PUBLIC OPEN HOUSE WELCOME HEBER VALLEY PARKWAY PLANNING STUDY AND MAIN STREET CORRIDOR PLANNING STUDY February 20, 2019 PLANNING STUDY Heber Valley Parkway AND MAIN STREET CORRIDOR PLANNING STUDY

9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PUBLIC OPEN HOUSE

WELCOME

HEBER VALLEY PARKWAY PLANNING STUDY AND MAIN STREET CORRIDOR PLANNING STUDY

February 20, 2019

PLANNING STUDY

Heber Valley Parkway

AND MAIN STREET CORRIDOR PLANNING STUDY

Page 2: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PURPOSE

To address growth and provide

a reliable transportation

system for residents, visitors

and commuters in Heber City

and the surrounding area,

the Utah Department of

Transportation (UDOT) and

Heber City are conducting a

corridor planning study in

the Heber Valley to identify

an alternate corridor to Heber

City’s Main Street.

GOALS

• Alleviate specific types of traffic from Heber

City’s Main Street, including large trucks.

• Reduce traffic congestion on Main

Street, enhance economic development

opportunities and improve the overall

quality of life in Heber City and

Wasatch County.

• Improve safety and mobility on the Main

Street Corridor.

• Provide an opportunity for Main Street to

become a more visitor-friendly destination.

PURPOSE & GOALSPLANNING STUDY

Heber Valley Parkway

Page 3: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PLANNING STUDY AREAS

Ce

nte

r St

Ce

nte

r St

Main StMain St

Da

nie

ls R

d D

an

iels

Rd

Ma

in S

t M

ain

St

100 S100 S

U.S

. 40

U.S

. 40U.S

. 189

U.S

. 189

So

uth

field

Rd

So

uth

field

Rd

STUDY AREAS

Heber Valley

Parkway

Main Street Corridor

PLANNING STUDY

Heber Valley Parkway

N

Page 4: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PLANNING STUDY

Heber Valley ParkwayDAILY TRAFFIC VOLUME EVALUATIONEXISTING AND 2050 NO BUILD CONDITIONS

2050 CONDITIONS W/OHEBER VALLEY PARKWAY

U.S

. 40

U.S

. 4

0

U.S. 1

89

100 S.Midway Ln.

39,000

N

EXISTING CONDITIONS

U.S

. 40

U.S

. 4

0

U.S. 1

89

100 S.Midway Ln.

30,000

N

Daily Traffic Volume

Page 5: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PLANNING STUDY

Heber Valley ParkwayDAILY TRAFFIC VOLUME EVALUATIONOTHER OPTIONS CONSIDERED

Daily Traffic Volume

2050 HEBER VALLEYPARKWAY W/FREEWAY

SPEEDS

U.S

. 40

U.S

. 4

0

U.S. 1

89

100 S.Midway Ln.

N

34,00013,000

20,000

26,000

14,000

Eliminated due to high impacts for similar benefits

2050 EXTENDED HEBERVALLEY PARKWAY

U.S

. 40

U.S

. 4

0

To

U.S

. 40

U.S. 1

89

100 S.Midway Ln.

N

36,000

16,000

14,000

4,500

Eliminated due to low volumes on proposed parkway

2050 HEBER VALLEY PARKWAYW/O E-W CONNECTION

U.S

. 40

U.S

. 4

0

U.S. 1

89

100 S.Midway Ln.

N

33,000

19,000

14,000

Eliminated due to low volumes on proposed parkway

Page 6: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PLANNING STUDY

Heber Valley ParkwayDAILY TRAFFIC VOLUME EVALUATIONOTHER OPTIONS CONSIDERED

Daily Traffic Volume

2050 HEBER VALLEY PARKWAYEXISTING U.S. 189

U.S

. 40

U.S

. 4

0

U.S. 1

89

100 S.Midway Ln.

N

32,00012,000

19,000

23,000

13,000

Advanced for further analysis

2050 WITH HEBER VALLEY PARKWAYU.S. 189 RE-ALIGNMENT

U.S

. 40

U.S

. 4

0

U.S. 1

89

100 S.

1300 S.

MidwayLn.

32,000

21,000

19,000

25,000

21,000

N

Advanced for further analysis

Page 7: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PLANNING STUDY

Heber Valley ParkwayMAIN STREETCONGESTION LEVELS

U.S

. 189

Existing

U.S

. 4

0

U.S. 4

0

NB

SB

100 South

500 North

Center St.

600 South

U.S

. 189

Future 2050Build U

.S.

40

U.S. 4

0

NB

SB

100 South

500 North

Center St.

600 South

100 South

600 South

500 North

Center St.

U.S

. 4

0

Future 2040No-Build

* Southbound queue

extends back more

than 1 mile

*

NB

SB

U.S

. 189

U.S. 4

0

LOS A to C

LOS D

LOS F

LOS E

Arterial Level

of Service

Color Legend

Page 8: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PLANNING STUDY

Heber Valley Parkway

Ma

in S

tM

ain

St

So

uth

field

Rd

So

uth

field

Rd

100 S100 S

1200 S1200 S

A

N

Ma

in S

tM

ain

St

So

uth

field

Rd

So

uth

field

Rd

100 S100 S

1200 S1200 S

B

N

Ma

in S

tM

ain

St

So

uth

field

Rd

So

uth

field

Rd

100 S100 S

1200 S1200 S

C

N

NORTH SEGMENTOPTIONS CONSIDERED

Three options were reviewed for the northern segment. Due to extensive wetlands, further evaluation is needed in an

environmental study to determine a recommended route for this area.

Page 9: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PLANNING STUDY

Heber Valley ParkwayNORTH SEGMENTWETLAND ROUTE CONSIDERATIONS

To comply with the National Environmental Policy Act of 1969,

agencies to the extent permitted by law, must avoid

undertaking or providing assistance for new construction

located in wetlands unless the head of the agency finds:

• That there is no practicable alternative to such construction

which would have less adverse impact.

• The proposed action includes all practicable measures to

minimize harm to wetlands which may result from such use.

In making this finding the head of the agency may take into

account economic, environmental and other pertinent factors.

Page 10: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

SCREENING CRITERIANORTH SEGMENT**NORTHERN SEGMENT RECOMMENDATION PENDING

FURTHER ENVIRONMENTAL EVALUATION

PLANNING STUDY

Heber Valley Parkway

AOriginal Concept

Screening Measure

Wetland Impacts

Traffic Performance

Direct Property Impacts

Adjacent Property Impacts

BModified

Edge Concept

CEdge Concept

More Favorable Performance Moderately Favorable Performance Unfavorable Performance

Page 11: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

WEST SEGMENTOPTIONS CONSIDERED PLANNING STUDY

Heber Valley Parkway

U.S

. 189

U.S

. 189

So

uth

field

Rd

So

uth

field

Rd

1200 S1200 S

A

N

Heber Valley Parkway will be

grade separated over railroad

and 1200 S crossings

So

uth

field

Rd

So

uth

field

Rd

1200 S1200 S

B

N

U.S

. 189

U.S

. 189

Heber Valley Parkway will be

grade separated over railroad

and 1200 S crossings

Realignment of U.S. 189

and Southfield Rd

So

uth

field

Rd

So

uth

field

Rd

1200 S1200 S

C

N

U.S

. 189

U.S

. 189

Recommended Route

Heber Valley Parkway will be

grade separated over railroad

and 1200 S crossings

Realignment of U.S. 189

and Southfield Rd

Page 12: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

SCREENING CRITERIAWEST SEGMENT (ASSUMES U.S. 189 REALIGNMENT)

PLANNING STUDY

Heber Valley Parkway

AOriginal Concept

Screening Measure

Sewer Farm Impacts(Acres)

Traffic Performance

Truck Utility

Property Impacts

BEdge Concept

CEdge Concept w/Roundabout

More Favorable Performance Moderately Favorable Performance Unfavorable Performance Recommended Route

Page 13: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PLANNING STUDY

Heber Valley ParkwaySOUTH SEGMENTOPTIONS CONSIDERED

U.S

. 40

Daniels Road

U.S

. 189

1300 S.

1200 S.

1A: SOUTH CONNECTIONU.S. 189 EXISTING

U.S

. 40

Daniels Road

U.S

. 189

1300 S.

1200 S.

1B: FAR-SOUTH CONNECTIONU.S. 189 EXISTING

U.S

. 40

Daniels Road

1300 S.

1200 S.

2A: SOUTH CONNECTIONU.S. 189 REALIGNED

U.S

. 40

Daniels Road

1300 S.

1200 S.

2B: FAR-SOUTH CONNECTIONU.S. 189 REALIGNED

U.S

. 40

Da

nie

ls R

oa

d

U.S

. 189

1300 S.

1200 S.

1C: CENTRAL CONNECTION (3 INTERSECTIONS)

U.S. 189 EXISTING

U.S

. 40

Da

nie

ls R

oa

d

U.S

. 189

U.S

. 1

89

1300 S.

1200 S.

1D: NORTH CONNECTIONU.S. 189 EXISTING

U.S

. 40

Da

nie

ls R

oa

d

U.S

. 1

89

1300 S.

1200 S.

2E: CENTRAL CONNECTION (3 INTERSECTIONS)

U.S. 189 REALIGNED

U.S

. 40

Da

nie

ls R

oa

d

U.S

. 1

89

1200 S.

1300 S.

2F: EXISTING CONNECTIONU.S. 189 REALIGNED

Page 14: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

PLANNING STUDY

Heber Valley ParkwaySOUTH SEGMENT RECOMMENDED ROUTE**ASSUMES REALIGNMENT OF U.S. 189

U.S

. 40

Da

nie

ls R

oa

d

U.S

. 189

1300 S.

1200 S.

2C: CENTRAL CONNECTION (3 INTERSECTIONS)

Page 15: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

SCREENING CRITERIASOUTH SEGMENT

PLANNING STUDY

Heber Valley Parkway

1AScreening Measure

Traffic Performance

Truck Utility

Property Impacts

Local Connections

1B 1C 1D 2A 2B 2E 2F2C

More Favorable Performance Moderately Favorable Performance Unfavorable Performance Recommended Route

Includes Existing U.S. 189 Re-aligns U.S. 189

Page 16: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

RECOMMENDED ROUTE

U.S

. 189

U.S

. 189

U.S

. 40

U.S

. 40

Ma

in S

tM

ain

St

So

uth

field

Rd

So

uth

field

Rd

100 S100 S

Da

nie

ls R

d D

an

iels

Rd

Ce

nte

r St

Ce

nte

r St

1200 S1200 S

PLANNING STUDY

Heber Valley Parkway

C

2C

N

Heber Valley Parkway will be

grade separated over railroad

and 1200 S crossings

Northern Segment Recommendation

Pending Further Environmental Evaluation

Realignment of U.S. 189

and Southfield Rd

North

West C

South 2C

North

Page 17: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

ConstructionProjectFundingNo Funding Identified

CorridorPreservationOngoing

Current Phase

STUDY BEGANSpring 2018

OPEN HOUSE 1Summer 2018

OPEN HOUSE 2Winter 2018/2019

STUDY COMPLETEWinter 2018/2019

EnvironmentalImpactStatement

EnvironmentalStudy FundingCurrently Seeking Funding

CorridorPlanning Study• Determine Traffic Needs

• Evaluate and

Eliminate Concepts

• Recommend Route

for Future Study

PROCESS AND TIMELINEPLANNING STUDY

Heber Valley Parkway

Page 18: 9644 3 HeberValley Open House Boards WEB · Daniels Rd Main St 100 S U.S. 189 U.S. 40 Southfield Rd STUDY AREAS Heber Valley Parkway Main Street Corridor PLANNING STUDY Heber Valley

COMMENT AREA

Heber Valley Parkway [email protected]

Main Street Corridor [email protected]

PLANNING STUDY

Heber Valley Parkway

AND MAIN STREET CORRIDOR PLANNING STUDY