Upload
others
View
8
Download
1
Embed Size (px)
Citation preview
D10
D26
D25
D2
D3
D24
D29
D32
D38
D40
D6
D34
D22
D23
D4
D7
SYST
EM =
ALUM
ABOA
RD
INSTA
LLATIO
N ELE
VATIO
NSC
ALE:
NTS
01/29/
2018
E
FASCIA & SOFFIT DETAILS
D1 - HORIZONTAL FASCIA TO PARALLEL SOFFIT
D2 - VERTICAL FASCIA TO PARALLEL SOFFIT
D3 - SOFFIT FROM STARTER
D4 - SOFFIT FROM J CLOSURE
D5 - SOFFIT (A) TO SNAPCAP END
D6 - SOFFIT (B) TO SNAPCAP END
BUTTING DETAILS
D7 - SNAPCAP REVEAL JOINT
D8 - SNAPCAT FLAT JOINT
D9 - BUTT JOINT
VENTED DETAILS
D10 - SOFFIT VENT 1 @ FASCIA (H)
D11 - SOFFIT VENT 1 @ FASCIA (V)
D12 - SOFFIT VENT 2 @ FASCIA (H)
D13 - SOFFIT VENT 2 @ FASCIA (V)
D14 - SOFFIT VENT 3 @ JCL (A)
D15 - SOFFIT VENT 3 @ JCL (B)
D16 - SOFFIT VENT 3 @ SCE (A)
D17 - SOFFIT VENT 3 @ SCE (B)
D18 - SOFFIT VENT 4 @ JCL (A)
D19 - SOFFIT VENT 4 @ JCL (B)
D20 - SOFFIT VENT 4 @ SCE (A)
D21 - SOFFIT VENT 4 @ SCE (B)
WALL DETAILS
D22 - OUTSIDE CORNER VERTICAL
D23 - OUTSIDE CORNER HORIZONTAL
D24 - INSIDE CORNER VERTICAL
D25 - INSIDE CORNER HORIZONTAL
D26 - HORIZONTAL WALL @ JCL BASE
D27 - HORIZONTAL WALL @ STR BASE
D28 - VERTICAL WALL @ BASE
PENETRATION DETAILS
D29 - HORIZONTAL SILL SCE
D30 - VERTICAL SILL SCE
D31 - HORIZONTAL JAMB SCE
D32 - VERTICAL JAMB SCE
D33 - VERTICAL JAMB SJCL
D34 - HORIZONTAL JAMB JCL
D35 - HORIZONTAL HEAD JCL
D36 - VERTICAL HEAD JCL
D37 - VERTICAL HEAD SCE
D38 - HORIZONTAL HEAD SCE
D39 - PENETRATION (A)
D40 - PENETRATION (B)
SYSTEM = ALUMABOARD
DETAIL INDEXSCALE: NTS 01/29/2018
I
6" PLANK - ALB 6PL
6.00"
4.00"
4" PLANK - ALB 4PL
PLANK CLIP - ALB PLCP
0.75"
0.80"
ALUMABOARD PLANKS & CLIPS
8.00"
8" PLANK - ALB 8PL
SYSTEM = ALUMABOARD
PLANKS AND CLIPSSCALE: NTS 01/29/2018
P
0.63"
0.59"
1.89"
0.92"
1.50"
1.47"
J CLOSURE - ALB JCL
INSIDE CORNER - ALB ISC J COUTSIDE CORNER - ALB OSC
STARTER - ALB STR
SNAP CAP END TOP - ALB SCETSNAP CAP END BASE - ALB SCEB
SNAP CAP BASE - ALB SCB
SNAP CAP REVEAL - ALB SCR
SNAP CAP FLAT - ALB SCF
0.79"
0.79"
0.59"
1.47"
1.99"
0.46"
0.46"
0.99"
0.46"
0.59"
2.00"
0.99"
0.24"
0.21"
1.50"
0.38"
1.50"
1.99"
SNAP CAP END ASSEMBLY
SNAP CAP REVEAL ASSEMBLY
SNAP CAP FLAT ASSEMBLY
ALUMABOARD COMPONENTS
SYSTEM = ALUMABOARD
COMPONENTSSCALE: NTS 01/29/2018
C
HAT CHANNEL / ZEE GIRTS
(BY OTHERS)
WALL SHEATHING (BY OTHERS)
ALUMABOARD PLANK
INSTALLED PARALLEL TO FASCIA
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
J CLOSURE - (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
@ 24" O.C.
1
8
"-
1
4
" GAP FOR
MOISTURE WEEP
SOFFIT (BY OTHERS)
4" or 6" ALUMABOARD PLANK (ALB 4PL or ALB 6PL)
INSTALLED HORIZONTALLY
AIR / VAPOR BARRIER (BY OTHERS)
D1
SYSTEM = ALUMABOARD
HORIZONTAL FASCIA TO PARALLEL SOFFITSCALE: NTS 01/29/2018
D1
HAT CHANNEL / ZEE GIRTS
(BY OTHERS)
WALL SHEATHING (BY OTHERS)
ALUMABOARD PLANK
INSTALLED PARALLEL TO FASCIA
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
J CLOSURE - (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
@ 24" O.C.
1
8
"-
1
4
" GAP FOR
MOISTURE WEEP
SOFFIT (BY OTHERS)
4" or 6" ALUMABOARD PLANK (ALB 4PL or ALB 6PL)
INSTALLED VERTICALLY
AIR / VAPOR BARRIER (BY OTHERS)
D2
SYSTEM = ALUMABOARD
VERTICTAL FASCIA TO PARALLEL SOFFITSCALE: NTS 01/29/2018
D2
WALL SHEATHING (BY OTHERS)
HAT CHANNEL / ZEE GIRTS
(BY OTHERS)
SOFFIT (BY OTHERS)
ALUMABOARD PLANK
INSTALLED PARALLEL TO FASCIA
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
STARTER (ALB STR)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D3
SYSTEM = ALUMABOARD
SOFFIT FROM STARTERSCALE: NTS 01/29/2018
D3
ALUMABOARD PLANK
INSTALLED PARALLEL TO FASCIA
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
J CLOSURE (ALB JCL)
WALL SHEATHING (BY OTHERS)
HAT CHANNEL / ZEE GIRTS
(BY OTHERS)
SOFFIT (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D4
SYSTEM = ALUMABOARD
SOFFIT FROM J CLOSURESCALE: NTS 01/29/2018
D4
ALUMABOARD PLANK
SOFFIT (BY OTHERS)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
STUCCO / BRICK
(BY OTHERS)
.040 ALUMINUM ISOLATOR
ZEE - BLIND RIVET TO
PLANKS @ 32" O.C.
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D5
SYSTEM = ALUMABOARD
SOFFIT (A) TO SNAPCAP ENDSCALE: NTS 01/29/2018
D5
ALUMABOARD PLANK
SOFFIT (BY OTHERS)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
STUCCO / BRICK
(BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D6
SYSTEM = ALUMABOARD
SOFFIT (B) TO SNAPCAP ENDSCALE: NTS 01/29/2018
D6
1/4" min. GAP @
SNAP CAP BASE
TO ALLOW FOR
THERMAL EXPANSION
ALUMABOARD PLANK
SNAP CAP REVEAL
SNAP CAP BASE
(ALB SCR & ALB SCB)
SOFFIT (BY OTHERS)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D7
SYSTEM = ALUMABOARD
SNAPCAP REVEAL JOINTSCALE: NTS 01/29/2018
D7
ALUMABOARD PLANK
SNAP CAP REVEAL
SNAP CAP BASE
(ALB SCR & ALB SCB)
SOFFIT (BY OTHERS)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D7a
SYSTEM = ALUMABOARD
SNAPCAP REVEAL JOINTSCALE: NTS 01/29/2018
D7a
.040 ALUMINUM ISOLATOR
ZEE, BLIND RIVETED TO
PLANKS @ 36" O.C.
ALUMABOARD PLANK
SNAP CAP REVEAL
SNAP CAP BASE
(ALB SCR & ALB SCB)
SOFFIT (BY OTHERS)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D8
SYSTEM = ALUMABOARD
SNAPCAP FLAT JOINTSCALE: NTS 01/29/2018
D8
ALUMABOARD PLANK
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
SOFFIT (BY OTHERS)
*PLANK SPLICE*
1. USE TOUCH-UP PEN ON BOTH PLANK ENDS.
2. INSTALL THE PLANKS AND BUTT THE PLANKS TOGETHER (MAX 24'-0" LENGTH).
3. SNAP 1 CLIP ONTO THE PLANKS AT THE BUTTING JOINT (SPAN THE PLANKS).
4. HARD FASTEN EACH PLANK TO THE SUBSTRATE WITH AN APPROPRIATE FASTENER.
***A CAP / CLOSURE COMPONENT MUST BE USED AT THE OPPOSITE END OF A SPLICE NO MORE THAN
A MAXIMUM DISTANCE OF 24'-0", IN EITHER DIRECTION FROM THE SPLICE. A MINIMUM CLEARANCE OF
1
4
" NEEDS TO BE MAINTAINED BETWEEN THE END OF THE PLANK AND THE COMPONENT POCKET TO
ALLOW FOR THERMAL EXPANSION AND CONTRACTION.
MAX DISTANCE 24'-0"
TO END COMPONENT
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
MAX DISTANCE 24'-0"
TO END COMPONENT
D9
SYSTEM = ALUMABOARD
BUTT JOINTSCALE: NTS 01/29/2018
D9
J CLOSURE - (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
@ 24" O.C.
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF1)
SOFFIT (BY OTHERS)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
J CLOSURE
(ALB CLO)
ALUMABOARD PLANK
FASCIA (BY OTHERS)
HAT CHANNELS (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
HAT CHANNELS / ZEE GIRT
(BY OTHERS)
D10
SYSTEM = ALUMABOARD
SOFFIT VENT 1 @ FASCIA (H)SCALE: NTS 01/29/2018
D10
J CLOSURE - (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
@ 24" O.C.
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF1)
ZEE GIRT (BY OTHERS)
SOFFIT (BY OTHERS)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
J CLOSURE
(ALB CLO)
ALUMABOARD PLANK
FASCIA (BY OTHERS)
HAT CHANNELS / ZEE GIRTS (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D11
SYSTEM = ALUMABOARD
SOFFIT VENT 1 @ FASCIA (V)SCALE: NTS 01/29/2018
D11
J CLOSURE - (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
@ 24" O.C.
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF2)
HAT CHANNELS / ZEE GIRT
(BY OTHERS)
SOFFIT (BY OTHERS)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
J CLOSURE
(ALB CLO)
ALUMABOARD PLANK
FASCIA (BY OTHERS)
HAT CHANNEL (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D12
SYSTEM = ALUMABOARD
SOFFIT VENT 2 @ FASCIA (H)SCALE: NTS 01/29/2018
D12
J CLOSURE - (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
@ 24" O.C.
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF2)
ZEE GIRT (BY OTHERS)
SOFFIT (BY OTHERS)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
J CLOSURE
(ALB CLO)
ALUMABOARD PLANK
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
FASCIA (BY OTHERS)
HAT CHANNEL / ZEE GIRTS (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D13
SYSTEM = ALUMABOARD
SOFFIT VENT 2 @ FASCIA (V)SCALE: NTS 01/29/2018
D13
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF3)
SOFFIT (BY OTHERS)
ALUMABOARD PLANK
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
J CLOSURE
(ALB CLO)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
D14
SYSTEM = ALUMABOARD
SOFFIT VENT 3 @ JCL (A)SCALE: NTS 01/29/2018
D14
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF3)
SOFFIT (BY OTHERS)
ALUMABOARD PLANK
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
J CLOSURE
(ALB CLO)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
D15
SYSTEM = ALUMABOARD
SOFFIT VENT 3 @ JCL (B)SCALE: NTS 01/29/2018
D15
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF3)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
SOFFIT (BY OTHERS)
ALUMABOARD PLANK
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
.040 ALUMINUM
ISOLATOR ZEE
BLIND RIVET TO
PLANKS @ 32" O.C.
D16
SYSTEM = ALUMABOARD
SOFFIT VENT 3 @ SCE (A)SCALE: NTS 01/29/2018
D16
ALUMABOARD PLANK
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF3)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
CEE CHANNEL (BY OTHERS)
SOFFIT (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D17
SYSTEM = ALUMABOARD
SOFFIT VENT 3 @ SCE (B)SCALE: NTS 01/29/2018
D17
J CLOSURE
(ALB CLO)
ALUMABOARD PLANK
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF4)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
SOFFIT (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
D18
SYSTEM = ALUMABOARD
SOFFIT VENT 4 @ JCL (A)SCALE: NTS 01/29/2018
D18
J CLOSURE
(ALB CLO)
ALUMABOARD PLANK
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF4)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
SOFFIT (BY OTHERS)
CEE CHANNEL (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D19
SYSTEM = ALUMABOARD
SOFFIT VENT 4 @ JCL (B)SCALE: NTS 01/29/2018
D19
.040 ALUMINUM ISOLATOR
ZEE, BLIND RIVETED TO
PLANKS @ 36" O.C.
ALUMABOARD PLANK
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF4)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
SOFFIT (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
D20
SYSTEM = ALUMABOARD
SOFFIT VENT 4 @ SCE (A)SCALE: NTS 01/29/2018
D20
ALUMABOARD PLANK
FULLY PERFORATED FLASHING
PAINTED TO MATCH (ALB PERF4)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
(SPACING & PERFORATION
PATTERN PER AIR FLOW
REQUIREMENTS)
CEE CHANNEL (BY OTHERS)
SOFFIT (BY OTHERS)
D21
SYSTEM = ALUMABOARD
SOFFIT VENT 4 @ SCE (B)SCALE: NTS 01/29/2018
D21
HAT CHANNEL / ZEE GIRTS
(BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
ALUMABOARD PLANK
INSTALLED VERTICALLY
OUTSIDE CORNER (ALB OSC)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D22
SYSTEM = ALUMABOARD
OUTSIDE CORNER VERTICALSCALE: NTS 01/29/2018
D22
HAT CHANNEL / ZEE GIRTS
(BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
ALUMABOARD PLANK
INSTALLED VERTICALLY
OUTSIDE CORNER (ALB OSC)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D23
SYSTEM = ALUMABOARD
OUTSIDE CORNER HORIZONTALSCALE: NTS 01/29/2018
D23
ALUMABOARD PLANK
INSTALLED VERTICALLY
INSIDE CORNER (ALB ISC)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
WALL SHEATHING (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
AIR / VAPOR BARRIER (BY OTHERS)
D24
SYSTEM = ALUMABOARD
INSIDE CORNER VERTICALSCALE: NTS 01/29/2018
D24
ALUMABOARD PLANK
INSTALLED HORIZONTALLY
INSIDE CORNER (ALB ISC)
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
WALL SHEATHING (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
AIR / VAPOR BARRIER (BY OTHERS)
D25
SYSTEM = ALUMABOARD
INSIDE CORNER HORIZONTALSCALE: NTS 01/29/2018
D25
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
BASE WEEP FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
J CLOSURE (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
AS SHOWN @ 24" O.C.
GRADE
SLAB
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D26
SYSTEM = ALUMABOARD
HORIZONTAL WALL @ JCL BASESCALE: NTS 01/29/2018
D26
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
BASE WEEP FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
J CLOSURE (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
AS SHOWN @ 24" O.C.
GRADE
SLAB
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D27
SYSTEM = ALUMABOARD
HORIZONTAL WALL @ STR BASESCALE: NTS 01/29/2018
D27
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
BASE WEEP FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
J CLOSURE (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
AS SHOWN @ 24" O.C.
ZEE GIRT (BY OTHERS)
GRADE
SLAB
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D28
SYSTEM = ALUMABOARD
VERTICAL WALL AT BASESCALE: NTS 01/29/2018
D28
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
SILL FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
CEE GIRT (BY OTHERS)
INSTALLED @ SILL
BACKER ROD & CAULKING
.040 ALUMINUM ISOLATOR ZEE
BLIND RIVET TO PLANK @ 36" O.C.
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D29
SYSTEM = ALUMABOARD
HORIZONTAL SILL SCESCALE: NTS 01/29/2018
D29
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
SILL FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
CEE GIRT (BY OTHERS)
INSTALLED @ SILL
BACKER ROD & CAULKING
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D30
SYSTEM = ALUMABOARD
VERTICAL SILL SCESCALE: NTS 01/29/2018
D30
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
JAMB FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
CEE GIRT (BY OTHERS)
INSTALLED @ SILL
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D31
SYSTEM = ALUMABOARD
HORIZONTAL JAMB SCESCALE: NTS 01/29/2018
D31
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
JAMB FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
ZEE GIRT (BY OTHERS)
INSTALLED @ SILL
CEE GIRT (BY OTHERS)
INSTALLED @ SILL
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D32
SYSTEM = ALUMABOARD
VERTICAL JAMB SCESCALE: NTS 01/29/2018
D32
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
JAMB FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
J CLOSURE (ALB JCL)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
.040 ALUMINUM ISOLATOR ZEE
D33
SYSTEM = ALUMABOARD
VERTICAL JAMB SJCLSCALE: NTS 01/29/2018
D33
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
JAMB FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
J CLOSURE (ALB JCL)
ZEE GIRT (BY OTHERS)
INSTALLED @ SILL
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D34
SYSTEM = ALUMABOARD
HORIZONTAL JAMB JCLSCALE: NTS 01/29/2018
D34
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
HEAD FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
J CLOSURE (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
AS SHOWN @ 24" O.C.
1
4
" MINIMUM
FOR DRAINAGE
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
.040 ALUMINUM ISOLATOR ZEE
D35
SYSTEM = ALUMABOARD
HORIZONTAL HEAD JCLSCALE: NTS 01/29/2018
D35
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
HEAD FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
J CLOSURE (ALB JCL)
3
16
" WEEP HOLES FIELD DRILLED
AS SHOWN @ 24" O.C.
ZEE GIRT (BY OTHERS)
INSTALLED @ SILL
1
4
" MINIMUM
FOR DRAINAGE
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D36
SYSTEM = ALUMABOARD
VERTICAL HEAD JCLSCALE: NTS 01/29/2018
D36
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
HEAD FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
CEE GIRT (BY OTHERS)
INSTALLED @ SILL
1
4
" MINIMUM
FOR DRAINAGE
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D37
SYSTEM = ALUMABOARD
VERTICAL HEAD SCESCALE: NTS 01/28/2018
D37
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
ALUMABOARD PLANK
(INSTALLED VERTICALLY)
HEAD FLASHING (BY OTHERS)
HAT CHANNEL (BY OTHERS)
WALL SHEATHING (BY OTHERS)
AIR / VAPOR BARRIER (BY OTHERS)
SNAP CAP END & BASE
(ALB SCET & ALB SCEB)
.040 ALUMINUM ISOLATOR ZEE
BLIND RIVET TO PLANK @ 36" O.C.
1
4
" MINIMUM
FOR DRAINAGE
CEE GIRT (BY OTHERS)
INSTALLED @ SILL
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D38
SYSTEM = ALUMABOARD
HORIZONTAL HEAD SCESCALE: NTS 01/29/2018
D38
ALUMABOARD PLANK
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
SOFFIT (BY OTHERS)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
CUT HOLE IN ALUMABOARD
WITH A NON-FERROUS
BLADE - JIG OR HOLE SAW.
USE PENETRATION'S BEAUTY
RING TO FINISH OFF.
PENETRATION (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D39
SYSTEM = ALUMABOARD
PENETRATION (A)SCALE: NTS 01/29/2018
D39
ALUMABOARD PLANK
HAT CHANNELS / ZEE GIRTS
(BY OTHERS)
SOFFIT (BY OTHERS)
#8 x 1" TEK PT FASTENER
PLANK CLIP (ALB PLCP)
CUT HOLE IN ALUMABOARD
WITH A NON-FERROUS
BLADE - JIG OR HOLE SAW.
USE PENETRATION'S BEAUTY
RING TO FINISH OFF.
PENETRATION (BY OTHERS)
**ALL DETAILS SHOW ALUMABOARD ATTACHED TO HAT CHANNELS OVER SOLID SUBSTRATE**
**REFERENCE LOAD SPAN TABLES FOR ALL ATTACHMENT TYPES, ANCHOR TYPES, & ANCHOR SPACING***
INSTALLATION OPTIONS ARE:
1) OPEN FRAMING - WOOD OR METAL STUDS
2) WOOD SHEATHING
3) HAT CHANNEL OVER SHEATHING WITHOUT OR WITH A *VAPOR BARRIER (*RECOMMENDED FOR WALLS)
D40
SYSTEM = ALUMABOARD
PENETRATION (B)SCALE: NTS 01/29/2018
D40