A  BRIEF  GUIDE  TO    

STRUCTURA  UK  LIMITED  

 

 

 

 

 

 

 

   

Page 2: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   2  

 

    Table  of  Contents  

 

1   INTRODUCTION...........................................................................................................................................................3  

2   SCHEDULE  OF  INSURANCES .......................................................................................................................................10  

3   KEY  PERSONNEL ........................................................................................................................................................11  

4   INDUSTRIAL  RELATIONS ............................................................................................................................................13  

5   ENVIRONMENTAL  POLICY .........................................................................................................................................14  

6   FINANCIAL  SUMMARY...............................................................................................................................................15  

7   SELECTED  CLIENTS  &  TESTIMONIALS .........................................................................................................................16  

8   APPENDIX  A  –  QUALITY  AND  HEALTH  AND  SAFETY  CERTIFICATES..............................................................................21  

   

Page 3: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   3  

1 INTRODUCTION  Structura  UK  supplies,  manufactures  and  installs  bespoke  curtainwalling,  Kalwall  products,  rainscreens,  atria   glazing   and   roofs,   windows   and   glazed   doors   using   a   choice   of   high-­‐performance   aluminium  systems.  We  provide  architects,  surveyors  and  facilities  managers  with  advice  and  project  management  for  refurbishments,  alterations,  remedial  improvements,  planned  maintenance  and  new-­‐builds.      In  August  2012,  Structura  UK  was  awarded  OHSAS  18001  Health  and  Safety  Management  and  ISO  14001  Environmental  Management  certification,  in  addition  to  the  ISO  9001  Quality  Management  certification  which  it  has  held  since  1995.  Achieving  these  stringent  certifications  made  Structura  UK  one  of  the  first  curtainwall   engineering   firms   to   actively   use   an   integrated   management   system   which   ensures  internationally-­‐recognised  best  practice   in   relation   to  quality  management,  health  and   safety  and   the  business’  impact  on  the  environment.    Structura  UK  works  for  organisations  including:    

• St  George  Plc  • CBRE  • Jones  Lang  LaSalle  • MACE  Group  • ISG  PLC  • British  Land    • Johnson  Controls  • Savills  • Great  Portland  Estates  • Galliford  Try  • Chorus  Group  • British  Airways  • Overbury  PLC  • King  Sturge  • IBM  • Jones  Lang  Lasalle  • Land  Securities  • Emcor    

 Why  choose  Structura  UK?    

• Our   staff   are   professionally   qualified,   fully   experienced   and   provide   a   complete   service   from  conception  to  completion  anywhere  in  the  UK.  

• We   operate   an   integrated   and   internationally-­‐recognised,   fully   integrated   quality   control  assurance   system   in   accordance   with   BS   EN   ISO   9001   (formally   BS5750   Part1;   OHSAS   18001  Health  and  Safety  Management  and  ISO  14001  Environmental  Management  certification    

• The  company  is  a  full  member  of  the  Centre  for  Window  and  Cladding  Technology  (CWCT),  and  the  Construction  Health  &  Safety  Group.  

• We  offer  comprehensive  design  and  building,  remedial/maintenance  services  for  curtainwalling,  structural   glazing,   atria   vertical   glazing   and   roofs,   windows,   glazed   doors,   high-­‐performance  aluminium  glazing  system,  entrances  and  associated  works.  

Page 4: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   4  

 

1.1 Recent  Projects  Please  see  our  web  site  for  details  and  images.  Curtainwalling   Friary  House,  Godalming  

    Pinnacle  House,  Wimbledon  

    Central  House,  Harrogate    

   Terminal  3,  Heathrow  Breakspear  Park  –  Hemel  Hempstead      

Structural  and  Architectural  Glazing   New  Scotland  Yard,  London    

    5  Stockley  Park,  Heathrow      

   

5  Triton  Square,  London    AXA  Basingstoke    Great  Ormond  Street  Hospital      

 Façade  Refurbishment   199  Bishopsgate,  London    

    Central  House  Harrogate  

    10  Fenchurch  St,  London    

    Braehead  Shopping  Centre,  Glasgow    

   

BT  Tower,  London  Unit  3,  Guildford  Business  Park    4  St  Dunstans  Hill  –  London      

Planned  Maintenance   National  Magazine  House,  London    

    10  Old  Jewry,  London    

    Solent  1000,  Fareham    

   Charter  School,  Dulwich  London  Heathrow  Terminal  3    

Window  Repairs   Castle  Court,  Putney  

    Curzon  Cinema,  London    

   Athenaeum  Hotel,  London      

Atria  and  Roof  Glazing   Lloyds  Chambers,  London    

  Evelina  Children's  Hospital,  London  

 The  National  Archives,  Kew    CBX  II,  Milton  Keynes  

 IBM  North  Harbour,  Cosham  Kings  Court  ,  Sheffield    

 

 

 

 

Page 5: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   5  

 

1.2 Products  &  Services  

Products  • Curtainwalling    • Kalwall  Translucent  Building  Systems  • Structural  Glazing    • Atria  vertical  glazing  and  roofs  • Windows  • Glazed  doors  • High-­‐performance  aluminium  glazing  systems  • Entrances.    

Services  • Refurbishment  • Repairs    • Remedial  works  • Refinishing  and  Glass  Polishing  • Leak  investigation  • Planned  maintenance  programmes  • Installation  by  our  own  highly  trained  engineers  • Project  management  • Estimating  • After-­‐sales  maintenance    • Independent  on-­‐site  water  testing.  

 

Structura  UK  has  been  recognised  by  the  following  companies  to  be  highly  competent  in  the  use  of  their  products:      Schuco         NSG  Pilkington  Reynaers   Guardian  Glass  Industries    Technal   Kalwall  Hueck   Comar  Geze    

Dorma      

In  June  2013  Structura  UK  took  over  the  Kalwall  distributorship  for  England,  Wales  and  Northern  Ireland  from  Stoakes  Systems.  As  part  of  the  arrangement,  key  Stoakes  personnel  have  transferred  to  Structura  UK.  

Kalwall   is   a   diffuse   light-­‐transmitting   construction   system   that   is   manufactured   in   the   US   by   Kalwall  Corporation.  The  primary  component   is  a   translucent   structural   composite   sandwich  panel   formed  by  permanently   bonding   fibreglass   sheets   to   a   grid   core   constructed   of   interlocked   thermally-­‐broken  aluminium  I-­‐beams.  

The  panels  are  factory  prefabricated  to  a  size  and  configuration  specified  for  each  project.  Structura  UK  managing  director  Manny  Patel  said:  “Adding  Kalwall  products  to  our  offering  means  that  we  can  give  architects,   specifiers   and   project   managers   wider   choice   of   ways   to   bring   light   into   commercial   and  leisure   buildings.   It   perfectly   complements   our   existing   range   of   structural   and   architectural   glazing  products  from  market-­‐-­‐-­‐leaders  such  as  Schuco,  NSG  Pilkington,  Reynaers  and  Hueck.”  

Page 6: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   6  

1.3 Estimating  Our  estimating  department  uses   the   latest  bespoke  estimating,  optimisation  and  calculation   software  packages.   From   the   information   derived   from   our   bespoke   software,   we   calculate   quotations   using  spreadsheets  that  include  comparable  data  from  similar  contracts  previously  completed  so  that  we  can  ensure  that  the  price  quoted  is  accurate  and  competitive.    We  constantly  analyse  past  performance  by  specific  types  of  contract  so  that  we  continue  to   improve  efficiency  and  competitive  edge.  We  use  an  accounts  package   that  allows  our  estimating  and   finance  departments  to  analyse  performance  against  budget.    This  level  of  information  enables  us  to  offer  clients  a  ‘partnering’  or  ‘framework’  agreement  approach,  with  rates  agreed  in  advance,  in  return  for  a  commitment  from  clients  for  future  work.    Tender   submissions   are   prepared   in   a   clear   and   concise   manner,   paying   great   attention   to   our  responsibilities  as  a  specialist  contractor.    

1.4 Health  and  Safety  As   a   specialist   glazing   contractor,   Health   and   safety   are   of   paramount   importance   for   every   project.  Health  and  safety  are  taken  into  consideration  from  the  earliest  planning  stages  of  a  project,  through  to  safety  on  site  and  the  requirements  for  compliance  with  current  Construction  Design  and  Management  (CDM)  Regulations.  We  ensure  that  all  of  our  staff  and  sub-­‐contractors  are  aware  of  the  project  Health  &  Safety  Plan,  including  all  relevant  Risk  Analysis  Management  Systems  (RAMS)  and  conform  to  these.      Structura  UK  is  a  member  of  Achilles,  the  Constructor’s  Health  &  Safety  Scheme  CHAS,  the  Construction  Health   &   Safety   Group   (CHSG)   and   holds   OHSAS   18001   Health   and   Safety   Management.   Please   see  Appendix  A  for  copies  of  current  membership  certifications.    HEALTH  &  SAFETY  POLICY  STATEMENT    

 We  are  committed  to  the  prevention  of  injury  and  ill  health  and  providing  a  safe  working  environment  for   our   employees   and   others   who   may   be   affected   by   our   activities.   Compliance   with   legislation  including   the   Health   and   Safety   at  Work   Act   1974   is   the   minimum   acceptable   standard   and   we   are  committed   to   achieving   the   highest   levels   of   health   and   safety   performance   through   continual  improvement.    Health  and  safety   is  an   integral  part  of  our  business  and  has  equal  status  to  other  aspects  of  business  performance.  Appropriate  financial  and  physical  resources  will  therefore  be  provided  to  implement  this  policy.    We  recognise  that  successful  health  and  safety  management  can  only  be  achieved  with  the  support  and  commitment  of  our  employees.  All  employees  will  be  actively  encouraged  to  take  ownership  of  Health  and   Safety   and  empowered   to   assist   in   decision-­‐making.  All   employees   and   contractors  will   be  made  aware   of   their   Health   and   Safety   obligations   and   compliance   with   this   policy   is   a   condition   of  employment.    We  will  ensure   that   this  policy   is  documented,   implemented  and  maintained,  and  communicated  and  understood  at  all  levels  throughout  the  organisation.    

Page 7: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   7  

Responsibilities  for  health  and  safety  are  defined  in  our  Health  and  Safety  Management  System  which  conforms  to  the  requirements  of  OHSAS  18001.  The  day-­‐to-­‐day  management  of  health  and  safety   is  a  responsibility  of  managers  at  all  levels  but  overall  responsibility  rests  with  the  Managing  Director.    To  assist  with  the  implementation  of  our  Health  and  Safety  Management  system,  professional  external  advice  will  also  be  obtained  where  necessary.    To  facilitate  continuous  improvements  in  health  and  safety  standards  we  will  identify  specific  health  and  safety  objectives.  A  programme  for  the  objectives  will  be  outlined  with  timescales  and  responsibilities.  Progress  towards  the  objectives  will  be  closely  monitored.    Periodic   auditing   of   our   Health   and   Safety   Management   System   will   be   undertaken   to   ensure   its  continued  suitability  and  effectiveness  and  we  will   review  this  policy  at   least  annually  and  revise   it  as  often  as  is  appropriate.  This  policy  will  be  made  available  upon  request  to  all  interested  parties.  

1.5 Contract  Management  Our  contract  management  team  controls  all  Structura  UK  contracts.  Projects  are  planned  in  detail  and  we  continually  monitor  progress  to  ensure  that  the  right  number  of  staff  with  the  right  skills  are  on  site  as   the  project  demands.  The  contract   team  also  ensures   that   the  site   is   supplied  with  quality-­‐assured  materials   to   enable   them   to   work   quickly   and   efficiently   with   the   minimum   number   of   unexpected  complications.  Weekly  contract  meetings,  led  by  the  Contracts  Director,  mean  that  we  can  identify  any  potential   problems   and   rectify   them   early   on   to   enable   site   teams   to   complete   jobs   to   the   highest  standard  on  time  and  on  budget.    

1.6 Quality  Management  Structura  UK  is  one  of  few  owner-­‐operated  curtainwalling  and  cladding  specialist  companies  with  triple  certification.  We   have   held   BS   EN   ISO   9001   accreditation   since   1995   and   in   2012  we  were   awarded  OHSAS  18001  Health  and  Safety  Management  and  ISO  14001  Environmental  Management  certification.        We  ensure  skilled,  trained  staff  are  always  available  by  pursuing  a  rigorous  training  structure  at  all  levels  throughout   the   company.   We   maintain   regular   management   reviews   to   ensure   continuous  improvement  in  all  our  procedures  and  services.  Our  suppliers  are  required  to  conform  to  all  aspects  of  Structura  UK’s  quality  system  and  are  vendor-­‐rated  to  ensure  our  approved  suppliers  base  is  accurately  maintained.    Structura   UK’s   Quality   Assurance   scheme   is   designed   to   ensure   the   preparation   and   effective  implementation   of   appropriate   procedures   and   instructions   to   achieve   the   required   specification   of  design,  product  and  service.    The   company’s   mission   is   to   provide   a   comprehensive   personal   service   comprising   consultancy,   site  survey  and  design,  manufacture  and   installation,  commissioning  and  acceptance   to   the  satisfaction  of  the  client.    The  directors  are  jointly  responsible  for  ensuring  that  the  provisions  of  the  company  quality  system  are  understood,   implemented   and   observed   throughout   the   company.   Authority   for   all   organisational  aspects  of  quality  is  the  responsibility  of  the  Quality  Manager  and  is  independent  of  other  job  functions.              

Page 8: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   8  

QUALITY  POLICY  STATEMENT    The  Quality  Policy  is:  

• Issued  to  and  understood  by  all  staff.  • Displayed  in  a  prominent  position  at  each  premises.  • Issued  and  explained  to  all  new  employees.  • Made  available   to  anyone  who  has  an   interest   in   the  product  quality  or  service  offered  by  the  

company.    It   is   Structura   UK’s   policy   to   observe   a   quality   assurance   system   compliant   with   BS   EN   ISO   9001  comprising  formal  procedures  which  are  constantly  maintained  to  meet  customers’  needs.    Quality  depends  on  taking  steps  to  avoid  potential  deficiencies,  the  prompt  detection  of  adverse  trends  and  conditions  and  the  swift  implementation  of  corrective  action.    External  suppliers  are  covered  by  the  company’s  Quality  Assurance  System.  

1.7 Design  The  company’s  design  facilities  mean  we  can  offer  in-­‐house  and  approved  supplier  sub-­‐contract  services  in  both  structural  engineering  and  design  draughting,  with  structural  design  concept  analysis  and  precise  detail   design   drawings   of   the   highest   standard.     We   use   current   Auto   Cad   computer   aided   design  equipment  and  software  including  the  latest  Autodesk  Inventor  3D  package.  All  our  structural  engineers  are  professionally  recognised  in  their  fields  by  Institutional  membership  or  fellowship.  

1.8 Training  Structura  UK   is  a   full  member  of   the  Curtain  Walling  &  Construction  Training  group   (CWCT),  based  at  Bath  University  and  plays  an  active  part  in  the  setting  of  standards  in  our  industry.    Structura  UK  places  great  importance  on  the  training  of  staff  at  all  levels.    We  regularly  review  the  skills  we  need  to  deliver  a  first   class   service   and  we   have   an   ongoing   training   programme   to   ensure   our   staff   are   able   to  meet  customer’s  requirements.  Over  95%  of  our  site  engineers  have  been  accredited  with  Construction  Skills  Certificate  Scheme  (CSCS)  cards  and  all  outside  staff  are  committed  to  future  NVQs.  We  have  developed  our  own   training   logs   to  provide  a   structure   for   the  career  progression  of  our   staff  and   to  encourage  them  to  constantly  improve  and  develop  their  skills.    

Page 9: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   9  

 

2.   GENERAL  INFORMATION    

Offices:   Structura  UK  Limited    Headquarters    

Structura  UK  Limited    Sales  and  Estimating  Office  

  Unit  1  Oakcroft  Road  Chessington  Surrey  KT9  1RH  Tel:  020  8397  4361  Fax:  020  8391  5805    

6  The  Glenmore  Centre  Moat  Way  Sevington  Ashford  Kent  TN24  0TL  Tel:  01233  501  504  Fax:  01233  503  372    

  Email:  [email protected]     www.structura-­‐uk.com      Company  Principals:   Manish  Patel   MD  &  Company  Secretary     Robert  Sanders   Finance/  IT  Director     David  Rickman     Contracts/  H&S  Director     Paul  Mackett   Sales  /  Estimating  Director     Mike  Ford   Design  /  Quality  Manager    Company  Registration  No:   2499497  VAT  Registration  No:   564012274  

 Company  Bank:   Lloyds  Bank  Plc.  

Third    Floor  39  Threadneedle  Street  London  EC2R  8AU    

Date  of  last  accounts  filed   November  2013  Date  Operations  Commenced:   1984  Date  of  Incorporation  (Structura  UK  Limited):   1990    

 

Page 10: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   10  

 

2 SCHEDULE  OF  INSURANCES  This   register   is   intended  only   to  provide  a   summary  of  our   insurance  cover.  General  policy  conditions  and  full  details  will  be  provided  on  acceptance  of  our  quotation.  The  insurance  cover  provided  has  been  extended  to  include  full  cover  for  damage  caused  by  Acts  of  Terrorism  in  respect  of  contract  work.  We  hereby  confirm  that  all  the  insurance  policies  shown  are  current  and  that  all  required  premiums  are  paid  in  full  to  date.  Combined  Liabilities  Insurance  Company:   Aviva  Policy  No:   100555571CSI  Period  of  Insurance:   1st  June  2017  to  31st  May  2018  Employers’  Liability:   £10,000,000  any  one  occurrence.  Public  Liability:   £20,000,000  any  one  occurrence.  Products  Liability:   £20,000,000  any  one  occurrence  and  in  the  aggregate.  Excess:   £250  Third  Party  Property  Damage  each  and  every  claim.    It  is  noted  that  in  respect  of  the  Public  and  Products  liability  Avia  carry  £1M  and  then  AIG  £9M  with  Ace  carrying  the  final  £10M    Contract  Works  Insurance  Company:   Aviva  Policy  No:   100555571CSI  Period  of  Insurance:   1st  June  2017  to  31st  May  2018  Maximum  Contract  Value:   £3,300,000  Hired  in  Plant:   £975,000  (limit  any  one  item)  Excess:   £350  each  and  every  claim.    Professional  Indemnity:  Insurance  Company:   Navigators  Policy  No:   Epic  50548A/ProfLiab/19013109  Period  of  Insurance:   1st  June  2017  to  31st  May  2018  Limit  of  Indemnity:   £5,000,000  any  one  claim.  Excess:   £10,000  each  and  every  claim.      

 

Signed:  

 

Manish  Patel        Company  Secretary  

                     

Page 11: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   11  

 

3 KEY  PERSONNEL  Manny  Patel   MD  &  Company  Secretary  

Co-­‐founded  Structura  UK  in  1984  and  led  its  incorporation  to  Structura  UK  Limited  in  1990.  

Robert  Sanders   Finance  /  IT  Director  Co-­‐founded  Structura  UK  in  1984  and  led  its  incorporation  to  Structura  UK  Limited  in  1990.  

David  Rickman     Contracts  and  Health  &  Safety  Director  Director  of  Structura  with  responsibility  for  the  company’s  Health  and  Safety  and  training.  

Paul  Mackett   Sales  &  Estimating  Director  Based  in  our  Ashford  Office,  Paul  is  responsible  for  the  estimating  department  and  generation  of  leads.  

Mike  Ford   Design  &  Quality  and  Drawing  Office  Manager,  responsible  for  overseeing  the  company’s  integrated  management  systems      

Contracts  Management    Mark  Restall   Senior  Contracts  Manager  Joy  Patel   Contracts  Manager  David  Beal   Small  Works  Division  Manager  Liam  Murtagh   Contracts  Manager  Michael  Woodcock     Contracts  Manager  Leroy  Graham   Contracts  Manager  Kathryn  Saunders   Contracts  Secretary  John  Walsh   Managing  Surveyor  Design  Team    Tony  Duffy   Designer  Jerome  Allen   Designer  Francois  Arnaud   Designer  Cesar  Cortes  Aguilea   Designer  Mohanan  Ramani  Miroslaw  Hyczko  Gary  Evans  

Designer  Designer  Designer  

Anthony  Hill   Structural  Engineer  Product  Team    David  Sanders   Factory  Manager  Angela  Johnson   Buyer  Estimating  Team    Simon  Keam   Senior  Estimator  Keith  Miles  Lauren  Thear  

Estimator  Estimator  

Ritchie  Andrews   Trainee  Estimator  Administration  team    Susan  Gleeson   Office  &  Accounts  Manager  Hemi  Ladwa   Credit  Controller  Lynn  Loosely   Office  Assistant  Joanne  Radley   Office  Assistant,  Estimating  Ciara  Denieffe   Accounts  Administrator  Ann  Wylie   Accounts  Administrator  Kalwall    Mark  Taylor  Dario  Paixao  

Kalwall  Business  Development    Kalwall  Business  Development    

Nick  Westwood  Steve  Maguire  Bob  Nickolson  

Kalwall  Product  Manager  Kalwall  Contracts  Manager  Kalwall  Procurement  Manager  

Page 12: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   12  

Daniel  Rickman   Kalwall  General  Manager  Refinishing  Brian  Angus  

 Refinishing  General  Manager  

Marius  Kunigonis   Refinishing  Contracts  Manager  

Page 13: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   13  

4 INDUSTRIAL  RELATIONS      Structura   UK   is   committed   to   protecting   the  welfare   of   its   employees   and  maintains   good   industrial  relations.      Structura  UK’s   aim   is   always   to   successfully   complete   the   contract.  Within   the   contract  management  organisation,  industrial  relations  will  receive  an  equal  level  of  importance  as  other  key  functions.    Good  industrial  relations  rely  upon  effective  communication,  both  on  an  informal  and  formal  basis.  It  is  the   responsibility   of   the  management   to   ensure   adequate   procedures   are   implemented   to   maintain  meaningful  dialogue.    The  day  to  day  relations  are  the  responsibility  of  the  project  manager  for  each  contract  who  has,  and  is  seen   to   have,   a   keen   interest   in   ensuring   that   justifiable   grievances   are   resolved   quickly   and   to   the  satisfaction  of  all  concerned.    Structura  UK  ensures  that  employees  are  made  aware  (via  personal  contact  with  their  supervisors,  staff  appraisals,  newsletter,  meetings,  notice  boards  etc.)  of  matters  not  only  relating  to  industrial  relations  but  also  other  aspects  of  the  contract  to  enable  employees  to  share  in  the  commitment  to  a  successful  project.    Structura  UK  ensures  that  employees  are  aware  of  their  responsibilities  within  the  site  organisation  and  that  each  manager  is  fully  trained  with  responsibilities  and  authority  clearly  defined.    Structura   UK   ensures   adequate   working   conditions   for   all   employees.   All   safety,   health   and   welfare  conditions  comply  with  statutory  requirements.    Where  Trade  Unions  are  recognised  for  negotiating  purposes,  Structura  UK  ensures:  

• Effective   arrangements   for   consultation,   communication,   negotiation   and   the   settling   of  grievances  and  disputes.  

• Managers  observe  agreements  and  agree  procedures.    Structura  UK  has  no  objection  to  its  employees  being  members  of  a  recognised  Trade  Union.      

Page 14: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   14  

 

5 ENVIRONMENTAL  POLICY      

 The  management  and  all  who  work  at  Structura  UK  are  committed  to  the  protection  of  the  environment  and  the  prevention  of  pollution.  

 

The  organisation  is  further  committed  to  ensuring  that  all  its  activities  are  carried  out  in  compliance  with  the  relevant  environmental  legislation  and  non-­‐legal  compliance  obligations.  

 

The   organisation   seeks   to   minimise   waste   arising,   promote   recycling,   reduce   energy   consumption,  reduce   harmful   emissions   and,   where   possible,   to   work   with   suppliers   who   themselves   have   sound  environmental  policies.  

 

An   essential   feature   of   the   environmental   management   system   is   a   commitment   to   continual  improvement   of   environmental   performance.   This   is   achieved   by   setting   annual   environmental  improvement  objectives  and   targets  which  are   regularly  monitored  and   reviewed.  The  objectives  and  targets  are  publicised  throughout  the  organisation  and  all  staff  are  committed  to  their  achievement.  

 

In  order  to  ensure  the  achievement  of  the  above  commitments,  the  organisation  has   implemented  an  environmental  management   system  which   satisfies   the   requirements   of   ISO   14001:2015   and  we   are  committed  to  its  continual  improvement.  

 

This  Policy  and  the  obligations  and  responsibilities  required  by  the  environmental  management  system  will  be  communicated  to  all  employees  and  contractors  working  on  behalf  of  the  organisation.    

 

This  Policy  is  available  to  the  public  on  request  and  will  be  reviewed  periodically  to  ensure  its  continuing  suitability.  

Signed:                

Manish  Patel        Company  Secretary  

Feb  2017  

Page 15: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   15  

 

6 FINANCIAL  SUMMARY    

  Turnover  (£K)   Profit  before  Tax  (£K)   Gross  Profit  (£K)  2017   13,893   907   4,013  2016   10,656   1,345   4,458  2015   8,010   259   2,764  2014   6,224   -­‐396   1,689  2013   6,770   -­‐78   1,808  2012   7,445   282   2,422  2011   7,954   925   3,024  2010   7,186   668   2,605  2009   10,621   1,319   3,309  2008   10,200   2,192   4,182  2007   7,580   1,206   2,962  2006   4,647   91   1,659  2005   4,536   92   1,556  

 

 

 

Page 16: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   16  

 

7 SELECTED  CLIENTS  &  TESTIMONIALS    

7.1 List  of  Clients  Below  is  a  list  of  selected  clients  that  Structura  UK  has  had  the  pleasure  of  working  for:    

8  Build  Limited   Glaxo     Northcroft  

Abbey  National  PLC   GMW  Architects   OPL  Group  

AECOM  /  Davis  Langdon   Goldman  Sachs   Oracle    

Alan  Nash  Associates     Great  Portland  Estates   ORMS  

Allies  and  Morrison  Architects   GVA  Grimley   Osborne  Construction  

AON  Ltd   Hamilton  Associates   Ove  Arup  and  Partners  

Atis  Real  Weatheralls   Hammonds  Consulting   Overbury  PLC    

Atkins  Global   HBG     Parkeray  Ltd  

Aukett  Europe   Hillier  Parker   Procter  and  Gamble    

Aviva   HMCS     Prudential  Portfolio  

AXA     Hyatt  Regency  Hotels   Quantem  Consulting  

B  D  P  Partnership   IBM     Rank  Xerox  

B  P  PLC   Interserve     Regus  

BAA  PLC   ISG  PLC   Richard  Rogers  Partnership    

Balfour  Beatty   John  Cobb  &  Partners     RWE  NPower    

BAM  Construction   John  Pelling  and  Partners   SAGA    

Barr  Gazetas   Jones  Lang  Lasalle     Samsung    

Berkeley  Group   JRA  Architects   Savills    

Bickerdike  Allen  and  Partners   Kier  Construction   SBT  Architects  

Blackburn  LLP   King  Sturge   Scottish  Provident  

Blackstone  LLP   Laing  Orouke   Serco    

Bovis  Land  Lease   Land  Securities   Shepherd  Construction  Ltd  

British  Gas  PLC   Land  Securities   Sheppard  Robson  Architects  

British  Land  PLC   LDDC   Sir  Norman  Foster  &  Ptnrs  

British  Steel  Pensions  Fund   Leslie  Clark   Sir  Robert  McAlpine    

Broadgate  Estates  PLC   Leslie  Jones  Architects   Slaughter  and  May  

Broadway  Malyan   Longcross  PLC   St  George  PLC  

Buro  Happold   M3  Consulting   Standard  Life  

Capital  Shopping  Centres   Mace  Group     Structuretone  Limited    

Carillion     Maggie’s  Centre     Strutt  and  Parker  

CBRE     Mansell  Construction   Sun  Alliance  PLC  

CCS  Consultancy   Marks  and  Spencer   T  P  Bennett  

Chapman  Taylor  and  Partners   McLaren  Construction   Telereal    Trillium  

Chorus  Group   MEPC     TFT  Consultants  

Civil  Aviation  Authority   Merrill  Lynch   Thames  Water  

Page 17: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   17  

Cladtech  Associates     Michael  Aukett  Architects   The  Crown  Estate  

COMO  Group   Michael  Hopkins  Architects   TTSP  Architects  

Costain  Construction   Mitie  PLC   Turner  &  Townsend  

Crown  Prosecution  Service     MJ  Consulting   Unilever  PLC  

Cushman  Wakefield   Modus  Group   University  of  Westminster    

AECM  Davis  Langdon     Montresor  Partnership      

Direct  Line  Insurance     Morgan  Lovell  PLC     Vinci  Construction  

DTZ     MPM  Capita   Virgin  PLC  

EC  Harris   National  Archives   W  S  P  Consulting  

EPR  Architects   Nationwide  Building  Society     Warings  

Ericsson  Limited   NEC  Electronics  Limited   Wates  Group  

ETDE   NET  Consultancy   Wintech  

Fitzroy  Robinson   NHS  Trust   Workman  LLP  

Frederick  Gibberd  and  Partners  Nicholas  Grimshaw  and  

Partners  Zurich  Insurance  

Gerald  Eve      

Page 18: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

 

7.2 Selected  Testimonials    

National  Archives,  Kew        

“Structura  UK  was  retained  as  a  specialist  contractor  by  ETDE  FM  to  carry  out  a  complex  re-­‐glazing  and   refurbishment   contract   at   The   National   Archives.   The   building   was   in   full   occupation  throughout   the   works   and   it   was   critical   that   the   daily   operations   of   the   building   remained  unimpeded.   Structura   UK’s   professional   approach   to   all   aspects   of   the   project   ensured   that   the  works   where   carried   out   on   time   and   on   budget.   They   were   responsible   for   all   aspects   of   the  project,   including   the   scaffolding   and   temporary   works   elements,   replacement   of   2,100m²   of  existing  double  glazed  units  and  the  refurbishment  of   the  existing  glazing  system,  replacement  of  the  existing  smoke  vent  and  associated  electrical  works.  Over  40,000  man  hours  were  expended  on  the  project  during  the  12-­‐month  on-­‐site  period  without  any  major  incidents  or  accidents.  We  would  not  hesitate  to  use  Structura  UK  again.”  

 Shahram  Safari,  Senior  Project  Manager,  ETDE  FM  

Evelina  Hospital,  St.  Thomas’  &  Guys  Hospital  Trust,  London        

“We   selected   Structura  UK   to   complete   the   glazing   replacement   at   Evelina  Children’s  Hospital   as  they  offered  an   innovative   solution   to  what  was  an  extremely   challenging  project   in   the  heart  of  London.  

This  was  an  award  winning,  extremely  busy  Children’s  Hospital,  the  scale  and  risk  involved  were  not  to   be   underestimated.    Structura   UK’s   approach   was   best   described   as   ‘outstanding,’   completed  safely,  on  time,  and  to  budget.  Structura  will  be  our  first  choice  selection  for  future  projects.”    

Sean  Quinn,  Contracts  Director,  MJ  Gleeson  

Central  House,  Harrogate          

"Structura   was   principal   contractor   for   the   refurbishment   and   re-­‐modelling   of   the   curtain   wall  installation  at  Central  House,  Harrogate,   a  200,000sf  multi   let  office  building  on   three   floors   that  was  originally  built  in  1979  as  head  office  for  the  CEGB.  The  works  were  undertaken  over  a  40  week  period  whilst  the  building  remained  in  full  occupation  throughout.  We  were  very  pleased  with  the  way  the  project  ran  and  Structura  ensured  that  those  using  the  building  had  appropriate  temporary  access  during  the  project.  I  would  not  hesitate  to  recommend  Structura  to  manage  and  deliver  this  type  of  project."  

Steve  Throp,  Building  Consultancy  Director,  Savills  

Athanaeum  Hotel,  London  

“I  worked  with  Structura  UK  as  the  principal  contractor  for  the  refurbishment  and  re-­‐modelling  of  the   new   windows,   doors   and   balustrading   on   the   Athenaeum   Hotel,   Piccadilly.   The   works   were  undertaken  over  a  26  week  period  and  required  careful  and  concurrent  working  with  the   internal  refurbishment   contractor.   It   was   difficult   at   times,   particularly   at   the   start,   though   without   the  pragmatism,   proactive   and   personal   approach   of   David   Rickman   and  Manny   Patel   it   could   have  been  far  more  challenging.  The  final  product  is  something  to  be  proud  of  and  I  would  not  hesitate  to  recommend  Structura  to  manage  and  deliver  this  type  of  project."      

Chris  Twigg,  Hammonds  Consulting  

Page 19: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   19  

9.   News  

 

 

 

 

 

15th  August  2012  

 

Structura  UK  demonstrates  commitment  to  safety,  quality  and  reducing  its  impact  on  the  environment  with  triple  ISO  certifications  

Structura  UK  has  become  one  of   the   first   curtain  wall  engineering   firms   to  achieve   three  key   ISO  standards.  The  company  has  this  week  been  awarded  OHSAS  18001  Health  and  Safety  Management  and   ISO   14001   Environmental   Management   certification,   in   addition   to   the   ISO   9001   Quality  Management   certification   which   it   has   held   since   1995.   Achieving   these   stringent   certifications  makes   Structura   UK   one   of   the   first   curtainwall   engineering   firms   to   actively   use   an   integrated  management   system  which   ensures   internationally-­‐recognised   best   practice   in   relation   to   quality  management,  health  and  safety  and  the  business’  impact  on  the  environment.      As  Structura  UK  MD  Manny  Patel  explained,  “As  a  leader  in  the  field  of  glass  curtain  walling  and  rain  shields,   we   felt   it   was   important   to   demonstrate   to   our   staff   and   our   customers   how   important  quality,   safety   and   our   impact   on   the   environment   are   to   us.  When   you   are   working  with   large  panels  of  glass,  often  hundreds  of  feet  in  the  air,  these  factors  are  critical  and  it  is  important  for  us  to  have  clear  risk  assessments  and  safety  procedures  to  internationally-­‐recognised  standards.”    The   triple   standard   is   designed   to   enable   organisations   with   complex   or   high-­‐risk   processes  undertaken  at  different  sites   to  use  a   framework  that  minimises  risk  and   improves  standards  and  performance,  whilst  making  a  minimal  impact  on  the  environment.    Finance  Director,  Robert  Sanders,  continued,  “Historically,  there  have  been  multiple  standards  used  to  assess  occupational  health  &  safety  in  particular,  and  organisations  had  to  choose  the  standard  which  was  the  best  fit  for  their  business.  The  new  OHSAS  18001  gives  organizations  like  ours  which  are  committed  to  minimising  risk  and  optimising  efficiency  a  clear  set  of  standards  to  work  to,  so  our  customers  can  clearly  see  the  operational  and  financial  benefits  of  using  a  contractor  with  this  level  of  accreditation  across  the  board”.  -­‐  -­‐  Ends  -­‐  -­‐                

NEWS

RELEASE  

Page 20: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   20  

June  2013  

Structura   UK   taken   over   the   Kalwall   distributorship   for   England,   Wales   and  Northern  Ireland  from  Stoakes  Systems.  

 As   part   of   the   arrangement,   key   Stoakes   personnel   have   transferred   to  Structura  UK.  Kalwall  is  a  diffuse  light-­‐transmitting  construction  system  that  is  manufactured   in  the  US  by  Kalwall  Corporation.  The  primary  component   is  a  translucent   structural   composite   sandwich   panel   formed   by   permanently  bonding  fibreglass  sheets  to  a  grid  core  constructed  of  interlocked  thermally-­‐broken  aluminium  I-­‐beams.  The  panels  are  factory  prefabricated  to  a  size  and  configuration   specified   for   each   project.   Structura   UK   managing   director  Manny  Patel  said:  “Adding  Kalwall  products  to  our  offering  means  that  we  can  give  architects,  specifiers  and  project  managers  wider  choice  of  ways  to  bring  light   into   commercial   and   leisure   buildings.   It   perfectly   complements   our  existing   range  of   structural   and  architectural   glazing  products   from  market-­‐-­‐-­‐leaders  such  as  Schuco,  NSG  Pilkington,  Reynaers  and  Hueck.  

“We   have  worked  with   Stoakes   Systems   for  many   years   and   are   fully   committed   to   offering   the  same  level  of  professional  service”  

-­‐  -­‐  Ends  -­‐  -­‐    

 Media  Enquiries:  Emma  Tarring,  The  Marketing  Matrix:  07957  439080  [email protected]    

Page 21: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   21  

APPENDIX  A  –  QUALITY  AND  HEALTH  AND  SAFETY  CERTIFICATES  

 

Page 22: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   22  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 23: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   23  

Page 24: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   24  

 

 

Page 25: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   25  

 

 

 

 

 

 

 

 

 

 

Page 26: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   26  

 

 

 

 

Page 27: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   27  

 

 

Page 28: A Brief Guide to Structura - Jan 2018structura-uk.com/wp-content/uploads/2018/03/A-Brief-Guide-to-Structura... · StructuraUKUpdated’8Jan’2018’ 3! 1 INTRODUCTION! StructuraUK’supplies,’manufactures’and’installs’bespoke’curtainwalling,’Kalwall’products

 

Structura  UK    Updated  8  Jan  2018   28  

APPENDIX  B  –  IMAGES  OF  RECENTLY  COMPLETED  PROJECTS  

 

Evelina  Children’s  Hospital  

The  National  Archives,  Kew  

Lloyds  Chambers,  London  

IBM  Northarbour,  Cosham  

New  Scotland  Yard    

10  Fenchurch  Street  

Friary  House,  Goldaming  

Athanaeum  Hotel