Governor
An Equal Opportunity Employer M/F/D
TRANSPORTATION CAB
March 6, 2018
CALL NO. 100
CONTRACT ID NO. 181201
ADDENDUM # 1
Subject: Fayette County, NHPP 2681 (033)
Letting March 23, 2018
(1) Delete -
(2) Added -
(3) Added -
(4) Revised -
(5) Revised –
(6) Revised -
(7) Replace -
(8) Replace -
(9) Replace -
(10) Replace -
Special Note for Geogrid Reinforcement for Asphalt Pavements-
Pages 219-220 of 281
Special Note – Page 45(a) of 281
Drawing Station E58 – Page 47(a) of 281
Special Note - Page 48 of 281
Proposal Bid Items – Pages 270-281 of 281
Plan Sheets- R2N, R2O, R26, R30, R58, R58A, R70A, R78, R82, R82A, R104 and T001
Structure Drawing #27260 Sheets S1 - S52
Structure Drawing #27261 Sheets S1 – S39
Structure Drawing #27262 Sheets S1 – S37
Structure Drawing #27263 Sheets S1 – S6
Proposal revisions are available at http://transportation.ky.gov/Construction-
Procurement/.
Plan revisions are available at http://www.lynnimaging.com/kytransportation/.
If you have any questions, please contact us at 502-564-3500.
Sincerely,
Rachel Mills, P.E.
Director
Division of Construction Procurement
RM:mr
Enclosures
SPECIAL NOTE FOR FABRICATED COMPONENTS 1.0 DESCRIPTION. Furnish all equipment, materials and labor necessary for constructing the bridge using previously fabricated prestressed concrete beams. Work includes delivery and erection of the beams. 2.0 MATERIALS. Selected prestressed concrete beams to be installed by the Contractor have been fabricated and will be provided by the Department. The beams are located at the Prestress Services Industries LLC (PSI) facility at 5501 Briar Hill Road, Lexington, KY, 40516. The contact information for bidding purposes of “Beam Erection” at PSI is Mr. Paul Baker, (859) 294-8277. The successful bidder shall contact Mr. Gehrig Roberts ((859) 685-1322) at PSI a minimum of four (4) weeks prior to needing beams on the project to arrange transportation of the beams.
3.0 CONSTRUCTION. Perform all work in accordance with the Kentucky Transportation Cabinet, Department of Highway’s 2012 Standard Specifications for Road and Bridge Construction and applicable Supplemental Specifications, the Standard Drawings, this Note, the Contract Plans, and as directed by the Engineer.
The lifting loops on the beams will not be usable for handling of the beams. The contractor shall use others means, such as slings, to lift the beams. The Contractor will be required to submit a lifting plan to the Department for review and approval a minimum of two weeks prior to transporting beams. This plan should detail the equipment and means of how the beams will be loaded, unloaded, and set into place. 4.0 MEASUREMENT.
4.1 Beam Erection: The Department will measure the quantity by each individual unit, precast piece. The Department will not measure any modifications to the prestressed concrete beams or fabrication and installation of the elastomeric bearing assemblies and structural steel intermediate diaphragms and will consider them incidental to this item of work.
5.0 PAYMENT. The Department will make payment for the completed and accepted quantities under the following:
Code Pay Item Pay Unit 23953EC Beam Erection Each The Department will consider payment as full compensation for all work required in this note. Note, after the project begins, the Department will inventory and evaluate all Fabricated Components. The Department will pay for by change order to the contract any missing or damaged components.
FAYETTE COUNTY NHPP 2681 (033)
ADDED ADDENDUM #1: 3-6-18 Contract ID: 181201
Page 45(a) of 281
16
'
5'
F
E
34
65
P2
P3
SC
AL
E 1
"=
20'
12
P1
34
P216
'
5'
65
P3
1
JB
A1
1
JB
A2
5'
5'
ST
AT
ION
E58
~L
AT
/LO
NG
N 3
8.0
74684, W
84.5
15357
FA
YE
TT
E C
O.
KY
4 ~
m.p
. 8
.25
PA
VE
D S
HO
UD
LE
R
PA
VE
D S
HO
UD
LE
R
12
P1
ME
DIA
N B
AR
RIE
R W
AL
L
PA
VE
D S
HO
UD
LE
R
1 IN
ST
AL
L O
NE
(1)
2" C
ON
DU
IT.
CO
DE
D N
OT
E:
PO
ST
S E
AC
H.
INS
TA
LL
TW
O (
2)
20
"X
20
"X
8" C
AB
INE
TS
MO
UN
TE
D T
O T
WO
(2
) W
OO
D
INS
TA
LL
TW
O (
2)
TY
PE
A J
UN
CT
ION
BO
XE
S (
JB
A1 A
ND
A2).
JU
NC
TIO
N B
OX
.
INS
TA
LL
ON
E (
1)
1‚"
CO
ND
UIT
FR
OM
EA
CH
SA
W S
LO
T T
O N
EA
RE
ST
CA
BIN
ET
.
PE
RS
ON
NE
L W
ILL
CO
NN
EC
T T
HE
LO
OP
S A
ND
PIE
ZO
S I
NS
IDE
TH
E
EA
CH
JU
NC
TIO
N B
OX
AN
D C
AB
INE
T.
DIV
ISIO
N O
F P
LA
NN
ING
WIR
E F
OR
EA
CH
SE
NS
OR
SH
AL
L B
E C
OIL
ED
AN
D L
AB
EL
ED
IN
SID
E
INS
TA
LL
ED
SP
LIC
E-F
RE
E T
O T
HE
CA
BIN
ET
AN
D A
MIN
IMU
M O
F 2
' O
F
TH
E C
OR
RE
SP
ON
DIN
G D
RIV
ING
LA
NE
. L
OO
PS
AN
D P
IEZ
OS
SH
AL
L B
E
LO
OP
S W
ITH
TH
E E
DG
E O
F E
AC
H P
IEZ
O F
LU
SH
WIT
H T
HE
ED
GE
OF
SE
NS
OR
S (
PIE
ZO
S)
SH
AL
L B
E I
NS
TA
LL
ED
5' F
RO
M T
HE
ED
GE
OF
FR
OM
LE
AD
ING
ED
GE
TO
LE
AD
ING
ED
GE
AS
SH
OW
N.
PIE
ZO
EL
EC
TR
IC
AL
L L
OO
PS
SH
AL
L B
E 6
'X6
' S
QU
AR
E A
ND
SH
AL
L B
E I
NS
TA
LL
ED
16
'
TO
AN
Y C
ON
ST
RU
CT
ION
.
FIE
LD
AN
D A
PP
RO
VE
D B
Y D
IVIS
ION
OF
PL
AN
NIN
G P
ER
SO
NN
EL
PR
IOR
SIT
E L
OC
AT
ION
IS
AP
PR
OX
IMA
TE
AN
D W
ILL
BE
DE
TE
RM
INE
D I
N T
HE
FAYETTE COUNTY NHPP 2681 (033)
ADDED ADDENDUM #1: 3-6-18 Contract ID: 181201
Page 47(a) of 281
Permanent Traffic Data Acquisition Station Estimate Of Quantities
Revised April, 2017
PERMANENT TRAFFIC DATA ACQUISITION STATIONS ESTIMATE OF QUANTITIES
Bid Item Code Description Unit Quantity 2562 TEMPORARY SIGNS SQ FT 2650 MAINTAIN AND CONTROL TRAFFIC LP SUM 2775 ARROW PANEL EACH 4791 CONDUIT ¾ INCH LIN FT 4793 CONDUIT 1 ¼ INCH LIN FT 180 4795 CONDUIT 2 INCH LIN FT 100 4811 ELECTRICAL JUNCTION BOX TYPE B EACH 4820 TRENCHING AND BACKFILLING LIN FT 250 4821 OPEN CUT ROADWAY LIN FT 4829 PIEZOELECTRIC SENSOR EACH 21 4830 LOOP WIRE LIN FT 9925 4850 CABLE NO. 14/1 PAIR LIN FT 4871 POLE – 35’ WOODEN EACH 4895 LOOP SAW SLOT AND FILL LIN FT 2050 4899 ELECTRICAL SERVICE EACH 20213EC INSTALL PAD MOUNT ENCLOSURE EACH 20359NN GALVANIZED STEEL CABINET EACH 6 20360ES818 WOOD POST EACH 12 20391NS835 ELECTRICAL JUNCTION BOX TYPE A EACH 6 20392NS835 ELECTRICAL JUNCTION BOX TYPE C EACH 20468EC ELECTRICAL JUNCTION BOX 10x8x4 EACH 21543EN BORE AND JACK CONDUIT LIN FT 23206EC INSTALL CONTROLLER CABINET EACH
FAYETTE COUNTY NHPP 2681 (033)
Contract ID: 181201 Page 48 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 1 of 12
181201
Section: 0001 - PAVINGLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT0010 00001 DGA BASE 130,558.00 TON $0020 00018 DRAINAGE BLANKET-TYPE II-ASPH 19,840.00 TON $0030 00100 ASPHALT SEAL AGGREGATE 373.00 TON $0040 00103 ASPHALT SEAL COAT 46.00 TON $0050 00190 LEVELING & WEDGING PG64-22 8,921.00 TON $0060 00214 CL3 ASPH BASE 1.00D PG64-22 61,450.00 TON $0070 00216 CL3 ASPH BASE 1.00D PG76-22 18,105.00 TON $0080 00336 CL3 ASPH SURF 0.38A PG76-22 11,301.00 TON $0090 00339 CL3 ASPH SURF 0.38D PG64-22 1,696.00 TON $0100 00356 ASPHALT MATERIAL FOR TACK 222.00 TON $0110 00358 ASPHALT CURING SEAL 70.00 TON $0120 02073 JPC PAVEMENT-9 IN 402.00 SQYD $0130 02101 CEM CONC ENT PAVEMENT-8 IN 82.00 SQYD $0140 02677 ASPHALT PAVE MILLING & TEXTURING 2,699.00 TON $0150 22906ES403 CL3 ASPH SURF 0.38A PG64-22 4,471.00 TON $0160 24470ED PERMEABLE PAVEMENT DRAIN 212.00 SQYD $0170 24942EC CEM CONC ENT PAVEMENT-9 IN 557.00 SQYD $
Section: 0002 - ROADWAYLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT0180 00071 CRUSHED AGGREGATE SIZE NO 57 3,900.00 TON $0190 00078 CRUSHED AGGREGATE SIZE NO 2 290.00 TON $0200 00080 CRUSHED AGGREGATE SIZE NO 23 15,333.00 TON $0210 01310 REMOVE PIPE 157.00 LF $0220 01314 PLUG PIPE 3.00 EACH $0230 01584 CAP DROP BOX INLET 2.00 EACH $0240 01585 REMOVE DROP BOX INLET 1.00 EACH $0250 01810 STANDARD CURB AND GUTTER 12,440.00 LF $0260 01820 LIP CURB AND GUTTER 1,366.00 LF $0270 01825 ISLAND CURB AND GUTTER 4,452.00 LF $0280 01830 STANDARD INTEGRAL CURB 1,679.00 LF $0290 01875 STANDARD HEADER CURB 112.00 LF $0300 01880 BARRIER HEADER CURB 85.00 LF $0310 01891 ISLAND HEADER CURB TYPE 2 208.00 LF $0320 01917 STANDARD BARRIER MEDIAN TYPE 2 1,800.00 SQYD $0330 01946 MOUNTABLE MEDIAN TYPE 2A 333.00 SQYD $
0340 01982DELINEATOR FOR GUARDRAIL MONODIRECTIONAL WHITE 92.00 EACH $
0350 01983DELINEATOR FOR GUARDRAIL MONODIRECTIONAL YELLOW 2.00 EACH $
0360 01984 DELINEATOR FOR BARRIER - WHITE 1.00 EACH $0370 01985 DELINEATOR FOR BARRIER - YELLOW 44.00 EACH $
0380 01987DELINEATOR FOR GUARDRAIL BIDIRECTIONAL WHITE 11.00 EACH $
0390 01990 DELINEATOR FOR BARRIER WALL-B/W 10.00 EACH $0400 02001 CURB TO BARRIER WALL TRANS 10.00 EACH $
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 270 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 2 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT0410 02003 RELOCATE TEMP CONC BARRIER 24,205.00 LF $0420 02014 BARRICADE-TYPE III 12.00 EACH $0430 02015 CEMENT CONCRETE ISLAND 414.00 SQYD $0440 02091 REMOVE PAVEMENT 2,760.00 SQYD $0450 02157 PAVED DITCH TYPE 1 9.00 SQYD $0460 02159 TEMP DITCH 29,500.00 LF $
0470 02200ROADWAY EXCAVATION(REVISED: 3-6-18) 185,181.00 CUYD $
0480 02242WATER(FOR DUST CONTROL) 11.90 MGAL $
0490 02262 FENCE-WOVEN WIRE TYPE 1 2,634.00 LF $0500 02265 REMOVE FENCE 1,382.00 LF $0510 02268 REMOVE & REPLACE FENCE 990.00 LF $0520 02351 GUARDRAIL-STEEL W BEAM-S FACE 6,613.00 LF $
0530 02363GUARDRAIL CONNECTOR TO BRIDGE ENDTY A 7.00 EACH $
0540 02367 GUARDRAIL END TREATMENT TYPE 1 14.00 EACH $0550 02369 GUARDRAIL END TREATMENT TYPE 2A 11.00 EACH $0560 02381 REMOVE GUARDRAIL 8,831.00 LF $
0570 02387GUARDRAIL CONNECTOR TO BRIDGE ENDTY A-1 1.00 EACH $
0580 02403 REMOVE CONCRETE MASONRY 125.00 CUYD $0590 02429 RIGHT-OF-WAY MONUMENT TYPE 1 74.00 EACH $0600 02430 RIGHT-OF-WAY MONUMENT TYPE 1A 3.00 EACH $0610 02432 WITNESS POST 3.00 EACH $0620 02483 CHANNEL LINING CLASS II 437.00 TON $0630 02484 CHANNEL LINING CLASS III 404.00 TON $
0640 02545CLEARING AND GRUBBING(APPROXIMATELY 31.4 ACRES) 1.00 LS $
0650 02555 CONCRETE-CLASS B 462.00 CUYD $0660 02562 TEMPORARY SIGNS 1,500.00 SQFT $0670 02585 EDGE KEY 1,935.00 LF $0680 02587 HOOK BOLT WITH EXPAN ANCHOR 255.00 EACH $0690 02599 FABRIC-GEOTEXTILE TYPE IV 132,798.00 SQYD $0700 02600 FABRIC GEOTEXTILE TY IV FOR PIPE 41,592.00 SQYD $2.00 $ $83,184.000710 02625 REMOVE HEADWALL 1.00 EACH $0720 02650 MAINTAIN & CONTROL TRAFFIC 1.00 LS $
0730 02651DIVERSIONS (BY-PASS DETOURS)(EX EB KY4 TO EX NB NT) 1.00 LS $
0740 02651DIVERSIONS (BY-PASS DETOURS)(EX SB NT TO PR WB KY4) 1.00 LS $
0750 02651DIVERSIONS (BY-PASS DETOURS)(EX WB KY4 TO PR SB NT) 1.00 LS $
0760 02671 PORTABLE CHANGEABLE MESSAGE SIGN 8.00 EACH $0770 02676 MOBILIZATION FOR MILL & TEXT 1.00 LS $0780 02690 SAFELOADING 223.00 CUYD $0790 02696 SHOULDER RUMBLE STRIPS 56,520.00 LF $0800 02701 TEMP SILT FENCE 35,900.00 LF $0810 02703 SILT TRAP TYPE A 122.00 EACH $0820 02704 SILT TRAP TYPE B 122.00 EACH $0830 02705 SILT TRAP TYPE C 186.00 EACH $0840 02706 CLEAN SILT TRAP TYPE A 732.00 EACH $
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 271 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 3 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT0850 02707 CLEAN SILT TRAP TYPE B 732.00 EACH $0860 02708 CLEAN SILT TRAP TYPE C 558.00 EACH $0870 02720 SIDEWALK-4 IN CONCRETE 4,388.00 SQYD $0880 02726 STAKING 1.00 LS $
0890 02731REMOVE STRUCTURE(STA. 135+05, 2-SPAN BRIDGE) 1.00 LS $
0900 02731REMOVE STRUCTURE(STA. 146+12, BILLBOARD) 1.00 LS $
0910 02731REMOVE STRUCTURE(STA. 166+10, 4-SPAN BRIDGE) 1.00 LS $
0920 02731REMOVE STRUCTURE(STA. 166+75,4-SPAN BRIDGE) 1.00 LS $
0930 02731REMOVE STRUCTURE(STA. 179+10, 2-SPAN BRIDGE) 1.00 LS $
0940 02731REMOVE STRUCTURE(STA. 197+52, BILLBOARD) 1.00 LS $
0950 02775 ARROW PANEL 6.00 EACH $0960 02898 RELOCATE CRASH CUSHION 31.00 EACH $0970 03171 CONCRETE BARRIER WALL TYPE 9T 9,540.00 LF $0980 03225 TUBULAR MARKERS 62.00 EACH $0990 04934 TEMP SIGNAL MULTI PHASE 1.00 EACH $1000 05950 EROSION CONTROL BLANKET 15,211.00 SQYD $1010 05952 TEMP MULCH 290,000.00 SQYD $1020 05953 TEMP SEEDING AND PROTECTION 28,378.00 SQYD $1030 05963 INITIAL FERTILIZER 8.90 TON $1040 05964 20-10-10 FERTILIZER 16.70 TON $1050 05985 SEEDING AND PROTECTION 283,780.00 SQYD $1060 05989 SPECIAL SEEDING CROWN VETCH 20,850.00 SQYD $1070 05990 SODDING 7,907.00 SQYD $1080 05992 AGRICULTURAL LIMESTONE 177.00 TON $1090 06510 PAVE STRIPING-TEMP PAINT-4 IN 295,000.00 LF $1100 06514 PAVE STRIPING-PERM PAINT-4 IN 33,862.00 LF $1110 06515 PAVE STRIPING-PERM PAINT-6 IN 76,291.00 LF $
1120 06516PAVE STRIPING-PERM PAINT-8 IN(CROSS WALK) 1,994.00 LF $
1130 06542 PAVE STRIPING-THERMO-6 IN W 1,121.00 LF $1140 06545 PAVE STRIPING-THERMO-8 IN Y 534.00 LF $1150 06546 PAVE STRIPING-THERMO-12 IN W 5,908.00 LF $1160 06550 PAVE STRIPING-TEMP REM TAPE-W 1,000.00 LF $1170 06551 PAVE STRIPING-TEMP REM TAPE-Y 1,000.00 LF $1180 06566 PAVE MARKING-THERMO X-WALK-12 IN 1,974.00 LF $1190 06568 PAVE MARKING-THERMO STOP BAR-24IN 723.00 LF $1200 06569 PAVE MARKING-THERMO CROSS-HATCH 2,711.00 SQFT $1210 06574 PAVE MARKING-THERMO CURV ARROW 84.00 EACH $1220 06575 PAVE MARKING-THERMO COMB ARROW 3.00 EACH $1230 06576 PAVE MARKING-THERMO ONLY 10.00 EACH $1240 06578 PAVE MARKING-THERMO MERGE ARROW 12.00 EACH $1250 06600 REMOVE PAVEMENT MARKER TYPE V 219.00 EACH $1260 06601NC PAVE MARKING-PAINT WORDS 6.00 EACH $1270 08100 CONCRETE-CLASS A 249.00 CUYD $1280 08150 STEEL REINFORCEMENT 626.00 LB $
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 272 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 4 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT1290 08903 CRASH CUSHION TY VI CLASS BT TL3 8.00 EACH $1300 10020NS FUEL ADJUSTMENT 272,776.00 DOLL $1.00 $ $272,776.001310 10030NS ASPHALT ADJUSTMENT 414,199.00 DOLL $1.00 $ $414,199.00
1320 14003W CAP EXISTING MAIN(SANITARY SEWER) 16.00 EACH $
1330 15012 S ENCASEMENT CONCRETE 8.00 LF $1340 15017 S ENCASEMENT STEEL BORED RANGE 4 330.00 LF $1350 15018 S ENCASEMENT STEEL BORED RANGE 5 20.00 LF $1360 15019 S ENCASEMENT STEEL BORED RANGE 6 180.00 LF $1370 15023 S ENCASEMENT STEEL OPEN CUT RANGE 4 40.00 LF $1380 15024 S ENCASEMENT STEEL OPEN CUT RANGE 5 216.00 LF $1390 15058 S FORCE MAIN PVC 03 INCH 370.00 LF $1400 15072 S FORCE MAIN TIE-IN 03 INCH 1.00 EACH $1410 15086 S LATERAL CLEANOUT 4.00 EACH $1420 15090 S LATERAL SHORT SIDE 06 INCH 4.00 EACH $1430 15092 S MANHOLE 27.00 EACH $1440 15093 S MANHOLE ABANDON/REMOVE 25.00 EACH $1450 15095 S MANHOLE CASTING STANDARD 25.00 EACH $1460 15096 S MANHOLE CASTING WATERTIGHT 2.00 EACH $1470 15112 S PIPE PVC 08 INCH 1,855.00 LF $1480 15114 S PIPE PVC 12 INCH 3,486.00 LF $1490 15117 S PIPE PVC 24 INCH 470.00 LF $
1500 15118S PIPE SPECIAL(PVC 30-IN) 220.00 LF $
1510 15118S PIPE SPECIAL(PVC 36-IN) 142.00 LF $
1520 20000ES724TREE(AUTUMN GOLD GINKO) 3.00 EACH $
1530 20000ES724TREE(EASTERN RED CEDAR) 14.00 EACH $
1540 20000ES724TREE(LONDON PLANETREE) 5.00 EACH $
1550 20000ES724TREE(SARGENT CHERRY) 5.00 EACH $
1560 20000ES724TREE(SERVICEBERRY) 3.00 EACH $
1570 20191ED OBJECT MARKER TY 3 6.00 EACH $1580 20411ED LAW ENFORCEMENT OFFICER 5,000.00 HOUR $
1590 20430EDSAW CUT(NO LONG. EDGE KEY) 1,330.00 LF $
1600 20451NS724 WHITE OAK 4.00 EACH $1610 20550ND SAWCUT PAVEMENT 2,000.00 LF $1620 20591EC REMOVE BARRIER 60.00 LF $1630 20782NS714 PAVE MARKING THERMO-BIKE 17.00 EACH $1640 21289ED LONGITUDINAL EDGE KEY 34,412.00 LF $1650 21568ES724 SHELLBARK HICKORY 5.00 EACH $1660 22520EN PAVE MARKING-THERMO YIELD BAR-36 IN 98.00 LF $
1670 22861ENHIGH STRENGTH GEOTEXTILE FABRIC TY V(TY 5) 132,100.00 SQYD $
1680 22880ED BARRIER WALL TRANSITION 275.00 LF $
1690 23143ENDECORATIVE HANDRAIL(LEGACY TRAIL) 120.00 LF $
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 273 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 5 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT1700 23158ES505 DETECTABLE WARNINGS 1,152.00 SQFT $1710 23244NS724 BLACKGUM 8.00 EACH $1720 23274EN11F TURF REINFORCEMENT MAT 1 7,826.00 SQYD $
1730 23877ECCONC MEDIAN BARRIER WALL TY 14C(MODIFIED: TEXTURED) 4,006.00 LF $
1740 23979EC CRASH CUSHION TY VI CLASS C TL3 2.00 EACH $
1750 24386ECPAVE MARKING THERMO-BIKE LANEARROW 17.00 EACH $
1760 24489EC INLAID PAVEMENT MARKER 1,763.00 EACH $1770 24679ED PAVE MARK THERMO CHEVRON 956.00 SQFT $1780 24814EC PIPELINE INSPECTION 10,037.00 LF $1790 24845EC UTILITY COORDINATION 1.00 LS $
Section: 0003 - DRAINAGELINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT1800 00443 ENTRANCE PIPE-24 IN 22.00 LF $1810 00461 CULVERT PIPE-15 IN 585.00 LF $1820 00462 CULVERT PIPE-18 IN 194.00 LF $1830 00464 CULVERT PIPE-24 IN 139.00 LF $1840 00471 CULVERT PIPE-54 IN 53.00 LF $1850 00520 STORM SEWER PIPE-12 IN 52.00 LF $1860 00521 STORM SEWER PIPE-15 IN 1,621.00 LF $1870 00522 STORM SEWER PIPE-18 IN 3,658.00 LF $1880 00524 STORM SEWER PIPE-24 IN 1,459.00 LF $1890 00526 STORM SEWER PIPE-30 IN 1,078.00 LF $1900 00528 STORM SEWER PIPE-36 IN 520.00 LF $1910 00530 STORM SEWER PIPE-48 IN 534.00 LF $1920 00531 STORM SEWER PIPE-54 IN 174.00 LF $1930 01000 PERFORATED PIPE-4 IN 22,254.00 LF $1940 01001 PERFORATED PIPE-6 IN 7,273.00 LF $1950 01002 PERFORATED PIPE-8 IN 1,427.00 LF $1960 01004 PERFORATED PIPE-12 IN 3,200.00 LF $1970 01010 NON-PERFORATED PIPE-4 IN 1,396.00 LF $1980 01011 NON-PERFORATED PIPE-6 IN 399.00 LF $1990 01012 NON-PERFORATED PIPE-8 IN 55.00 LF $2000 01020 PERF PIPE HEADWALL TY 1-4 IN 9.00 EACH $2010 01021 PERF PIPE HEADWALL TY 1-6 IN 2.00 EACH $2020 01024 PERF PIPE HEADWALL TY 2-4 IN 4.00 EACH $2030 01025 PERF PIPE HEADWALL TY 2-6 IN 1.00 EACH $2040 01028 PERF PIPE HEADWALL TY 3-4 IN 13.00 EACH $2050 01029 PERF PIPE HEADWALL TY 3-6 IN 5.00 EACH $2060 01032 PERF PIPE HEADWALL TY 4-4 IN 27.00 EACH $2070 01033 PERF PIPE HEADWALL TY 4-6 IN 3.00 EACH $2080 01034 PERF PIPE HEADWALL TY 4-8 IN 2.00 EACH $2090 01200 PIPE CULVERT HEADWALL-12 IN 1.00 EACH $2100 01202 PIPE CULVERT HEADWALL-15 IN 8.00 EACH $2110 01204 PIPE CULVERT HEADWALL-18 IN 3.00 EACH $2120 01208 PIPE CULVERT HEADWALL-24 IN 2.00 EACH $
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 274 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 6 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT2130 01210 PIPE CULVERT HEADWALL-30 IN 2.00 EACH $2140 01212 PIPE CULVERT HEADWALL-36 IN 1.00 EACH $2150 01223 PIPE CULVERT HEADWALL-27 IN 1.00 EACH $2160 01432 SLOPED BOX OUTLET TYPE 1-15 IN 11.00 EACH $2170 01433 SLOPED BOX OUTLET TYPE 1-18 IN 14.00 EACH $2180 01434 SLOPED BOX OUTLET TYPE 1-24 IN 7.00 EACH $2190 01450 S & F BOX INLET-OUTLET-18 IN 1.00 EACH $2200 01452 S & F BOX INLET-OUTLET-30 IN 1.00 EACH $2210 01456 CURB BOX INLET TYPE A 36.00 EACH $2220 01480 CURB BOX INLET TYPE B 18.00 EACH $2230 01487 CURB BOX INLET TYPE F 3.00 EACH $2240 01490 DROP BOX INLET TYPE 1 5.00 EACH $2250 01496 DROP BOX INLET TYPE 3 1.00 EACH $2260 01511 DROP BOX INLET TYPE 5D 2.00 EACH $2270 01544 DROP BOX INLET TYPE 11 15.00 EACH $2280 01559 DROP BOX INLET TYPE 13G 3.00 EACH $2290 01577 DROP BOX INLET TYPE 14 7.00 EACH $2300 01584 CAP DROP BOX INLET 3.00 EACH $2310 01615 CONC MED BARR BOX INLET TY 14B2 4.00 EACH $2320 01616 CONC MED BARR BOX INLET TY 14B1 1.00 EACH $2330 01634 CAP CURB BOX INLET 7.00 EACH $2340 01642 JUNCTION BOX-18 IN 3.00 EACH $2350 01644 JUNCTION BOX-30 IN 1.00 EACH $2360 01691 FLUME INLET TYPE 2 4.00 EACH $2370 01756 MANHOLE TYPE A 8.00 EACH $2380 01767 MANHOLE TYPE C 6.00 EACH $2390 01791 ADJUST MANHOLE FRAME TO GRADE 2.00 EACH $2400 02555 CONCRETE-CLASS B 72.00 CUYD $2410 08100 CONCRETE-CLASS A 15.93 CUYD $2420 08821 DRAIN PIPE-8 IN 59.00 LF $2430 20932ND CONC MEDIAN BARRIER BOX INLET TY 14A1 1.00 EACH $2440 23610NC CORED HOLE DRAINAGE BOX CON 73.00 EACH $2450 23952EC DRAINAGE JUNCTION BOX TY B 12.00 EACH $2460 23970NC RESET GRATE 1.00 EACH $2470 24026EC PIPE CULVERT HEADWALL-54 IN 3.00 EACH $
Section: 0004 - BRIDGE - US 25 - GEORGETOWN ROAD - DWG. 27260LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT2480 02203 STRUCTURE EXCAV-UNCLASSIFIED 336.00 CUYD $2490 02231 STRUCTURE GRANULAR BACKFILL 790.00 CUYD $2500 02998 MASONRY COATING 2,801.00 SQYD $2510 03299 ARMORED EDGE FOR CONCRETE 220.00 LF $2520 08001 STRUCTURE EXCAVATION-COMMON 1,001.00 CUYD $2530 08002 STRUCTURE EXCAV-SOLID ROCK 188.00 CUYD $
2540 08003FOUNDATION PREPARATION(PIER NO. 1) 1.00 LS $
2550 08003FOUNDATION PREPARATION(PIER NO. 3) 1.00 LS $
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 275 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 7 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT2560 08020 CRUSHED AGGREGATE SLOPE PROT 683.00 TON $2570 08033 TEST PILES 24.00 LF $2580 08046 PILES-STEEL HP12X53 354.00 LF $2590 08094 PILE POINTS-12 IN 16.00 EACH $2600 08100 CONCRETE-CLASS A 711.00 CUYD $2610 08104 CONCRETE-CLASS AA 1,159.00 CUYD $2620 08130 MECHANICAL REINF COUPLER #5 40.00 EACH $2630 08131 MECHANICAL REINF COUPLER #6 30.00 EACH $2640 08134 MECHANICAL REINF COUPLER #9 8.00 EACH $2650 08135 MECHANICAL REINF COUPLER #10 48.00 EACH $
2660 08140MECHANICAL REINF COUPLER #5 EPOXYCOATED 709.00 EACH $
2670 08141MECHANICAL REINF COUPLER #6 EPOXYCOATED 376.00 EACH $
2680 08150 STEEL REINFORCEMENT 120,780.00 LB $2690 08151 STEEL REINFORCEMENT-EPOXY COATED 276,785.00 LB $2700 08634 PRECAST PC I BEAM TYPE 4 1,990.00 LF $2710 20637ED DRILLED SHAFT-ROCK 48 IN 24.00 LF $2720 20745ED ROCK SOUNDINGS 95.00 LF $2730 20746ED ROCK CORINGS 334.00 LF $2740 21532ED RAIL SYSTEM TYPE III 502.00 LF $2750 23538EC PEDESTRIAN RAIL 502.00 LF $2760 23583EC DRILLED SHAFT-48 IN-COMMON 95.00 LF $2770 23584EC DRILLED SHAFT-42 IN-ROCK 112.00 LF $2780 23953EC BEAM ERECTION 12.00 EACH $
Section: 0005 - BRIDGE - KY 922 - NEWTOWN PIKE - DWG. 27261LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT2790 02231 STRUCTURE GRANULAR BACKFILL 346.00 CUYD $2800 02998 MASONRY COATING 2,104.00 SQYD $2810 03299 ARMORED EDGE FOR CONCRETE 264.00 LF $2820 08001 STRUCTURE EXCAVATION-COMMON 642.00 CUYD $2830 08002 STRUCTURE EXCAV-SOLID ROCK 103.00 CUYD $2840 08020 CRUSHED AGGREGATE SLOPE PROT 776.00 TON $2850 08033 TEST PILES 45.00 LF $2860 08050 PILES-STEEL HP14X73 693.00 LF $2870 08095 PILE POINTS-14 IN 34.00 EACH $2880 08100 CONCRETE-CLASS A 347.00 CUYD $2890 08104 CONCRETE-CLASS AA 1,260.00 CUYD $2900 08130 MECHANICAL REINF COUPLER #5 16.00 EACH $2910 08134 MECHANICAL REINF COUPLER #9 16.00 EACH $2920 08135 MECHANICAL REINF COUPLER #10 24.00 EACH $
2930 08140MECHANICAL REINF COUPLER #5 EPOXYCOATED 20.00 EACH $
2940 08150 STEEL REINFORCEMENT 63,530.00 LB $2950 08151 STEEL REINFORCEMENT-EPOXY COATED 433,171.00 LB $2960 21532ED RAIL SYSTEM TYPE III 522.00 LF $2970 23538EC PEDESTRIAN RAIL 510.00 LF $
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 276 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 8 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
2980 24405ECMECHANICAL REINF COUPLER-#8 EPOXYCOATED 6.00 EACH $
2990 24539EC PPC I-BEAM HN 60-49 3,354.00 LF $
Section: 0006 - BRIDGE - LEXMARK ACCESS ROAD - DWG. 27262LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT3000 02203 STRUCTURE EXCAV-UNCLASSIFIED 1,510.00 CUYD $3010 02231 STRUCTURE GRANULAR BACKFILL 200.00 CUYD $3020 02998 MASONRY COATING 1,135.00 SQYD $3030 03299 ARMORED EDGE FOR CONCRETE 82.00 LF $3040 08001 STRUCTURE EXCAVATION-COMMON 45.00 CUYD $3050 08002 STRUCTURE EXCAV-SOLID ROCK 25.00 CUYD $3060 08100 CONCRETE-CLASS A 310.70 CUYD $3070 08104 CONCRETE-CLASS AA 279.60 CUYD $3080 08130 MECHANICAL REINF COUPLER #5 12.00 EACH $3090 08132 MECHANICAL REINF COUPLER #7 7.00 EACH $3100 08133 MECHANICAL REINF COUPLER #8 7.00 EACH $
3110 08140MECHANICAL REINF COUPLER #5 EPOXYCOATED 12.00 EACH $
3120 08150STEEL REINFORCEMENT(REVISED: 3-6-18) 11,635.00 LB $
3130 08151 STEEL REINFORCEMENT-EPOXY COATED 101,096.00 LB $
3140 08170SHEAR CONNECTORS(APPROXIMATELY 1,036) 1.00 LS $
3150 20637ED DRILLED SHAFT-ROCK 48 IN 200.00 LF $3160 20743ED DRILLED SHAFT 54 IN-SOLID ROCK 170.00 LF $3170 20745ED ROCK SOUNDINGS 218.00 LF $3180 20746ED ROCK CORINGS 610.00 LF $3190 21532ED RAIL SYSTEM TYPE III 333.00 LF $3200 22417EN DRILLED SHAFT-54 IN-COMMON 186.00 LF $3210 23849EC BICYCLE RAIL 160.00 LF $3220 23963EC PPC I-BEAM TYPE HN 36-49 983.00 LF $
3230 24405ECMECHANICAL REINF COUPLER-#8 EPOXYCOATED 28.00 EACH $
Section: 0007 - BRIDGE - CULVERT #1 - CANE RUN CREEK - DWG. 27263LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT3240 08002 STRUCTURE EXCAV-SOLID ROCK 40.00 CUYD $3250 08003 FOUNDATION PREPARATION 1.00 LS $3260 08100 CONCRETE-CLASS A 134.10 CUYD $3270 08150 STEEL REINFORCEMENT 16,340.00 LB $
Section: 0008 - SIGNINGLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 277 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 9 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT3280 04904 BARRIER MOUNTING BRACKET 2.00 EACH $3290 06400 GMSS GALV STEEL TYPE A 1,628.00 LB $3300 06401 FLEXIBLE DELINEATOR POST-M/W 235.00 EACH $3310 06404 FLEXIBLE DELINEATOR POST-M/Y 165.00 EACH $3320 06405 SBM ALUMINUM PANEL SIGNS 8,056.00 SQFT $3330 06406 SBM ALUM SHEET SIGNS .080 IN 534.00 SQFT $3340 06407 SBM ALUM SHEET SIGNS .125 IN 1,529.00 SQFT $3350 06410 STEEL POST TYPE 1 4,273.00 LF $3360 06412 STEEL POST MILE MARKERS 4.00 EACH $3370 06436 OSS ALUMINUM 75 FT TRUSS 2.00 EACH $3380 06438 OSS ALUMINUM 80 FT TRUSS 3.00 EACH $3390 06441 GMSS GALV STEEL TYPE C 17,513.00 LB $
3400 06448SIGN BRIDGE ATTACHMENT BRACKET(REVISED: 3-6-18) 5.00 EACH $
3410 06490 CLASS A CONCRETE FOR SIGNS 293.00 CUYD $3420 06491 STEEL REINFORCEMENT FOR SIGNS 21,810.00 LB $3430 20418ED REMOVE & RELOCATE SIGNS 3.00 EACH $3440 20419ND ROADWAY CROSS SECTION 23.00 EACH $3450 20912ND BARRIER WALL POST 2.00 EACH $3460 21596ND GMSS TYPE D 28.00 EACH $3470 24631EC BARCODE SIGN INVENTORY 257.00 EACH $
3480 24962EDOSS ALUMINUM 90 FT TRUSS - SPECIAL(800-SF SIGN AREA) 2.00 EACH $
Section: 0009 - SIGNALIZATIONLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT3490 04792 CONDUIT-1 IN 265.00 LF $3500 04795 CONDUIT-2 IN 235.00 LF $3510 04811 ELECTRICAL JUNCTION BOX TYPE B 27.00 EACH $3520 04820 TRENCHING AND BACKFILLING 3,450.00 LF $3530 04821 OPEN CUT ROADWAY 235.00 LF $3540 04830 LOOP WIRE 14,250.00 LF $3550 04845 CABLE-NO. 14/7C 12,200.00 LF $3560 04850 CABLE-NO. 14/1 PAIR 19,250.00 LF $3570 04885 MESSENGER-10800 LB 2,675.00 LF $3580 04886 MESSENGER-15400 LB 125.00 LF $3590 04895 LOOP SAW SLOT AND FILL 5,700.00 LF $3600 04932 INSTALL STEEL STRAIN POLE 20.00 EACH $3610 20093NS835 INSTALL PEDESTRIAN HEAD-LED 24.00 EACH $3620 20094ES835 TEMP RELOCATION OF SIGNAL HEAD 106.00 EACH $3630 20188NS835 INSTALL LED SIGNAL-3 SECTION 44.00 EACH $3640 20189NS835 INSTALL LED SIGNAL-5 SECTION 1.00 EACH $3650 20266ES835 INSTALL LED SIGNAL- 4 SECTION 8.00 EACH $3660 21543EN BORE AND JACK CONDUIT 235.00 LF $3670 21743NN INSTALL PEDESTRIAN DETECTOR 24.00 EACH $
3680 23068NNREMOVE & REINSTALL COORDINATINGUNIT 2.00 EACH $
3690 23150NN COMMUNICATION CABLE 100.00 LF $
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 278 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 10 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT3700 23157EN TRAFFIC SIGNAL POLE BASE 96.00 CUYD $3710 23222EC INSTALL SIGNAL PEDESTAL 18.00 EACH $3720 24900EC PVC CONDUIT-1 1/4 IN-SCHEDULE 80 1,500.00 LF $3730 24901EC PVC CONDUIT-2 IN-SCHEDULE 80 2,150.00 LF $3740 24908EC INSTALL SIGNAL CONTROLLER-TY ATC 5.00 EACH $3750 24955ED REMOVE SIGNAL EQUIPMENT 6.00 EACH $
Section: 0010 - LIGHTINGLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT3760 04710 POLE 80 FT MTG HT HIGH MAST 17.00 EACH $3770 04740 POLE BASE 59.00 EACH $3780 04761 LIGHTING CONTROL EQUIPMENT 4.00 EACH $3790 04780 FUSED CONNECTOR KIT 6.00 EACH $3800 04797 CONDUIT-3 IN 2,333.00 LF $3810 04800 MARKER 26.00 EACH $3820 04820 TRENCHING AND BACKFILLING 15,247.00 LF $3830 04821 OPEN CUT ROADWAY 4,759.00 LF $3840 04834 WIRE-NO. 6 3,000.00 LF $3850 04835 WIRE-NO. 4 1,750.00 LF $
3860 04940REMOVE LIGHTING(GEORGETOWN ROAD) 1.00 LS $
3870 04940REMOVE LIGHTING(KU GEORGETOWN) 1.00 LS $
3880 04940REMOVE LIGHTING(LEXMARK BRIDGE TO WALMART ENTR) 1.00 LS $
3890 04940REMOVE LIGHTING(LEXMARK ROUNDABOUT) 1.00 LS $
3900 04940REMOVE LIGHTING(NEWTOWN PIKE) 1.00 LS $
3910 20391NS835 ELECTRICAL JUNCTION BOX TYPE A 25.00 EACH $3920 20392NS835 ELECTRICAL JUNCTION BOX TYPE C 6.00 EACH $
3930 20410EDMAINTAIN LIGHTING(GEORGETOWN ROAD) 1.00 LS $
3940 20410EDMAINTAIN LIGHTING(KU GEORGETOWN ) 1.00 LS $
3950 20410EDMAINTAIN LIGHTING(LEXMARK BRIDGE TO WALMART ENTR) 1.00 LS $
3960 20410EDMAINTAIN LIGHTING(LEXMARK ROUNDABOUT) 1.00 LS $
3970 20410EDMAINTAIN LIGHTING(NEWTOWN PIKE) 1.00 LS $
3980 21543EN BORE AND JACK CONDUIT 4,759.00 LF $3990 23161EN POLE BASE-HIGH MAST 205.00 CUYD $4000 24589ED LED LUMINAIRE 14.00 EACH $4010 24749EC HIGH MAST LED LUMINAIRE 80.00 EACH $4020 24851EC CABLE-NO. 10/3C DUCTED 22,300.00 LF $4030 24901EC PVC CONDUIT-2 IN-SCHEDULE 80 3,951.00 LF $
Section: 0011 - TRAFFIC LOOPS - STATION E58
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 279 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 11 of 12
181201
Section: 0011 - TRAFFIC LOOPS - STATION E58LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
4040 04793CONDUIT-1 1/4 IN(ADDED: 3-6-18) 60.00 LF $
4050 04795CONDUIT-2 IN(ADDED: 3-6-18) 40.00 LF $
4060 04820TRENCHING AND BACKFILLING(ADDED: 3-6-18) 90.00 LF $
4070 04829PIEZOELECTRIC SENSOR(ADDED: 3-6-18) 6.00 EACH $
4080 04830LOOP WIRE(ADDED: 3-6-18) 2,900.00 LF $
4090 04895LOOP SAW SLOT AND FILL(ADDED: 3-6-18) 600.00 LF $
4100 20359NNGALVANIZED STEEL CABINET(ADDED: 3-6-18) 2.00 EACH $
4110 20360ES818WOOD POST(ADDED: 3-6-18) 4.00 EACH $
4120 20391NS835ELECTRICAL JUNCTION BOX TYPE A(ADDED: 3-6-18) 2.00 EACH $
Section: 0012 - TRAFFIC LOOPS - STATION D64LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT4130 04793 CONDUIT-1 1/4 IN 60.00 LF $4140 04795 CONDUIT-2 IN 30.00 LF $4150 04820 TRENCHING AND BACKFILLING 80.00 LF $4160 04829 PIEZOELECTRIC SENSOR 9.00 EACH $4170 04830 LOOP WIRE 4,250.00 LF $4180 04895 LOOP SAW SLOT AND FILL 850.00 LF $4190 20359NN GALVANIZED STEEL CABINET 2.00 EACH $4200 20360ES818 WOOD POST 4.00 EACH $4210 20391NS835 ELECTRICAL JUNCTION BOX TYPE A 2.00 EACH $
Section: 0013 - TRAFFIC LOOPS - STATION D66LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT4220 04793 CONDUIT-1 1/4 IN 60.00 LF $4230 04795 CONDUIT-2 IN 30.00 LF $4240 04820 TRENCHING AND BACKFILLING 80.00 LF $4250 04829 PIEZOELECTRIC SENSOR 6.00 EACH $4260 04830 LOOP WIRE 2,775.00 LF $4270 04895 LOOP SAW SLOT AND FILL 600.00 LF $4280 20359NN GALVANIZED STEEL CABINET 2.00 EACH $4290 20360ES818 WOOD POST 4.00 EACH $4300 20391NS835 ELECTRICAL JUNCTION BOX TYPE A 2.00 EACH $
Section: 0014 - INTELLIGENT TRANSPORTATION SYSTEMS
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 280 of 281
REVISED ADDENDUM #1: 3-6-18
PROPOSAL BID ITEMS
Report Date 3/6/18Page 12 of 12
181201
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
4310 04810ELECTRICAL JUNCTION BOX(COMMUNICATIONS JB) 40.00 EACH $
4320 04820 TRENCHING AND BACKFILLING 10,700.00 LF $4330 04835 WIRE-NO. 4 2,100.00 LF $4340 04932 INSTALL STEEL STRAIN POLE 1.00 EACH $
4350 21066NDMODEL 336 ENCLOSURE(DDM) 1.00 EACH $
4360 21077ED FIBER OPTIC CABLE 12,200.00 LF $4370 21543EN BORE AND JACK CONDUIT 1,800.00 LF $4380 22403NN WEB CAMERA ASSEMBLY 1.00 EACH $4390 23150NN COMMUNICATION CABLE 100.00 LF $4400 23157EN TRAFFIC SIGNAL POLE BASE 4.00 CUYD $4410 24901EC PVC CONDUIT-2 IN-SCHEDULE 80 11,450.00 LF $
Section: 0015 - TRAINEESLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
4420 02742TRAINEE PAYMENT REIMBURSEMENT1 CEMENT MASON 1,200.00 HOUR $
Section: 0016 - DEMOBILIZATION &/OR MOBILIZATIONLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT4430 02568 MOBILIZATION 1.00 LS $4440 02569 DEMOBILIZATION 1.00 LS $
FAYETTE COUNTYNHPP 2681 (033)
Contract ID: 181201Page 281 of 281
REVISED ADDENDUM #1: 3-6-18
HA
LF SIZ
E
H
ALF SIZ
E
GENERAL SUMMARY
CODE
ITEM
71
80
1314
1810
1820
1825
1875
1880
1891
1917
1982
1983
1984
1985
1987
1990
2001
2003
2014
2015
2091
2157
2159
2200
2242
2262
2265
2268
2351
2363
2367
2369
2381
2387
2429
2430
2432
2483
2484
2545
2555
2562
2568
2569
2585
2587
CRUSHED AGGREGATE SIZE NO. 57
CRUSHED AGGREGATE SIZE NO. 23
PLUG PIPE
STANDARD CURB AND GUTTER
LIP CURB AND GUTTER
ISLAND CURB AND GUTTER
STANDARD HEADER CURB
BARRIER HEADER CURB
ISLAND HEADER CURB TYPE 2
STANDARD BARRIER MEDIAN TYPE 2
DELINEATOR FOR GUARDRAIL - MONO DIRECTIONAL WHITE
DELINEATOR FOR GUARDRAIL - MONO DIRECTIONAL YELLOW
DELINEATOR FOR BARRIER - WHITE
DELINEATOR FOR BARRIER - YELLOW
DELINEATOR FOR GUARDRAIL - BI-DIRECTIONAL WHITE
DELINEATOR FOR BARRIER WALL - BI-DIRECTIONAL WHITE
CURB TO BARRIER WALL TRANSITION
RELOCATE TEMPORARY CONCRETE BARRIER WALL
BARRICADE - TYPE III
CEMENT CONCRETE ISLAND
REMOVE PAVEMENT
PAVED DITCH TYPE 1
TEMPORARY DITCH
ROADWAY EXCAVATION
WATER
FENCE - WOVEN WIRE TYPE 1
REMOVE FENCE
REMOVE AND REPLACE FENCE
GUARDRAIL STEEL "W" BEAM SINGLE FACE
GUARDRAIL CONNECTOR TO BRIDGE END TY A
GUARDRAIL END TREATMENT TY 1
GUARDRAIL END TREATMENT TY 2A
REMOVE GUARDRAIL
GUARDRAIL CONNECTOR TO BRIDGE END TY A-1
RIGHT-OF-WAY MONUMENT TYPE 1
RIGHT-OF-WAY MONUMENT TYPE 1A
WITNESS POST
CHANNEL LINING CLASS II
CHANNEL LINING CLASS III
CLEARING AND GRUBBING
TEMPORARY SIGNS
MOBILIZATION
DEMOBILIZATION
EDGE KEY
HOOK BOLT WITH EXPAN ANCHOR
UNIT
TON
TON
EACH
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
SQ YD
EACH
EACH
EACH
EACH
EACH
EACH
EACH
LIN FT
EACH
SQ YD
SQ YD
SQ YD
LIN FT
CU YD
MGAL
LIN FT
LIN FT
LIN FT
LIN FT
EACH
EACH
EACH
LIN FT
EACH
EACH
EACH
EACH
TON
TON
LS
CU YD
SQ FT
LS
LS
LIN FT
KY 4
3,900
15,333
3
1,726
4,452
23
1
44
24,205
12
586
11,100
117,847
4.5
943
395
235
3,128
7
5
1
28
1
3
221
180
1
1,500
1
1
RO
AD
GE
OR
GE
TO
WN
2,348
80
85
2
6
58
1,331
1,800
0.7
52
2
2
348
14
1
31
RA
MP
S
GE
OR
GE
TO
WN
581
25
340
4,200
1.7
945
1,365
1
1
5
44
378
56
PIK
E
NE
WT
OW
N
2,924
1,800
4
4
6
9
2,000
0.8
355
597
211
352
2
1
1,349
9
15
162
RA
MP
S
NE
WT
OW
N
197
34
2
3
5,700
2.3
391
390
544
1,361
3
2
4,773
2
157
60
LE
XM
AR
K
2,014
186
66
4
4
1,200
0.5
355
2
1
2
233
381
RO
AD
FR
ON
TA
GE
2,526
2,000
0.8
16
1
AP
PR
OA
CH
ES
124
4
1,500
0.6
2
TO
TA
LS
PR
OJ
EC
T
3,900
15,333
3
12,440
4,452
1,800
92
2
1
44
11
10
10
24,205
12
414
2,760
9
29,500
185,181
2,634
1,382
990
6,613
7
14
11
8,831
1
74
3
3
437
404
1
462
1,500
1
1
1,935
EARTHWORK QUANTITIES
1 TO BE USED AS DIRECTED BY THE ENGINEER
2 APPROXIMATELY 31.4 ACRES
NOTES:
3
BY MAINTAINING TRAFFIC ONLY
FOR CONTROLLING DUST CAUSED
4
5
EMB BENCHING
DITCH EXC
SOLID ROCK
COMMON
TOTAL EXCAVATION
EXCAVATION INCLUDES:
EMBANKMENT INCLUDES:
ROCK ROADBED
EMBANKMENT
12,588 CU YDS
0 CU YDS
33,342 CU YDS
139,251 CU YDS
185,181 CU YDS
0 CU YDS
76,775 CU YDS
76,775 CU YDS
6 ESTIMATED AT 10% SEEDING & PROTECTION
7 QUANTITY FOR ESTIMATING PURPOSES ONLY
GEOTECHNICAL NOTES FOR DETAILS.
PLATFORM AND WET & SOFT AREAS. SEE
INCLUDES QUANTITIES FOR THE WORKING
8 SEE SHEET R2M FOR DETAILS
9 QUANTITY FOR THE OVERALL PROJECT
10
11
SAWCUT IS CONSIDERED INCIDENTAL
NOT ASSOCIATED LONGITUDINAL EDGE KEY
12 QUANTITY FOR MAINTENANCE OF TRAFFIC
13
7
7 9
9
912
912
3
1
2
912
TOTAL EMBANKMENT*
85
126
503
1
1,625 503
14
AND SUMMARY)
(EXCLUDES QUANTITIES ITEMIZED AND NOTED ON PIPE SHEETS
ITEMS TO BE REMOVED OUTSIDE OF CONSTRUCTION LIMITS
141310 REMOVE PIPE LIN FT 22
1585 EACH 1
135 157
114REMOVE DROP BOX INLET
RAISED MEDIAN (GEORGETOWN ROAD)
QUANTITY FOR CONCRETE MEDIAN BARRIER END (MAINLINE) AND
1946 SQ YDMOUNTABLE MEDIAN TYPE 2A 333 333
2403 REMOVE CONCRETE MASONRY CU YD15 125 125
15 QUANTITY FOR REMOVAL OF STAIRS
16 QUANTITY FOR MEDIAN BARRIER WIDENING UNDER BRIDGE
230
17
2-SPAN BRIDGE
4-SPAN BRIDGE, LT STA 197+52 BILLBOARD, STA 179+10
146+12 BILLBOARD,STA 166+10 4-SPAN BRIDGE, STA 166+75
REMOVE STRUCTURES: STA 135+05 2-SPAN BRIDGE, RT STA
1,100 1,366
1830 STANDARD INTEGRAL CURB LIN FT 1,679 1,679
LIN FT
76
113 208
3,474 17,520 4,706 24,644 2,410 3,83410,746
2599 FABRIC - GEOTEXTILE TYPE IV SQ YD 71,707 11,795 13,304 17,208 3,730 10,349 4,705 132,79847
EACH 255 255
1
18
WWF TY 1 FOOTINGS
QUANTITY FOR MOD. GRAVITY RETAINING WALLS AND
CONCRETE CLASS B 18
905 470 92
4
1584 EACH 2 2
19
OR EXTENSIONS ARE PROPOSED.
QUANTITY INCLUDES EXISTING PIPES WHERE CONNECTIONS
CAP DROP BOX INLET
KY 4
INCLUDES QUANTITY FOR UTILITY LINE INSTALLATION IN
13 36 112
13
13
13
29
11.9
83
4
4
78 TONCRUSHED AGGREGATE SIZE NO. 2 225
20
97 20 225
20
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
Fe
bruary
16, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
J:\
KD
OT\
CIR
CL
E4\
SU
M\
GE
NE
RA
L S
UM
MA
RY.
DG
NFIL
E
NA
ME:
R2N7-366.00FAYETTE
KY 4NEW CIRCLE ROAD
GENERAL SUMMARY SHEET 1 OF 3
ENTRANCES AND 65 TONS FROM PERFORATED PIPE SUMMARY.
QUANTITY INCLUDES MATERIAL FOR FOUR CONSTRUCTION
EMBANKMENT OF 33,900 CUBIC YARDS IS SHOWN.
SHOWN ON INTERCHANGE GRADING PLAN (SHEET R104). ADDITIONAL
*EARTHWORK QUANTITIES DO NOT INCLUDE EMBANKMENT EARTHWORKS
RESPONSIBILITY.
FOR SHRINKAGE AND SWELL FACTORS ARE THE CONTRACTOR'S
CALCULATIONS SHOWN ARE FOR INFORMATION ONLY. ASSUMPTIONS
THE CONTRACTOR IS ADVISED THATTHE EARTHWORK
ESTIMATE FOR EARTHWORK CALCULATIONS FOR DESIGN ONLY.
NOTE:
21
FOR REMOVAL OF EXISTING LOOP AND DRAINAGE MODIFICATIONS.
QUANTITY INCLUDES 11,600 CU. YDS. FROM INTERCHANGE GRADING
21
HA
LF SIZ
E
H
ALF SIZ
E
GENERAL SUMMARY
CODE
ITEM
71
80
1314
1810
1820
1825
1875
1880
1891
1917
1982
1983
1984
1985
1987
1990
2001
2003
2014
2015
2091
2157
2159
2200
2242
2262
2265
2268
2351
2363
2367
2369
2381
2387
2429
2430
2432
2483
2484
2545
2555
2562
2568
2569
2585
2587
CRUSHED AGGREGATE SIZE NO. 57
CRUSHED AGGREGATE SIZE NO. 23
PLUG PIPE
STANDARD CURB AND GUTTER
LIP CURB AND GUTTER
ISLAND CURB AND GUTTER
STANDARD HEADER CURB
BARRIER HEADER CURB
ISLAND HEADER CURB TYPE 2
STANDARD BARRIER MEDIAN TYPE 2
DELINEATOR FOR GUARDRAIL - MONO DIRECTIONAL WHITE
DELINEATOR FOR GUARDRAIL - MONO DIRECTIONAL YELLOW
DELINEATOR FOR BARRIER - WHITE
DELINEATOR FOR BARRIER - YELLOW
DELINEATOR FOR GUARDRAIL - BI-DIRECTIONAL WHITE
DELINEATOR FOR BARRIER WALL - BI-DIRECTIONAL WHITE
CURB TO BARRIER WALL TRANSITION
RELOCATE TEMPORARY CONCRETE BARRIER WALL
BARRICADE - TYPE III
CEMENT CONCRETE ISLAND
REMOVE PAVEMENT
PAVED DITCH TYPE 1
TEMPORARY DITCH
ROADWAY EXCAVATION
WATER
FENCE - WOVEN WIRE TYPE 1
REMOVE FENCE
REMOVE AND REPLACE FENCE
GUARDRAIL STEEL "W" BEAM SINGLE FACE
GUARDRAIL CONNECTOR TO BRIDGE END TY A
GUARDRAIL END TREATMENT TY 1
GUARDRAIL END TREATMENT TY 2A
REMOVE GUARDRAIL
GUARDRAIL CONNECTOR TO BRIDGE END TY A-1
RIGHT-OF-WAY MONUMENT TYPE 1
RIGHT-OF-WAY MONUMENT TYPE 1A
WITNESS POST
CHANNEL LINING CLASS II
CHANNEL LINING CLASS III
CLEARING AND GRUBBING
TEMPORARY SIGNS
MOBILIZATION
DEMOBILIZATION
EDGE KEY
HOOK BOLT WITH EXPAN ANCHOR
UNIT
TON
TON
EACH
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
SQ YD
EACH
EACH
EACH
EACH
EACH
EACH
EACH
LIN FT
EACH
SQ YD
SQ YD
SQ YD
LIN FT
CU YD
MGAL
LIN FT
LIN FT
LIN FT
LIN FT
EACH
EACH
EACH
LIN FT
EACH
EACH
EACH
EACH
TON
TON
LS
CU YD
SQ FT
LS
LS
LIN FT
KY 4
3,900
15,333
3
1,726
4,452
23
1
44
24,205
12
586
11,100
117,847
4.5
943
395
235
3,128
7
5
1
28
1
3
221
180
1
1,500
1
1
RO
AD
GE
OR
GE
TO
WN
2,348
80
85
2
6
58
1,331
1,800
0.7
52
2
2
348
14
1
31
RA
MP
S
GE
OR
GE
TO
WN
581
25
340
4,200
1.7
945
1,365
1
1
5
44
378
56
PIK
E
NE
WT
OW
N
2,924
1,800
4
4
6
9
2,000
0.8
355
597
211
352
2
1
1,349
9
15
162
RA
MP
S
NE
WT
OW
N
197
34
2
3
5,700
2.3
391
390
544
1,361
3
2
4,773
2
157
60
LE
XM
AR
K
2,014
186
66
4
4
1,200
0.5
355
2
1
2
233
381
RO
AD
FR
ON
TA
GE
2,526
2,000
0.8
16
1
AP
PR
OA
CH
ES
124
4
1,500
0.6
2
TO
TA
LS
PR
OJ
EC
T
3,900
15,333
3
12,440
4,452
1,800
92
2
1
44
11
10
10
24,205
12
414
2,760
9
29,500
185,181
2,634
1,382
990
6,613
7
14
11
8,831
1
74
3
3
437
404
1
462
1,500
1
1
1,935
EARTHWORK QUANTITIES
1 TO BE USED AS DIRECTED BY THE ENGINEER
2 APPROXIMATELY 31.4 ACRES
NOTES:
3
BY MAINTAINING TRAFFIC ONLY
FOR CONTROLLING DUST CAUSED
4
5
EMB BENCHING
DITCH EXC
SOLID ROCK
COMMON
TOTAL EXCAVATION
EXCAVATION INCLUDES:
EMBANKMENT INCLUDES:
ROCK ROADBED
EMBANKMENT
12,588 CU YDS
0 CU YDS
33,342 CU YDS
139,251 CU YDS
185,181 CU YDS
0 CU YDS
76,775 CU YDS
76,775 CU YDS
6 ESTIMATED AT 10% SEEDING & PROTECTION
7 QUANTITY FOR ESTIMATING PURPOSES ONLY
GEOTECHNICAL NOTES FOR DETAILS.
PLATFORM AND WET & SOFT AREAS. SEE
INCLUDES QUANTITIES FOR THE WORKING
8 SEE SHEET R2M FOR DETAILS
9 QUANTITY FOR THE OVERALL PROJECT
10
11
SAWCUT IS CONSIDERED INCIDENTAL
NOT ASSOCIATED LONGITUDINAL EDGE KEY
12 QUANTITY FOR MAINTENANCE OF TRAFFIC
13
7
7 9
9
912
912
3
1
2
912
TOTAL EMBANKMENT*
85
126
503
1
1,625 503
14
AND SUMMARY)
(EXCLUDES QUANTITIES ITEMIZED AND NOTED ON PIPE SHEETS
ITEMS TO BE REMOVED OUTSIDE OF CONSTRUCTION LIMITS
141310 REMOVE PIPE LIN FT 22
1585 EACH 1
135 157
114REMOVE DROP BOX INLET
RAISED MEDIAN (GEORGETOWN ROAD)
QUANTITY FOR CONCRETE MEDIAN BARRIER END (MAINLINE) AND
1946 SQ YDMOUNTABLE MEDIAN TYPE 2A 333 333
2403 REMOVE CONCRETE MASONRY CU YD15 125 125
15 QUANTITY FOR REMOVAL OF STAIRS
16 QUANTITY FOR MEDIAN BARRIER WIDENING UNDER BRIDGE
230
17
2-SPAN BRIDGE
4-SPAN BRIDGE, LT STA 197+52 BILLBOARD, STA 179+10
146+12 BILLBOARD,STA 166+10 4-SPAN BRIDGE, STA 166+75
REMOVE STRUCTURES: STA 135+05 2-SPAN BRIDGE, RT STA
1,100 1,366
1830 STANDARD INTEGRAL CURB LIN FT 1,679 1,679
LIN FT
76
113 208
3,474 17,520 4,706 24,644 2,410 3,83410,746
2599 FABRIC - GEOTEXTILE TYPE IV SQ YD 71,707 11,795 13,304 17,208 3,730 10,349 4,705 132,79847
EACH 255 255
1
18
WWF TY 1 FOOTINGS
QUANTITY FOR MOD. GRAVITY RETAINING WALLS AND
CONCRETE CLASS B 18
905 470 92
4
1584 EACH 2 2
19
OR EXTENSIONS ARE PROPOSED.
QUANTITY INCLUDES EXISTING PIPES WHERE CONNECTIONS
CAP DROP BOX INLET
KY 4
INCLUDES QUANTITY FOR UTILITY LINE INSTALLATION IN
13 36 112
13
13
13
29
11.9
83
4
4
78 TONCRUSHED AGGREGATE SIZE NO. 2 225
20
97 20 225
20
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
Fe
bruary
16, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
J:\
KD
OT\
CIR
CL
E4\
SU
M\
GE
NE
RA
L S
UM
MA
RY.
DG
NFIL
E
NA
ME:
R2N7-366.00FAYETTE
KY 4NEW CIRCLE ROAD
GENERAL SUMMARY SHEET 1 OF 3
ENTRANCES AND 65 TONS FROM PERFORATED PIPE SUMMARY.
QUANTITY INCLUDES MATERIAL FOR FOUR CONSTRUCTION
EMBANKMENT OF 33,900 CUBIC YARDS IS SHOWN.
SHOWN ON INTERCHANGE GRADING PLAN (SHEET R104). ADDITIONAL
*EARTHWORK QUANTITIES DO NOT INCLUDE EMBANKMENT EARTHWORKS
RESPONSIBILITY.
FOR SHRINKAGE AND SWELL FACTORS ARE THE CONTRACTOR'S
CALCULATIONS SHOWN ARE FOR INFORMATION ONLY. ASSUMPTIONS
THE CONTRACTOR IS ADVISED THATTHE EARTHWORK
ESTIMATE FOR EARTHWORK CALCULATIONS FOR DESIGN ONLY.
NOTE:
21
FOR REMOVAL OF EXISTING LOOP AND DRAINAGE MODIFICATIONS.
QUANTITY INCLUDES 11,600 CU. YDS. FROM INTERCHANGE GRADING
21
1 REVISED 02-16-18
1
REVISED EMBANKMENT QUANTITY ADDED NOTE 21 REVISED EARTHWORK QUANTITIES REVISED EARTHWORKS SPECIAL NOTE
HA
LF SIZ
E
H
ALF SIZ
E
6 ESTIMATED AT 10% SEEDING & PROTECTION
7 QUANTITY FOR ESTIMATING PURPOSES ONLY
8 SEE SHEET R2M FOR DETAILS
9 QUANTITY FOR THE OVERALL PROJECT
10
11
SAWCUT IS CONSIDERED INCIDENTAL
NOT ASSOCIATED LONGITUDINAL EDGE KEY
12 QUANTITY FOR MAINTENANCE OF TRAFFIC
13
14
AND SUMMARY)
(EXCLUDES QUANTITIES ITEMIZED AND NOTED ON PIPE SHEETS
ITEMS TO BE REMOVED OUTSIDE OF CONSTRUCTION LIMITS
1 TO BE USED AS DIRECTED BY THE ENGINEER
2 APPROXIMATELY 31.4 ACRES
NOTES:
3
BY MAINTAINING TRAFFIC ONLY
FOR CONTROLLING DUST CAUSED
4
5
GEOTECHNICAL NOTES FOR DETAILS.
PLATFORM AND WET & SOFT AREAS. SEE
INCLUDES QUANTITIES FOR THE WORKING
RAISED MEDIAN (GEORGETOWN ROAD)
QUANTITY FOR CONCRETE MEDIAN BARRIER END (MAINLINE) AND
15 QUANTITY FOR REMOVAL OF STAIRS
16 QUANTITY FOR MEDIAN BARRIER WIDENING UNDER BRIDGE
17
2-SPAN BRIDGE
4-SPAN BRIDGE, LT STA 197+52 BILLBOARD, STA 179+10
146+12 BILLBOARD,STA 166+10 4-SPAN BRIDGE, STA 166+75
REMOVE STRUCTURES: STA 135+05 2-SPAN BRIDGE, RT STA
18
WWF TY 1 FOOTINGS
QUANTITY FOR MOD. GRAVITY RETAINING WALLS AND
19
OR EXTENSIONS ARE PROPOSED.
QUANTITY INCLUDES EXISTING PIPES WHERE CONNECTIONS
KY 4
INCLUDES QUANTITY FOR UTILITY LINE INSTALLATION IN
20
GENERAL SUMMARY
21
TO
TA
L P
ROJ
EC
T
AP
PR
OA
CH
ES
RO
AD
FR
ON
TA
GE
LE
XM
AR
K
RA
MP
S
NE
WT
OW
N
PIK
E
NE
WT
OW
N
RA
MP
S
GE
OR
GE
TO
WN
RO
AD
GE
OR
GE
TO
WN
KY 4
UNITITEMCODE
ITEM
ENTRANCES. SEE SHEET R2N FOR EARTHWORK ITEMS.
QUANTITY INCLUDES MATERIAL FOR FOUR CONSTRUCTION
22
SEE SPECIAL NOTE FOR UTILITY COORDINATION.
2600
2650
2651
2671
2676
2690
2696
2701
2703
2704
2705
2706
2707
2708
2720
2726
2775
2898
3171
3225
4934
5950
5952
5953
5963
5964
5985
5989
5990
5992
6510
6514
6515
6516
6542
6550
6551
6574
6575
FABRIC - GEOTEXTILE TYPE IV FOR PIPE
MAINTAIN AND CONTROL TRAFFIC
PORTABLE CHANGEABLE MESSAGE SIGN - 3 LINE
MOBILIZATION FOR MILL & TEXT
SAFELOADING
SHOULDER RUMBLE STRIPS - SAWED
TEMPORARY SILT FENCE
SILT TRAP TYPE A
SILT TRAP TYPE B
SILT TRAP TYPE C
CLEAN SILT TRAP TYPE A
CLEAN SILT TRAP TYPE B
CLEAN SILT TRAP TYPE C
SIDEWALK - 4 INCH CONCRETE
STAKING
RELOCATE CRASH CUSHION
CONCRETE BARRIER WALL TYPE 9T
TABULAR MARKINGS
TEMPORARY SIGNAL MULTI-PHASE
EROSION CONTROL BLANKET
TEMPORARY MULCH
TEMPORARY SEEDING AND PROTECTION
INITIAL FERTILIZER
20-10-10 FERTILIZER
SEEDING AND PROTECTION
SPECIAL SEEDING CROWN VETCH
SODDING
AGRICULTURAL LIMESTONE
PAVE STRIPING - TEMP PAINT - 4 IN
PAVE STRIPING - THERMO- 6 IN W
PAVE STRIPING - TEMP REM TAPE - W
PAVE STRIPING - TEMP REM TAPE - Y
SQ YD
LS
EACH
EACH
LS
CU YD
LF
LIN FT
EACH
EACH
EACH
EACH
EACH
EACH
SQ YD
LS
EACH
EACH
LIN FT
EACH
SQ YD
SQ YD
SQ YD
TON
TON
SQ YD
SQ YD
SQ YD
TON
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
EACH
EACH
41,592
1
1
8
10,500
16,000
122
122
186
732
732
558
353
1
6
31
9,540
8,257
290,000
28,378
283,780
9,200
3,388
295,000
75,791
1,994
1,121
1,000
1,000
2,200
1,644
1,400
33,862
5,300
3,072
4,800
669
2,000
1,680
376
1,000
1,164
5,700
123
3,439
3,100
236
1,200
543
1
67
2,418
2,000
1,000
45
350
32
41,592
1
1
8
1
56,520
35,900
122
122
186
732
732
558
4,388
1
6
31
9,540
62
1
15,211
290,000
28,378
283,780
20,850
7,907
295,000
76,291
1,994
1,121
1,000
1,000
84
912
12
1 9
9
9
9
912
912
912
912
1
6
9
9
912
912
912
33,862
2731 LS 1 1
62
9
177 177
8.9
16.7
8.9
16.7
9
EACH
2625 REMOVE HEADWALL 14 EACH 1 1
9
1
17
17 223
37,800
1,500
9
9
ARROW PANEL
8903 912 EACH 8 8
8,220
6576 EACH 10 10
PAVE MARKING - THERMO CURV ARROW 84
3PAVE MARKING - THERMO COMB ARROW
19713
13
CRASH CUSHION TY VI CLASS BY TL3
9
2651 12 9 EACH 1 1
2651 12 9 EACH 1 1
DIVERSIONS (BY-PASS DETOURS) - EX EB KY4 TO EX NB NT
DIVERSIONS (BY-PASS DETOURS) - EX WB KY4 TO PR SB NT
DIVERSIONS (BY-PASS DETOURS) - EX SB NT TO PR WB KY4
1 9
1 9
PAVE STRIPING - PERM PAINT - 4 IN 9
PAVE STRIPING- PERM PAINT- 6 IN 9
PAVE STRIPING- PERM PAINT- 8 IN 9
9
6545 PAVE STRIPING - THERMO- 8 IN W LIN FT9
6546 LIN FT 5,908 5,9089PAVE STRIPING - THERMO- 12 IN W
534 534
6566 LIN FT9
6568 LIN FT9
PAVE MARKING - THERMO X-WALK - 12 IN 1,974 1,974
PAVE STRIPING - THERMO STOP BAR- 24 IN 723 723
9
3
9
9
6578 PAVE MARKING - THERMO MERGE ARROW 9 EACH 12 12
PAVE MARKING - THERMO ONLY
6569 9PAVE MARKING - THERMO CROSS-HATCH SQFT 2,711 2,711
2731 LS 1 1
REMOVE STRUCTURE STA. 135+05
17
17
17
17
17
2731
2731
2731
2731
LS
LSLS
LS
1
1
1
1
1
1
1
1
REMOVE STRUCTURE STA. 146+12
REMOVE STRUCTURE STA. 166+10
REMOVE STRUCTURE STA. 166+75
REMOVE STRUCTURE STA. 197+52
REMOVE STRUCTURE STA. 179+10
4793
4795
4820
4829
4830
4895
20359NN
20360ES818
20391NS835
CONDUIT - 1 1/4 IN
CONDUIT - 2 IN
TRENCHING AND BACKFILLING
PIEZOELECTRIC SENSOR
LOOP WIRE
LOOP SAW SLOT AND FILL
GALVANIZED STEEL CABINET
WOOD POST
ELECTRICAL JUNCTION BOX TYPE A
LIN FT
LIN FT
LIN FT
LIN FT
EACH
EACH
EACH
EACH
LIN FT
ST
ATIO
N
D64
TR
AFFIC
LO
OP
S
ST
ATIO
N
D66
TR
AFFIC
LO
OP
S
60 60
30 30
80 80
9 6
4250 2775
850 600
2 2
4 4
2 2
6
6
12
180
250
21
2050
9925
22
22
22
22
22
22
22
22
22
REVISED 12/6/17
100
ST
ATIO
N
E58
TR
AFFIC
LO
OP
S
60
40
6
2900
600
2
4
2
90
E58, D64, AND D66.
STATIONS. INCLUDES ALL WORK FOR REPLACING STATIONS
SEE SPECIAL NOTE FOR ITEM DETAILS OF TRAFFIC COUNTING
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.832
COUNTY OF ITEM NO. SHEET NO.
Fe
bruary
26, 2018
DA
TE P
LO
TT
ED:
joshua.sa
mple
sU
SE
R:
U:\366\
FIN
AL P
LA
N
SU
BMIT
TA
L\
AD
DE
ND
UM\
R0020
OS
U.
DG
NFIL
E
NA
ME:
R2O7-366.00FAYETTE
KY 4NEW CIRCLE ROAD
GENERAL SUMMARY SHEET 2 OF 3
HA
LF SIZ
E
H
ALF SIZ
E
6 ESTIMATED AT 10% SEEDING & PROTECTION
7 QUANTITY FOR ESTIMATING PURPOSES ONLY
8 SEE SHEET R2M FOR DETAILS
9 QUANTITY FOR THE OVERALL PROJECT
10
11
SAWCUT IS CONSIDERED INCIDENTAL
NOT ASSOCIATED LONGITUDINAL EDGE KEY
12 QUANTITY FOR MAINTENANCE OF TRAFFIC
13
14
AND SUMMARY)
(EXCLUDES QUANTITIES ITEMIZED AND NOTED ON PIPE SHEETS
ITEMS TO BE REMOVED OUTSIDE OF CONSTRUCTION LIMITS
1 TO BE USED AS DIRECTED BY THE ENGINEER
2 APPROXIMATELY 31.4 ACRES
NOTES:
3
BY MAINTAINING TRAFFIC ONLY
FOR CONTROLLING DUST CAUSED
4
5
GEOTECHNICAL NOTES FOR DETAILS.
PLATFORM AND WET & SOFT AREAS. SEE
INCLUDES QUANTITIES FOR THE WORKING
RAISED MEDIAN (GEORGETOWN ROAD)
QUANTITY FOR CONCRETE MEDIAN BARRIER END (MAINLINE) AND
15 QUANTITY FOR REMOVAL OF STAIRS
16 QUANTITY FOR MEDIAN BARRIER WIDENING UNDER BRIDGE
17
2-SPAN BRIDGE
4-SPAN BRIDGE, LT STA 197+52 BILLBOARD, STA 179+10
146+12 BILLBOARD,STA 166+10 4-SPAN BRIDGE, STA 166+75
REMOVE STRUCTURES: STA 135+05 2-SPAN BRIDGE, RT STA
18
WWF TY 1 FOOTINGS
QUANTITY FOR MOD. GRAVITY RETAINING WALLS AND
19
OR EXTENSIONS ARE PROPOSED.
QUANTITY INCLUDES EXISTING PIPES WHERE CONNECTIONS
KY 4
INCLUDES QUANTITY FOR UTILITY LINE INSTALLATION IN
20
GENERAL SUMMARY
21
TO
TA
L P
ROJ
EC
T
AP
PR
OA
CH
ES
RO
AD
FR
ON
TA
GE
LE
XM
AR
K
RA
MP
S
NE
WT
OW
N
PIK
E
NE
WT
OW
N
RA
MP
S
GE
OR
GE
TO
WN
RO
AD
GE
OR
GE
TO
WN
KY 4
UNITITEMCODE
ITEM
ENTRANCES. SEE SHEET R2N FOR EARTHWORK ITEMS.
QUANTITY INCLUDES MATERIAL FOR FOUR CONSTRUCTION
22
SEE SPECIAL NOTE FOR UTILITY COORDINATION.
2600
2650
2651
2671
2676
2690
2696
2701
2703
2704
2705
2706
2707
2708
2720
2726
2775
2898
3171
3225
4934
5950
5952
5953
5963
5964
5985
5989
5990
5992
6510
6514
6515
6516
6542
6550
6551
6574
6575
FABRIC - GEOTEXTILE TYPE IV FOR PIPE
MAINTAIN AND CONTROL TRAFFIC
PORTABLE CHANGEABLE MESSAGE SIGN - 3 LINE
MOBILIZATION FOR MILL & TEXT
SAFELOADING
SHOULDER RUMBLE STRIPS - SAWED
TEMPORARY SILT FENCE
SILT TRAP TYPE A
SILT TRAP TYPE B
SILT TRAP TYPE C
CLEAN SILT TRAP TYPE A
CLEAN SILT TRAP TYPE B
CLEAN SILT TRAP TYPE C
SIDEWALK - 4 INCH CONCRETE
STAKING
RELOCATE CRASH CUSHION
CONCRETE BARRIER WALL TYPE 9T
TABULAR MARKINGS
TEMPORARY SIGNAL MULTI-PHASE
EROSION CONTROL BLANKET
TEMPORARY MULCH
TEMPORARY SEEDING AND PROTECTION
INITIAL FERTILIZER
20-10-10 FERTILIZER
SEEDING AND PROTECTION
SPECIAL SEEDING CROWN VETCH
SODDING
AGRICULTURAL LIMESTONE
PAVE STRIPING - TEMP PAINT - 4 IN
PAVE STRIPING - THERMO- 6 IN W
PAVE STRIPING - TEMP REM TAPE - W
PAVE STRIPING - TEMP REM TAPE - Y
SQ YD
LS
EACH
EACH
LS
CU YD
LF
LIN FT
EACH
EACH
EACH
EACH
EACH
EACH
SQ YD
LS
EACH
EACH
LIN FT
EACH
SQ YD
SQ YD
SQ YD
TON
TON
SQ YD
SQ YD
SQ YD
TON
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
EACH
EACH
41,592
1
1
8
10,500
16,000
122
122
186
732
732
558
353
1
6
31
9,540
8,257
290,000
28,378
283,780
9,200
3,388
295,000
75,791
1,994
1,121
1,000
1,000
2,200
1,644
1,400
33,862
5,300
3,072
4,800
669
2,000
1,680
376
1,000
1,164
5,700
123
3,439
3,100
236
1,200
543
1
67
2,418
2,000
1,000
45
350
32
41,592
1
1
8
1
56,520
35,900
122
122
186
732
732
558
4,388
1
6
31
9,540
62
1
15,211
290,000
28,378
283,780
20,850
7,907
295,000
76,291
1,994
1,121
1,000
1,000
84
912
12
1 9
9
9
9
912
912
912
912
1
6
9
9
912
912
912
33,862
2731 LS 1 1
62
9
177 177
8.9
16.7
8.9
16.7
9
EACH
2625 REMOVE HEADWALL 14 EACH 1 1
9
1
17
17 223
37,800
1,500
9
9
ARROW PANEL
8903 912 EACH 8 8
8,220
6576 EACH 10 10
PAVE MARKING - THERMO CURV ARROW 84
3PAVE MARKING - THERMO COMB ARROW
19713
13
CRASH CUSHION TY VI CLASS BY TL3
9
2651 12 9 EACH 1 1
2651 12 9 EACH 1 1
DIVERSIONS (BY-PASS DETOURS) - EX EB KY4 TO EX NB NT
DIVERSIONS (BY-PASS DETOURS) - EX WB KY4 TO PR SB NT
DIVERSIONS (BY-PASS DETOURS) - EX SB NT TO PR WB KY4
1 9
1 9
PAVE STRIPING - PERM PAINT - 4 IN 9
PAVE STRIPING- PERM PAINT- 6 IN 9
PAVE STRIPING- PERM PAINT- 8 IN 9
9
6545 PAVE STRIPING - THERMO- 8 IN W LIN FT9
6546 LIN FT 5,908 5,9089PAVE STRIPING - THERMO- 12 IN W
534 534
6566 LIN FT9
6568 LIN FT9
PAVE MARKING - THERMO X-WALK - 12 IN 1,974 1,974
PAVE STRIPING - THERMO STOP BAR- 24 IN 723 723
9
3
9
9
6578 PAVE MARKING - THERMO MERGE ARROW 9 EACH 12 12
PAVE MARKING - THERMO ONLY
6569 9PAVE MARKING - THERMO CROSS-HATCH SQFT 2,711 2,711
2731 LS 1 1
REMOVE STRUCTURE STA. 135+05
17
17
17
17
17
2731
2731
2731
2731
LS
LSLS
LS
1
1
1
1
1
1
1
1
REMOVE STRUCTURE STA. 146+12
REMOVE STRUCTURE STA. 166+10
REMOVE STRUCTURE STA. 166+75
REMOVE STRUCTURE STA. 197+52
REMOVE STRUCTURE STA. 179+10
4793
4795
4820
4829
4830
4895
20359NN
20360ES818
20391NS835
CONDUIT - 1 1/4 IN
CONDUIT - 2 IN
TRENCHING AND BACKFILLING
PIEZOELECTRIC SENSOR
LOOP WIRE
LOOP SAW SLOT AND FILL
GALVANIZED STEEL CABINET
WOOD POST
ELECTRICAL JUNCTION BOX TYPE A
LIN FT
LIN FT
LIN FT
LIN FT
EACH
EACH
EACH
EACH
LIN FT
ST
ATIO
N
D64
TR
AFFIC
LO
OP
S
ST
ATIO
N
D66
TR
AFFIC
LO
OP
S
60 60
30 30
80 80
9 6
4250 2775
850 600
2 2
4 4
2 2
6
6
12
180
250
21
2050
9925
22
22
22
22
22
22
22
22
22
REVISED 12/6/17
100
ST
ATIO
N
E58
TR
AFFIC
LO
OP
S
60
40
6
2900
600
2
4
2
90
E58, D64, AND D66.
STATIONS. INCLUDES ALL WORK FOR REPLACING STATIONS
SEE SPECIAL NOTE FOR ITEM DETAILS OF TRAFFIC COUNTING
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.832
COUNTY OF ITEM NO. SHEET NO.
Fe
bruary
26, 2018
DA
TE P
LO
TT
ED:
joshua.sa
mple
sU
SE
R:
U:\366\
FIN
AL P
LA
N
SU
BMIT
TA
L\
AD
DE
ND
UM\
R0020
OS
U.
DG
NFIL
E
NA
ME:
R2O7-366.00FAYETTE
KY 4NEW CIRCLE ROAD
GENERAL SUMMARY SHEET 2 OF 3
954
956
958
960
962
964
966
968
970
956
958
960
962
964
966
968
970
169+00 169+50 170+00 170+50 171+00 171+50 172+00 172+50 173+00 173+50 174+00
174+50 175+00
954
956
958
960
962
964
966
968
970
954
956
958
960
962
964
966
968
169+00 169+50 170+00 170+50 171+00 171+50 172+00 172+50 173+00 173+50 174+00 174+50 175+00
VPI 16
9+50.00
Ele
v. 966.87
VPI 17
0+00.00
Ele
v. 966.93
VPI 17
0+50.00
Ele
v. 966.87
VPI 17
1+00.00
Ele
v. 966.71
VPI 17
1+50.00
Ele
v. 966.51
VPI 17
2+00.00
Ele
v. 966.19
VPI 17
2+50.00
Ele
v. 965.63
VPI 17
3+00.00
Ele
v. 964.97
VPI 17
3+50.00
Ele
v. 964.35
VPI 17
4+00.00
Ele
v. 963.66
VPI 17
4+50.00
Ele
v. 962.79
VPI 17
5+00.00
Ele
v. 961.
89
0.358% 0.122% -0.120% -0.320% -0.400%-0.640%
-1.120%
-1.320%
-1.240%
-1.380%
-1.740%
-1.800%
966.69
966.87
966.93
966.87
966.71
966.51
966.19
965.63
964.97
964.35
963.66
962.79
961.
89
VPI 16
9+50.00
Ele
v. 966.87
VPI 17
0+00.00
Ele
v. 966.93
VPI 17
0+50.00
Ele
v. 966.87
VPI 17
1+00.00
Ele
v. 966.71
VPI 17
1+50.00
Ele
v. 966.51
VPI 17
2+00.00
Ele
v. 966.19
VPI 17
2+50.00
Ele
v. 965.63
VPI 17
3+00.00
Ele
v. 964.97
VPI 17
3+50.00
Ele
v. 964.35
VPI 17
4+00.00
Ele
v. 963.66
VPI 17
4+50.00
Ele
v. 962.79
VPI 17
5+00.00
Ele
v. 961.
89
0.358% 0.122% -0.120% -0.320% -0.400%-0.640%
-1.120%
-1.320%
-1.240%
-1.380%
-1.740%
-1.800%
966.69
966.87
966.93
966.87
966.71
966.51
966.19
965.63
964.97
964.35
963.66
962.79
961.
89
HA
LF SIZ
E
H
ALF SIZ
E
GRADE POINT
EXISTING CENTERLINE
EXISTING
GRADE POINT
EXISTING CENTERLINE
EXISTING
OUTER LOOP (WESTBOUND)
INNER LOOP (EASTBOUND)
966.6
966.7
966.8
966.8
966.6
966.4
966.1
965.5
964.9
964.3
963.6
962.7
961.
8
966.5
966.7
966.8
966.7
966.6
966.3
965.9
965.4
964.9
964.2
963.3
962.3
961.
4
EXC.EMB.
00 6590 13,879
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 169+00 TO 175+00
*
*
-2.00%
-2.00%
-2.00%
-0.56%-0.59%
4.06
%
"V" DITCH RT.
0.50%0.50% -1.98%
-2.08%
-1.06%
EXIST. 30" RCP
EXIST. 30" RCP
963.78
+00
VPI 16
9+00.00
Ele
v. 966.69
VPI 16
9+00.00
Ele
v. 966.69
963.28
+00
Ele
v. 961.
50
963.53
+50
962.79
+50
961.75
+00
963.00
+50
962.00
+00
961.00
+50
960.00
+00
959.72
+50
959.47
+00
961.50
+50
*
DATUMDATUM
KY 4 - NEW CIRCLE ROAD
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R26
PROFILE SHEET
STA. 169+00 TO STA. 175+00
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
16, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R02600
PR.
DG
NFIL
E
NA
ME:
DATUM
FROM INTERCHANGE GRADING PLAN ARE EXCLUDED.
FOR LOOP REMOVAL AND DRAINAGE MODIFICATIONS. 33,900 CU. YDS. OF EMBANKMENT
NOTE: QUANTITY INCLUDES 11,600 CU. YDS. EXCAVATION FROM INTERCHANGE GRADING PLANS
954
956
958
960
962
964
966
968
970
956
958
960
962
964
966
968
970
169+00 169+50 170+00 170+50 171+00 171+50 172+00 172+50 173+00 173+50 174+00
174+50 175+00
954
956
958
960
962
964
966
968
970
954
956
958
960
962
964
966
968
169+00 169+50 170+00 170+50 171+00 171+50 172+00 172+50 173+00 173+50 174+00 174+50 175+00
VPI 16
9+50.00
Ele
v. 966.87
VPI 17
0+00.00
Ele
v. 966.93
VPI 17
0+50.00
Ele
v. 966.87
VPI 17
1+00.00
Ele
v. 966.71
VPI 17
1+50.00
Ele
v. 966.51
VPI 17
2+00.00
Ele
v. 966.19
VPI 17
2+50.00
Ele
v. 965.63
VPI 17
3+00.00
Ele
v. 964.97
VPI 17
3+50.00
Ele
v. 964.35
VPI 17
4+00.00
Ele
v. 963.66
VPI 17
4+50.00
Ele
v. 962.79
VPI 17
5+00.00
Ele
v. 961.
89
0.358% 0.122% -0.120% -0.320% -0.400%-0.640%
-1.120%
-1.320%
-1.240%
-1.380%
-1.740%
-1.800%
966.69
966.87
966.93
966.87
966.71
966.51
966.19
965.63
964.97
964.35
963.66
962.79
961.
89
VPI 16
9+50.00
Ele
v. 966.87
VPI 17
0+00.00
Ele
v. 966.93
VPI 17
0+50.00
Ele
v. 966.87
VPI 17
1+00.00
Ele
v. 966.71
VPI 17
1+50.00
Ele
v. 966.51
VPI 17
2+00.00
Ele
v. 966.19
VPI 17
2+50.00
Ele
v. 965.63
VPI 17
3+00.00
Ele
v. 964.97
VPI 17
3+50.00
Ele
v. 964.35
VPI 17
4+00.00
Ele
v. 963.66
VPI 17
4+50.00
Ele
v. 962.79
VPI 17
5+00.00
Ele
v. 961.
89
0.358% 0.122% -0.120% -0.320% -0.400%-0.640%
-1.120%
-1.320%
-1.240%
-1.380%
-1.740%
-1.800%
966.69
966.87
966.93
966.87
966.71
966.51
966.19
965.63
964.97
964.35
963.66
962.79
961.
89
HA
LF SIZ
E
H
ALF SIZ
E
GRADE POINT
EXISTING CENTERLINE
EXISTING
GRADE POINT
EXISTING CENTERLINE
EXISTING
OUTER LOOP (WESTBOUND)
INNER LOOP (EASTBOUND)
966.6
966.7
966.8
966.8
966.6
966.4
966.1
965.5
964.9
964.3
963.6
962.7
961.
8
966.5
966.7
966.8
966.7
966.6
966.3
965.9
965.4
964.9
964.2
963.3
962.3
961.
4
EXC.EMB.
00 6590 13,879
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 169+00 TO 175+00
*
*
-2.00%
-2.00%
-2.00%
-0.56%-0.59%
4.06
%
"V" DITCH RT.
0.50%0.50% -1.98%
-2.08%
-1.06%
EXIST. 30" RCP
EXIST. 30" RCP
963.78
+00
VPI 16
9+00.00
Ele
v. 966.69
VPI 16
9+00.00
Ele
v. 966.69
963.28
+00
Ele
v. 961.
50
963.53
+50
962.79
+50
961.75
+00
963.00
+50
962.00
+00
961.00
+50
960.00
+00
959.72
+50
959.47
+00
961.50
+50
*
DATUMDATUM
KY 4 - NEW CIRCLE ROAD
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R26
PROFILE SHEET
STA. 169+00 TO STA. 175+00
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
16, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R02600
PR.
DG
NFIL
E
NA
ME:
DATUM
FROM INTERCHANGE GRADING PLAN ARE EXCLUDED.
FOR LOOP REMOVAL AND DRAINAGE MODIFICATIONS. 33,900 CU. YDS. OF EMBANKMENT
NOTE: QUANTITY INCLUDES 11,600 CU. YDS. EXCAVATION FROM INTERCHANGE GRADING PLANS
1 REVISED 02-16-18
1 REVISED EARTHWORKS QUANTITIES AND NOTE
936
938
940
942
944
946
948
950
952
938
940
942
944
946
948
950
952
181+00 181+50 182+00 182+50 183+00 183+50 184+00 184+50 185+00 185+50 186+00
186+50 187+00
936
938
940
942
944
946
948
950
952
936
938
940
942
944
946
948
950
181+00 181+50 182+00 182+50 183+00 183+50 184+00 184+50 185+00 185+50 186+00 186+50 187+00
VPI 18
1+50.00
Ele
v. 948.96
VPI 18
2+00.00
Ele
v. 948.01
VPI 18
2+50.00
Ele
v. 947.13
VPI 18
3+00.00
Ele
v. 946.40
VPI 18
3+50.00
Ele
v. 945.81
VPI 18
4+00.00
Ele
v. 945.23
VPI 18
4+50.00
Ele
v. 944.63
VPI 18
5+00.00
Ele
v. 944.02
VPI 18
5+50.00
Ele
v. 943.36
VPI 18
6+00.00
Ele
v. 942.73
VPI 18
6+50.00
Ele
v. 942.15
-1.982%
-1.890%
-1.760%
-1.460%
-1.178%
-1.178%
-1.196%
-1.214%
-1.320%
-1.254%
-1.168%
-0.966%
VPI 18
1+50.00
Ele
v. 948.96
VPI 18
2+00.00
Ele
v. 948.01
VPI 18
2+50.00
Ele
v. 947.13
VPI 18
3+00.00
Ele
v. 946.40
VPI 18
3+50.00
Ele
v. 945.81
VPI 18
4+00.00
Ele
v. 945.23
VPI 18
4+50.00
Ele
v. 944.63
VPI 18
5+00.00
Ele
v. 944.02
VPI 18
5+50.00
Ele
v. 943.36
VPI 18
6+00.00
Ele
v. 942.73
VPI 18
6+50.00
Ele
v. 942.15
-1.982%
-1.890%
-1.760%
-1.460%
-1.178%
-1.178%
-1.196%
-1.214%
-1.320%
-1.254%
-1.168%
-0.966%
949.95
948.96
948.01
947.13
946.40
945.81
945.23
944.63
944.02
943.36
942.73
942.15
941.
67
949.95
948.96
948.01
947.13
946.40
945.81
945.23
944.63
944.02
943.36
942.73
942.15
941.
67
HA
LF SIZ
E
H
ALF SIZ
E
GRADE POINT
EXISTINGCENTERLINE
EXISTING
GRADE POINT
EXISTING
CENTERLINE
EXISTING
OUTER LOOP (WESTBOUND)
INNER LOOP (EASTBOUND)
949.8
948.8
947.9
947.0
946.2
945.6
944.9
944.3
943.8
943.3
942.6
942.0
941.
5
949.7
948.8
947.9
947.0
946.3
945.6
945.0
944.3
943.7
943.2
942.6
942.0
941.
5
-0.50%
-1.58%
-1.76%
-1.46%
-1.18%
-1.16%
-1.20%
-2.72%
-1.40% 1.74%
-0.50%
2' F.B. SPCL. DT. RT.
2' F.B. SPCL. DT. RT.
-1.12%
-0.98%
-1.90%
-1.76%
-1.40%
-1.12%
-1.12%
-2.94%
-3.00%
-3.00%
-1.63%
-0.96%
2' F.B. SPCL. DT. LT.
U-TYPE HDWLL LT STA. 186+20.81
PIPE OUTLET RT STA. 185+17.78
27"
U-
TY
PE
HE
AD
WA
LL
ST
A. 18
6+20.81 -
CO
NS
T.
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
24"
SL
OP
ED
BO
X
OU
TL
ET
&
ST
A. 18
5+17.78 -
CO
NS
T.
945.68
+50946.17
+00
VPI 18
1+00.00
Ele
v. 949.95
VPI 18
1+00.00
Ele
v. 949.95
944.73
+00
943.85
+50
943.15
+00
942.59
+50
942.03
+00
941.47
+50
940.00
+00
938.50
+50
937.00
+00
938.87
+50
938.39
+00
VPI 18
7+00.00
Ele
v. 941.
67
Ele
v. 941.
67
VPI 18
7+00.00
944.53
+00
944.28
+50
943.49
+00
942.61
+50
941.88
+00
941.29
+50
940.71
+00
940.11
+50
938.75
+00
939.50
+50
939.25
+00
EXC.EMB.
2,3890 6560 7,290
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 181+00 TO 187+00
So=0.040 ft/ft24" RCP (RT)
CONST. 28 LF
So=0.004 ft/ft24" RCP (LT)CONST. 21 LF
So=Match Existing Slope24" RCP (RT)CONST. 4 LF
DESIGN
CHECK
RUNOFF
(cfs)
STORM
(YR)
FLOOD DATA
(ft)
HEADWATER ELEV
25 18.0 940.12
100 22.6 940.51
DESIGN
CHECK
RUNOFF
(cfs)
STORM
(YR)
FLOOD DATA
(ft)
HEADWATER ELEV
25 26.7 938.75
100 33.6 939.09
DATUMDATUM
KY 4 - NEW CIRCLE ROAD
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R30
PROFILE SHEET
STA. 181+00 TO STA. 187+00
SCALE: 1" = 20' HORIZONTAL
1" = 2' VERTICAL
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R03000
PR.
DG
NFIL
E
NA
ME:
DATUM
936
938
940
942
944
946
948
950
952
938
940
942
944
946
948
950
952
181+00 181+50 182+00 182+50 183+00 183+50 184+00 184+50 185+00 185+50 186+00
186+50 187+00
936
938
940
942
944
946
948
950
952
936
938
940
942
944
946
948
950
181+00 181+50 182+00 182+50 183+00 183+50 184+00 184+50 185+00 185+50 186+00 186+50 187+00
VPI 18
1+50.00
Ele
v. 948.96
VPI 18
2+00.00
Ele
v. 948.01
VPI 18
2+50.00
Ele
v. 947.13
VPI 18
3+00.00
Ele
v. 946.40
VPI 18
3+50.00
Ele
v. 945.81
VPI 18
4+00.00
Ele
v. 945.23
VPI 18
4+50.00
Ele
v. 944.63
VPI 18
5+00.00
Ele
v. 944.02
VPI 18
5+50.00
Ele
v. 943.36
VPI 18
6+00.00
Ele
v. 942.73
VPI 18
6+50.00
Ele
v. 942.15
-1.982%
-1.890%
-1.760%
-1.460%
-1.178%
-1.178%
-1.196%
-1.214%
-1.320%
-1.254%
-1.168%
-0.966%
VPI 18
1+50.00
Ele
v. 948.96
VPI 18
2+00.00
Ele
v. 948.01
VPI 18
2+50.00
Ele
v. 947.13
VPI 18
3+00.00
Ele
v. 946.40
VPI 18
3+50.00
Ele
v. 945.81
VPI 18
4+00.00
Ele
v. 945.23
VPI 18
4+50.00
Ele
v. 944.63
VPI 18
5+00.00
Ele
v. 944.02
VPI 18
5+50.00
Ele
v. 943.36
VPI 18
6+00.00
Ele
v. 942.73
VPI 18
6+50.00
Ele
v. 942.15
-1.982%
-1.890%
-1.760%
-1.460%
-1.178%
-1.178%
-1.196%
-1.214%
-1.320%
-1.254%
-1.168%
-0.966%
949.95
948.96
948.01
947.13
946.40
945.81
945.23
944.63
944.02
943.36
942.73
942.15
941.
67
949.95
948.96
948.01
947.13
946.40
945.81
945.23
944.63
944.02
943.36
942.73
942.15
941.
67
HA
LF SIZ
E
H
ALF SIZ
E
GRADE POINT
EXISTINGCENTERLINE
EXISTING
GRADE POINT
EXISTING
CENTERLINE
EXISTING
OUTER LOOP (WESTBOUND)
INNER LOOP (EASTBOUND)
949.8
948.8
947.9
947.0
946.2
945.6
944.9
944.3
943.8
943.3
942.6
942.0
941.
5
949.7
948.8
947.9
947.0
946.3
945.6
945.0
944.3
943.7
943.2
942.6
942.0
941.
5
-0.50%
-1.58%
-1.76%
-1.46%
-1.18%
-1.16%
-1.20%
-2.72%
-1.40% 1.74%
-0.50%
2' F.B. SPCL. DT. RT.
2' F.B. SPCL. DT. RT.
-1.12%
-0.98%
-1.90%
-1.76%
-1.40%
-1.12%
-1.12%
-2.94%
-3.00%
-3.00%
-1.63%
-0.96%
2' F.B. SPCL. DT. LT.
U-TYPE HDWLL LT STA. 186+20.81
PIPE OUTLET RT STA. 185+17.78
27"
U-
TY
PE
HE
AD
WA
LL
ST
A. 18
6+20.81 -
CO
NS
T.
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
24"
SL
OP
ED
BO
X
OU
TL
ET
&
ST
A. 18
5+17.78 -
CO
NS
T.
945.68
+50946.17
+00
VPI 18
1+00.00
Ele
v. 949.95
VPI 18
1+00.00
Ele
v. 949.95
944.73
+00
943.85
+50
943.15
+00
942.59
+50
942.03
+00
941.47
+50
940.00
+00
938.50
+50
937.00
+00
938.87
+50
938.39
+00
VPI 18
7+00.00
Ele
v. 941.
67
Ele
v. 941.
67
VPI 18
7+00.00
944.53
+00
944.28
+50
943.49
+00
942.61
+50
941.88
+00
941.29
+50
940.71
+00
940.11
+50
938.75
+00
939.50
+50
939.25
+00
EXC.EMB.
2,3890 6560 7,290
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 181+00 TO 187+00
So=0.040 ft/ft24" RCP (RT)
CONST. 28 LF
So=0.004 ft/ft24" RCP (LT)CONST. 21 LF
So=Match Existing Slope24" RCP (RT)CONST. 4 LF
DESIGN
CHECK
RUNOFF
(cfs)
STORM
(YR)
FLOOD DATA
(ft)
HEADWATER ELEV
25 18.0 940.12
100 22.6 940.51
DESIGN
CHECK
RUNOFF
(cfs)
STORM
(YR)
FLOOD DATA
(ft)
HEADWATER ELEV
25 26.7 938.75
100 33.6 939.09
DATUMDATUM
KY 4 - NEW CIRCLE ROAD
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R30
PROFILE SHEET
STA. 181+00 TO STA. 187+00
SCALE: 1" = 20' HORIZONTAL
1" = 2' VERTICAL
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R03000
PR.
DG
NFIL
E
NA
ME:
DATUM
1 REVISED SOLID ROCK QUANTITY
1 REVISED 02-16-18
960
962
964
966
968
970
972
974
976
978
980
982
984
986
988
990
992
994
996
998998
962
964
966
968
970
972
974
976
978
980
982
984
986
988
990
992
994
996
42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50
48+00
VPI 42
+50.00
Ele
v. 974.88
PV
C 44
+33.68
Ele
v. 981.
31
3.500
%
L 1100.00'
SD 560'
K 145
975.0
976.2
977.2
977.8
978.9
980.1
981.
5
982.8
983.8
984.6
985.4
986.3
974.88
976.63
978.38
980.13
981.
87
983.48
984.91
986.18
987.27
988.19
988.93
989.51
HA
LF SIZ
E
H
ALF SIZ
E
ELEV. 995.4STA. 43+00LOW WIRE
ELEV. STA. 45+20LOW WIRE
EXC.EMB.
01,672 8,0680 171
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 42+50 TO 48+00
"V" DITCH RT.
0.50%0.50%
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
BO
X
OU
TL
ET
&
1-C
UR
B
BO
X IN
LE
T
TY
PE F (H
=4.27')
#219 S
TA. 43
+65, 47.51' R
T. -
CO
NS
T.
1-C
UR
B
BO
X IN
LE
T
TY
PE F (H
=4.00')
#220
ST
A. 44
+15.78, 82.39'
RT. -
CO
NS
T.
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
BO
X
OU
TL
ET
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
A (H
=4.00')
#221
ST
A. 44
+60, 49.67'
RT. -
CO
NS
T.
1-C
UR
B
BO
X IN
LE
T
TY
PE
A (H
=3.20')
#223 S
TA. 47
+54.66, 79.87'
RT. -
CO
NS
T.
969.00
+50 969.25
+00 969.50
+50
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.060 ft/ft
CONST 47 LF 15" PIPE
S=0.015 f
t/ft15" P
IPE (RT) CONST. 6
0 LF
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.086 ft/ft
CONST 25 LF 15" PIPE
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.119 ft/ft
CONST 91 LF 15" PIPE
S=0.005 ft/ft
15" PIPE (RT)
CONST. 84 LF
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
BO
X
OU
TL
ET
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
B (H
=3.67')
#222 S
TA. 46
+20, 59.25'
LT. -
CO
NS
T.
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ja
mes-f
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R58
NEWTOWN PIKE PROFILE SHEET
STA. 42+50 TO STA. 48+00
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R05800
PR.
DG
NFIL
E
NA
ME:
960
962
964
966
968
970
972
974
976
978
980
982
984
986
988
990
992
994
996
998998
962
964
966
968
970
972
974
976
978
980
982
984
986
988
990
992
994
996
42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00 47+50
48+00
VPI 42
+50.00
Ele
v. 974.88
PV
C 44
+33.68
Ele
v. 981.
31
3.500
%
L 1100.00'
SD 560'
K 145
975.0
976.2
977.2
977.8
978.9
980.1
981.
5
982.8
983.8
984.6
985.4
986.3
974.88
976.63
978.38
980.13
981.
87
983.48
984.91
986.18
987.27
988.19
988.93
989.51
HA
LF SIZ
E
H
ALF SIZ
E
ELEV. 995.4STA. 43+00LOW WIRE
ELEV. STA. 45+20LOW WIRE
EXC.EMB.
01,672 8,0680 171
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 42+50 TO 48+00
"V" DITCH RT.
0.50%0.50%
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
BO
X
OU
TL
ET
&
1-C
UR
B
BO
X IN
LE
T
TY
PE F (H
=4.27')
#219 S
TA. 43
+65, 47.51' R
T. -
CO
NS
T.
1-C
UR
B
BO
X IN
LE
T
TY
PE F (H
=4.00')
#220
ST
A. 44
+15.78, 82.39'
RT. -
CO
NS
T.
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
BO
X
OU
TL
ET
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
A (H
=4.00')
#221
ST
A. 44
+60, 49.67'
RT. -
CO
NS
T.
1-C
UR
B
BO
X IN
LE
T
TY
PE
A (H
=3.20')
#223 S
TA. 47
+54.66, 79.87'
RT. -
CO
NS
T.
969.00
+50 969.25
+00 969.50
+50
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.060 ft/ft
CONST 47 LF 15" PIPE
S=0.015 f
t/ft15" P
IPE (RT) CONST. 6
0 LF
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.086 ft/ft
CONST 25 LF 15" PIPE
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.119 ft/ft
CONST 91 LF 15" PIPE
S=0.005 ft/ft
15" PIPE (RT)
CONST. 84 LF
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
BO
X
OU
TL
ET
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
B (H
=3.67')
#222 S
TA. 46
+20, 59.25'
LT. -
CO
NS
T.
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ja
mes-f
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R58
NEWTOWN PIKE PROFILE SHEET
STA. 42+50 TO STA. 48+00
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R05800
PR.
DG
NFIL
E
NA
ME:
1 REVISED EMBANKMENT QUANTITY
1 REVISED 02-16-18
3.500
%
-4.075%
962
964
966
968
970
972
974
976
978
980
982
984
986
988
990
992
994
996
998
10001000
964
966
968
970
972
974
976
978
980
982
984
986
988
990
992
994
996
998
48+00 48+50 49+00 49+50 50+00 50+50 51+00 51+50
VPI 49+83.68
Elev. 1000.56
986.3
987.3
982.0
964.0
966.4
964.3
979.3
985.3
989.51
989.91
990.14
990.20
990.09
989.80
989.34
988.71
HA
LF SIZ
E
H
ALF SIZ
E
ELEV. 1009.15STA. 50+95LOW WIRE
EXC.EMB.
0523 2,1010 0
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 48+00 TO 51+50
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
&
FL
AR
ED
HE
AD
WA
LL
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
B (H
=3.67')
#225 S
TA. 48
+23, 59.50'
LT. -
CO
NS
T.
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
&
FL
AR
ED
HE
AD
WA
LL
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
B (H
=5.43')
#224 S
TA. 48
+38, 60.43'
RT. -
CO
NS
T.
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.247 ft/ft
CONST 65 LF 15" PIPE
S=0.005 ft/ft
15" PIPE (RT)
CONST. 84 LF
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.283 ft/ft
CONST 34 LF 15" PIPE
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R58A
NEWTOWN PIKE PROFILE SHEET
STA. 48+00 TO STA. 51+50
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R058
A0
PR.
DG
NFIL
E
NA
ME:
3.500
%
-4.075%
962
964
966
968
970
972
974
976
978
980
982
984
986
988
990
992
994
996
998
10001000
964
966
968
970
972
974
976
978
980
982
984
986
988
990
992
994
996
998
48+00 48+50 49+00 49+50 50+00 50+50 51+00 51+50
VPI 49+83.68
Elev. 1000.56
986.3
987.3
982.0
964.0
966.4
964.3
979.3
985.3
989.51
989.91
990.14
990.20
990.09
989.80
989.34
988.71
HA
LF SIZ
E
H
ALF SIZ
E
ELEV. 1009.15STA. 50+95LOW WIRE
EXC.EMB.
0523 2,1010 0
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 48+00 TO 51+50
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
&
FL
AR
ED
HE
AD
WA
LL
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
B (H
=3.67')
#225 S
TA. 48
+23, 59.50'
LT. -
CO
NS
T.
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 15
" S
LO
PE
D
&
FL
AR
ED
HE
AD
WA
LL
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
B (H
=5.43')
#224 S
TA. 48
+38, 60.43'
RT. -
CO
NS
T.
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.247 ft/ft
CONST 65 LF 15" PIPE
S=0.005 ft/ft
15" PIPE (RT)
CONST. 84 LF
So=0.010 ft/ft
CONST. 10 LF 15" PIPE
So=0.283 ft/ft
CONST 34 LF 15" PIPE
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R58A
NEWTOWN PIKE PROFILE SHEET
STA. 48+00 TO STA. 51+50
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R058
A0
PR.
DG
NFIL
E
NA
ME:
1 REVISED 02-16-18
1 REVISED EMBANKMENT QUANTITY
HA
LF SIZ
E
H
ALF SIZ
E
936
938
940
942
944
946
948
950
952
954
956
958
960
962
964
966
968
970
972
974974
938
940
942
944
946
948
950
952
954
956
958
960
962
964
966
968
970
972
1209+00 1209+50 1210+00 1210+50 1211+00 1211+50 1212+00 1212+50 1213+00 1213+50 1214+00
1214+50 1215+00
VPI 12
09
+82.79
Ele
v. 960.08
PV
T 12
10+82.79
Ele
v. 960.55
VPI 12
11+00.00
Ele
v. 960.63
VPI 12
11+50.00
Ele
v. 960.84
VPI 12
12+00.00
Ele
v. 961.
10
VPI 12
12+50.00
Ele
v. 961.
49
VPI 12
13+00.00
Ele
v. 961.
79
VPI 12
13+50.00
Ele
v. 962.10
VPI 12
14+00.00
Ele
v. 962.50
VPI 12
14+43.99
Ele
v. 962.60
0.470% 0.420%0.520%
0.780%0.600%
0.620%0.800%
0.227%L 200.00'
SD 407'
K 67
959.1
959.2
959.0
958.0
956.2
955.2
955.4
956.5
957.7
958.8
958.9
962.17
961.
23
960.67
960.47
960.63
960.84
961.
10
961.
49
961.
79
962.10
962.50
ELEV. STA. 1211+72LOW WIRE
ELEV. STA. 1212+35LOW WIRE
ELEV. STA. 1213+38LOW WIRE
SE
E
GE
OT
EC
H
NO
TES
PR
EF
OR
AT
ED
PIP
E
ST
A. 12
10+51
CO
NS
T.
EXC.EMB.
01,844 5,6010 687
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 1209+00 TO P.O.E.
"V" DITCH LT.
-2.00%
-3.42% TYPE 1
DBI
1.08%
"V" DIT
CH LT.
6.54
%
4.46
%
"V" DITCH RT.
-4.00%
AN
CH
OR
HE
AD
WA
LL
& IN
TE
RM
EDIA
TE PIP
E
(H=5.76') W/ 30"
SL
OP
ED
&
FL
AR
ED
LT.-
CO
NS
T. 1-
DR
OP
BO
X IN
LE
T
TY
PE 1
#249 S
TA. 12
09
+78.63, 75.37'
-2.50%
DBI TY 1 LT STA. 1209+78.63
-2.70%
-4.58%
3.03%
2.00%
"V" DITCH RT.
2.00%
4.00
%
8.0
0%
6.00
%
"V" DIT
CH RT.
8.0
0%
946.00
+00
944.00
+50
943.00
+50
942.75
+00
941.40
+50 942.00
+00
944.00
+00
946.00
+50
950.00
+00
953.00
+50
957.00
+00
958.76
+44
955.00
+00
954.00
+50
953.25
+00
959.64
+00
961.87
+50
956.37
+504.
00%
STA. 1503+58, 44.00 (LT)FROM DBI @ LOOP B
24" PIPE (LT), So=0.031 ft/ftCONST. 194 LF
MATCH EXIST. So.
CONST. 4 LF 30" RCP
So=0.005 ft/ft
CONST. 7 LF 30" RCP
So=0.031 ft/ft
CONST 32 LF 30" RCP
DESIGN
CHECK
RUNOFF
(cfs)
STORM
(YR)
FLOOD DATA
(ft)
HEADWATER ELEV
25 4.1 953.41
100 4.9 953.46
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R70A
RAMP B - PROFILE SHEET
STA. 1209+00 TO P.O.E.
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R070
A0
PR.
DG
NFIL
E
NA
ME:
HA
LF SIZ
E
H
ALF SIZ
E
936
938
940
942
944
946
948
950
952
954
956
958
960
962
964
966
968
970
972
974974
938
940
942
944
946
948
950
952
954
956
958
960
962
964
966
968
970
972
1209+00 1209+50 1210+00 1210+50 1211+00 1211+50 1212+00 1212+50 1213+00 1213+50 1214+00
1214+50 1215+00
VPI 12
09
+82.79
Ele
v. 960.08
PV
T 12
10+82.79
Ele
v. 960.55
VPI 12
11+00.00
Ele
v. 960.63
VPI 12
11+50.00
Ele
v. 960.84
VPI 12
12+00.00
Ele
v. 961.
10
VPI 12
12+50.00
Ele
v. 961.
49
VPI 12
13+00.00
Ele
v. 961.
79
VPI 12
13+50.00
Ele
v. 962.10
VPI 12
14+00.00
Ele
v. 962.50
VPI 12
14+43.99
Ele
v. 962.60
0.470% 0.420%0.520%
0.780%0.600%
0.620%0.800%
0.227%L 200.00'
SD 407'
K 67
959.1
959.2
959.0
958.0
956.2
955.2
955.4
956.5
957.7
958.8
958.9
962.17
961.
23
960.67
960.47
960.63
960.84
961.
10
961.
49
961.
79
962.10
962.50
ELEV. STA. 1211+72LOW WIRE
ELEV. STA. 1212+35LOW WIRE
ELEV. STA. 1213+38LOW WIRE
SE
E
GE
OT
EC
H
NO
TES
PR
EF
OR
AT
ED
PIP
E
ST
A. 12
10+51
CO
NS
T.
EXC.EMB.
01,844 5,6010 687
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. 1209+00 TO P.O.E.
"V" DITCH LT.
-2.00%
-3.42% TYPE 1
DBI
1.08%
"V" DIT
CH LT.
6.54
%
4.46
%
"V" DITCH RT.
-4.00%
AN
CH
OR
HE
AD
WA
LL
& IN
TE
RM
EDIA
TE PIP
E
(H=5.76') W/ 30"
SL
OP
ED
&
FL
AR
ED
LT.-
CO
NS
T. 1-
DR
OP
BO
X IN
LE
T
TY
PE 1
#249 S
TA. 12
09
+78.63, 75.37'
-2.50%
DBI TY 1 LT STA. 1209+78.63
-2.70%
-4.58%
3.03%
2.00%
"V" DITCH RT.
2.00%
4.00
%
8.0
0%
6.00
%
"V" DIT
CH RT.
8.0
0%
946.00
+00
944.00
+50
943.00
+50
942.75
+00
941.40
+50 942.00
+00
944.00
+00
946.00
+50
950.00
+00
953.00
+50
957.00
+00
958.76
+44
955.00
+00
954.00
+50
953.25
+00
959.64
+00
961.87
+50
956.37
+504.
00%
STA. 1503+58, 44.00 (LT)FROM DBI @ LOOP B
24" PIPE (LT), So=0.031 ft/ftCONST. 194 LF
MATCH EXIST. So.
CONST. 4 LF 30" RCP
So=0.005 ft/ft
CONST. 7 LF 30" RCP
So=0.031 ft/ft
CONST 32 LF 30" RCP
DESIGN
CHECK
RUNOFF
(cfs)
STORM
(YR)
FLOOD DATA
(ft)
HEADWATER ELEV
25 4.1 953.41
100 4.9 953.46
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R70A
RAMP B - PROFILE SHEET
STA. 1209+00 TO P.O.E.
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R070
A0
PR.
DG
NFIL
E
NA
ME:
1 REVISED 02-16-18
1 REVISED EMBANKMENT BENCHING QUANTITY
942
944
946
948
950
952
954
956
958
960
962
964
966
968
970
972
974
976
978
980980
960
962
964
966
968
970
972
974
976
978
980980
6000+00 6000+50 6001+00 6001+50 6002+00 6002+50 6003+00 6003+50 6004+00 6004+50 6005+00
953.2
954.7
956.5
958.5
960.5
962.6
964.5
966.5
968.7
970.5
972.3
960.50
962.56
964.62
966.92
969.42
971.
92
974.00
HA
LF SIZ
E
H
ALF SIZ
E
VPI 6002
+14.03
Ele
v. 961.
07
VPI 6002
+64.00
Ele
v. 963.29
PV
C 6002
+95.28
Ele
v. 964.45
VPI 6003
+15.28
Ele
v. 965.18
PV
T 6003
+35.28
Ele
v. 966.18
PV
C 6004
+50.00
Ele
v. 971.
92
4.43
5%
3.69
4%
5.00
0%
L 40.00'
SD 177'
K 31
L 300.00'
SD 254'
K 30
STA. 6002+14.03
LEXMARK OVERPASS
BEGIN CONSTRUCTION
CO
NS
T 2-F
LU
ME IN
LE
T
TY 2
RT
&
LT
ST
A. 6004
+90
966
968
970
972
974
976976
966
968
970
972
974
976976
0+00 0+20 0+40 0+60 0+80 1+00
VPI 0
+00.00
Ele
v. 973.45
PV
C 0
+14.83
Ele
v. 972.77
VPI 0
+19.83
Ele
v. 972.54
PV
T 0
+24.83
Ele
v. 972.06
VPI 0
+37.52
Ele
v. 970.84
PV
C 0
+50.00
Ele
v. 969.60
VPI 0
+55.00
Ele
v. 969.10
PV
T 0
+60.00
Ele
v. 968.93
VPI 0
+80.76
Ele
v. 968.23
-4.582%
-9.6
39
%-9.9
46
%
-3.390%
L 10.00'
SD 218'
K 2
L 10.00'
SD 48'
K 2
SIDELEGACY TRAIL - SOUTH
EXC.EMB.
00 4340 653
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. P.O.B. TO 6005+00
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R78
LEXMARK OVERPASS
P.O.B. TO STA. 6005+00
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R07800
PR.
DG
NFIL
E
NA
ME:
942
944
946
948
950
952
954
956
958
960
962
964
966
968
970
972
974
976
978
980980
960
962
964
966
968
970
972
974
976
978
980980
6000+00 6000+50 6001+00 6001+50 6002+00 6002+50 6003+00 6003+50 6004+00 6004+50 6005+00
953.2
954.7
956.5
958.5
960.5
962.6
964.5
966.5
968.7
970.5
972.3
960.50
962.56
964.62
966.92
969.42
971.
92
974.00
HA
LF SIZ
E
H
ALF SIZ
E
VPI 6002
+14.03
Ele
v. 961.
07
VPI 6002
+64.00
Ele
v. 963.29
PV
C 6002
+95.28
Ele
v. 964.45
VPI 6003
+15.28
Ele
v. 965.18
PV
T 6003
+35.28
Ele
v. 966.18
PV
C 6004
+50.00
Ele
v. 971.
92
4.43
5%
3.69
4%
5.00
0%
L 40.00'
SD 177'
K 31
L 300.00'
SD 254'
K 30
STA. 6002+14.03
LEXMARK OVERPASS
BEGIN CONSTRUCTION
CO
NS
T 2-F
LU
ME IN
LE
T
TY 2
RT
&
LT
ST
A. 6004
+90
966
968
970
972
974
976976
966
968
970
972
974
976976
0+00 0+20 0+40 0+60 0+80 1+00
VPI 0
+00.00
Ele
v. 973.45
PV
C 0
+14.83
Ele
v. 972.77
VPI 0
+19.83
Ele
v. 972.54
PV
T 0
+24.83
Ele
v. 972.06
VPI 0
+37.52
Ele
v. 970.84
PV
C 0
+50.00
Ele
v. 969.60
VPI 0
+55.00
Ele
v. 969.10
PV
T 0
+60.00
Ele
v. 968.93
VPI 0
+80.76
Ele
v. 968.23
-4.582%
-9.6
39
%-9.9
46
%
-3.390%
L 10.00'
SD 218'
K 2
L 10.00'
SD 48'
K 2
SIDELEGACY TRAIL - SOUTH
EXC.EMB.
00 4340 653
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
SHEET TOTALS STA. P.O.B. TO 6005+00
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R78
LEXMARK OVERPASS
P.O.B. TO STA. 6005+00
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R07800
PR.
DG
NFIL
E
NA
ME:
1 REVISED 02-16-18
1 REVISED EARTHWORK QUANTITIES
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
2100+00 2100+50 2101+00 2101+50
VPI 210
0+00.00
Ele
v. 942.45
VPI 210
0+26.48
Ele
v. 941.
98
PV
C 210
0+41.
78
Ele
v. 941.
58
VPI 210
0+64.28
Ele
v. 940.99
PV
T 210
0+86.78
Ele
v. 941.
52
VPI 210
1+00.00
Ele
v. 941.
83
VPI 210
1+13.84
Ele
v. 942.06
-1.775% -2.606% 2.341%1.667
%
L 45.00'
SD 97'
K 9
939.5
941.
4
941.
8
942.45
941.
40
941.
83
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
2200+00 2200+50 2201+00 2201+50
VPI 2200
+00.00
Ele
v. 940.71
PV
C 2200
+05.81
Ele
v. 940.55
VPI 2200
+30.81
Ele
v. 939.88
PV
T 2200
+55.81
Ele
v. 939.68
VPI 2201+
05.52
Ele
v. 939.29
-2.699%
-0.785%
L 50.00'
SD 1508'
K 26
940.7
939.4
938.3
940.71
939.73
939.33
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958
2300+00 2300+50 2301+00
VPI 2300
+00.00
Ele
v. 936.77
PV
C 2300
+20.95
Ele
v. 936.25
VPI 2300
+35.95
Ele
v. 935.89
PV
T 2300
+50.95
Ele
v. 936.32
VPI 2300
+75.57
Ele
v. 937.02
-2.454% 2.861%
L 30.00'
SD 78'
K 6
936.8
936.4
936.77
936.29
HA
LF SIZ
E
H
ALF SIZ
E
EXC.EMB.
00 00 155
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
LEXMARK WESTBOUND ON RAMP TOTALS
EXC.EMB.
00 00 1,605
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
LEXMARK EASTBOUND ON RAMP TOTALS
-3.76%
-1.14%
-16.00
%
0.60%0.58% 1.93
%
-0.90%-0.96%
"V" DITCH RT.
"V" DITCH RT.
2' F.B. SPCL. DT. RT.
-4.39%"V" DITCH LT.
939.00
+00939.30
+50939.59
+00
939.25
+00
937.37
+50
936.81
+00
940.00
+00
935.25
+00
934.75
+50
EXC.EMB.
00 40 469
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
LEXMARK EASBOUND OFF RAMP TOTALS
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R82
LEXMARK RAMPS - PROFILE SHEET
EB ON & OFF RAMP, WB ON RAMP
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R08200
PR.
DG
NFIL
E
NA
ME:
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
2100+00 2100+50 2101+00 2101+50
VPI 210
0+00.00
Ele
v. 942.45
VPI 210
0+26.48
Ele
v. 941.
98
PV
C 210
0+41.
78
Ele
v. 941.
58
VPI 210
0+64.28
Ele
v. 940.99
PV
T 210
0+86.78
Ele
v. 941.
52
VPI 210
1+00.00
Ele
v. 941.
83
VPI 210
1+13.84
Ele
v. 942.06
-1.775% -2.606% 2.341%1.667
%
L 45.00'
SD 97'
K 9
939.5
941.
4
941.
8
942.45
941.
40
941.
83
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
2200+00 2200+50 2201+00 2201+50
VPI 2200
+00.00
Ele
v. 940.71
PV
C 2200
+05.81
Ele
v. 940.55
VPI 2200
+30.81
Ele
v. 939.88
PV
T 2200
+55.81
Ele
v. 939.68
VPI 2201+
05.52
Ele
v. 939.29
-2.699%
-0.785%
L 50.00'
SD 1508'
K 26
940.7
939.4
938.3
940.71
939.73
939.33
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958958
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
956
958
2300+00 2300+50 2301+00
VPI 2300
+00.00
Ele
v. 936.77
PV
C 2300
+20.95
Ele
v. 936.25
VPI 2300
+35.95
Ele
v. 935.89
PV
T 2300
+50.95
Ele
v. 936.32
VPI 2300
+75.57
Ele
v. 937.02
-2.454% 2.861%
L 30.00'
SD 78'
K 6
936.8
936.4
936.77
936.29
HA
LF SIZ
E
H
ALF SIZ
E
EXC.EMB.
00 00 155
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
LEXMARK WESTBOUND ON RAMP TOTALS
EXC.EMB.
00 00 1,605
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
LEXMARK EASTBOUND ON RAMP TOTALS
-3.76%
-1.14%
-16.00
%
0.60%0.58% 1.93
%
-0.90%-0.96%
"V" DITCH RT.
"V" DITCH RT.
2' F.B. SPCL. DT. RT.
-4.39%"V" DITCH LT.
939.00
+00939.30
+50939.59
+00
939.25
+00
937.37
+50
936.81
+00
940.00
+00
935.25
+00
934.75
+50
EXC.EMB.
00 40 469
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
LEXMARK EASBOUND OFF RAMP TOTALS
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.867
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R82
LEXMARK RAMPS - PROFILE SHEET
EB ON & OFF RAMP, WB ON RAMP
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R08200
PR.
DG
NFIL
E
NA
ME:
1 REVISED 02-16-18
1 REVISED EARTHWORK QUANTITIES
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
2400+00 2400+50 2401+00 2401+50 2402+00 2402+50 2403+00 2403+50 2404+00 2404+50 2405+00
VPI 2400
+00.00
Ele
v. 929.95
PV
C 2401+
69.78
Ele
v. 931.
43
VPI 2401+
94.78
Ele
v. 931.
65
PV
T 2402
+19.78
Ele
v. 932.06
PV
C 2403
+90.95
Ele
v. 934.86
VPI 2404
+15.95
Ele
v. 935.27
PV
T 2404
+40.95
Ele
v. 935.56
VPI 2404
+72.84
Ele
v. 935.92
0.873%
1.637%
1.142%
L 50.00'
SD 313'
K 65
L 50.00'
SD 2207'
K 101
928.3
929.1
930.0
930.7
931.
5
932.3
933.1
934.0
934.8
935.7
929.95
930.39
930.82
931.
26
931.
77
932.55
933.37
934.19
935.01
935.66
HA
LF SIZ
E
H
ALF SIZ
E
-1.00% "V" DITCH RT. -0.92%
DBI TY 1 LT STA. 2401+96
TYPE 5
DBI
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 24"
SL
OP
ED
&
FL
AR
ED
HE
AD
WA
LL
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
A (H
=6.00')
#208 S
TA. 2401+
95, 3.67'
RT. -
CO
NS
T.
1-D
RO
P
BO
X IN
LE
T
TY
PE 5 (H
=4.00')
#207 S
TA. 2401+
96, 27.76'
LT. -
CO
NS
T.
919.54
+00920.00
+50920.50
+00
918
916
918
So=0.010 ft/ft
CONST. 10 LF 24" PIPE
So=0.147 ft/ft
CONST 38 LF 24" PIPE
TYPE 1
DBI
So=0.0193 ft/ft
CONST. 29 LF 24" PIPE
DESIGN
CHECK
RUNOFF
(cfs)
STORM
(YR)
FLOOD DATA
(ft)
HEADWATER ELEV
25 11 930.61
100 13 930.69
EXC.EMB.
01,068 2,1100 314
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
LEXMARK WESTBOUND OFF RAMP TOTALS
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R82A
LEXMARK RAMP - PROFILE SHEET
WESTBOUND OFF RAMP
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R082
A0
PR.
DG
NFIL
E
NA
ME:
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
920
922
924
926
928
930
932
934
936
938
940
942
944
946
948
950
952
954
2400+00 2400+50 2401+00 2401+50 2402+00 2402+50 2403+00 2403+50 2404+00 2404+50 2405+00
VPI 2400
+00.00
Ele
v. 929.95
PV
C 2401+
69.78
Ele
v. 931.
43
VPI 2401+
94.78
Ele
v. 931.
65
PV
T 2402
+19.78
Ele
v. 932.06
PV
C 2403
+90.95
Ele
v. 934.86
VPI 2404
+15.95
Ele
v. 935.27
PV
T 2404
+40.95
Ele
v. 935.56
VPI 2404
+72.84
Ele
v. 935.92
0.873%
1.637%
1.142%
L 50.00'
SD 313'
K 65
L 50.00'
SD 2207'
K 101
928.3
929.1
930.0
930.7
931.
5
932.3
933.1
934.0
934.8
935.7
929.95
930.39
930.82
931.
26
931.
77
932.55
933.37
934.19
935.01
935.66
HA
LF SIZ
E
H
ALF SIZ
E
-1.00% "V" DITCH RT. -0.92%
DBI TY 1 LT STA. 2401+96
TYPE 5
DBI
IN
TE
RM
EDIA
TE PIP
E
AN
CH
OR
W/ 24"
SL
OP
ED
&
FL
AR
ED
HE
AD
WA
LL
&
1-C
UR
B
BO
X IN
LE
T
TY
PE
A (H
=6.00')
#208 S
TA. 2401+
95, 3.67'
RT. -
CO
NS
T.
1-D
RO
P
BO
X IN
LE
T
TY
PE 5 (H
=4.00')
#207 S
TA. 2401+
96, 27.76'
LT. -
CO
NS
T.
919.54
+00920.00
+50920.50
+00
918
916
918
So=0.010 ft/ft
CONST. 10 LF 24" PIPE
So=0.147 ft/ft
CONST 38 LF 24" PIPE
TYPE 1
DBI
So=0.0193 ft/ft
CONST. 29 LF 24" PIPE
DESIGN
CHECK
RUNOFF
(cfs)
STORM
(YR)
FLOOD DATA
(ft)
HEADWATER ELEV
25 11 930.61
100 13 930.69
EXC.EMB.
01,068 2,1100 314
EXC.
DITCHS.R.
BENCH
E.
0
R.R.B.
LEXMARK WESTBOUND OFF RAMP TOTALS
DATUM
DATUM
KY 4 - NEW CIRCLE ROAD
HORIZONTAL 20'SCALE: 1" =
VERTICAL2' 1" =
Fe
bruary
15, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R82A
LEXMARK RAMP - PROFILE SHEET
WESTBOUND OFF RAMP
J:\
KD
OT\
CIR
CL
E4\
PR
OFIL
E\
R082
A0
PR.
DG
NFIL
E
NA
ME:
1 REVISED EARTHWORK QUANTITIES
1 REVISED 02-16-18
HA
LF SIZ
E
H
ALF SIZ
E
PROP. R/W
ES
MT.
PE
RM. D
RAIN
ES
MT.
PE
RM. D
RAIN
ES
MT.
PE
RM. D
RAIN
PR
OP. R/
W
PR
OP. R/
W
WA
LL C
ONS
T.
TE
MP. E
SM
T. F
OR
WA
LL
& S
LOP
E
CO
NS
T.
TE
MP. E
SM
T. F
OR
WALL & SLOPE CONST.TEMP. ESMT. FOR
960
960
985
985
955
955
960
960
960
960
960
960
960
980
980
980
980
980
975
975
975
975
975
960
960
960
960
970
970
970
970
970
970
970
970
940
940
945
945
945
945
950
950
950
950
950
950
950
950
955
955
955
955
955
955
955
955
960
960
960
960
960
960
960
960
960
960
960
965
965965
965
965
965
965965
965
965
965
965
965
965
965
965
965
965
965
965
965
965
965
EXISTING PLAN PROPOSED PLAN
170
+00
RA
MP
D
RAMP C
1305
+00
PC 13
00
+00.00
PT 13
01+
93.54
PI 14
09+79.5
4
55+00
PROPOSED INTERCHANGE GRADING PLAN MUST BE SUBMITTED FOR APPROVAL.
REGRADED INTERCHANGE WITH THE APPROVAL OF THE ENGINEER. ANY REVISION TO THE
INTERCHANGE AREA. THE CONTRACTOR MAY PLACE ADDITIONAL EMBANKMENT IN THE
BID QUANTITY FOR EXCAVATION IN ORDER TO ENSURE PROPER DRAINAGE OF THE REGRADED
AND REGRADE THE AREA TO DRAIN. THE 11,600 CY OF EXCAVATION IS INCLUDED IN THE
AND 33,900 CY OF EMBANKMENT. THE INTENTION IS TO REMOVE THE OLD LOOP RAMP
NOTE: THE PROPOSED INTERCHANGE GRADING PLAN IS BASED ON 11,600 CY OF EXCAVATION
NEWTOWN PIKE
Fe
bruary
16, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R104
INTERCHANGE GRADING PLANSCALE: 1"=50'
J:\
KD
OT\
CIR
CL
E4\
SU
BMIT
TA
LS\2018-02-16-
RE
VIS
ED
SH
EE
TS\
R10
400
DS.
DG
NFIL
E
NA
ME:
PI 1201+17.39
GLM
TMH
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
LW ELEV.= 1009.15
LW ELEV.= 1015.58
LOWCHORD ELEV.= 981.51 LOWCHORD ELEV.= 981.42
LOWCHORD ELEV.= 981.38
LOWCHORD ELEV.= 981.48
LOWCHORD ELEV.= 981.53
LOWCHORD ELEV.= 981.27
LOWCHORD ELEV.= 981.30
LOWCHORD ELEV.= 981.46
1-S-BLK
2-S-BR
1-S-
BR
1-S-BR
ASP
ASP
5W
LW
ELEV.= 10
04.6
6
LW ELEV.=
1003.8
8
1W
5W
LW ELEV.= 1001.74
SSMH
WV
WM
WV
WM
NE
WT
OW
N
RD. /
S.R. 922
GLM
TMH
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
5W
1W
5WSSMH
WV
WM
WV
WM
NE
WT
OW
N
RD. /
S.R. 922
S/
W
S/
W
S/
W
S/
W
S/
W
S/
W
S/
W
EX. R
ET
AININ
G
WA
LL
EX. R
ET
AININ
G
WA
LL
GR
AVIT
Y
RE
TAININ
G
WA
LL
GR
AVIT
Y
RE
TAININ
G
WA
LL
S
EXIS
TIN
G R
W
EXISTING RW
EXIS
TIN
G
RW
EXIS
TIN
G
RW
EXISTING RW
EXIS
TIN
G
RW
EXISTI
NG RW
EXIS
TIN
G R
W
80.38
+35.76
75.4
+04.75
75.43
+04.74
3.43'
N71°
32'4
2"W
N13
°40'2
9"E 69.17'
CHORD = S60
°40'12"E, 12
5.45'
R = 188.
88'
ARC = 127.
88'
167.52'S72°38'52"E
275.20'
N12°29'3
5"W
49.24'
S75°58'25"
W
156.92'
N12°32'3
6"W
73.7
3'
N27°3
8'2
2"E
492.42
+35.35
407.56
+89.71
196.14
+77.89
229.07'
N12°42'0
9"W
CHO
RD = N
22°42'34"W, 10
0.77'
R = 289.96
'
ARC = 10
1.29'
92.52'
N48°01'18
"E
N17
°49'0
9"E 99.99'
190.7
2'
N15°4
7'0
8"E
21.
64'
N22°13'0
5"E
CHORD
= S2
6°59'17"
E, 9
3.21'
R =
188.
88'
ARC
= 94.18'
121.62173+33.89
46.50'S72°38'52"E
190.7
2'
N15°4
7'0
8"E
975
960
965
955
950
960
945
950
955
955
955955
960
960
960
965
965
970
970
970
970
975
980
980
985
HA
LF SIZ
E
H
ALF SIZ
E
PROP. R/W
ES
MT.
PE
RM. D
RAIN
ES
MT.
PE
RM. D
RAIN
ES
MT.
PE
RM. D
RAIN
PR
OP. R/
W
PR
OP. R/
W
WA
LL C
ONS
T.
TE
MP. E
SM
T. F
OR
WA
LL
& S
LOP
E
CO
NS
T.
TE
MP. E
SM
T. F
OR
WALL & SLOPE CONST.TEMP. ESMT. FOR
960
960
985
985
955
955
960
960
960
960
960
960
960
980
980
980
980
980
975
975
975
975
975
960
960
960
960
970
970
970
970
970
970
970
970
940
940
945
945
945
945
950
950
950
950
950
950
950
950
955
955
955
955
955
955
955
955
960
960
960
960
960
960
960
960
960
960
960
965
965965
965
965
965
965965
965
965
965
965
965
965
965
965
965
965
965
965
965
965
965
EXISTING PLAN PROPOSED PLAN
170
+00
RA
MP
D
RAMP C
1305
+00
PC 13
00
+00.00
PT 13
01+
93.54
PI 14
09+79.5
4
55+00
PROPOSED INTERCHANGE GRADING PLAN MUST BE SUBMITTED FOR APPROVAL.
REGRADED INTERCHANGE WITH THE APPROVAL OF THE ENGINEER. ANY REVISION TO THE
INTERCHANGE AREA. THE CONTRACTOR MAY PLACE ADDITIONAL EMBANKMENT IN THE
BID QUANTITY FOR EXCAVATION IN ORDER TO ENSURE PROPER DRAINAGE OF THE REGRADED
AND REGRADE THE AREA TO DRAIN. THE 11,600 CY OF EXCAVATION IS INCLUDED IN THE
AND 33,900 CY OF EMBANKMENT. THE INTENTION IS TO REMOVE THE OLD LOOP RAMP
NOTE: THE PROPOSED INTERCHANGE GRADING PLAN IS BASED ON 11,600 CY OF EXCAVATION
NEWTOWN PIKE
Fe
bruary
16, 2018
DA
TE P
LO
TT
ED:
ste
phanie-b
US
ER:
E-S
HE
ET
NA
ME:
Micro
Statio
n v8.11.9.536
COUNTY OF ITEM NO. SHEET NO.
FAYETTE 7-366.00 R104
INTERCHANGE GRADING PLANSCALE: 1"=50'
J:\
KD
OT\
CIR
CL
E4\
SU
BMIT
TA
LS\2018-02-16-
RE
VIS
ED
SH
EE
TS\
R10
400
DS.
DG
NFIL
E
NA
ME:
PI 1201+17.39
GLM
TMH
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
LW ELEV.= 1009.15
LW ELEV.= 1015.58
LOWCHORD ELEV.= 981.51 LOWCHORD ELEV.= 981.42
LOWCHORD ELEV.= 981.38
LOWCHORD ELEV.= 981.48
LOWCHORD ELEV.= 981.53
LOWCHORD ELEV.= 981.27
LOWCHORD ELEV.= 981.30
LOWCHORD ELEV.= 981.46
1-S-BLK
2-S-BR
1-S-
BR
1-S-BR
ASP
ASP
5W
LW
ELEV.= 10
04.6
6
LW ELEV.=
1003.8
8
1W
5W
LW ELEV.= 1001.74
SSMH
WV
WM
WV
WM
NE
WT
OW
N
RD. /
S.R. 922
GLM
TMH
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
5W
1W
5WSSMH
WV
WM
WV
WM
NE
WT
OW
N
RD. /
S.R. 922
S/
W
S/
W
S/
W
S/
W
S/
W
S/
W
S/
W
EX. R
ET
AININ
G
WA
LL
EX. R
ET
AININ
G
WA
LL
GR
AVIT
Y
RE
TAININ
G
WA
LL
GR
AVIT
Y
RE
TAININ
G
WA
LL
S
EXIS
TIN
G R
W
EXISTING RW
EXIS
TIN
G
RW
EXIS
TIN
G
RW
EXISTING RW
EXIS
TIN
G
RW
EXISTI
NG RW
EXIS
TIN
G R
W
80.38
+35.76
75.4
+04.75
75.43
+04.74
3.43'
N71°
32'4
2"W
N13
°40'2
9"E 69.17'
CHORD = S60
°40'12"E, 12
5.45'
R = 188.
88'
ARC = 127.
88'
167.52'S72°38'52"E
275.20'
N12°29'3
5"W
49.24'
S75°58'25"
W
156.92'
N12°32'3
6"W
73.7
3'
N27°3
8'2
2"E
492.42
+35.35
407.56
+89.71
196.14
+77.89
229.07'
N12°42'0
9"W
CHO
RD = N
22°42'34"W, 10
0.77'
R = 289.96
'
ARC = 10
1.29'
92.52'
N48°01'18
"E
N17
°49'0
9"E 99.99'
190.7
2'
N15°4
7'0
8"E
21.
64'
N22°13'0
5"E
CHORD
= S2
6°59'17"
E, 9
3.21'
R =
188.
88'
ARC
= 94.18'
121.62173+33.89
46.50'S72°38'52"E
190.7
2'
N15°4
7'0
8"E
975
960
965
955
950
960
945
950
955
955
955955
960
960
960
965
965
970
970
970
970
975
980
980
985
1 REVISED 02-16-18
1 ADDED NOTE FOR CLARIFICATION
6401
6404
REVISED 2/16/18
5
6401
6404
REVISED 2/16/18
5