1
original by the property of and AStudio Architecture. notified immediately of any discrepancy. This drawing is copyright and remains commencing any work or producing shop drawings. The originator should be from this drawing. All dimensions must be checked and verified on site before This drawing is to be read in conjunction with all related drawings. Do not scale ap by date dr by rev description Disclaimer Client Project Drawing Project number Drawing number Issue status Scale ORIGINATOR CODE 1 CODE 2 CODE 3 REV Elizabeth House - Tower Building - 10th Floor - 11 York Road - London SE1 7NX - UK 16003 MORGAN SINDALL NEWHALL PRIMARY SCHOOL AND EARLY YEARS CENTRE K10 IWS-06B K10 IWS-06B K10 IWS-01 K10 IWS-06 K10 IWS-01 IWS-01 K10 K10 IWS-02 K10 IWS-01 IWS-02 K10 IWS-01 K10 IWS-01 K10 K10 IWS-01 K10 IWS-02 K10 IWS-02 K10 IWS-05 K10 IWS-06 IWS-01 K10 K10 IWS-05 K10 IWS-02 K10 IWS-03 K10 IWS-05 K10 IWS-03 IWS-01 K10 IWS-01 K10 IWS-03 K10 K10 IWS-03 K10 IWS-03 K10 IWS-06B K10 IWS-06B K10 IWS-01A IWS-01A K10 K10 IWS-03A IWS-03A K10 K10 IWS-02A K10 IWS-01A IWS-01A K10 ID.00.060 ID.00.063 ID.00.064 ID.00.065 ID.00.071 ID.00.072 ID.00.073 ID.00.074 ID.00.068 ID.00.062 ID.00.061 ID.00.059 ID.00.070 K10 IWS-10 K10 IWS-08 IWS-08 K10 IWS-08 K10 K10 IWS-08 K10 IWS-09 K10 IWS-08 K10 IWS-08 K10 IWS-04 2410 2325 2340 2395 1375 300 EXTERNAL WALL BUILD UP (Refer to Specification) EXTERNAL WALL BUILD UP (Refer to Specification) EXTERNAL WALL BUILD UP (Refer to Specification) EXTERNAL WALL BUILD UP (Refer to Specification) 705 ID.00.067 ID.00.069 DRG 01.1 DRG 01.1 DRG 01.1 DRG 12.1 DRG 01.1 DRG 01.1 DRG 12.1 DRG 03 DRG 03 DRG 01.1 DRG 01.1 DRG 03 DRG 03 DRG 13.2 DRG 04.1 755 600 755 K10 IWS-02 2 6 8 5 1 7 9 0 2665 110 2670 2020 875 2315 1425 3890 1560 2415 70 2000 4610 2675 2205 140 50 445 695 1685 365 695 1685 230 1210 675 1675 1420 460 900 1495 315 1530 1420 920 1740 5190 110 2395 275 140 110 EXTERNAL WALL BUILD UP (Refer to Specification) 2475 1150 2 8 5 390 265 265 265 265 135 6130 290 290 290 250 290 250 290 590 4190 85 1765 2175 20 1540 2150 2365 285 1175 1395 1590 3130 265 1105 590 1110 200 01 6100 01 6100 01 6100 09 6101 06 6101 825 8 25 70 820 8 05 95 K10 IWS-01 Riser 00-76 0.5 Sq. m GEA 374.8 Sq. m GIA 344.3 Sq. m Riser 00-77 0.5 Sq. m CReception Admin Off 00-62 10 Sq. m Reception Drop in 00-61 15 Sq. m Staff meeting 00-63 15 Sq. m General Store 00-69 8 Sq. m Plant 00-57 9 Sq. m Electrical Plant 00-58 9 Sq. m Servery 00-59 18 Sq. m Cleaners St Laundry 00-65 9 Sq. m Play Space 3-4YR 00-70 55 Sq. m Play Space 2-3YR 00-71 50 Sq. m Play Space 0-2YR 00-75 42 Sq. m Milk Prep 00-73 6 Sq. m Baby Change 00-72 6 Sq. m Staff WC 00-68 3 Sq. m Circulation 00-78 38 Sq. m Accessible WC 00-64 7 Sq. m Secure Buggy Store 00-60 7 Sq. m WC 00-66 7 Sq. m WC 00-67 7 Sq. m Baby Change 00-74 6 Sq. m FFL LEVEL 00 EL. 69.50m FFL LEVEL 00 EL. 69.50m HATCH ACCESS RL RL RWDP RWDP RWDP Tap Recessed fountain water Drinking BIN STORE FFL LEVEL 00 EL. 69.50m FFL LEVEL 00 EL. 69.50m HATCH ACCESS RL RL RWDP RWDP RWDP Tap Recessed fountain water Drinking A B C D E 2 1 3 4 1545 8140 8450 3135 5435 2395 6380 7040 01 6100 01 6100 06 6101 01 6100 09 6101 09 6101 02 5350 - 5314 - 5314 - 5314 - 5314 DISCLAIMER: 1. This drawing is copyright and remains the property of AStudio Ltd. 2. This drawing is protected by copyright and is for use on Newhall Primary School and Early Years site only. 3. Do not scale from this drawing. 4. This drawing is to be read in conjunction with all related drawings & specifications. 5. The originator should be notified immediately of any discrepancy. SURVEYS: Please note that this drawing is based on: + survey drawings: NHL-SUR-LOD3.dwg and will need to be updated with the correct surveys drawings, as soon as these will be available. This drawing is to be read in conjunction with drawings, information & specifications of specialist constultants, including: M&E+Structural+Landscape+Fire+Acoustic. This drawing is to be read in conjunction with the risk register produced for inclusion in the health and safety plan. The hazards noted are in addition to the normal hazards and risks faced by a competent contractor when dealing with the type of works detailed on this drawing. Fire rating as per fire strategy. Acoustic rating as per acoustic report. External levels refer to Struct. Eng + Landscape Arch. Layout A- NH- X- PL - 00 - GA- 1201 drg 1203 drg 1202 drg 1201 F Stage 5 - Construction 09.06.2017 MJ AK CK 09.01.2017 CK AK E CP Issue 21.04.2017 MJ AK D Stage 4 Draft 22.03.2017 MJ AK Stage 4 Draft 24.02.2017 MJ AK C AK MJ 14.02.2017 Stage 4 Draft B A Stage 4 Draft 09.01.2017 MJ AK GF PLAN - TILE 1 1:50@A1 Stage 5 F 001200 PL-00-GA A-NH AK

A B C D E - Essexdnn.essex.gov.uk/Portals/49/Documents/FUNDING/CapitalOpportunities... · F Stage 5 - Construction 09.06.2017 MJ AK CK 09.01.2017 CK AK E CP Issue 21.04.2017 MJ AK

Embed Size (px)

Citation preview

original by

the property of and AStudio Architecture.notified immediately of any discrepancy. This drawing is copyright and remainscommencing any work or producing shop drawings. The originator should befrom this drawing. All dimensions must be checked and verified on site beforeThis drawing is to be read in conjunction with all related drawings. Do not scale

ap bydate dr byrev description

Disclaimer

Client

Project

Drawing

Project number

Drawing number

Issue status

Scale

ORIGINATOR CODE 1 CODE 2 CODE 3 REV

Elizabeth House - Tower Building - 10th Floor - 11 York Road - London SE1 7NX - UK

16003

MORGAN SINDALL

NEWHALL PRIMARY SCHOOL

AND EARLY YEARS CENTRE

K10

IWS-06B

K10

IWS-06B

K10

IWS-01

K10

IWS-06

K10

IWS-01

IWS-01

K10

K10

IWS-02

K10

IWS-01

IWS-02

K10

IWS-01

K10IWS-01

K10

K10

IWS-01

K10

IWS-02

K10

IWS-02

K10

IWS-05

K10

IWS-06

IWS-01

K10

K10

IWS-05

K10

IWS-02

K10

IWS-03

K10

IWS-05

K10

IWS-03

IWS-01

K10

IWS-01

K10

IWS-03

K10

K10

IWS-03

K10

IWS-03

K10

IWS-06B

K10

IWS-06B

K10

IWS-01A

IWS-01A

K10

K10

IWS-03A

IWS-03A

K10

K10

IWS-02A

K10

IWS-01A

IWS-01A

K10

ID.00.060

ID.00.063

ID.00.064

ID.00.065 ID.00.071

ID.00.072

ID.00.073

ID.00.074

ID.00.068

ID.00.062ID.00.061

ID.00.059

ID.00.070

K10

IWS-10

K10

IWS-08

IWS-08

K10

IWS-08

K10

K10

IWS-08

K10

IWS-09

K10

IWS-08

K10

IWS-08

K10

IWS-04

241023252340 2395

1375

300

EXTERNAL WALL BUILD UP

(Refer to Specification)

EXTERNAL WALL BUILD UP

(Refer to Specification)

EXTERNAL WALL BUILD UP

(Refer to Specification)

EXTERNAL WALL BUILD UP

(Refer to Specification)

705

ID.00.067

ID.00.069

DRG 01.1DRG 01.1

DRG 01.1

DRG 12.1

DRG 01.1

DRG 01.1DRG 12.1

DRG 03

DRG 03

DRG 01.1

DRG 01.1

DRG 03

DRG 03

DRG 13.2

DRG 04.1

755

600

755

K10

IWS-02

2685

1790

2665

110

2670

2020

875

2315

1425

3890

1560

2415

70

2000

4610

2675

2205140 50

445

6951685365 695 1685 230 1210675167514204609001495

315

15301420

92017405190110 2395275 140 110

EXTERNAL WALL BUILD UP

(Refer to Specification)

2475

1150

285

390

265

265 265

265135

6130

2902902

90

250

290 250

290

5904190

85

1765

2175

20

1540

21502365285

1175

13951590

3130

265

1105590 1110 200

01

6100

01

6100

01

6100

09

6101

06

6101

825

825

70

820

805

95

K10

IWS-01

Riser00-76

0.5 Sq. m

GEA374.8 Sq. m

GIA344.3 Sq. m

Riser00-77

0.5 Sq. m

CReceptionAdmin Off

00-6210 Sq. m

ReceptionDrop in00-61

15 Sq. m

Staff meeting00-63

15 Sq. m

General Store00-69

8 Sq. m

Plant00-57

9 Sq. m

Electrical Plant00-58

9 Sq. m

Servery00-59

18 Sq. m

Cleaners StLaundry00-65

9 Sq. m

Play Space 3-4YR00-70

55 Sq. m

Play Space 2-3YR00-71

50 Sq. m

Play Space 0-2YR00-75

42 Sq. m

Milk Prep00-73

6 Sq. m

Baby Change00-72

6 Sq. m

Staff WC00-68

3 Sq. m

Circulation00-78

38 Sq. m

Accessible WC00-64

7 Sq. m

Secure Buggy Store00-60

7 Sq. m

WC00-66

7 Sq. m

WC00-67

7 Sq. m

Baby Change00-74

6 Sq. m

FFL LEVEL 00

EL. 69.50m

FFL LEVEL 00

EL. 69.50m

HATCHACCESS

RL RL

RWDP

RWDP

RWDP

TapRecessed

fountainwater

Drinking

BIN STORE

FFL LEVEL 00

EL. 69.50m

FFL LEVEL 00

EL. 69.50m

HATCHACCESS

RL RL

RWDP

RWDP

RWDP

TapRecessed

fountainwater

Drinking

A B C D E

2

1

3

814078307975298080157935

4

1545

8140

8450

31355435239563807040

01

6100

01

6100

06

6101

01

6100

09

6101

09

6101

02

5350

-

5314-

5314

-

5314

-

5314

DISCLAIMER:

1. This drawing is copyright and remains the property of AStudio Ltd.

2. This drawing is protected by copyright and is for use on Newhall Primary School and Early Years site only.

3. Do not scale from this drawing.

4. This drawing is to be read in conjunction with all related drawings & specifications.

5. The originator should be notified immediately of any discrepancy.

SURVEYS:

Please note that this drawing is based on:+ survey drawings: NHL-SUR-LOD3.dwg

and will need to be updated with the correct surveys drawings, as soon as these will be available.

This drawing is to be read in conjunction with drawings, information & specifications of specialist constultants, including: M&E+Structural+Landscape+Fire+Acoustic.

This drawing is to be read in conjunction with the risk register produced for inclusion in the health and safety plan. The hazards noted are in addition to the normal hazards and risks faced by a competent contractor when dealing with the type of works detailed on this drawing.

Fire rating as per fire strategy.Acoustic rating as per acoustic report.

External levels refer to Struct. Eng + Landscape Arch. Layout

A-N

H-X-P

L-0

0-G

A-1

201

drg 1203

drg 1202drg 1201

F Stage 5 - Construction 09.06.2017 MJ AK

CK 09.01.2017 CK AK

E CP Issue 21.04.2017 MJ AK

D Stage 4 Draft 22.03.2017 MJ AK

Stage 4 Draft 24.02.2017 MJ AKC

AKMJ14.02.2017Stage 4 Draft B

A Stage 4 Draft 09.01.2017 MJ AK

GF PLAN - TILE 1

1:50@A1

Stage 5

F001200PL-00-GAA-NHAK

akoning
New Stamp