South Western Railway (Construction) Annexure -I LOA No. W496/UBL-LC1/01 Date : 29/02/2016 of UCC Code :74098 Print Date : 29/02/2016 Name of Work : Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐ Kusugal stations: Proposed construction of two lane ROB in lieu of LC No.1 at Km.3/700‐800 as 1x36m Bowstring Girder (Railway Portion) and RE panels (Approach portion) with service roads with two subway of 4mx3m RCC box on either side of ROB, shifting of minor bridge No.6 ( 2x1.2m dia RCC pipe.) Waterway bridge 2x6mx5m RCC box including construction/dismantling of gate lodge, LC and temporary diversion of road (TWO PACKET SYSTEM) Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD. ABSTRACT Sl. No. Departmental Value as per Tender Contractor % Schedule Total Schedule Description 1 A Items of works covered by USSOR 2011 62,44,519.17 +11% 69,31,416.28 2 B Items of works pertains to Earthwork 1,08,90,203.40 Indv. Rate 1,08,90,203.40 3 C Items of works pertains to Supply of Cement 2,19,30,636.00 Indv. Rate 2,19,30,636.00 4 D Items of works pertains to Concrete works 3,06,10,370.00 Indv. Rate 3,06,10,370.00 5 E Items of works pertains to Supply of Steel 4,18,46,320.00 Indv. Rate 4,18,46,320.00 6 H Items of Collection & Supply of Ballast 4,96,000.00 Indv. Rate 4,96,000.00 7 I Items of miscellaneous works 4,98,140.00 Indv. Rate 4,98,140.00 8 J Items of miscellaneous works 8,89,33,900.00 Indv. Rate 8,89,33,900.00 Total Value : 20,21,36,985.68 Discount 0 % 0.00 20,21,36,985.68 Net Value : ( Rupees Twenty Crore Twenty One Lakh Thirty Six Thousand Nine Hundred and Eighty Five ONLY) 1

74098 LOA Schedule - swr.indianrailways.gov.in · ROB in lieu of LC No.1 at Km.3/700‐800 as 1x36m Bowstring Girder (Railway Portion) and RE panels (Approach portion) with service

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

South Western Railway (Construction)

Annexure -I

LOA No. W496/UBL-LC1/01 Date : 29/02/2016 of UCC Code :74098

 Print Date : 29/02/2016

Name of Work :

Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐  Kusugal stations: Proposed construction of two lane ROB  in  lieu    of  LC  No.1  at  Km.3/700‐800  as  1x36m  Bowstring  Girder  (Railway    Portion)  and  RE  panels(Approach portion) with service roads with   two subway of 4mx3m RCC box on either side of ROB, shifting ofminor  bridge  No.6  (  2x1.2m  dia  RCC  pipe.)  Waterway  bridge  2x6mx5m    RCC  box  includingconstruction/dismantling  of  gate  lodge,  LC  and      temporary  diversion  of  road  (TWO  PACKET  SYSTEM)   

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

ABSTRACT

Sl. No.

Departmental Value asper Tender

Contractor % ScheduleTotal

Schedule

Description

1

A

Items of works covered by USSOR 2011 62,44,519.17 +11% 69,31,416.28

2

B

Items of works pertains to Earthwork 1,08,90,203.40 Indv. Rate 1,08,90,203.40

3

C

Items of works pertains to Supply of Cement  

2,19,30,636.00 Indv. Rate 2,19,30,636.00

4

D

Items of works pertains to Concrete works 

3,06,10,370.00 Indv. Rate 3,06,10,370.00

5

E

Items of works pertains to Supply of Steel 

4,18,46,320.00 Indv. Rate 4,18,46,320.00

6

H

Items of Collection & Supply of Ballast

4,96,000.00 Indv. Rate 4,96,000.00

7

I

Items of     miscellaneous works 4,98,140.00 Indv. Rate 4,98,140.00

8

J

Items of  miscellaneous works 8,89,33,900.00 Indv. Rate 8,89,33,900.00

Total Value : 20,21,36,985.68

Discount 0 % 0.00

20,21,36,985.68

Net Value :

( Rupees Twenty Crore Twenty One Lakh Thirty Six Thousand Nine Hundred and Eighty Five ONLY)

1

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name  of  the  Work  :Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐  Kusugal stations: Proposed construction of two lane ROB in lieuof  LC  No.1  at  Km.3/700‐800  as  1x36m  Bowstring  Girder  (Railway    Portion)  and  RE  panels  (Approach  portion)  withservice roads with  two subway of 4mx3m RCC box on either side of ROB, shifting of  minor bridge No.6 ( 2x1.2m dia RCCpipe.)  Waterway  bridge  2x6mx5m    RCC  box  including  construction/dismantling  of  gate  lodge,  LC  and      temporarydiversion  of  road  (TWO  PACKET  SYSTEM)   

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : USSOR 2011 ITEMS

Schedule 'A'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1

192011

Earth  work  in  excavation  for foundations  and  floors  of  the bridges,  retaining  walls  etc., including  setting  out,  dressing  of sides,  ramming  of  bottom,  getting out  the  excavated  material,  back filling  in  layers  with  approved material  and  consolidation  of  the layers by ramming and watering etc. incl.  all  lift,  disposal  of  surplus  soil upto  a  lead  of  300  M,  all  types  of shoring and strutting with all labour and  material  complete  as  per drawing  and  technical  specification as  directed  by  Engineer  in  charge  : All kinds of soils 

4500.00

182.73

1 CUM 8,22,285.00

( Rupees  One Hundred and Eighty Two And Paise  Seventy Three )

 

Contractor's % : 0       Discount : 0

2

192012

Earth  work  in  excavation  for foundations  and  floors  of  the bridges,  retaining  walls  etc., including  setting  out,  dressing  of sides,  ramming  of  bottom,  getting out  the  excavated  material,  back filling  in  layers  with  approved material  and  consolidation  of  the layers by ramming and watering etc. incl.  all  lift,  disposal  of  surplus  soil upto  a  lead  of  300  M,  all  types  of shoring and strutting with all labour and  material  complete  as  per drawing  and  technical  specification as  directed  by  Engineer  in  charge  : Ordinary rock 

400.00

237.64

1 CUM 95,056.00

( Rupees  Two Hundred and Thirty Seven And Paise  Sixty Four )

 

Contractor's % : 0       Discount : 0

3

192013

Earth  work  in  excavation  for foundations  and  floors  of  the bridges,  retaining  walls  etc., including  setting  out,  dressing  of sides, ramming of bottom, getting 

40.00

371.16

1 CUM 14,846.40

( Rupees  Three Hundred and Seventy One And Paise  Sixteen )

 

Contractor's % : 0       Discount : 0

2

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : USSOR 2011 ITEMS

Schedule 'A'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

out  the  excavated  material,  back filling  in  layers  with  approved material  and  consolidation  of  the layers by ramming and watering etc. incl.  all  lift,  disposal  of  surplus  soil upto  a  lead  of  300  M,  all  types  of shoring and strutting with all labour and  material  complete  as  per drawing  and  technical  specification as  directed  by  Engineer  in  charge  : Hard rock ( requiring blasting) 

4

222240

Providing cast in situ bridge number plaques  as  per  Railway  drawing  in cement  concrete  1:2:4  mix  using 20mm  hard  stone    aggregate embedded in 30mm notch in Bridge parapet  coping  duly  engraving  the letter  and  figures  and  an  arrow indicating  the  direction  of  flow  and finishing  the  top  exposed  surface with  cement  mortar  1:3,    painting letters and figures with two coats of black  enamel  paint  on  two  coats  of white  back  ground  with  all  labour, tools, cement, paint etc.with all  lead and lifts 

8.00

536.26

1 EACH 4,290.08

( Rupees  Five Hundred and Thirty Six And Paise  Twenty Six )

 

Contractor's % : 0       Discount : 0

5

222250

Providing  cast  in  situ  plaques  for bridge  foundations  details  of  size 45x45x5  cm  in  cement  concrete 1:2:4  mix  using  20mm  hard stoneaggregate  embedded  in  30mm deep  notch  over  abutment  &  piers, engraving  the  letters &  figures with CM 1:3 and finished smoth including painting  letters  and  figures  with  2 coats  of  black  enamel  and  plaque with  white  enamel  with  all  labour, tools, cement, paint, curing, etc. as a complete job 

8.00

656.53

1 EACH 5,252.24

( Rupees  Six Hundred and Fifty Six And Paise  Fifty Three )

 

Contractor's % : 0       Discount : 0

6

222300

Dewtering  of  natural  or accumulated  water  from  any location.  Payment  to  be  done  for Horse power of pump multiplied by pumping hours 

125.00

23.58

1 HP HOUR

2,947.50

( Rupees  Twenty Three And Paise  Fifty Eight )

 

Contractor's % : 0       Discount : 0

3

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : USSOR 2011 ITEMS

Schedule 'A'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

7

238050

Providing and applying 2.5mm thick road  marking  strips  (retro‐reflective) of specified shade/ colour using hot  thermoplastic material by fully/  semi automatic  thermoplastic paint applicator machine fitted with profile  shoe,  glass  beads  dispenser, propane  tank  heater  and  profile shoe  heater,  driven  by  experienced operator  on  road  surface  including cost  of  material,  labour,  T&P, cleaning  the road surface of all dirt, seals,  oil,  grease  and  foreign material  etc.  complete  as  per direction  of  Engineer‐in‐charge  and in  accordance  with  applicable specifications 

150.00

479.92

1 SQM 71,988.00

( Rupees  Four Hundred and Seventy Nine And Paise  Ninety Two )

 

Contractor's % : 0       Discount : 0

8

222280

Supplying,  spreading  and  filling coarse  sand  (No  cohesive materials to  be  used)  of  approved  quality including  watering  and  ramming  in foundation,  plinth,  behind  the abutment,  wing wall,  retaining wall in layers not exceeding 150mm thick including  its  compaction  as  per direction of Engineer‐in‐charge. The rate  includes  all  lead,  lift,  ascent, descent,  crossing  of  Railway  line, etc.  complete  with  contractorãs labour, materials, tools and plant 

1500.00

1,270.33

1 CUM 19,05,495.00

( Rupees  One Thousand Two Hundred and Seventy And Paise  Thirty Three )

 

Contractor's % : 0       Discount : 0

9

181030

Demolishing  R.C.C.  work  including cutting  and  stacking  of  steel  bars and  disposal  of  unserviceable material  within  50m  lead.  (Extra payment  for  scraping,  cleaning  and straightening  of  bars  to  be  made separately) 

100.00

810.58

1 CUM 81,058.00

( Rupees  Eight Hundred and Ten And Paise  Fifty Eight )

 

Contractor's % : 0       Discount : 0

10

181023

Demolishing  plain  cement  concrete including disposal of material within 50m  lead  :  Dismantling  concrete kerb  stones/rail  level  platform stones  /concrete  beams  /  slabs  or similar light structural parts/ stones without appreciable damage 

500.00

597.53

1 CUM 2,98,765.00

( Rupees  Five Hundred and Ninety Seven And Paise  Fifty Three )

 

Contractor's % : 0       Discount : 0

4

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : USSOR 2011 ITEMS

Schedule 'A'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

including stacking 

11

182031

Demolishing  stone  rubble  masonry including  stacking  of  serviceable material  and  disposal  of unserviceable  material  within  50m lead : Dry masonry 

100.00

197.88

1 CUM 19,788.00

( Rupees  One Hundred and Ninety Seven And Paise  Eighty Eight )

 

Contractor's % : 0       Discount : 0

12

032020

Providing  and  fixing  precast  M  15 grade  cement concrete    in string or lacing  courses,  coping,  bed  plates, anchor  blocks,  plain  window  sills, shelves,  louvers,  steps,  etc.  upto floor  two  level,  including  hoisting and  setting  in position with  cement mortar  1:3  (1  cement  :  3  coarse sand),  cost  of  required  shuttering, centering    complete  ‐  excluding  the cost of cement. (cast at site) 

20.00

2,527.44

1 CUM 50,548.80

( Rupees  Two Thousand Five Hundred and Twenty Seven And Paise  Forty Four )

 

Contractor's % : 0       Discount : 0

13

252020

Moorum 

400.00

86.25

1 CUM 34,500.00

( Rupees  Eighty Six And Paise  Twenty Five )

 

Contractor's % : 0       Discount : 0

14

061013

Random  rubble  masonry  with  hard stone  in  foundation  and  plinth including  levelling up with concrete as  per  specifications,  upto  plinth level  with  :  :  Cement  mortar  1:6 (1cement: 6coarse sand) 

50.00

2,023.44

1 CUM 1,01,172.00

( Rupees  Two Thousand Twenty Three And Paise  Forty Four )

 

Contractor's % : 0       Discount : 0

15

221050

Providing  and  laying  Pitching  with stone  boulders  weighing  not  less than  35 kg each with the voids filled with  spalls  on  slopes  laid  over prepared  filter  media  including boulder apron laid dry in front of toe of  embankment  complete  as  per drawing  and  Technical specifications  (Filter  media  to  be paid  separately  under  the  relevant item) 

100.00

950.84

1 CUM 95,084.00

( Rupees  Nine Hundred and Fifty And Paise  Eighty Four )

 

Contractor's % : 0       Discount : 0

5

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : USSOR 2011 ITEMS

Schedule 'A'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

16

222020

300  mm  thick  (average)  Dry  stone flooring  with  boulders  of  not  less than  35  kg  each  in  weight  ,  hand packed  with  surface  levelled  off  to the  correct  section  with  hammer dressing as necessary on the ground including  filling  the  gaps  with quarry  spalls  and  ordinary  sand complete  including  the  cost  of supply of  all materials,  labour,  lead, lift,  tools,  plants,  crossing  of  tracks and  the  like  as  per  drawing  and technical specification as directed by Engineer 

75.00

911.26

1 CUM 68,344.50

( Rupees  Nine Hundred and Eleven And Paise  Twenty Six )

 

Contractor's % : 0       Discount : 0

17

192014

Earth  work  in  excavation  for foundations  and  floors  of  the bridges,  retaining  walls  etc., including  setting  out,  dressing  of sides,  ramming  of  bottom,  getting out  the  excavated  material,  back filling  in  layers  with  approved material  and  consolidation  of  the layers by ramming and watering etc. incl.  all  lift,  disposal  of  surplus  soil upto  a  lead  of  300  M,  all  types  of shoring and strutting with all labour and  material  complete  as  per drawing  and  technical  specification as  directed  by  Engineer  in  charge  : Hard rock (  blasting prohibited ) 

25.00

451.19

1 CUM 11,279.75

( Rupees  Four Hundred and Fifty One And Paise  Nineteen )

 

Contractor's % : 0       Discount : 0

18

192020a

Extra  for  the  quantity  of  works, executed  in  or  underwater  and/  or liquid  mud  including  pumping  out water as required : All kinds of soils (corresponding to item no.192011) 

500.00

36.55

1 CUM 18,275.00

( Rupees  Thirty Six And Paise  Fifty Five )

 

Contractor's % : 0       Discount : 0

19

192020b

Extra  for  the  quantity  of  works, executed  in  or  underwater  and/  or liquid  mud  including  pumping  out water  as  required  :  Ordinary  rock (corresponding to item no 192012) 

20.00

47.53

1 CUM 950.60

( Rupees  Forty Seven And Paise  Fifty Three )

 

Contractor's % : 0       Discount : 0

6

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : USSOR 2011 ITEMS

Schedule 'A'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

20

192020c

Extra  for  the  quantity  of  works, executed  in  or  underwater  and/  or liquid  mud  including  pumping  out water  as  required  :  Hard  rock (requiring  blasting)  (corresponding to item no 192013) 

10.00

74.23

1 CUM 742.30

( Rupees  Seventy Four And Paise  Twenty Three )

 

Contractor's % : 0       Discount : 0

21

192020d

Extra  for  the  quantity  of  works, executed  in  or  underwater  and/  or liquid  mud  including  pumping  out water  as  required  :  Hard  rock (blasting  prohibited) (corresponding to item no.192014) 

10.00

90.24

1 CUM 902.40

( Rupees  Ninety And Paise  Twenty Four )

 

Contractor's % : 0       Discount : 0

22

222290

Providing  Boulder  backing  behind wing wall, return wall, retaining wall with  hand  packed  boulders  & cobbles  with  smaller  size  boulders toward  the  back  including  all  lead, lift,  labour  &  other  incidental charges  as  complete  work  in  all respect.  Payment  for  boulder  / cobbles will be done extra. 

680.00

178.76

1 CUM 1,21,556.80

( Rupees  One Hundred and Seventy Eight And Paise  Seventy Six )

 

Contractor's % : 0       Discount : 0

23

192030

Providing  and  laying  Plain  Cement Concrete    1:3:6  with  graded  stone aggregate of 40 mm nominal size, in foundation  and  floors,    retaining walls  of  bridges    including mechanical  mixing,  vibrating, pumping  and  bailing  out    water where  ever  required    with  all materials  and  labour  complete  but excluding  the  cost  of  cement  and shuttering  as  per  drawings  and technical  specifications  as  directed by Engineer 

1075.00

1,538.08

1 CUM 16,53,436.00

( Rupees  One Thousand Five Hundred and Thirty Eight And Paise  Eight )

 

Contractor's % : 0       Discount : 0

24

111012

12 mm cement plaster of mix ‐ : 1:6 (1cement: 6fine sand) 

100.00

75.31

1 SQM 7,531.00

( Rupees  Seventy Five And Paise  Thirty One )

 

Contractor's % : 0       Discount : 0

7

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : USSOR 2011 ITEMS

Schedule 'A'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

25

182013

Demolishing  brick  work  including stacking of serviceable material and disposal  of  unserviceable  material within 50m lead : In cement mortar 

30.00

469.56

1 CUM 14,086.80

( Rupees  Four Hundred and Sixty Nine And Paise  Fifty Six )

 

Contractor's % : 0       Discount : 0

26

043015

Providing,  hoisting  and  fixing  in position  upto  floor  two  level  M20 Grade  precast  RCC  work  including setting  in  cement  mortar  1:3  (1 cement  :  3  coarse  sand)  and finishing  smooth  with  6mm  thick cement plaster 1:3 (1 cement : 3 fine sand) on exposed surfaces complete including  cost  of  centering, shuttering,  finishing,  Admixtures  in recommended  proportion  (as  per IS:9103) to accelerate, retard setting of  concrete,  improve  workability without  impairing  strength  and durability,  excluding  cost  of  cement and  steel  reinforcement,  as  per approved  plan  &  direction  of Engineer  incharge.  :  In  slabs  for drain  covers,  manhole  covers,  flue tops etc. 

60.00

3,030.35

1 CUM 1,81,821.00

( Rupees  Three Thousand Thirty And Paise  Thirty Five )

 

Contractor's % : 0       Discount : 0

27

185010

Dismantling  doors,  windows  and clerestory windows  (steel or wood) shutter  including  chowkhats, architrave,  holdfasts  in  CC  or masonry etc.  complete and  stacking within 50m lead 

5.00

121.40

1 EACH 607.00

( Rupees  One Hundred and Twenty One And Paise  Forty )

 

Contractor's % : 0       Discount : 0

28

183062

Dismantling  including  stacking  of serviceable material and disposal of unserviceable  material  within  50m lead : Bituminous top layer of road 

5000.00

98.72

1 SQM 4,93,600.00

( Rupees  Ninety Eight And Paise  Seventy Two )

 

Contractor's % : 0       Discount : 0

29

252390

Stone  Boulder  Weighing  minimum 35 Kg Each 

150.00

455.40

1 CUM 68,310.00

( Rupees  Four Hundred and Fifty Five And Paise  Forty )

 

Contractor's % : 0       Discount : 0

8

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : USSOR 2011 ITEMS

Schedule 'A'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

62,44,519.17

(No. of Items 29 ONLY)

Schedule A Departmental Value : 

6,86,897.11

ABOVE 11 %

69,31,416.28

Schedule A Total :

Rupees in Words ( Rupees  Sixty Nine Lakh Thirty One Thousand Four Hundred and Sixteen And Paise  Twenty Seven 

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: PLOT NO.68, FIRST FLOOR        RADHASWAMY COLONY, SIKH ROAD,  SIKH VILLAGESECUNDERABAD

9

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name  of  the  Work  :Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐  Kusugal stations: Proposed construction of two lane ROB in lieuof  LC  No.1  at  Km.3/700‐800  as  1x36m  Bowstring  Girder  (Railway    Portion)  and  RE  panels  (Approach  portion)  withservice roads with  two subway of 4mx3m RCC box on either side of ROB, shifting of  minor bridge No.6 ( 2x1.2m dia RCC pipe.)  Waterway  bridge  2x6mx5m    RCC  box  including  construction/dismantling  of  gate  lodge,  LC  and      temporarydiversion  of  road  (TWO  PACKET  SYSTEM)   

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'B'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1

EW2‐101

Earthwork  in  cutting  in  all  soils: Earthwork for excavation in cuttings for  all  kinds  of  soils  in  connection with  making  formation/side drains/catch  water drains/bridges/trolley  refuges  etc., as  per  required  cross  section,  L‐section & profile including removing all  trees,  bushes,  debris, constructions,  etc.,  from  the  site with  contractor`s  equipment, machinery,  labour,  consumables etc.,as per technical specifications & special  conditions,    including removing  cut  spoils  and  taking  to embankment/outside  railway  land so as to clear the site with all leads & lifts,  as  directed  by  Engineer‐in‐charge.  Note:  i)  Payment  shall  be  based  on cross  section  measurement  only.  ii)  The  term  'all  soils'  mentioned above  include  loose  soil,  ordinary soil (workable with spade), hard soil including stiff clay, moorum, shingle, soft  laterite  etc.,  requiring  close application  of  picks  to  loosen  and small  boulders measuring not more than  300  mm  in  any  direction.  (iii)  No  extra  payment  for  lead  etc., is  admisible.  (iv)  Only  75  percent    payment  for the quantity executed is payable in a particular bill initially.  15 percent of the  balance  amount  shall  be released  after  the  L  section  and profile  are  perfectly  reached  and handed over to Railways.  

45000.00

61.20

1 CUM 31,39,560.00

( Rupees  Sixty One And Paise  Twenty )

SPECIAL CASE RATES. Any increase in quantity beyond agreement  quantity under these items rate may be negotiated. This rate not to be taken as reference for future tenders.

Contractor's % : 14       Discount : 0

10

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'B'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

Remaining  10  percent  shall  be released  only  after  the  formation  in the  full  block  section  or  identified length  is  completed  in  all  respects and handed over. 

2

EW2‐102

Earthwork  in  cutting  in  Soft  Rock  : Earthwork for excavation in cuttings in  soft  rock  strata  comprising disintegrated  rocks  of  lime  stone, sand  stone,  hard  laterite  etc., removable  without  blasting  in connection  with  making formation/side  drains/catch  water drains/  bridges/trolley  refuges  etc., as  per  required  cross  section,  L‐section & profile including removing all  trees,  bushes,  debris, constructions,  etc.,  from  the  site with  contractor`s  equipment, machinery,  labour,  comsumables etc.,as per technical specifications & special  conditions,    including removing  cut  spoils  and  taking  to embankment/outside  railway  land so as to clear the site with all leads & lifts,  as  directed  by  Engineer‐in‐charge.  Note:  i)  Payment  shall  be  based  on cross  section  measurement  only.  ii) Soft rock means rock which does not  require  blasting  and  which  can be  excavated  by  continuous operation  of  excavators/picks/bars etc.    (iii)  No  extra  payment  for  lead  etc., is  admisible.  (iv) Only 75 percent payment for the quantity executed in a particular bill is payable initially.  15 percent of the balance  amount  shall  be  released after  the  L  section  and  profile  are perfectly reached and the formation is  handed  over  to  Railways. Remaining  10  percent  shall  be released only after the formation in 

300.00

78.00

1 CUM 26,676.00

( Rupees  Seventy Eight )

 

Contractor's % : 14       Discount : 0

11

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'B'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

the  full  block  section  or  identified length  is  completed  in  all  respects and handed over. 

3

EW2‐201

Earth work in filling with cut spoils: Earthwork  in  embankments  for making  formation    with  Railways usable  cut  spoils  excavated  from cuttings  in  speciofied  layers  not exceeding 300 mm in thickness with lead  and  lifts  including  rehandling, transportation,  unloading  & spreading  in  layers,  benching  of slopes,  sectioning  to  profile including removing all trees, bushes, debris,  constructions,  etc.,  from  the site  with  contractor`s  vehicles, machinery,  labour,  consumables etc.,  complete  as  per  technical specifications  &  special  conditions and  as  directed  by  Engineer‐in‐charge.  Note:  i)  Payment  shall  be  based  on cross  section  measurement  only  (ii)  The  rate  includes  testing  of  cut spoil  for  parameters  to  assess  the suitability  for  use  in  embankments which shall be done for every 10000 cum  and/or  for  every  change  of layer  characteristics.  (iii)  No  extra  payment  for  lead  etc.,is  admisible.  (iv) Only 75 percent payment for the quantity executed in a particular bill is payable initially.  15 percent of the balance  amount  shall  be  released after  the  L  section  and  profile  are perfectly reached and the formation is  handed  over  to  Railways. Remaining  10  percent  shall  be released only after  the  formation  in the  full  block  section  or  identified length  is  completed  in  all  respects and  handed  over. (v) Formation width at top shall be 

1000.00

52.50

1 CUM 59,850.00

( Rupees  Fifty Two And Paise  Fifty )

 

Contractor's % : 14       Discount : 0

12

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'B'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

made  with  500mm  extra  on  either side initially and after compaction be cut  to  standard  profile.  No  extra payment  shall  be  made  for  this purpose.  If  the extra width as above is not made at any single location of less  than  100  m  length,  payments due  shall  be  reduced  by  5  percent for  that  entire  100  m  stretch. (vi)  For  leads  upto  500m  from  the spot  of  release,  accepted  rates  shall apply.  For  leads  beyond  500 m  and upto 1 km, 5 percent extra over  the accepted  rates  shall  be  paid.  For  all leads beyond 1  km and  irrespective of  any  extent  further,  another  5 percent over the accepted rates shall be  paid  and  no  ther  compensation will be eligible. 

4

EW2‐202

Earth  work  in  filling  with  COE: Earthwork  in  embankment  in making  formation   with  contractors own  earth  of  approved  quality  in specified  layers  not  exceeding 300mm  thickness  from  approved earth quarries outside railway limits in  all  soils  with  loading,  unloading, all  lead  and  lifts,  rehandling, transportation,  spreading  in  layers, benching  of  slopes,  sectioning  to profile,  clearing  of  debris/garbage/ vegetation/shrubs  etc.,  in  the railway alignment using contractor's vehicles,  machinery,  labour, consumables  etc.,  as  per  technical specification  &  special  conditions and  as  directed  by  Engineer‐in‐charge.  Note:  (i)  Payment  shall  be  made based on cross section measurement only.   (ii)  The  rate  includes  all  charges, taxes,  royalty,  seignorage  etc.,  and for  pretesting  of  soil  quality  at quarry  for  every  20000  cum  or change of layer and testing at site for 

48500.00

126.60

1 CUM 69,99,714.00

( Rupees  One Hundred and Twenty Six And Paise  Sixty )

 

Contractor's % : 14       Discount : 0

13

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'B'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

every  5000  cum  or  change  of  layer for  assessing  the  suitability  of  the soil  for use  in embankments and all other  tests  as  specified  in  the specifications.  (iii) No extra payment for lead etc., is admisible.    (iv) Only 75 percent payment for the quantity executed in a particular bill is payable initially. 15 percent  of the balance  amount  shall  be  released after  the  L  section  and  profile  are prefectly reached and the  formation is  handed  over  to  Railways. Remaining  10  percent  shall  be released  only  after  the  formation  in the  full  block  section  or  identitifed length  is  completed  in  all  respects and  handed  over. (v) Only soils of category I or II or III or  IV  as  per  clause  15  of  Technical Specifications is permitted. Payment for category III will be reduced by 5 percent and for cateogory IV will be reduced  by  10  percent  of  the accepted rates.  Accepted rates apply to soil with PI upto 7.  For PI beyond 7 and upto 20, a further reduction of 10  percent  in  accepted  rates  shall apply. Use of category  V  soil  as per clause 15 of Technical Specifications is  banned.  (vi) Formation width at  top shall be made  with  500mm  extra  on  either side initially and after compaction be cut  to  standard  profile.  No  extra payment  shall  be  made  for  this purpose.  If  the  extra  width  is  not made  at  any  single  location  of  less than  100  m  length,  payments  due shall  be  reduced  by  5%  for  that entire 100 m stretch. 

14

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'B'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

5

EW2‐301

Mechanical  compaction  of  earth work:  Mechanical  compaction  of embankment, approaches to bridges etc.,  in  specified  layers  using specified  capacity  vibratory  power rollers as per type of soil,  to achieve specified dry density of earth/other material  using  contractor`s  power rollers,  tools  and  plants, consumables,  labour,  watering  etc., all  complete  as  per    specification & special conditions and as directed by Engineer‐in‐charge.  Note:  If  any  other  roller  or  other equipment  is  used  for  compaction, payment for the complete layer shall be  reduced  by  20  percent  of  the accepted  rate  for  mechanical compaction. 

48500.00

10.50

1 CUM 5,80,545.00

( Rupees  Ten And Paise  Fifty )

 

Contractor's % : 14       Discount : 0

6

EW2‐104

Earthwork  in  cutting  in  Hard  Rock requiring  controlled  blasting  or other  means  Earthwork  for excavation  in  cuttings  in  hard  rock strata  using    explosives    or chemicals,  jack  hammers  or  any other  advance  methods  from authorised  manufacturers/  license holders,  in  controlled  manner,  in connection with making  formation/ side  drains/catch  water drains/bridges/trolley  refuges  etc., as  per  required  cross  section,  L‐section  &  profile    including removing  all  trees,  bushes,  debris, constructions,  etc.,  from  the  site with  contractors  equipment, machinery,  labour,  comsumables etc.,as per technical specifications & special  conditions,    including removing  cut  spoils  and  taking  to embankment / outside railway  land so  as  to  clear  the  the  site  with  all leads  &  lifts,  as  directed  by Engineer‐in‐charge.  Note:  i)  Payment  shall  be  based  on cross  section  measurement  only.  

50.00

478.00

1 CUM 27,246.00

( Rupees  Four Hundred and Seventy Eight )

 

Contractor's % : 14       Discount : 0

15

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'B'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

ii)  Hard  rock  requiring  controlled blasting means rock which cannot be excavated  by  excavators/  picks/ bars  etc.  and  which  require controlled  blasting  duly  providing protection  measures  for  properties around  or  which  require  use  of chemicals  or  other means  to  loosen the  rock.  (iii) No extra payment for lead etc., is admisible.   (iv)  Only  75%  payment  for  the quantity executed in a particular bill is  payable  initially.    15%  of  the balance  amount  shall  be  released after  the  L  section  and  profile  are perfectly reached and the  formation is  handed  over  to  Railways. Remaining  10%  shall  be  released only  after  the  formation  in  the  full block  section  or  identified  length  is completed  in  all  respects  and handed  over.  (v)This  item  shall  be  operated with specific  prior  approval  of    CE (construction)  for  works  requiring blasting  near  inhabited  area/ residential  houses  within  town/ village  limits where open blasting  is not permitted by the revenue / local authorities. 

7

EW1‐304

Fixing reference pegs: Striking out of centre  line  of  railway  alignment using  total  station  or  any  other latest  survey  equipment  and  fixing centre  line  pegs  of  adequate  size with  Railway's  tie  bars/cut  rails  at every 100m on straight and 25m  incurves,  at  bridges  etc.,  with contractors surveyor, equipment, all consumables,  labour  etc.  Note : (i) The reference pegs shall be fixed  along  the  alignment  at appropriate  locations  to  provide information for execution of 

200.00

154.30

1 EACH 35,180.40

( Rupees  One Hundred and Fifty Four And Paise  Thirty )

 

Contractor's % : 14       Discount : 0

16

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'B'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

formation,  bridges,  ballasting  and linking  of  track  throughout  the period  of  construction.  (ii)  Contractor  is  responsible  for maintaining  the  reference  pegs including  shifting  in  case  of  shifting of  alignment  or  to  facilitate construction.    (iii)  The  reference  pegs  shall  be usable  as  temporary  bench  marks wherever required. 

8

DD1‐101

Plotting  initial  levels:  Computer Plotting  of  the  theoretical  cross section  profile  based  on  the  initial levels  of  ground,  recorded  in  the level  books  for cuttings/embankments  at  intervals of  25m  or  less  including computation  of  theoritical profile/quantities  duly  deducting quantities for bridges and any other structure not requiring execution of earthwork  in  A4  size  sheet  with contractor's  material,  man  power, consumables,  tools  and  plants  etc., and  as  directed  by  Engineer‐in‐charge.  Note:  i)  Plottings  and  calculations are  to be submitted  to Railway  in 3 sets.    (ii) One cross section in one A4 size sheet is required. 

2.00

4,700.00

1 KM 10,716.00

( Rupees  Four Thousand Seven Hundred )

 

Contractor's % : 14       Discount : 0

9

DD1‐102

Plotting  final  levels:  Computer plotting  of  the  theoretical  &  actual final  finished  cross  section  profile, duly  indicating  different  type  of strata available/ excavated  in the x‐section,  based  on  the  final  levels recorded  in  the  level  books  for banks/  cuttings  at  intervals  of  25mor  less,  including  computation  of theoritical/actual quantities done as per classification of different types 

2.00

4,700.00

1 KM 10,716.00

( Rupees  Four Thousand Seven Hundred )

SPECIAL CASE RATES. Any increase in quantity beyond agreement  quantity under these items rate may be negotiated. This rate not to be taken as reference for future tenders.

Contractor's % : 14       Discount : 0

17

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'B'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

of  soil/blanketing  material  as certified by Engineer‐in‐charge duly deducting quantities for bridges and any  other  structure  not  requiring execution  of  earthwork  in  A4  size sheet  with  contractor's  material, man  power,  consumables,  tools  and plants  etc.,    and  as  directed  by Engineer‐in‐charge.  Note:  i)  Plottings  and  calculations are  to  be  submitted  to Railway  in  3 sets   ii) One cross section in one A4 sheet is  required.  iii)  For  embankments,  computation of  different  soils  viz.,  cut  spoils, contractor's  own  earth,  blanketing material are to be shown separately as per measurement recorded. 

1,08,90,203.40

(No. of Items 9 ONLY)

Schedule B Departmental Value : 

0.00

1,08,90,203.40

Schedule B Total :

Rupees in Words ( Rupees  One Crore Eight Lakh Ninety Thousand Two Hundred and Three And Paise  Forty ONLY )

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: PLOT NO.68, FIRST FLOOR        RADHASWAMY COLONY, SIKH ROAD,  SIKH VILLAGESECUNDERABAD

18

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name  of  the  Work  :Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐  Kusugal stations: Proposed construction of two lane ROB in lieuof  LC  No.1  at  Km.3/700‐800  as  1x36m  Bowstring  Girder  (Railway    Portion)  and  RE  panels  (Approach  portion)  with service roads with  two subway of 4mx3m RCC box on either side of ROB, shifting of  minor bridge No.6 ( 2x1.2m dia RCCpipe.)  Waterway  bridge  2x6mx5m    RCC  box  including  construction/dismantling  of  gate  lodge,  LC  and      temporary diversion  of  road  (TWO  PACKET  SYSTEM)   

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'C'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1

CE1‐01A

Supply of Ordinary Portland cement of  43  /  53  grade  conforming  to  IS 8112  /  IS  12269  (upto date)and/or Portland  Pozzolana  Cement conforming  to  IS/1489  (upto  date), at  site  of  work  to  the  extent  of  the quantities  required  for  various items  of  works  in  schedule  items including  all  cost  of  loading, unloading,leading,  transporting, stacking,  storing  including  making proper storage arrangements and all consumables,  machinery,  vehicles, labour etc., complete and as directed by  the  Engineer‐in‐charge. (a)  Ordinary  Portland  Cement (43/53  Grade)  NOTE :1)  Use of Portland Pozzolona cement shall be restricted strictly to the  permitted  construction  items only.  Pozzolana cement shall not be used  in  PSC  construction.  2)  Admixtures  such  as  super plasticizers will  be permitted based on  specific  designs  for  permitted construction  items  with  the approval  of  the  DY.Chief  Engineer‐in‐charge.    However,  admixtures proposed  shall  be  supplied  free  of cost  by  the  Contractor  and  no compensation  will  be  payable. 3. 33 Grade cement shall not be used in railway construction works. 

3325.00

6,342.00

1 T 2,19,30,636.00

( Rupees  Six Thousand Three Hundred and Forty Two )

SPECIAL CASE RATES. Any increase in quantity beyond agreement  quantity under these items rate may be negotiated. This rate not to be taken as reference for future tenders.

Contractor's % : 4       Discount : 0

19

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'C'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

2,19,30,636.00

(No. of Items 1 ONLY)

Schedule C Departmental Value : 

0.00

2,19,30,636.00

Schedule C Total :

Rupees in Words ( Rupees  Two Crore Nineteen Lakh Thirty Thousand Six Hundred and Thirty Six And Paise  Twenty 

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: PLOT NO.68, FIRST FLOOR        RADHASWAMY COLONY, SIKH ROAD,  SIKH VILLAGESECUNDERABAD

20

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name  of  the  Work  :Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐  Kusugal stations: Proposed construction of two lane ROB in lieuof  LC  No.1  at  Km.3/700‐800  as  1x36m  Bowstring  Girder  (Railway    Portion)  and  RE  panels  (Approach  portion)  withservice roads with  two subway of 4mx3m RCC box on either side of ROB, shifting of  minor bridge No.6 ( 2x1.2m dia RCCpipe.)  Waterway  bridge  2x6mx5m    RCC  box  including  construction/dismantling  of  gate  lodge,  LC  and      temporarydiversion  of  road  (TWO  PACKET  SYSTEM)   

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1

BRPC1

Plain Cement Concrete (M15 to M30 design  mix)  Cast‐in‐situ  work (cement  will  be  paid  separately) with  Contractors  all  materials including  40mm  or  below  graded hard crushed stone aggregate, sand, admixture,  water,  etc.,  of  approved quality  in  foundations,  abutments, piers,  wing  walls,  return  walls  etc., of  bridges  and  other  structures  as required,  including  fixing  and removal  of  contractors  shutter/ form  work/  supports, vibrating/compacting,  providing weep  holes  with  contractors  AC pipes  75  to  100mm  dia  wherever necessary,  providing normal/approved  expansion  joints with  necessary  materials  as  per design/drawings, curing of concrete, pumping/bailing  out  of  water wherever  necessary  with Contractors  own  pump,  power,  fuel etc;, finishing the surfaces wherever required,  etc.,  complete,  with  all lead,  lift,  transport,  consumables, labour,  tools  and  plant,  materials, etc.,  as  per  approved drawings/specification  /conditions and  as  directed  by  the  Engineer‐in‐charge.  NOTES: (1)  Single  rate  will  apply  for  all mixes  (M15,M20,M25  and  M30) irrespective  of  proportion  of materials  used  (per  cubic  metre  ( cum)  of  concrete).(2)  All  concrete  shall  be  weigh batched, machine mixed, compacted with  mechanical  vibrators  and should conform to IRS Concrete 

460.00

2,500.00

1 CUM 13,68,500.00

( Rupees  Two Thousand Five Hundred )

 

Contractor's % : 19       Discount : 0

21

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

Bridge  Code  and  relevant  IS Codes/Specifications  and  other relevant specifications as prescribed. Weigh batching  is mandatory  for all PCC,  RCC  and  PSC  works.(3) Rates  shall  include all materials, operations, etc.,  complete except for Cement,  which  will  be  paid  for separately.    Steels  including fabrication,  if  used,  and  excavations for  foundations  will  be  paid  under relevant  SSR  or  other  schedules separately. (4)  Shuttering  and  supporting  form work  shall  be  of  good  quality materials  only.    For  PSC/RCC girders/slabs/beams/columns,  only rigid  plate  steel  shutters  shall  be used. (5) Mix  design with  requirement  of all  tests  shall  be  arranged  by  the Contractor  at  his  cost.(6)  Admixtures  as  required/  as  per designs  shall  be  arranged  by  the Contractor  at  his  cost.(7) All material and concrete tests as required  shall  be  arranged  by  the contractor  at  his  cost.(8) Rate includes placing of concrete in  position  for  all  heights  by manual/concrete pump/crane etc., 

2

BRPC2

Plain Cement Concrete (M15 to M30 design  mix)  Cast‐in‐situ  work (cement  will  be  paid  separately) with  Contractors  all  materials including  20mm/12.5mm  graded hard crushed stone aggregate, sand, admixture,  water,  etc.,  of  approved quality  in  bed  blocks, wearing  coat, coping,  ballast  walls  etc.  of  bridges and  other  structures  as  required, including  fixing  and  removal  of contractors  shutter/form  work/ supports,  vibrating/compacting, providing  weep  holes  with contractors  AC  pipes  75  to  100mm dia  wherever  necessary,  providingnormal/approved expansion joints 

650.00

2,600.00

1 CUM 20,11,100.00

( Rupees  Two Thousand Six Hundred )

 

Contractor's % : 19       Discount : 0

22

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

with  necessary  materials  as  per design/drawings, curing of concrete, pumping/  bailing  out  of  water wherever  necessary  with Contractors  own  pump,  power,  fuel etc;,  finishing the surfaces wherever required,  etc.,  complete,  with  all lead,  lift,  transport,  consumables, labour,  tools  and  plant,  materials, etc.,  as  per  approved drawings/specification  /  conditions and  as  directed  by  the  Engineer‐in‐charge.  NOTES: (1)  Single  rate  will  apply  for  all mixes  (M15,M20,M25  and  M30) irrespective  of  proportion  of materials  used  (per  cubic  metre (cum)  of  concrete)(2)  All  concrete  shall  be  weigh batched, machine mixed,  compacted with  mechanical  vibrators  and should  conform  to  IRS  Concrete Bridge  Code  and  relevant  IS Codes/Specifications  and  other relevant specifications as prescribed. Weigh batching  is mandatory  for all PCC,  RCC  and  PSC  works.(3) Rates  shall  include all materials, operations, etc.,  complete except for Cement,  which  will  be  paid  for separately.    Steels  including fabrication,  if  used,  and  excavations for  foundations  will  be  paid  under relevant  SSR  or  other  schedules separately. (4)  Shuttering  and  supporting  form work  shall  be  of  good  quality materials  only.    For  PSC/RCC girders/slabs/beams/columns,  only rigid  plate  steel  shutters  shall  be used. (5) Mix  design with  requirement  of all  tests  shall  be  arranged  by  the Contractor  at  his  cost.(6) Admixtures   as  required/ as per designs  shall  be  arranged  by  the Contractor  at  his  cost.(7)     All material  and concrete  tests as required shall be arranged by the 

23

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

contractor  at  his  cost.(8) Rate includes placing of concrete in  position  for  all  heights  by manual/concrete pump/crane etc., 

3

BRRC1

Reinforced  Cement  Concrete  (M20 to M40  design mix) work (Cement & Steel  will  be  paid  separately),with Contractors  all  materials  including 20mm  graded  hard  crushed  stone aggregate,  sand,  admixture,  water etc.,  of  approved  quality  in foundations including below ground level,  abutments,  piers,  pile  caps, bed  blocks,  trestle  beams,  girders, pedestals,  retaining  walls, boxes/slabs  for  flat  top  bridges, deck  slabs,  girders,  kerb  walls, diaphrams,  cross  frames  etc.,  on girder  bridges  and  other  structures of  any  design/shape  as  required, above or below ground  level  of  any size  and  shape,  including  fixing  and removal  of  contractors shutters/form  work/  supports, vibrating/compacting,  and providing weep holes with AC pipes 75mm  to  100mm  dia  and normal/approved  expansion  joints with  necessary  materials  as  per designs/drawings  wherever necessary,  curing  of  concrete, pumping/bailing  out  of  water wherever  necessary  with Contractors  own  pump,  power,  fuel etc.,  finishing the surfaces wherever required  etc.,  complete  and including  handling,  uncoiling, cutting,  bending,  cranking,  tying M.S./Tor  Rods/wires/other  steel  to form  reinforcement  with Contractors  galvanizsed  binding wire of size 18/20 SWG(0.90mm) to IS280,  etc.,  fixing  in  position reinforcement  gauge  complete  as required with all lead, lift, transport, materials,  consumables,  labour, tools and plant, etc., and including 2 coats  of  cement  painting  as  per approved  drawings/specifications/ 

5150.00

3,600.00

1 CUM 2,20,62,600.00

( Rupees  Three Thousand Six Hundred )

 

Contractor's % : 19       Discount : 0

24

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

and  as  directed  by  the  Engineer‐in‐charge.    Plant  produced  Ready‐mix concrete shall be used only with the specific  approval  of  the  Dy.Chief Engineer.  NOTES: (1)  Single  rate  will  apply  for  all mixes  (M20,M25,  M30,  M35  and M40)  irrespective  of  proportion  of materials  used  (per  cubic  metre (cum)  of  concrete).  Rate  is  for  site mixed concrete.  For plant produced Ready‐mix  concrete,  an  extra payment of Rs.500/‐ per cum will be applicable.  (2)  All  concrete  shall  be  weigh batched, machine mixed,  compacted with  mechanical  vibrators  and should  conform  to  IRS  Concrete Bridge  Code  and  relevant  IS Codes/Specifications  and  other relevant specifications as prescribed. Weigh batching  is mandatory  for all PCC,  RCC  and  PSC  works. (3) Rates  shall  include all materials, operations, etc.,  complete except for Cement and Steel and excavation for foundations  and  substructure,  if required,  which  will  be  paid  for separately under relevant SSR/other schedules.    Similarly,  neoprene bearing  pads,  expansion  joints  and steel  ladders  attached  to  the  PSC girder/slab  will  also  be  paid  for separately.  (4)  Shuttering  and  supporting  form work  shall  be  of  good  quality materials  only.    For  PSC/RCC girders/slabs/beams/columns,  only rigid  plate  steel  shutters  shall  be used.  (5) Mix  design with  requirement  of all  tests  shall  be  arranged  by  the Contractor  at  his  cost. (6) Admixtures, binding wires, 

25

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

clamps/anchors etc., as required/ as per designs shall be arranged by the Contractor  at  his  cost.  (7)      75%  of  the  value  of  the  work completed will  be  paid  initially  and remaining 25% will be paid after all tests  connected  with  concrete including materials and 7 days cube tests  are  completed  and  results  are accepted.  Any concrete which is not passing  the  design/codal requirements  shall  be  summarily rejected.  (8)   Rates include cost of  launching, lifting  and  placing  of  slabs/  girders on  bearings  if  required. (9)  This  item  will  apply  for  all standard/special designs required in the  work  where  such  design  is  not specially  provided  for  in  any  other schedule/item.  (10)  Rate  includes  placing  of concrete  in  position  for  all  heights by  manual/concrete  pump/crane etc., 

4

BRGL3

Supply,  fabricating  and  fixing  of gratings  for  inspection  chambers, inspection  ladders,  platforms,  hand railing on bridges, Box girder doors etc.,  to  facilitate  inspection/locking with contractorãs M.S  rods/ plates/ flats/  pipes  of  appropriate  sizes including  anti‐corrosive  painting and  providing  anchorage,  locking arrangement  as  required  complete with  all  lead,  lift,  transport, consumables,  labour,  tools  &  plants etc., complete and as directed by the Engineer‐in‐charge. 

3.00

46,000.00

1 T 1,64,220.00

( Rupees  Forty Six Thousand )

 

Contractor's % : 19       Discount : 0

5

BRPL1A

Providing  and  installing 1000mm/600mm  dia  RCC  cast‐in‐situ  BORED  PILES  using  Rotary/ Conventional method of drilling in 

400.00

4,800.00

1 RM 22,84,800.00

( Rupees  Four Thousand Eight Hundred )

 

Contractor's % : 19       Discount : 0

26

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

all kinds of soils and rock (including boulders,  soft,  weathered  or  hard rock)  duly  providing  Contractor's M35/M40  grade  concrete  (with 20mm  size  graded  stone  aggregate and  all  other  materials  including admixtures  as  required),  including fabricating  and  fixing  in  position reinforcement  gauge    as  per designs/drawings, removing/chipping  off latience  and concrete  above  cut  off  level  for  a depth  upto  1.0  M  of  the  pile  top, protection  arrangements  for  the bore  hole  as  required  for  various types  of  soil  (except  for  providing permanent  M.S.liners  in  very  loose soils)  with  all  lead,  lift,  transport, materials,  consumables,  tools  & plant,  labour  etc.,  complete  as  per specifications and as directed by the Engineer‐in‐charge. (Per  running metre  of  pile  depth  to be  quoted) (a)  1000  mm  dia  RCC  pile  in M35/M40  Concrete  in  all  soils including  weathered  rock  including through  boulders/  obstructions. NOTES:‐ (1)  Rates  include  cost  of  all operations  and  cost  of  all  materials including temporary liners and other protection as required but excluding cement and reinforcement steel and permanent  M.S  liners  in  very  loose soil.    Reinforcement  steel,  cement (including  10%  extra  cement  for under  water  concreting)  and permanent  M.S  liners  will  be  paid under  other  relevant  schedules  at the  discretion  of  the  Engineer‐in‐charge.    Pile  measurement  for payment  will  be  upto  cut  off  level only.  (2)  Piles  shall  be  provided  with proper  shoe/base  to  rest  properly on  rock/  soil  as  designed.    Rates include  cost  of  bedding  and  seating the piles on hard rock, wherever 

27

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

specified,  with  a  minimum  of  1.0m anchorage  as  specified.    However, hard  rock  blasting  required,  if  any, will  be  paid  separately  under  other relevant  schedules  at  the  discretion of the Engineer‐in‐charge. 

6

BRPL2A

Supplying,  fabricating,  driving  and placing  in  position  permanently 6mm  thick  M.S.Liners  including cutting,  bending,  welding  and fabricating  with  Contractor's  6mm thick  M.S.Sheets  as  necessary  for RCC piles  of  1000/600mm dia with all  lead,  lift,  transport  materials, consumables,  tools  &  plant,  labour including  operation  of rig/machinery  for  driving  etc., complete  as  per  specifications  and as  directed  by  the  Engineer‐in‐charge.(per  running  metre  of  liner depth  to  be  quoted) (a)  6mm  thick  M.S.liners  for 1000mm  dia  RCC  piles. NOTES:‐ (1)  Rate  is  payable  for  the  liner depth  used  only  and  does  not include  wastage  of  any  material involved  and  no  extra rate/compensation is payable in this regard. 

240.00

7,000.00

1 RM 19,99,200.00

( Rupees  Seven Thousand )

 

Contractor's % : 19       Discount : 0

7

BRPL1C

Providing  and  installing 1000mm/600mm  dia  RCC  cast‐in‐situ  BORED  PILES  using Rotary/Conventional  method  of drilling in all kinds of soils and rock (including boulders, soft, weathered or  hard  rock)  duly  providing Contractor's  M35/M40  grade concrete  (with  20mm  size  graded stone  aggregate  and  all  other materials  including  admixtures  as required),  including  fabricating  and fixing  in  position  reinforcement gauge    as  per  designs/drawings, removing/chipping  off latience  and 

25.00

5,500.00

1 RM 1,63,625.00

( Rupees  Five Thousand Five Hundred )

 

Contractor's % : 19       Discount : 0

28

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

concrete  above  cut  off  level  for  a depth  upto  1.0  M  of  the  pile  top, protection  arrangements  for  the bore  hole  as  required  for  various types  of  soil  (except  for  providing permanent  M.S.liners  in  very  loose soils)  with  all  lead,  lift,  transport, materials,  consumables,  tools  & plant,  labour  etc.,  complete  as  per specifications and as directed by the Engineer‐in‐charge. (Per  running metre  of  pile  depth  to be  quoted) (c)  1000mm  dia  RCC  pile  in M35/M40  Concrete  in  hard  rock. NOTES:‐ (1)  Rates  include  cost  of  all operations  and  cost  of  all  materials including temporary liners and other protection as required but excluding cement and reinforcement steel and permanent  M.S  liners  in  very  loose soil.    Reinforcement  steel,  cement (including  10%  extra  cement  for under  water  concreting)  and permanent  M.S  liners  will  be  paid under  other  relevant  schedules  at the  discretion  of  the  Engineer‐in‐charge.    Pile  measurement  for payment  will  be  upto  cut  off  level only.  (2)  Piles  shall  be  provided  with proper  shoe/base  to  rest  properly on  rock/  soil  as  designed.    Rates include  cost  of  bedding  and  seating the  piles  on  hard  rock,  wherever specified,  with  a  minimum  of  1.0m anchorage  as  specified.    However, hard  rock  blasting  required,  if  any, will  be  paid  separately  under  other relevant  schedules  at  the  discretion of the Engineer‐in‐charge. 

8

BRPL3

Conducting  and  pile  load  test  on  a 600mm  to  1200  mm    pile  duly creating  all  loads  and  providing  all staging and instrumentation, with 

500.00

380.00

1 T 2,26,100.00

( Rupees  Three Hundred and Eighty )

 

Contractor's % : 19       Discount : 0

29

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

all  lead,  lift,  transport,  materials, consumables,  tools  &  plant,  labour etc.,  complete  as  per  specifications and  as  directed  by  the  Engineer‐in‐charge. (per metric tonne (t) of loading to be quoted).  NOTES:‐  (1)  Single  rate  shall  apply  for  all piles of any dia metre.  Rate includes cost  of  all  materials,  operations, instrumentations,  technical  works etc.,  and  disposing  of  all  wastematerials  away  from  the  site appropriately.  (2)  Testing  shall  be  done  as  per  IS 2911 specifications or as directed by the Engineer‐in‐charge duly creating all  necessary  loads which will  be  in the  range  of  300‐600  t  depending upon  the designs.    All  loads may be created with available local material or  any  other  at  the  cost  of  the contractor.    (3)  Loading  calculations  and procedure shall be submitted by the Contractor  in  advance  and  got approved.  Report shall be submitted by  the  contractor  after  the  test  in  a proper  format  specifying  the calculations  for  loads,  deflections and other parameters (specified and actual)  as  per  relevant specifications. 

9

BRGL2

Supplying  and  providing  special type  of  Elastomeric  strip  seal  type Expansion  joints  capable  of movement  of  +/‐  40mm  to  60mm complete  as  per  drawing/as  per specifications  in  bridges  with  PSC BOX/ I or U girders for the complete width  of  the  deck  slab  as  per approved  drawings/  specifications with  contractorãs  steel,  dowels, plates, rubber pads, elastomers, 

25.00

10,800.00

1 RM 3,21,300.00

( Rupees  Ten Thousand Eight Hundred )

 

Contractor's % : 19       Discount : 0

30

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

bitumen  and  other  material, including  fabrication,  galvanising and  fixing  with  all  lead,  lift, transport,  consumables,  labours, tools & plants etc., as directed by the Engineer‐in‐charge.  (per  running metre length of expansion joint to be quoted)  NOTE: (1)  Rate  shall  include  all  materials, operations,  etc.,  except  cement which  will  be  paid  for  separately. (2)  All  tests  as  required  shall  be carried  out  by  the  contractor  at  his cost. 

10

BRGL4

Drilling of 25mm/40mm dia holes in concrete/stone  masonry/hard  rock underground/over  ground,  to  a depth  of  400mm  for  dowelling/ anchoring  including  fixing  of  steel dowels/angles/flats    and  grouting with  cement  mortar  (1:3)  with Contractors  all  materials,  drilling equipment,  lead,  lift,  labour, transport,  tools  &  plant, consumables,  etc.,  complete (excluding  cement  &  steel)  as  per specifications and as directed by the Engineer‐in‐charge.  NOTES:‐  (1)  Rate  includes  all  materials, operations  etc.,  excluding  cement and  steel, which will  be  paid  under other relevant schedules. 

50.00

150.00

1 EACH 8,925.00

( Rupees  One Hundred and Fifty )

 

Contractor's % : 19       Discount : 0

31

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'D'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

3,06,10,370.00

(No. of Items 10 ONLY)

Schedule D Departmental Value : 

0.00

3,06,10,370.00

Schedule D Total :

Rupees in Words ( Rupees  Three Crore Six Lakh Ten Thousand Three Hundred and Seventy And Paise  Thirty ONLY )

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: PLOT NO.68, FIRST FLOOR        RADHASWAMY COLONY, SIKH ROAD,  SIKH VILLAGESECUNDERABAD

32

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name  of  the  Work  :Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐  Kusugal stations: Proposed construction of two lane ROB in lieuof  LC  No.1  at  Km.3/700‐800  as  1x36m  Bowstring  Girder  (Railway    Portion)  and  RE  panels  (Approach  portion)  withservice roads with  two subway of 4mx3m RCC box on either side of ROB, shifting of  minor bridge No.6 ( 2x1.2m dia RCCpipe.)  Waterway  bridge  2x6mx5m    RCC  box  including  construction/dismantling  of  gate  lodge,  LC  and      temporarydiversion  of  road  (TWO  PACKET  SYSTEM)   

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'E'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1

ST1‐001

Supply  of  High  Yield  Strength Deformed  reinforcement  steel bars/wires    of  grade  FE 415/500/550  confirming  to  IS 1786‐1985  (upto  date)  at  site  of work to the extent actually required for  the  work  including  all  cost  of loading,  unloading,  leading, transporting,  stacking,  storing, labour,  consumables,  machinery, vehicles  etc.,  complete  and  as directed  by  the  Engineer‐in‐charge. NOTE:  (1)  The  rate  quoted  for  this item  is  applicable  for  both  Fe500 and Fe550.  FE 415 steel used will be paid  with  a  reduction  of  Rs.2000/‐from the agreed rates. Steel shall be procured  only  from  any  of  the following  manufacturer's  SAIL, TISCO,  IISCO,  RINL. (2) Stage payment for supply of steel shall be limited to 75% of the agreed rates  subject  to  production  of  Bank Guarantee/Indemnity  Bond  as specified,  Test  certificates, Insurance,  limitation  in  quantity supplied  at  a  time,  conditions  for stacking/storing/ preserving at site. However,  this  payment  will  be restricted  to  a maximum of  30% of the Schedule quantity at any point of time.  (3)  Payment  for  reinforcement rods/wires  will  be  made  as  per actual  used  including  over  laps, cranks,  bends,  etc.,  if  any,  as  per approved  drawing  and  as  per Special  Conditions  for  use  of  steel. However, no payment will be made 

800.00

51,790.00

1 T 4,18,46,320.00

( Rupees  Fifty One Thousand Seven Hundred and Ninety )

SPECIAL CASE RATES. Any increase in quantity beyond agreement  quantity under these items rate may be negotiated. This rate not to be taken as reference for future tenders.

Contractor's % : 1       Discount : 0

33

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'E'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

for  any  wastages.  Quantity  will  be calculated  for  nominal  diameter  of the bars using standard weights per running  metre  or  as  per  actual weights  whichever  is  less. (4) Binding wire, clamping materials etc., used in construction will not be treated  as  supply  items  under  this schedule and will be governed by the Schedule  and  Special  Conditions under  the  relevant  items  of concreting  etc.,  and  no  extra payment  shall  be  eligible. (5)  Reinforcement  steel  shall  be supplied  and  used  as  per  approved drawings  and  as  per  instructions  of the  Engineer‐in‐charge. (6) The steel shall be as per specified code  and  the  process  of manufacturing shall be the latest and as  recommended  by  the  relevant  IS Specifications.  However,  the  rates quoted  shall  apply  to  all  types  of manufacturing  and  no  extra payment is admissible in this regard. 

4,18,46,320.00

(No. of Items 1 ONLY)

Schedule E Departmental Value : 

0.00

4,18,46,320.00

Schedule E Total :

Rupees in Words ( Rupees  Four Crore Eighteen Lakh Forty Six Thousand Three Hundred and Twenty And Paise  Forty 

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: PLOT NO.68, FIRST FLOOR        RADHASWAMY COLONY, SIKH ROAD,  SIKH VILLAGESECUNDERABAD

34

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name  of  the  Work  :Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐  Kusugal stations: Proposed construction of two lane ROB in lieuof  LC  No.1  at  Km.3/700‐800  as  1x36m  Bowstring  Girder  (Railway    Portion)  and  RE  panels  (Approach  portion)  with service roads with  two subway of 4mx3m RCC box on either side of ROB, shifting of  minor bridge No.6 ( 2x1.2m dia RCCpipe.)  Waterway  bridge  2x6mx5m    RCC  box  including  construction/dismantling  of  gate  lodge,  LC  and      temporarydiversion  of  road  (TWO  PACKET  SYSTEM)   

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1

BA12‐1A

Collection,  Supply  and  stacking  of MACHINE  CRUSHED  50mm  hard, durable,    graded  angular,  cubical graded  stone  ballast  of  Granite geological  variety,  conforming  to Railway  specifications  at  specified Depots  and/or  on  cess/formation along the alignment at places within the railway limit including making of approach roads , crossing of railway line/nallahs/any  obstructions, clearing  of  shrubs/bushes/rubble, making  the  ground  level,  preparing stacking  area,  handling/rehandling where  ever  required,  observing  all safety  precautions,  furnishing  test reports  of  ballast  samples  at  each stage  of  measurements,  assisting railways  in  measurement  of  stacks and  sieve  analysis  and  tests, numbering  stacks,  sprinkling    lime after measurement and resprinkling whenever  necessary  for identification,  including    Seignorage /Royalty charges  , sales tax and any other  taxes  /octroi  /duties  leviable by  the  local  bodies/State  /Central Govt. with the contractor's material, labour, crew, tools, plant, machinery ,  rail/road  vehicles,  consumables, with  all  ascents,  descents,  lead,  lift, etc.,  complete  as  per  special conditions,  specifications  and regulations    and  as  directed  by  the Engineer‐in‐Charge.   a)  For  supply  along  the  alignment between  Km....  to  Km...... NOTES:  1.1  Each  tenderer  at  the time  of  tendering  shall  submit  the test report of ballast for impact 

400.00

992.00

1 CUM 4,96,000.00

( Rupees  Nine Hundred and Ninety Two )

 

Contractor's % : 25       Discount : 0

35

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

value,  abrasion  value  and  water absorption  value  from  railway laboratories  or  approved laboratories  mentioned  in  tender document  in  accordance  with  the Railway specification and IS codes as per  provision  of  "Specification  of Track Ballast, IRS‐GE‐1, failing which the offer is liable to be rejected. Test report shall indicate the name of the quarry  from  where  the  sample  is submitted.  1.2    Tenderer  shall  submit  along with offer, adequate proof of having made  sufficient  arrangements  by way  of  tie  up  of  either  existing quarries or new quarries intended to be setup for timely supply of ballast. 1.3    The  tenderer  shall  also  furnish an  undertaking  that  the  ballast supply  at  all  times  will  conform  to Specification  for  track  Ballast  as specified  by  Railways. 1.4    Ballast's  sample  should  satisfy the  following  physical  properties  in accordance with IS 2386 Pt‐IV‐1963 when  tested  as  per  the  procedure laid down  in Specification of Ballast IRS‐GE‐1  June  2004  and  amended from  time  to  time. Abrasion  Value      ‐  30%  maxImpact  Value          ‐  20%  maxWater  absorption  ‐    1%. 1.5    Ballast  should  satisfy  the following  size  and  gradation: a) Retained on 65mm sq mesh sieve ‐  5%  Maximumb) Retained on 40mm sq mesh sieve ‐  40%  to  60%c) Retained on 20mm sq mesh sieve ‐  Not  less  than                                    98%.  1.6  In  case  gradation  of  ballast  in  a stack does not conform to required 

36

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

gradation, payment for the stack will be  reduced  as  below: i)  In  case  ballast  retained on 65mm sieve  exceeds      5%  but  does  not exceed  10%  payment  at  5% reduction in agreement rate shall be made  for  full  stack. ii) In case ballast retained on 40mm square  mesh  sieve  exceeds  60% limit  prescribed  payment  at  the following  reduced  rates  shall  be made for the full stack in addition to the  reduction  worked  out  at  (i) above.  a) 5% reduction  in  agreement  rates if  retention on 40mm sq.mesh  sieve is  between  60%  (excluding)  and 65%  (including). b) 10% reduction in contracted rates if retention on 40mm sq. mesh sieve is  between  65%  (excluding)  and 70%  (including). iii)  In  case  retention  on  40mm square mesh sieve exceeds 70%, the stack  shall  be  rejected. 1.7   Ballast in the satck, deviating in size  and  gradation  shall  be  rejected under  any  of  the  following: i)  Retention  on  65mm  square mesh sieve  is  more  than  10%.ii) Retention on 40mm square mesh sieve  is  more  than  70%.iii)  Retention  on  40mm  Sq.mesh sieve  is  les  than  40%.iv) Retention on 20mm square mesh sieve  is  less  than  98%. 1.8    All  reduction  in  payments  as above  shall  apply  over  the agreemental  rates. 1.9    The  contractor  shall  have  no claims  whatsoever  for  the  reduced rates of p 

37

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : VETTED ITEMS

Schedule 'H'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

4,96,000.00

(No. of Items 1 ONLY)

Schedule H Departmental Value : 

0.00

4,96,000.00

Schedule H Total :

Rupees in Words ( Rupees  Four Lakh Ninety Six Thousand And Paise  Forty Nine ONLY )

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: PLOT NO.68, FIRST FLOOR        RADHASWAMY COLONY, SIKH ROAD,  SIKH VILLAGESECUNDERABAD

38

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name  of  the  Work  :Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐  Kusugal stations: Proposed construction of two lane ROB in lieuof  LC  No.1  at  Km.3/700‐800  as  1x36m  Bowstring  Girder  (Railway    Portion)  and  RE  panels  (Approach  portion)  withservice roads with  two subway of 4mx3m RCC box on either side of ROB, shifting of  minor bridge No.6 ( 2x1.2m dia RCCpipe.)  Waterway  bridge  2x6mx5m    RCC  box  including  construction/dismantling  of  gate  lodge,  LC  and      temporarydiversion  of  road  (TWO  PACKET  SYSTEM)   

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1

000725

Lifting of  track  including points and crossings  trap  switches  etc.,  on PSC/CST‐9/Wooden  sleepers manually  UNDER  TRAFFIC CONDITIONS  to  a  lift  of  75mm  at  atime  with  one  round  of  packing using the dumped moorum / earth / at  each  stage  of  lifting  including providing  ramp  at  each  stage wherever  required  for  allowing  the traffic  at  restricted  speed  without disturbing the alignment of  through track  etc.,  complete  and  as  directed by  the  Engineer‐in‐charge.  The lifting  of  track  by  moorum  is  only upto  the  proposed  formation  level.  a) Main  line  track upto a max  lift of 1250mm. 

400.00

120.00

1 M 48,000.00

( Rupees  One Hundred and Twenty )

 

Contractor's % : 0       Discount : 0

2

216270

Removing  the  existing  p‐way  with psc/wooden/steel  sleepers  with  all fittings  and  fastening  and  stacking along  side  the  track  without  any damage and relaying the same after complection  of  the  work  with correct  spacing  and  alignment  and as directed by the engineer incharge with  all  lead  and  lift  etc. complete(all  labour,materail,  tolls and plants,etc are  to be supplied by the  tenderer  /contractor  only  at  is own cost) 

150.00

140.00

1 TRM 21,000.00

( Rupees  One Hundred and Forty )

SPECIAL CASE RATES. Any increase in quantities beyond agreement quantities of these items  rate may be negotiated. Rates for such items shall not to be taken as reference for future tenders

Contractor's % : 0       Discount : 0

3

216271

Removing  of  existing ballast,screening  and  collecting  the same  into  gunny/polythene  bags and  stacking  at  the  nominated locations  and  dumping  the  same 

150.00

150.00

1 TRM 22,500.00

( Rupees  One Hundred and Fifty )

SPECIAL CASE RATES. Any increase in quantities beyond agreement quantities of these items  rate may be negotiated. Rates for such items shall not 

39

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

the  RCC  box  in  position  and  as directed  by  the  engineer  in  charge with  all  lead  and  lifts  complete  (All labour  ,materials  ,tools  and  plants etc  are  to  be  supplied  by  the tenderer  /  contractor  only  at  his own cost) 

to be taken as reference for future tenders

Contractor's % : 0       Discount : 0

4

216274

Lifting,  packing,  aligning  &  gauging of  track  portion  after  laying  of  pre casted  RCC  boxes  in  order  to maintain  the  track,  and  approaches &  cess with  in  the  safety  range  and relax the speed restriction. 

90.00

1,600.00

1 DAY 1,44,000.00

( Rupees  One Thousand Six Hundred )

SPECIAL CASE RATES. Any increase in quantities beyond agreement quantities of these items  rate may be negotiated. Rates for such items shall not to be taken as reference for future tenders

Contractor's % : 0       Discount : 0

5

007482

Fusion  welding  of  rails  joints  in main  line,  loop  line  and  in  points and  crossings  including  for  glued joints and SEJ, carrying out ancillary works  in  SKV  welding  for conversion  of  free  rails  into SWR/LWR/CWR such as removal of fish  plates,  clearing  of  rails  ends with  wire  brush  and  kerosene  oil, renewal  of  sleeper  if  required, fittings,  pulling  of  rails  to  required gap  at  joints,  respacing  joining sleepers  for  fixing  weld,  mould  in position, aligning, lifting, levelling of rail ends as directed by the Engineer and  trimming  of  the  extra metal  by double  weld  trimmer  and  filling weld by profile girder so as to satisfy the  requirement  of  finish  as  per manual  or  fusion  welding  to  the specifications  No.T‐19‐1984  and  asper  alumino  Thermit  welding manual 1988 and LWR manual 1996 and  LWR  manual  1996  with  latest corrections  upto  date  including respacing,  repacking  the  joint sleeper with one rough packing and painting  the  collor  of  welded  joint with  two coats of bituminious black paint  to  IS  Specification  as  per  the procedure  indicated  in  RDSO's Lr.No.M&C/FCN/P/1480  dated 31.3.89 Para  (2)  and  as directed by the Engineer, driving back to the 

50.00

1,200.00

1 JOINT 60,000.00

( Rupees  One Thousand Two Hundred )

 

Contractor's % : 0       Discount : 0

40

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

position  with  liners,  pandrol  clips, rubber pads, fish plate and bolts etc., and  giving  one  through  packing  of respaced  joint  sleepers  as  directed by  the  Engineer  and  marking  the welding  joint  number  with  steel punch of 5mm size on the non‐gauge face  of  rail  head  under  non‐traffic condition  by  Alumino  Thermit  SKV process  (in  accordance  with  the terms  of  this  contract  and  the  IRS Specification for the work) on the UP main  line  ,  DN  Main  line  and  loop lines  between  Hospet  ‐  Tornagallu section,  and  Bellary  yard.    All welding  tools,  plants  and equipments  and  consumables whether  imported  or  indigenous required  for  the  work  and  sand  of requisite  quantity  and  quality  along with  necessary  pre‐fabricated moulds  including  the  required quantity of petrol are to be arranged by the contractor.   The contractor is required  to make  available    for  use at the work spot at his cost his own tools  and  plants  required  for  the process including small tools such as hammer  and  chisels,  hot  and  cold sets  and  to  provide  the  service  of competent  supervisors  whose salaries and  incidental expenses are to  be  borne  by  the  contractor.For Conversion of 52 kg 90 UTS rails. 

6

043283

Dismantling of  rail barricading   and stacking of released materials in the yard  including  loading  leading with contractor's  labour  tools  plants  etc complete and as per the instructions of Engineer ‐in ‐charge at site. 

150.00

500.00

1 T 75,000.00

( Rupees  Five Hundred )

 

Contractor's % : 0       Discount : 0

7

043027

Providing  speed  brakers  of  3.66M width  along  the  length  of  the  Road on  either  side  approach  of  Level crossings  as  shown  in  the  Drg  No. GM/W/SC/SK/219  with  CC  1:2:4 mix using Contractors 20mm metal 

100.00

0.00

1 RM 0.00

( Rupees  Zero )

DELETED

Contractor's % : 0       Discount : 0

41

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

and  cement  etc.including  all operations  such  as  mixing  concrete and  sppreading  on  the  road  at  the location indicated by the Engineer to the  shape  and  length  with  all contractor's  material,tools,plant with all lead and lift complete  to the Railway  drawing  and  specifications and  as  directed  by  the  Engineer  in charge. 

8

214610

Transportation  of  various  p‐way materials  such  as  rails,points  and crossing,switches,SEJ,Glued joints,Buffer  stops,liftsing  barrier booms  winch  and  other  similar items  from  any  store/locations  in S.W.Railways  with contractor's trailers,machinery,consumables,tools  and  plants.loading  and unloading,lead and lift etc, complete and  as  directed  by  Engineer‐in  ‐charge(This  item  will  be  operated for  the  items  transported  by 

50.00

500.00

1 TONNE

25,000.00

( Rupees  Five Hundred )

 

Contractor's % : 0       Discount : 0

9

031912

Gas  cutting  of  any  section  of  rail posts/  gate  leaves  which  are infringing  the  BG  dimensions, transporting  the  released  material to nominated locations & stacking as per  instructions  of  Engineer‐in‐Charge. 

50.00

60.00

1 EACH 3,000.00

( Rupees  Sixty )

 

Contractor's % : 0       Discount : 0

10

000644

Fabrication and  fixing of check rails for  trolley  path/level  crossing  with 52 kg/90R rails on PSC sleeper duly drilling  of  holes  in  PSC  sleepers 16mm  dia  as  directed  for  fixing check rails   with all operations such as  cutting,bending  the  52  kg/90R rails  to  the  proper  size  alongwith fixing  contractors  grip  expansion bolt  and  nut  and  heavy  duty washers  as  per  drawing No.302/04/R of size 16x140x150 

30.00

300.00

1 M 9,000.00

( Rupees  Three Hundred )

 

Contractor's % : 0       Discount : 0

42

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

11

001290

Assembling  and  laying  SEJ  with  52 Kg/90R  rails  with  special  type  PSC sleepers  as  per  RDSO  drawing including  cutting  the  track  by mechanical  saw  and  laying  the assembled  SEJs  at  correct  location alongwith  closure  rail  as  per  SEJ Drg.No.RDSO/T‐4160 complete with all  lead  and  lift  and  as  directed  by the  Engineer‐in‐charge.Note  : 1) All  the materials  indicated in  the  assembly  drawing  will  be supplied free by the railways except angle  50x50x5mm, which  has  to  be arranged  by  the  contractor  and  all other  material,  tools  and  plants  for the work will have to be procured by the  contractor  at  his  cost.2)  all  the  p.way  material  required for the work shall be supplied by the railway  at  the  store  and  the contractor  shall  make  his  own arrangement to  lead the material  to the  workspot  at  his  cost.3) One set consists of 2 nos. of SEJs 

4.00

8,000.00

1 SET 32,000.00

( Rupees  Eight Thousand )

 

Contractor's % : 0       Discount : 0

12

001305

Fixing  of  52  Kg/90R  rail  SEJ reference  pillar  ‐  1.20m  to  1.50m length  for  LWR  including  cutting  of rail  to  required  length,  execution  to the required depth, fixing concreting with  1:2:4  mix  30cmx30cmx60cm (30cm below ground level and 30cm above ground level) painting, chiesel marking  on  the  top of  rail  post  and paint marking on the non‐gauge face side  of  rail  on  the  track  as  directed by  engineer‐in‐charge  with contractor  labour,  tools  and  plants, paints,  cement,  sand,  aggregate  etc., complete.  (Rails  will  be  supplied  at specified depot) 

24.00

360.00

1 SET 8,640.00

( Rupees  Three Hundred and Sixty )

 

Contractor's % : 0       Discount : 0

13

216267

Destressing  of  LWR/CWR  with hydraulic  destressor(tensor)  or otherwise  at  the  desired  rail temperature  duly  carrying  out  all the  operations  stipulated  in  LWR manual and as directed by the 

2000.00

25.00

1 TRM 50,000.00

( Rupees  Twenty Five )

 

Contractor's % : 0       Discount : 0

43

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'I'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

Engineer‐in‐charge  with contractor's  labour,  tools, tensors, rollers etc., required for the work  as  per  LWR  manual.NOTE  1)Sufficient  number  of  men required  for  destressing  each LWR/CWR shall be employed by the contractor  at  site.2)  Payment  shall  be  per  metre  of track. 

4,98,140.00

(No. of Items 13 ONLY)

Schedule I Departmental Value : 

0.00

4,98,140.00

Schedule I Total :

Rupees in Words ( Rupees  Four Lakh Ninety Eight Thousand One Hundred and Forty And Paise  Forty Nine ONLY )

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: PLOT NO.68, FIRST FLOOR        RADHASWAMY COLONY, SIKH ROAD,  SIKH VILLAGESECUNDERABAD

44

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name  of  the  Work  :Hubli division: Hubli ‐ Guntakal section : Between Hubli ‐  Kusugal stations: Proposed construction of two lane ROB in lieuof  LC  No.1  at  Km.3/700‐800  as  1x36m  Bowstring  Girder  (Railway    Portion)  and  RE  panels  (Approach  portion)  withservice roads with  two subway of 4mx3m RCC box on either side of ROB, shifting of  minor bridge No.6 ( 2x1.2m dia RCC pipe.)  Waterway  bridge  2x6mx5m    RCC  box  including  construction/dismantling  of  gate  lodge,  LC  and      temporarydiversion  of  road  (TWO  PACKET  SYSTEM)   

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

1

216280

Supply  and  fabrication of  structural steel  Bowstring  girder  as  per RDSO Drg  No.RDSO/B‐10407  for  Road over bridge of clear span 36.0 as per the  approved  drawing  and  using contractors  supply  of  steel  for fabrication  of  main  girder  should confirm with  high  tensile  Fe  410  & 490  grade  (Weldable  quality)  steel from  SAIL/TATA/JINDAL/RINL  as per  IS  2062‐2011  grade B & C  fully killed  along  with  the  proper  test report,  both  physical  chemical  and fabrication  of  steel  girders  at  work shop  as  per  relevant  IRC/IRS  codes and  specification  using  submerged arc  welding/Co2  welding/manual metal  arc  welding  with  approved welding  rods/Co2  gas,  Bolts  and nuts  and  rivets  for  connection  of splice  joints  using  high  tensile steel/mild steel material and as per IS 1149/1148 and  for  inspection as per  IS‐822,  the  fabricated  girder  to be  transported  to  bridge  site  with contractors own tailor/truck labour, crane  etc  at  the  cost  of  firm fabrication is carried out in the work shop  complete  assembled  at  site before  launching  as  directed  by  the Engineer‐in‐charge.  Payment conditions 1. 50% of rate on supply of  steel  against  bank  guarantee,for fabrication  is  done  at  contractor workshop.  2.  30%  of  rate  after complete fabrication carried at work shop  in  all  respects  including drilling holes, sand blasting an done coat  of  painting  at  workshop.  3) 20%  of  rate  after  completion  and transport  fabricated  girder  to  the site of work including assembling 

140.00

1,11,000.00

1 T 1,55,40,000.00

( Rupees  One Lakh Eleven Thousand )

SPECIAL CASE RATES. Any increase in quantities beyond agreement quantities of these items  rate may be negotiated. Rates for such items shall not to be taken as reference for future tenders

Contractor's % : 0       Discount : 0

45

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

site  of  work  to  the  satisfy  of Engineer  ‐in‐charge.(sand  blasting and  painting  will  be  paid separately).  NOTE  1)contractor  has to  engage  3rd  party  as  a consultant/Inspection  of  fabricated girder  like BHEL/TPJ.& BARC 2) No payment  towards  wastage/loss  of steel section is permitted. 

2

216281

Launching  the  Railway  Steel  Girder assembled/pieces  in  the  span  of ROB  over  the  trussel  beam  of existing  piers with  contractors  own method  and  arrangements  duly approved  by  Railways  at  an  height of  approximately  at  an  height  of 6.5m  above  rail  level,  OHE  power line  in  restricted  time  limit  under power  and  loine  block  in  day  and night time duly arranging temporary supporting  arrangement  lighting arrangement  if  required  labour crane  crew  consumables  erection tools  and  plant  etc.  complete  as directed,  OHE  lines will  be  lowered up  to a height of 1m below  the bed block level. The rate for this item ofr work  includes  the  cost  of  supply  of steel fabrication and cost of erection of  temporary  staging  including foundation  work  is  to  be  borne  by the  contractor  any  additional staging for the purpose of launching and  fabrication  needed  during  the course of work will have to be done by the contractor at his own cost the steel cribs from the railways will be issued  to  the extent available at  the standard  hire  charges.  The  steel cribs will  have  to be  transported  to the  site  and  to  be  returned  to PWI/Stores  at  contractors  cost.Payment Condition (1). 20% of  rate after  submission  and  approval  of design  and  drawing  of  launching scheme.  (2).  50%  of  rate  after successful  launching  including  bolt and nuts and rivets. (3).30% of rate after completion of balance work  

140.00

20,000.00

1 T 28,00,000.00

( Rupees  Twenty Thousand )

 

Contractor's % : 0       Discount : 0

46

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

after final coat of painting. (_Painting will  be  paid  separately  under relevant  item). Note  Contractor  should  submit  the design  and  drawing  for  l;launching scheme  for  approval  before launching. 

3

057612

Conducting non‐destructive tests on butt and fillet welds as per IS codes by  Radiography/Ultrasonic, Magnetic  particle  test  and  dye Penetration  tests  by  approved agency  and  submitting  the  proper test  report  to  the  department  duly certification by the approved agency with  contractor,  labour,  materials, tools  and  plants  including  leading loading  and unloading  etc  complete as  directed  by  the  Engineer‐in‐charge. a)D.P.Test 

350.00

640.00

1 MTR 2,24,000.00

( Rupees  Six Hundred and Forty )

 

Contractor's % : 0       Discount : 0

4

066109

Conducting non‐destructive tests on butt and fillet welds as per IS codes by  Radiography/Ultrasonic, Magnetic  particle  test  and  dye Penetration  tests  by  approved agency  and  submitting  the  proper test  report  to  the  department  duly certification by the approved agency with  contractor,  labour,    materials, tools  and  plants  including  leading loading and  unloading etc complete as  directed  by  the  Engineer‐in‐charge.  a)U.T.Test 

120.00

0.00

1 NOS 0.00

( Rupees  Zero )

DELETED

Contractor's % : 0       Discount : 0

5

066110

Conducting non‐destructive tests on butt and fillet welds as per IS codes by  Radiography/Ultrasonic, Magnetic  particle  test  and  dye Penetration  tests  by  approved agency  and  submitting  the  proper test  report  to  the  department  duly certification by the approved agency with  contractor,  labour,    materials, tools and plants including leading 

20.00

2,400.00

1 NOS 48,000.00

( Rupees  Two Thousand Four Hundred )

 

Contractor's % : 0       Discount : 0

47

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

loading and  unloading etc complete as  directed  by  the  Engineer‐in‐charge.   a)R.T.Test  (film 300mm long) 

6

068594

Supplying,  fabricating  and  erection like  cross  beam,  bracings,  gussets and shear connectors  for Road over Bridge  of  span  36m  clear  with contractor's  supply  of  steel confirming  to  Fe410  grade  to  IS 2062/2006  grade  'B'  fully  killed  as per approved drawing, welding it to the already fabricated and  launched girder  of  high  tensile  steel  Fe  , 540W,  with  contractor's  labour, tools  and  plants,  consumables, electrodes,  confirming  to  IS:  7018 and  HSFG/MS  bolts  and  nuts  etc., complete  as  directed  by  the Engineer‐In‐Charge.  The  payment will be made for the quantity of steel work  involved  for  the  fabrication only                                                                (a)  FABRICATION  WORKS:  If fabrication of  steel  girder  is  carried out  at  contractor's  workshop,  the same is to be transported to bring to site  with  contractor's  own trailer/truck,  labour,  crane  etc., complete  and  assembled  at  site  as directed  by  Engineer‐In‐Charge. ERECTION  WORKS  :The  assembled steel cross girder to be launched and welded  to  the  plate  girder  to  be launched  and  welded  to  the  plate girder  as  per  drawing  and specification  with  contractor's  own method,  design  and  arrangements duly  approved  by  Railways  at  an height  of  6.5m  above  rail  level  at OHE  area  in  restricted  time  limit under power block and line block at day/night  time,  duly  arranging temporary  supporting arrangements,  lighting arrangement if  required,  labour,  crane,  crew, consumables,  erection  tools  and plants  etc.,  complete  as  directed  by Engineer‐In‐Charge. If any 

30.00

82,000.00

1 T 24,60,000.00

( Rupees  Eighty Two Thousand )

 

Contractor's % : 0       Discount : 0

48

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

additional stagings or any temporary platform  for  the  purpose  of launching and fabrication is required then  the  same will  have  to  be  done by  contractor  at  his  own  cost  as approved  by  Railways. 1).  50% of rate on supply of steel to the  site  of  work  against  bank guarantee  for  fabrication    done  in contractor's  workshop 2).  20%  Payment,  after    fabrication of  steel  and  after  bringing  the fabricated  steel  to  site  of  work.3).  20%  Payment,  after  satisfactory completion  of  launching  in  span. 4).  10%  of  payment  after satisfactory  completion  of  all works pertaining  to  this  item.  Note: 1. The rate quoted for this item inclusive  of  all  tests  conducted  for steel  supply,  weldings,  bolts  and nuts  etc.,  complete.  2. No payment towards loss/wastage of steel section is permitted. 

7

216268

Supplying  and  providing  and fabricating  and  fixing  in  position true  to  line  and  level  elastomeric POT/PTFE  bearings  drawings technical  specifications  or  as directed  by  the  Engineer‐in‐charge. The  unit  rate  shall  cater  for  any resetting of bearings if required. (In case of different capacity of bearing, required  for  the  work  the  rate quoted  will  be  proportionately increase/decreased.)  a.  Fixed bearings b. Free bearings 

3000.00

360.00

1 T 10,80,000.00

( Rupees  Three Hundred and Sixty )

SPECIAL CASE RATES. Any increase in quantities beyond agreement quantities of these items  rate may be negotiated. Rates for such items shall not to be taken as reference for future tenders

Contractor's % : 0       Discount : 0

8

216277

Painting of steel girder of ROB with contractor's  supply  of  epoxy paints  as  follows,  duly  removing oil/grease from the metal surface by using  petroleum  Hydrocarbon Solvents to IS 1745 and prepare the surface by sand/grit blasting using 

1500.00

630.00

1 SQM 9,45,000.00

( Rupees  Six Hundred and Thirty )

 

Contractor's % : 0       Discount : 0

49

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

Air  compresssor  and  apply  two primer  coats  with  epoxy  zinc phosphate to RDSO specification No. Mfc/PCM  ‐  102/86  to  60  microns (for  two coats)  intermediate  coat of Epoxy Micaceous Iron Oxide to RDSO No.Mfc/PCN‐103/86 to 100 microns (one coat) and finish with two coats of  polyurethane Red Oxide  to RDSO No.  mfc/PCN‐109/88  ‐  80  microns (two coats) ‐ (Total five coats) at an height  of  6.5m  above  rail  level  over OHE  power  line  area  under restricted  time  limit,  under  power shut  down  either  at  day  time  or night  time  with  contractor's labour,  T&P,  Epoxy  paints, consumables,  Sand  Blasting equipments,  sand,  Air  compressor, all  lead  and  lift,  staging  required  if any  complete  and  as  directed  by Engineer‐in‐charge. 

9

066083

Designing,  supplying  and  erecting diamond  shaped  or  any  other architectural  finish  as  directed, precast  concrete  facia  panels  of suitable  thickness  and  a  grade  of concrete  as  approved  to  including supplying  and  providing  required reinforcing  stripes  (hot  dipped galvanised)  of  suitable  section with all  fixtures  accessories,  bolts,  nuts, joint  filers  for  vertical  joints between  panels  bearing  plates  for horizontal  joints  between  panels complete all as per relevant IS codes, MOST  specifications  and  IRC  codes and  technical  specifications  of reinforced  earth  and  as  directed  by Engineer‐In‐Charge.   Note:  i) Design of  the  structure  shall  carry  out based  on  locally  available  back  fill material  or  a  practically  achievable blended  material.  Preliminary designs  shall  be  submitted  along with the tender. ii) Rate for this item shall  include  the  cost of  the  cement and reinforcement steel required for the work. 

6800.00

4,800.00

1 SQM 3,26,40,000.00

( Rupees  Four Thousand Eight Hundred )

 

Contractor's % : 0       Discount : 0

50

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

10

216278

Filling  in  embankment  for  road approach  as  per  approved reinforcement  earth  technology behind the erected precast concrete facia  panels with  contractor's supply  of  backfill  material  which shall  be  reasonably  free  from organic  or  otherwise  deleterious materials  and  shall  confirm  to  the mechanical  &  Physio‐Chemical requirements  including  mechanical compaction  as  per  reinforced  earth technology  specifications  complete as  directed  by  the  Engineer‐in‐charge.  NOTE  This  work  shall  be carried  out  as  per  approved reinforced  earth  technology  which shall be submitted by the contractor and got approved from the Railways. The  work  is  to  be  done  alongwith reinforcing  strips  provided  with concrete facia panels. 

36000.00

280.00

1 CUM 1,00,80,000.00

( Rupees  Two Hundred and Eighty )

 

Contractor's % : 0       Discount : 0

11

055075

Supplying  and    providing  of  well graded  crushed  aggregate  of  size varying from  19.5mm to 9.10mm as drainage    bay  backing  provided along  the  facia  behind  theerected concrete pannels of reinforced earth retaining  wall  including  supplying and  providing    perforated  drainage pires conecting to the near by drain including    compaction  of  the  filled material  at  a  specified  layer thickness  as  per  approved reinforced  earth  technology specifications. 

1950.00

1,050.00

1 CUM 20,47,500.00

( Rupees  One Thousand Fifty )

 

Contractor's % : 0       Discount : 0

12

216230

Supplying,  fabricating  and  erection in  position  hand  rail  comprising  of one  horizontal  row  of  MS  pipe  of 100mm dia (as per IS‐1239) fixed to the  vertical  supporting MS brackets 16mm  thick  and  of  height  30cm above crash barrier/parapet of 2.0m intervals  (as  per  approved drawings)  including  painting  the hand rails/MS bracket by one coat of red oxide primer and two coats of 

30.00

75,000.00

1 T 22,50,000.00

( Rupees  Seventy Five Thousand )

 

Contractor's % : 0       Discount : 0

51

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

synthetic enamel painting of suitable colour  with  contractor's  all materials,  tools  and  plants,  labour, consumables all lead and lift etc and as directed by Engineer in charge 

13

049110

Providing  and  fixing  MS/GI  pipes 150mm dia (inner dia) for fixing the electrical poles to the crash barriers including  all  materials,labour,  lead and  lift, with two coats of red oxide paint and basement, poles should be welded with base plate complete as per direction of Engineer‐in‐charge 

40.00

2,700.00

1 EACH 1,08,000.00

( Rupees  Two Thousand Seven Hundred )

SPECIAL CASE RATES. Any increase in quantities beyond agreement quantities of these items  rate may be negotiated. Rates for such items shall not to be taken as reference for future tenders

Contractor's % : 0       Discount : 0

14

204266

Fixing of Railway's Retro  ‐reflective boards all type of boards i.e. caution indicator,  stop  indicator,  speed indicators  ‐20/30/45/75kmph, whistle  boards....etc  as  required  on MS  'T'    angle  75mmx75mmx6mm fabricated  and  supplied  by  the contractor including cutting, drilling, holes,  in  'T'  angle,  supplying  of 1.50mm  thick  MS  plate stiffeners,  hold  fasts,  bolts  and nuts with  washers  to  required  size, bolting,  welding  if  necessary, painting the channel with white and black colour bands to standard size, painting two coats synthetic enamel paint  over  one  coat  of  primer  with approved  quality  as  per  plan including  earthwork  excavation  for foundation,  fixing  the  posts  in cement  concrete  base  of  size 0.60mx0.60mx1.20m  using  40m using  40mm  graded  metal  in  1:3:6 mix  with  all  leads  and  lifts  etc., complete and as directed.(All labour, metal  by  contractor's  cement, aggregate,  sand  etc.,(Approximate length  of  'T'  ‐  angle  is  4.75m).Note: payment for each post 

10.00

4,800.00

1 EACH 48,000.00

( Rupees  Four Thousand Eight Hundred )

 

Contractor's % : 0       Discount : 0

52

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

15

205555

preparation  and  submission  of completion drawing for the TROB in AUTO  CAD  on  100  microns  film double  mat  finish  and  materials approved by the Engineer  in charge to  specified  scales  including submission  of  the  same  in  CD  in  3 copies ammonia print 3 copies each of the above (necessary details to be collected from the site). 

2.00

15,000.00

1 EACH 30,000.00

( Rupees  Fifteen Thousand )

 

Contractor's % : 0       Discount : 0

16

216231

Supplying,  fabricating  and  fixing drainage spouts and grating made of GI  sheet  and  MS  flats  for  all  deck slabs  as  per  approved  drawing  and to  the  shape  required  as  per  site conditions  with  the  contractor's materials  and  labour  including  all lead  and  lifts  etc.,  complete  as  per drawings  and  specifications  and  as directed  by  the  Engineer‐in‐charge (approximate  weight  of  each  spout should not be less than 15kg) 

40.00

0.00

1 EACH 0.00

( Rupees  Zero )

DELETED

Contractor's % : 0       Discount : 0

17

010074

Providing  and  laying  of  sand  bags layer  by  layer  filled  with  sand  in each  bag  of  standard    cement  bag size with  all  contractor's  own  bags, sand,  labour,  tools  and  plants including  transportation  to  the  site of work complete as directed by the Engineer‐in‐charge. 

500.00

36.00

1 NOS 18,000.00

( Rupees  Thirty Six )

SPECIAL CASE RATES. Any increase in quantities beyond agreement quantities of these items  rate may be negotiated. Rates for such items shall not to be taken as reference for future tenders

Contractor's % : 0       Discount : 0

18

054625

Provision  of  caution  watch  man  at caution  order  location  round  the clock  one  watch  man  8  hours  shift with  necessary  supply  of  three cell/tricolour  electricle tourch,bannerflag,etc  to  on continuous  vigil  and  to  exhibit necessary  hand  signal  to  the  train for the passage over th caution spot. 

300.00

650.00

1 DAYS 1,95,000.00

( Rupees  Six Hundred and Fifty )

 

Contractor's % : 0       Discount : 0

53

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

19

000009

Drilling of holes in 52kg/90R rails of 32mm  dia  or  28mm  dia  and  26.5 mm dia by drilling machine  for  fish plating  as  per  standards  and    as directed.  All  labour,  machine,  and consumables  to  be  supplied  by  the contractor 

100.00

45.00

1 HOLES

4,500.00

( Rupees  Forty Five )

 

Contractor's % : 0       Discount : 0

20

000010

Drilling holes  in BG PSC  sleepers  at specified  locations  and  inserting GRIP  expansion  bolts  including supply  of  bolts  and  nuts  as  per approved drawing 

50.00

90.00

1 HOLES

4,500.00

( Rupees  Ninety )

 

Contractor's % : 0       Discount : 0

21

079444

KSRRB  M400‐6.2Construction  of granular  sub‐base  by  providing close  graded  Material,  mixing  in  a mechanical  mix  plant  at  OMC, carriage  of  mixed  Material  to  work site,  spreading  in  uniform  layers with  motor  grader  on  prepared surface  and  compacting  with vibratory  power  roller  to  achieve the desired density, complete as per clause  401      of  MORT  &  H  For Grading‐I  Material(225*1.28=288cum) 

2900.00

1,100.00

1 CUM 31,90,000.00

( Rupees  One Thousand One Hundred )

 

Contractor's % : 0       Discount : 0

22

077801

KSRRB  M400‐17:  Providing,laying, spreading  and  compacting  graded stone  aggregate  to  wet  mix macadam  specification  including premixing  the  material  with  water at  OMC  in  mechanical  mix  plant, carriage of mixed material by tipper to site, laying in uniform layers with paver  in  sub‐base/base  course  on well  prepared  surface  and compacting with  vibratory  roller  to achieve  desired  density.  Material (Table  400‐11) Clause: 406 of MORT & H 

1930.00

1,400.00

1 CUM 27,02,000.00

( Rupees  One Thousand Four Hundred )

 

Contractor's % : 0       Discount : 0

54

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

23

077804

KSRRB  M500‐13:  Providing  and laying  dense  graded  bituminous macadam 75mm thick with 100‐120 TPH HMP using  crushed  aggregates of  specified  grading,  premixed with bituminous binder,  transporting  the hot  mix  to  work  site,  laying  with  a hydrostatic  paver  finisher  with sensor control to the required grade, level  and  alignment,  rolling  with smooth  wheeled,  vibratory  and tandem  rollers  to  achieve  the desired  compaction  as  per  MORTH specification  clause  No.  504 complete  in  all  respects.  (Bitumen= 0.0981 Metal= 1.401) 

725.00

6,500.00

1 CUM 47,12,500.00

( Rupees  Six Thousand Five Hundred )

 

Contractor's % : 0       Discount : 0

24

077802

KSRRB  500‐8:  Providing  and applying  tack  coat  with  bitumen emulsion  using  emulsion  pressure distributor on the prepared granular surface  cleaned  with  mechanical broom  such  as  WBM  and  WMM surfaces  treated  with  primer  and dry and bituminous surface. MORTH specification No. 503 

20000.00

23.00

1 SQM 4,60,000.00

( Rupees  Twenty Three )

 

Contractor's % : 0       Discount : 0

25

000350

Cutting  of  52kg/90R  rails  true  to vertical  with  rail  cutting  machine only  duly  marking  the  line  as directed  by  the  Engineer‐in‐charge with  contractor's  rail  cutting machine, tools, labour, consumables, etc.,  (Hand  cut with  hacksaw  is  not acceptable) 

100.00

90.00

1 EACH 9,000.00

( Rupees  Ninety )

 

Contractor's % : 0       Discount : 0

26

071828

Supplying  and  laying  UPVC  rain water  pipe  of  150mm  dia  of 6kgf/sqcm  working  pressure  (Type B) confirming to IS 13592 including specials  as  required  and  jointing with  contractor's  jointing  materials and fixing accessories. 

100.00

390.00

1 MTR 39,000.00

( Rupees  Three Hundred and Ninety )

 

Contractor's % : 0       Discount : 0

55

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

27

004085

Painting  of  crash  barrier  /  kerb stones of CC/ RCC  slabs,  stone with approved  quality  reflective  type  of enamel  paint,  including  one  coat  of primer with contractors own labour & material etc complete  as directed by the Engineer‐in‐charge. 

3600.00

900.00

10 SQM 3,24,000.00

( Rupees  Nine Hundred )

 

Contractor's % : 0       Discount : 0

28

077806

KSRRB  M500‐18:  Providing  and laying  semi  dense  bituminous concrete  25mm  thick  with  40‐60 TPH HMP using  crushed  aggregates of  specified  grading,  premixed with bituminous  binder  at  5  percent  by weight  of  total  mix  and  filler, transporting  the  hot  mix  to  work site,  laying with a hydrostatic paver finisher  with  sensor  control  to  the required grade, level and alignment, rolling  with  smooth  wheeled, vibratory  and  tandem  rollers  to achieve  the  desired  compaction  as per MORTH specification  clause No. 500.8  complete  in  all  respects. (Bitumen=  0.0981,  Metal=  1.401, cement=  0.042)  over  B.T.  surface with using 80/100 grade bitumen. 

240.00

6,300.00

1 CUM 15,12,000.00

( Rupees  Six Thousand Three Hundred )

 

Contractor's % : 0       Discount : 0

29

001272

Providing guard rail on bridges with 52Kg/90R rails as per provisions  in IRPWM,  including  cutting,  bending and  fixing  of  rails  with  all  fittings and  fastenings,  fixing  of  wooden blocks  at  ends  of  guard  rails  on either end of bridges, etc., (excluding drilling  of  holes  in  sleepers  and fixing of grip expansion bolts & nuts and  M.S.Clip/washers)  all  with Contractor's  labour,  tools  &  plants, consumables,  etc., with  all  lead  and lift,  complete  as  directed  by  the Engineer‐in‐charge.  Note:  Rate  includes  leading  of  rails to respective bridges  from specified locations  between  Chickbanavara  ‐Nelamangala  and  wooden  sleepers from  specified  P.Way  depot. Payment per metre of track upto 

125.00

450.00

1 TRM 56,250.00

( Rupees  Four Hundred and Fifty )

 

Contractor's % : 0       Discount : 0

56

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

end of guard rails junction. 

30

206951

Supplying and fixing junction box of size  18"x9"x6" made  of  18  gauge  MS  plate  withclamping  arrangement  to  fix  the connectors inside the box as per the drawing  and instruction of Engineer in charge. 

12.00

1,200.00

1 EACH 14,400.00

( Rupees  One Thousand Two Hundred )

 

Contractor's % : 0       Discount : 0

31

022980

Supply,  fabrication,  painting  and erection  of  road  traffic  warning boards for various purposes such as No  Parking,  No  Entry,  HTV Prohibited  etc.,  made  of 50/50/5mm  MS  angle  and  3mm thick  MS  plate  of  total  height  2m painting  2  coats  of  appropriate enamel  paint  and  pasted  with reflective  stickets  /  reflective  paint on  the  board  erected  into  the ground  with  cement  concrete  1:3:6 mix  for  0.3  x  0.3  x  0.6m  including earthwork,  excavation  cement  etc., as  directed  by  the  Engineer‐in‐charge. 

15.00

0.00

1 SQM 0.00

( Rupees  Zero )

DELETED

Contractor's % : 0       Discount : 0

32

001006

Providing  of    barricading  with contractor's  bamboos/casurina vertical  posts  of minimum 100 mm dia  planted  at  every  2.0  Metre intervals  projecting  at  least  1.50 metre  above  the  ground  level  and driven  firmly  inside  the ground and with  2  horizontal  bamboo/ casuarina  members  of  minimum 50mm dia spaced equally , including painting the verticals and horzontals with  red  luminous  paing/  strips  at alternate    bay  on  the  barricade  , removing the barricades, completely when  no  longer  required  with  all leads  and  lift  etc  complete  and  as directed.(All  labour  ,materials  ,tools and  plants  ,consumables  etc  to  be supplied  by  contractor). 

2000.00

180.00

1 M 3,60,000.00

( Rupees  One Hundred and Eighty )

 

Contractor's % : 0       Discount : 0

57

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

 NOTE: The removed materials of the barricades  will  be  the  property  of the  tenderer/contractor  and  hence the rates to be inclusive of the above removal also. 

33

214605

Fabrication  and  erection  of  height gauge  for  the  road  approaches  of RUB  clear  span  4m  using  ISMC 400x75  for  vertical  posts  and horizontal  beam  with  contractor's bolts and nuts making holes and two brackets  to  hold  horizontal  beam one  each  on  vertical  posts  with contractor's  angles,  erecting  the vertical  in  a  foundation  of  CC  1:3:6 of  size  0.6x0.6x1.5m  including supply  of  cement  coarse  and  fine aggregates  earthwork  excavation with  labour  tools  &planting  work with  one  coat  of  red  oxide  primer and  two  coats  of  reflective  paint  of approved  quality  with  all  lead  and lift  complete  as  directed  by  the Engineer  in  charge  as  per  RDSO drawing. 

20.00

72,000.00

1 MT 14,40,000.00

( Rupees  Seventy Two Thousand )

 

Contractor's % : 0       Discount : 0

34

098004

Dumping  of  railway  ballast  from stacks  available  in  tank  bed  along the  existing  track  on  need  basis  to the rquired section with all lead and lift(payment will  be made based on recorded stack measurements) Note that no extra lead or lift shall be paid irrespective  of  the  distance involvedand  shall  be  evenly distributed  on  every  location  of  the track. 

450.00

125.00

1 CUM 56,250.00

( Rupees  One Hundred and Twenty Five )

 

Contractor's % : 0       Discount : 0

35

205565

Providing  two  coats  of  protective treatment to the concrete surface of superstructure  and  substructure above bed  level with suitable epoxy phenolic  coating  system  (Ipnet polymer  anticorrosive  system  or similar products) duly cleaning the 

2000.00

180.00

1 SQM 3,60,000.00

( Rupees  One Hundred and Eighty )

 

Contractor's % : 0       Discount : 0

58

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

surface  of  concrete  of  all  dust,  dirt, oil,  grease,  dust,  etc.,  with contractor's  labour,  materials, equipment,  staging,  scaffolding arrangements,  etc.,  complete  as directed by the Engineer‐in‐charge. 

36

206205

Casting RCC box segments base slab etc  as  per  approved  RDSO/Railway drawing with specified design mix of M‐35 with  all  contractors materials such  as  coarse  and  fine  aggregates, labour  machinery,  tools  and  plants etc complete as directed by Engineer in  charge.  Casting  of  RCC  box segments  has  to  be  done  near  to bridge  site  and  kept  ready  for launching. 

300.00

4,500.00

1 CUM 13,50,000.00

( Rupees  Four Thousand Five Hundred )

 

Contractor's % : 0       Discount : 0

37

216279

Lifting  and  laying  in  position  of precast  RCC  boxes/slabs manufactured at site  in  the  location to  correct  alignment  by  using contractors  road  crane  of  required capacity  or  by  any  other  means including jointing the box units with epoxy pressure grouting to make the joints water tight and filling the gaps between the sides of the boxes with Railway  excavated  earth  including compaction  as  specified  and  as directed  by  the  Engineer  in  charge, with  all  lead  and  lift  etc  complete (All  labour,  materials,  tools  and plant  etc  are  to  be  supplied  by  the tenderer/contractor only at his own cost)  Note  Rate  includes  the  hire charges  of  the  required  capacity  of road  crane with  scroler wheel  type or similar type including stand by. 

750.00

2,100.00

1 MT 15,75,000.00

( Rupees  Two Thousand One Hundred )

SPECIAL CASE RATES. Any increase in quantities beyond agreement quantities of these items  rate may be negotiated. Rates for such items shall not to be taken as reference for future tenders

Contractor's % : 0       Discount : 0

38

205567

Excavation  along  the  alignment  of the  signalling  cable/OFC/Power cable  carefully  and  exposing  the same  without  any  damage  and excavating the new trench along the Railway alignment or any as 

200.00

190.00

1 M 38,000.00

( Rupees  One Hundred and Ninety )

 

Contractor's % : 0       Discount : 0

59

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

specified  by  the  Engineer  in  charge laying of removed cable filling up all complete  with  sand  and  layer  of brick with contractors own material tools  and  plants  etc  as  directed  by Engineer  in  charge.Note:  I(n  case  the  cable  is  damaged cost of restoration & the cost of cable will  be  recovered  from  the contractor.  The  decision  of  the Railways with regards the cost to be recovered will be final. 

39

035174

Grouting  pitching/flooring  with cement  concrete  1:3:6  using  12mm graded  hard  stone  aggregate  of approved  quality  and  pointing with CM  1:3  with  all  contractor's materials,cement,labour,tools  and all  lead  and  lifts  ,  curing  etc., complete  as  per  specifications  and as  directed  by  the  Engineer‐in‐charge.(Minimum  cement 7.0kg/sqm) 

600.00

150.00

1 SQM 90,000.00

( Rupees  One Hundred and Fifty )

 

Contractor's % : 0       Discount : 0

40

216232

Jointing  of  Precast  RCC  units  by applying  apoxy  mortor  with  all contractor's  materials,labour tools & plants consumable crew fuel transportation  etc  complete  as directed  by  the  Engineer  in  charge during day light & during permitted line block 

300.00

410.00

1 SQM 1,23,000.00

( Rupees  Four Hundred and Ten )

 

Contractor's % : 0       Discount : 0

60

Schedule of Items   LOA No. W496/UBL­LC1/01 Date 29/02/2016 of UCC 74098 

Tender Ref No :-

UBL-LC1/01

Notice Date :-

Original LOA Schedule

14/09/2015

Project : 30574 ‐ ROB HUBLI‐KUSGAL  IN LIEU OF LC NO.1

Dept : ENGINEERING

Name of the Contractor : E0059 ‐ ESSVY CONSTRUCTIONS INDIA PVT.LTD.

DETAILS OF ITEMS

Jurisdiction : NON VETTED ITEMS

Schedule 'J'

Rate

Amount

Sl. No.

Description of  Items Quantity

Unit

USSOR/ Sys.code

8,89,33,900.00

(No. of Items 40 ONLY)

Schedule J Departmental Value : 

0.00

8,89,33,900.00

Schedule J Total :

Rupees in Words ( Rupees  Eight Crore Eighty Nine Lakh Thirty Three Thousand Nine Hundred And Paise  Eighty Eight 

Chief Administrative Officer South Western Railway 18, Millers Road BANGLORE ‐ 560 046

Signature of Agency Date      :

Agency Adress: PLOT NO.68, FIRST FLOOR        RADHASWAMY COLONY, SIKH ROAD,  SIKH VILLAGESECUNDERABAD