Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Est. 199 Spain:
OlmedillYecla, 3VillanueEscalona12 projeothers Italy:
Sicily, 9Sicily, 2 Puglia, 2Puglia, 1Puglia, 118 projeSolar En
99 - More
la de Alarcon.6 MW, dual
eva de Cordoa, 2.8 MW, dcts exceedin
.8 MW, sing MW, dual-a
2 MW, dual-1 MW, dual-1 MW, dual-cts with 1 M
nergy Italia a
than 70.00
n, 6 MW, dul-axis, owner
oba, 3.5 MWdual-axis, owg 1MW, own
gle-axis, custaxis, customeaxis, customaxis, customaxis, custom
MW each, ownand others
00 solar tra
ual-axis, ownr: Garbitek, 2, single-axis,
wner: Conersaners: Conerg
omer: Martifer: Etna Ener
mer: Sorgeniamer: La Eco Emer: Renergie
ners: Zanetti
acking syst
ner: Solaer, 22009 , owner: CMa, plus 7 oth
gy, Abantia, A
fer Solar, invrgia, 2011
a Solar, invesEnergie, prives, private invi Busigroup,
tems, 750 M
2007
ME, 2011 er 1 MW proAE 3000, Ec
vestor: Ampl
stor: RTR Caate investor, vestor, 2009SEI, Etna En
MW instal
ojects with Ccosolar, Lonj
lio Solar, 201
apital/Terra F2008
nergia, Savex
lled capaci
Conersa, 2008jas Technolo
10
Firma, 2009
ex, Energreen
ty
8 ogia and
n, SunIng,
Portugal:
Castroverde, 2.2 MW, dual-axis, owner: SER, 2010 Germany:
Neuental, 2.6 MW, dual-axis, customer: Consolaris, private investors, 2011 Bad Arolsen, 2.4 MW, dual-axis, customer: entrason, private investors, 2012
USA:
WisconsTennesse Kazakh
Almaty,
sin, 1 MW, cee, 1 MW, cu
stan:
Kapchagay,
customer: Coustomer: Ap
2 MW, dual
onvergence Epex Construct
l-axis, custom
Energy, privation Services
mer: Bisol, in
ate investors,s, Tennessee
nvestor: Sam
2011 Valley Auth
mruk-Energo,
hority, 2012
, 2012
Sweden:
Highway E18 Stockholm – Oslo, 1MW, dual-axis, owner: Kraftpojkarna, financed by SwedBank, 2013 Canada:
British Columbia, 1 MW, dual-axis, customer: Conergy, investor: The City of Kimberley, 2015 Ontario, 24 MW, Solar Garden Projects, dual-axis Multiple owners: AGRIS SOLAR, Sculler, Gengroth and more, financed by Farm Credit Canada and TD Canada Trust, 2015/2016.
Turkey:
Denizli,
Adiyama
Bingöl, 3
:
Tavas, 1 MW
an, Durak, 1
3 MW, singl
W, dual-axis
.2 MW, sing
le-axis, custo
, private inve
gle-axis, custo
omer: Startup
estor, 2016
omer: STC,
p Enerji, grou
2016
und-breaking
g in June 20116