for Architecture Generation & Performance Estimation to Support Early Negotiation in Complex System Design,“ 2013 ASME International Design Engineering Technical Conferences & The computer and Information in Engineering Conference (IDETC/CIE2013) , draft submitted.

Page 9: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Estimation of Specification Satisfaction

9

Step 1: Retrieval of previous knowledge on complex system design

[2]

[2] Y.Ye, M. Jankovic and J. Bocquet, “A Framework for Architecture Generation & Performance Estimation to Support Early Negotiation in Complex System Design,“ 2013 ASME International Design Engineering Technical Conferences & The computer and Information in Engineering Conference (IDETC/CIE2013) , draft submitted.

Page 10: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Estimation of Specification Satisfaction

10

Step 2: Integration & propagation of new specifications

[2]

[2] Y.Ye, M. Jankovic and J. Bocquet, “A Framework for Architecture Generation & Performance Estimation to Support Early Negotiation in Complex System Design,“ 2013 ASME International Design Engineering Technical Conferences & The computer and Information in Engineering Conference (IDETC/CIE2013) , draft submitted.

Page 11: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Estimation of Specification Satisfaction

11

Step 3: Estimation of specification satisfactionArchitecture Specification

Component Function1

2

3

[2][2] Y.Ye, M. Jankovic and J. Bocquet, “A Framework for Architecture Generation & Performance Estimation to Support Early Negotiation in Complex System Design,“ 2013 ASME International Design Engineering Technical Conferences & The computer and Information in Engineering Conference (IDETC/CIE2013) , draft submitted.

Page 12: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Estimation of Specification Satisfaction

12

[2]

[2] Y.Ye, M. Jankovic and J. Bocquet, “A Framework for Architecture Generation & Performance Estimation to Support Early Negotiation in Complex System Design,“ 2013 ASME International Design Engineering Technical Conferences & The computer and Information in Engineering Conference (IDETC/CIE2013) , draft submitted.

Page 13: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Management of Uncertainty

13

(Most probable value, Uncertainty) → (Most probable value, Interval)

Most probable value

Interval

[2]

[2] Y.Ye, M. Jankovic and J. Bocquet, “A Framework for Architecture Generation & Performance Estimation to Support Early Negotiation in Complex System Design,“ 2013 ASME International Design Engineering Technical Conferences & The computer and Information in Engineering Conference (IDETC/CIE2013) , draft submitted.

1 2 4 5

0.1 (1 1 )

2

m cl

c

Page 14: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Future Works

14

Estimation of specification satisfaction

Identification of main factors

Estimation of main factors

Finished

Doing

Case study

To be done

Architecture selection

Trade-offs of specifications

To be done

Page 15: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

Conclusion

15

Early Negotiation

Buyer Business Engineer

Supplier

Page 16: A Framework  for Performance Estimation to Support  Early Negotiation in Complex System Design

16

Thank you for your attention!