Page 1: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Report onPreliminary Geotechnical Investigation

North Ryde Station Precinct ProjectNorth Ryde

Prepared forTransport for New South Wales

Document Code: ADP – 1207 – GEO - 4008

Project 72518.00 November 2012

Page 2: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;
Page 3: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Table of Contents Page

1. Introduction ......................................................................................................................1

2. Site Description ...............................................................................................................1

3. Report Clarification ..........................................................................................................2

4. Geology ...........................................................................................................................3

5. Field Work Methods ........................................................................................................ 3

6. Field Work Results .......................................................................................................... 4

7. Groundwater ....................................................................................................................4

8. Laboratory Testing .......................................................................................................... 5

8.1 Soil Engineering Testing ....................................................................................... 5

8.2 Aggressivity Testing .............................................................................................. 6

9. Other Investigations ........................................................................................................ 6

10. Proposed Development ................................................................................................... 6

11. General Comments ......................................................................................................... 7

11.1 Existing Filling ....................................................................................................... 7

11.2 Site Preparation .................................................................................................... 811.2.1 Complete Excavation and Replacement ................................................. 811.2.2 Partial Excavation and Compaction ........................................................ 8

11.3 New Filling .......................................................................................................... 9

11.4 Working Platforms............................................................................................. 10

11.5 Excavation Conditions ...................................................................................... 10

11.6 Waste Classification.......................................................................................... 11

11.7 Excavated Material Disposal and Re-use ......................................................... 11

11.8 Excavation Batters ............................................................................................ 12

11.9 Excavation Support ........................................................................................... 12

11.10 Groundwater ..................................................................................................... 13

11.11 Foundations ...................................................................................................... 1411.11.1 Site Classification ................................................................................ 1411.11.2 Design ................................................................................................. 1411.11.3 Construction ........................................................................................ 15

11.12 Soil Aggressivity................................................................................................ 16

11.13 Soil Erodibility ................................................................................................... 16

11.14 Pavements ........................................................................................................ 16

Page 4: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

11.15 Epping to Chatswood Railway Line (ECRL) ..................................................... 17

12. M2 Site ..........................................................................................................................18

12.1 Description .......................................................................................................... 18

12.2 Field Work Results .............................................................................................. 19

12.3 Other Investigations ............................................................................................ 19

12.4 Geotechnical Model ............................................................................................ 20

12.5 Comments ........................................................................................................... 2012.5.1 ECRL ....................................................................................................... 2012.5.2 Site Preparation ....................................................................................... 2112.5.3 Foundations ............................................................................................. 21

13. Station Site North .......................................................................................................... 22

13.1 Description .......................................................................................................... 22

13.2 ECRL Investigations ............................................................................................ 22

13.3 Geotechnical Model ............................................................................................ 22

13.4 Comments ........................................................................................................... 2313.4.1 ECRL ....................................................................................................... 2313.4.2 Site Preparation ....................................................................................... 2313.4.3 Foundations ............................................................................................. 24

14. Station Site South .......................................................................................................... 24

14.1 Description .......................................................................................................... 24

14.2 Field Work Results .............................................................................................. 24

14.3 Other Investigations ............................................................................................ 25

14.4 Geotechnical Model ............................................................................................ 25

14.5 Comments ........................................................................................................... 2614.5.1 Site Preparation ....................................................................................... 2614.5.2 Foundations ............................................................................................. 26

15. Roads and Maritime Services (RMS) Site ..................................................................... 26

15.1 Description .......................................................................................................... 26

15.2 Field Work Results .............................................................................................. 26

15.3 Comments ........................................................................................................... 2715.3.1 Site Preparation ....................................................................................... 2715.3.2 Foundations ............................................................................................. 27

16. OSL Site ........................................................................................................................27

16.1 Field Work Results .............................................................................................. 28

16.2 Comments ........................................................................................................... 2816.2.1 Site Preparation ....................................................................................... 2816.2.2 Foundations ............................................................................................. 28

Page 5: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

17. The Pedestrian Bridge ................................................................................................... 29

17.1 Comments ........................................................................................................... 29

18. Further Investigation ...................................................................................................... 29

19. Sustainability .................................................................................................................30

20. Limitations .....................................................................................................................30

Appendix A: About this Report

Appendix B: Drawings

Appendix C: Results of Field Work

Appendix D: Results of Laboratory Tests

Appendix E: Borehole Logs from Other Reports

Appendix F: Site Photographs

Appendix G: Extract Drawings from Douglas Partners Pty Ltd EIS Report

Page 6: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Executive Summary

This Report on a Phase 1 Preliminary Geotechnical Investigation was prepared in support of a Rezoning Study (the Study) in respect of the North Ryde Station Precinct Project (NRSPP).

This report addresses the Director General’s Requirement to assess geotechnical considerations for the NRSPP. This report provides a preliminary assessment of geotechnical conditions on the sites, and demonstrates the suitability of the land for the proposed development including with respect to erosion potential and acid sulphate soils. Measures are proposed to avoid adverse impacts appropriate for Preliminary Design development.

Eleven boreholes were drilled across the Precinct. At six locations, boreholes were continued into the underlying rock using diamond core drilling to depths of approximately 10 m. The retrieved rock cores were photographed and point load strength tests undertaken on the rock. Regular standard penetration tests were undertaken within the soils from a depth of 1.0 m to 1.5 m. Laboratory testing was undertaken on selected soil and groundwater samples for the purpose of assessing engineering properties and subsurface aggressivity.

The subsurface conditions identified may be broadly summarised as follows:

FILLING: gravelly sandy clay filling to depths of between 1.1 m and 3.1 m; underlain by,

SILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only; underlain by,

BEDROCK: extremely low to low strength rock at depths ranging from 1.1 m to 3.0 m depth and increasing in strength with depth.

It is understood that the rezoning proposal would facilitate development options include multi-storey residential or mixed used buildings with access roads, open spaces and a pedestrian bridge.

The extent of excavation and earthworks at the site will vary depending on the final staging strategy and adopted site levels. Basements of varying depths are expected under most of the buildings. Therefore, comments are provided to cover a range of options for earthworks, excavations and foundations. Works within the Station Site South and M2 site must also consider impacts on the Epping to Chatswood Rail Line (ECRL).

Groundwater levels on the site were recorded at relatively deep levels within the rock during previous investigations. Only minor, periodic inflows are expected into any basement excavations, and it is expected that such inflows could be readily managed in the short and long term by the use of a normal “sump-and-pump” drainage system.

Based on the results from the chemical laboratory testing of soil and groundwater samples collected on the site, the exposure classification for structural elements falls into the non-aggressive or mild exposure classification for steel and concrete elements.

The site is located outside of areas of known acid sulphate soils, and no signs of concern for acid sulphate soils were identified during the investigation.

Page 7: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Filling and Silty Clay layers may be susceptible to erosion during construction. During construction erosion control measures should be implemented. Design and implementation of control measures should comply with the NSW Guideline Soils and Construction: Managing Urban Stormwater, Landcom, 2004. For the purposes of preliminary design of control measures, soils may be classified as Type F.

A pedestrian bridge is proposed over Delhi Road spanning from the M2 Site to the RMS site, with an ultimate second span to extend the bridge from the RMS site to the Station Site North. It is suggested that the foundations of the bridge are founded in rock. For the anticipated high loadings, bored piles founded in medium or high strength rock, which is expected at about 7 m depth (approximately RL 54 m) on the M2 site; about 8 m below the level of Delhi Road (approximately RL 50 m) on the RMS site; and approximately RL 52 m on the Station Site North, would be appropriate. The foundations of the bridge may come within the zone of influence of the ECRL, as such special consideration must be given to the foundations.

Page 8: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 1 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Report on Preliminary Geotechnical Investigation North Ryde Station Precinct Project Delhi Road, North Ryde

1. Introduction

This Report on a Phase 1 Preliminary Geotechnical Investigation was prepared in support of a Rezoning Study (the Study) in respect of the North Ryde Station Precinct Project (NRSPP).

The Study seeks to establish a site specific planning regime for the North Ryde Station Precinct, including land use zones, building height and floor space ratio to facilitate the ultimate redevelopment of the precinct for a mixed use, transit-oriented development.

The following Director General’s Requirements are addressed in this report:

Geotechnical – This report provides a preliminary assessment of geotechnical conditions on the sites, and demonstrates the suitability of the land for the proposed development including with respect to erosion potential, salinity and acid sulphate soils. Measures are proposed to avoid adverse impacts appropriate for Preliminary Design development.

Rail impacts – This report also addresses any geotechnical constraints associated with rail tunnels beneath the site.

The aim of the preliminary geotechnical investigation was to provide information on subsurface conditions for the preliminary design and planning of earthworks, foundations, excavation support and pavements.

The geotechnical investigation was carried out in conjunction with a Phase 1 Contamination Assessment, which will be provided in a separate report (refer to DP Report 72518.01).

2. Site Description

The subject lands, referred to as the North Ryde Station Precinct (the “Precinct”) are located within the Macquarie Park Corridor (MPC), a predominantly commercial area that lies between the M2 Motorway and Epping Road, North Ryde.

The Precinct is situated within the City of Ryde (Council) Local Government Area (LGA), at the southern end of the MPC. The North Ryde Station Precinct comprises a total land area of 13.99 ha and is adjacent to the M2 Motorway, Epping Road and Delhi Road.

The Precinct comprises five separate but linked land parcels described in Table 2.

Page 9: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 2 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Table 1: Summary of North Ryde Station Precinct Lands

Site Name Ownership Lot/DP Site Area (ha)

Government Owned Lands

M2 Site Transport for NSW Lot 101 DP 1131776 Lot 100 DP 1131776

9.16

Station Site North Transport for NSW Lot 4 DP 1131774 1.3

OSL Site Office of Strategic Lands (OSL)

Lot 565 DP 28914 1.48

RMS Site Roads and Maritime Services (RMS)

Lot 11 DP 1017829 Lot E DP 28507 Lot 11 DP 27851 Lot 12 DP 27851

0.29

Privately Owned Lands

Station Site South Goodman International Funds Management Limited (GIFML)

Lot 160 DP 1136651

1.76

Total 13.99

The sites are separated by the intersection of the M2 Motorway, Epping Road and Delhi Road and are shown on Drawing 1 in Appendix B. The Epping to Chatswood Rail Line (ECRL) tunnel passes under part of the site.

The specific site areas are described in more detail later in the report.

3. Report Clarification

At the time of carrying out the fieldwork and laboratory testing for this report in October 2011, reference was made to various sites and organisation names which have since changed. These changes are as follows:

Previous name Current Name

Transport Construction Authority (TCA) Transport for NSW (TfNSW)

Roads and Traffic Authority (RTA) Roads and Maritime Services (RMS)

North Ryde Station Site Station Site North

Goodman Site Station Site South

The previous names remain on the logs and laboratory records.

Page 10: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 3 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

4. Geology

Part of the Sydney 1:100 000 Geological Series Sheet is reproduced on Drawing 2 in Appendix B and indicates that the northern part of the entire site is underlain by Hawkesbury Sandstone and the southern part by Ashfield Shale.

Hawkesbury Sandstone typically comprises medium to coarse grained, quartz sandstone while Ashfield Shale typically comprises black to dark grey shale and laminate.

Between the younger Ashfield Shale and the older Hawkesbury Sandstone there is sometimes the Mittagong Formation. This is a relatively thin transition layer of interbedded sandstones and siltstones and is often omitted from the geological maps.

Reference to the Sydney 1:100,000 Soils Landscape Sheet, a part of which is reproduced on Drawing 3 in Appendix B, indicates that the site is underlain by soils belonging to the Glenorie and Lucas Heights groups with Hawkesbury soils to the south.

Glenorie Soils are described as red and brown podzolic soils which are highly plastic, moderately reactive, impermeable soils that are prone to erosion. They are located on undulating to rolling hills on Wianamatta Shales.

The Lucas Heights soils are generally moderately deep, hardsetting yellow podzolic soils and yellow soloths which are generally stony soils of low fertility. Lucas Heights soils tend to occur on gently undulating crests and ridges on plateau surfaces of the Mittagong Formation.

Hawkesbury soils are described as lithosols and siliceous sands, earthy sands, yellow earths occurring on rugged and rolling to very steep hills on Hawkesbury Sandstone. These soils are generally shallow, stony, highly permeable and prone to erosion.

Reference to digital data for Acid Sulphate Soil Risk (supplied by NSW Department of Environment and Climate Change in 2008 based on published 1:25,000 Acid Sulphate Soils Risk Mapping, 1994-1998) indicates that the site is located outside areas of known acid sulphate soils.

5. Field Work Methods

The geotechnical field work was undertaken between 14 and 20 October 2011 and included the following:

Set-out of the borehole locations by an engineer, including a review of client-provided services plans and Dial Before You Dig (DBYD) drawings followed by electromagnetic scanning for underground services at borehole locations.

Pot holing using non-destructive drilling to depths between 1 m and 1.5 m at all borehole locations. The method used high pressure water to loosen the soils. Both the water and disturbed soils were immediately removed by vacuum into a closed steel tank for disposal at a licensed waste depot.

Page 11: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 4 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Eleven boreholes (Boreholes 1 to 11) were drilled across the Precinct. Ten of the boreholes were drilled with a geotechnical drilling rig, and taken to refusal on rock (at depths ranging from 1.15 m to 4.9 m) using solid flight augers. At six of these locations (Boreholes 2, 3, 4, 6, 7 and 8), the boreholes were continued into the underlying rock using diamond core drilling to depths of approximately 10 m. The retrieved rock cores were photographed and point load strength tests undertaken on the rock. Regular standard penetration tests (SPT’s) were generally undertaken within the soils from a depth of 1.0 m to 1.5 m.

Borehole 9, which was located on the RMS site, was drilled after pot holing with hand augers to refusal because of access difficulties for the drilling rig. The proposed location of the borehole was in the middle of the narrow driveway, but there was a buried service exposed by the pot holing in the middle of the driveway. It was not possible to manoeuvre the drilling rig in the narrow driveway to locate the borehole off the centre of the driveway.

The final borehole locations and levels were determined by GPS methods with the accuracy generally within 0.1 m.

Notes about this report and classification methods and descriptive terms are given in Appendix A.

6. Field Work Results

Boreholes 1 to 11 were drilled across the site and their locations are shown on Drawing 1 in Appendix B. Details of the results of boreholes and in situ testing are given in the borehole logs in Appendix C. The subsurface conditions may be broadly summarised as follows:

FILLING: gravelly sandy clay filling to depths of between 1.1 m and 3.1 m; underlain by,

SILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only; underlain by,

BEDROCK: extremely low to low strength rock at depths ranging from 1.1 m to 3.0 m depth and increasing in strength with depth.

In all the cored boreholes, the recovered rock was generally shale, siltstone and fine grained sandstone near the rock surface indicating that these rocks belongs to Mittagong Formation. With depth, the rock changes to Hawkesbury Sandstone which tended to be generally high strength sandstone.

7. Groundwater

No free groundwater was observed whilst augering at any borehole location during the current investigation.

Long term groundwater monitoring was carried out for the ECRL and the results are given in Table 2.

Page 12: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 5 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Table 2: Groundwater Monitoring Results

Borehole Surface Level Site

Groundwater Levels

Lowest Date Highest Date

CB31 RL 58.7 m M2 RL 38.7 m 2/2/01 RL 41.2 m 16/4/00

CB32 RL 60.39 North Ryde Station RL 46.5 m 11/10/01 RL 53.2 m 2/2/01

SH100 RL 59.0 m North Ryde Station <RL 55.9 m 28/1/03

SH101 RL 63.4 m North Ryde Station RL 57.0 m 28/1/03

SH103 RL 64.4 m North Ryde Station RL 55.2 m 28/1/03

TC1 RL 58.9 m North Ryde Station RL 46.1 m 9/1/02 RL 47.3 m 23/1/02

TC3 RL59.4 m North Ryde Station RL 30.0 m 13/12/01 RL 38.5 m 11/1/02

8. Laboratory Testing

Laboratory testing was undertaken on selected soil and groundwater samples for the purpose of assessing engineering properties and subsurface aggressivity. The results sheets for these laboratory tests are included in Appendix D, and are summarised in the following sections.

8.1 Soil Engineering Testing

For soil classification purposes, three samples of silty clay were tested for Atterberg Limits. The results are summarised in Table 3.

Table 3: Results of Laboratory Classification Testing

Borehole SampleDepth

(m)

Liquid Limit

(%)

PlasticLimit(%)

Plasticity Index

(%)

LinearShrinkage

(%)

4 1.8 64% 29% 35% 15.5%

6 1.5 50% 26% 24% 11.0%

10 1.5 62% 29% 33% 17.0%

These results indicate that the natural site soils are of high plasticity clays with a relatively high potential for movements with changes in moisture content.

For the purpose of pavement design, two samples of filling were tested to determine the California Bearing Ratio (CBR) value of the site soils that could form the subgrade for pavements associated with the development. The compaction properties of the sample were determined, and the sample then prepared in a CBR mould at approximately 100% of the Standard Maximum Dry Density (SMDD) at Standard Optimum Moisture Content (SOMC). Once prepared, the sample was surcharged and

Page 13: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 6 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

immersed in a water tank for soaking for a four day period. The results of the laboratory compaction and CBR tests are summarised in Table 4.

Table 4: Results of Compaction and CBR Testing

Borehole Sample Depth (m)

SMDD

(t/m3)

SOMC

(%)

CBR (%)

4 day soaked

Swell

(%)

1 0 – 1.0 m 1.94 t/m3 11.5% 12% 0

2 0 – 1.0 m 1.79 t/m3 17.0% 5.0% 0

8.2 Aggressivity Testing

Selected soil samples were also submitted to Envirolab Services Pty Ltd, a NATA accredited testing laboratory, for the purpose of chemical testing for assessment of subsurface aggressivity. Soil samples were tested for pH and concentration of chloride and sulphate ions. The results are summarised in Table 5.

Table 5: Results of Aggressivity Testing - Soil

Borehole Sample Depth (m) pH Chloride (mg/kg) Sulphate (mg/kg)

2 1.0 9.5 240 72

3 1.5 6.4 270 99

4 1.8 4.4 69 14

7 1.5 5.4 74 49

10 1.5 4.9 94 24

9. Other Investigations

The geotechnical reports prepared for the ECRL have been provided for preparation of the geotechnical report. In addition, a previous investigation carried out by Douglas Partners on the Station Site North has also been used in preparing the report. The borehole locations are shown on Drawing 1 and the borehole logs in Appendix E.

A list of the reports is provided in Appendix G.

10. Proposed Development

It is understood that proposed development options have been based on the principles of transit-oriented development, locating residential development and employment opportunities close to public transport infrastructure. Proposed zones for the site have been identified for the site to provide for the following land uses:

Page 14: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 7 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

The high density residential zone (R4) across the majority of the M2 site and the medium density residential zone (R3) on the OSL and RMS sites providing for a diversity of housing types in close proximity to North Ryde Station.

The mixed use zone (B4) for the Station South and North sites and a potion of the M2 site providing for retail and commercial/employment on the M2 site and convenience retail and complementary commercial development in proximity to North Ryde Station.

The public recreation zone (RE1) throughout the precinct to provide a series of public open space areas, buffer zones and green links.

The RE1 zone will also allow for Community facilities, including a potential community centre with associated recreation space on the M2 site.

A pedestrian bridge across Delhi Road in the south-eastern corner of the M2 site, spanning between the M2 site and the RMS site. A second span is also proposed between the RMS site and the Station Site North.

It is understood that the TfNSW divestment strategy is to deliver Stage 1 works (enabling) infrastructure to support the sale of superlots to developers for future development.

The extent of excavation and earthworks at the site will vary depending on the final staging strategy and adopted site levels. Basements of varying depths are expected under most of the buildings. Therefore, comments are provided to cover a range of options for earthworks, excavations and foundations. Works within the Station Site South and M2 site shall also consider impacts on the Epping to Chatswood Rail Line (ECRL). This is addressed further in Section 11.15.

11. General Comments

11.1 Existing Filling

The boreholes indicate that the filling on the site is generally between about 1.1 m to 3.0 m thick. The filling is predominantly clay and crushed rock. In its present condition, the filling is considered to be “uncontrolled” and accordingly unsuitable for the support of structural loads, ground slabs and pavements.

The variable compaction within the existing filling could give rise to differential settlement unless some form of treatment is adopted. It is very difficult to estimate the extent of settlement which may take place; nevertheless it is contrary to standard engineering practice to build on variable compacted filling.

Generally, the options for the support of columns, slabs and pavements on the existing filling should include either support on reworked filling or on natural material below the filling. Reworking of the filling, however may not be sufficient to limit deflections of the internal ground slab which may have very stringent deflection requirements. The following section refers only to reworking of filling.

Page 15: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 8 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

11.2 Site Preparation

Site preparation for load bearing areas on the existing filling could include complete excavation and recompaction of the filling or partial excavation and recompaction of the filling with high energy impact rolling of the deeper filling. The choice of which option to adopt will not only depend on geotechnical reasons but also on other factors such as time and costs.

Compaction testing of all engineered filling and prepared subgrade surfaces should be carried out in accordance with AS3798 (known as “Earthworks Code”). In particular, the rate of testing suggested in the Earthworks Code should be adopted.

11.2.1 Complete Excavation and Replacement

Complete excavation and replacement of the filling will almost eliminate the risk of ongoing and differential settlements within the filling under typical structural loadings. This method would include removal of all the filling, sorting the filling by discarding unsuitable material and reuse of the filling by compacting it under controlled conditions. This option would be the most expensive and time consuming, but would ensure that ongoing settlements of pavements are minimised.

Site preparation for complete excavation and replacement should include the following steps:

Strip the surface of any vegetation or unsuitable material. This material should not be used as structural filling, however can be stockpiled for landscaping purposes;

Excavate the filling to expose the underlying natural material (clay and/or rock);

Proof roll the exposed surface with six passes of an 8-10 tonne roller, with the final pass carried out under observation of a geotechnical engineer to check for any soft or saturated zones. Any such zones should be over-excavated to a maximum depth of 300 mm and replaced with compacted granular material;

The existing filling materials may require some sorting by removal of oversize or unsuitable material to be considered for use as an “engineered” filling; then,

Filling should be placed in 300 mm thick horizontal layers and each layer compacted to 98% standard maximum dry density up to depths of 500 mm below the proposed subgrade level and to 100% standard maximum dry density in the upper 500 mm of filling. The moisture content during filling should be controlled so that it is always within ±2% of optimum moisture content determined in the standard compaction test.

11.2.2 Partial Excavation and Compaction

The advantage of partial excavation and compaction of the filling is that excavation can be limited, however it is noted that this method of site preparation presents a higher risk of settlements compared to complete excavation and replacement.

Partial removal of the filling and construction of a bridging layer using conventional filling methods may be used in conjunction with high energy impact compaction of the deeper filling from the excavation level. It is suggested that as a minimum, provision be made for over excavating to a depth of at least 1 m below the proposed construction level unless rock is encountered.

Page 16: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 9 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

High energy impact compaction would be carried out from this depth to compact the underlying filling and provide a bridging layer over natural stiff clays. This method involves the use of three to five sided heavy rollers to compact the ground. Difficulties are sometimes encountered using impact compaction in clayey soils. Accordingly the impact compaction should initially be carried out over a trial area to assess number of passes required and effectiveness. It is noted that impact rolling would not be required where excavation of the filling exposed rock or shaly clay.

The advantage of this method is that it is relatively quick as only the exposed surface is compacted and rolling takes place at speeds between 10 and 20 km/hour. There remains a risk, however of minor settlements, which may lead to some differential settlements.

Site preparation for partial excavation and replacement in conjunction with high energy impact compaction should include the following steps:

Strip the surface of any vegetation and unsuitable material. This material should not be used as structural filling, however can be used for landscaping purposes;

Excavate the existing filling to 1 m below finished subgrade levels for pavements, leaving a horizontal level surface;

Impact roll the exposed filling. Take levels at regular intervals (say every 10 passes) to measure the amount of settlement. Experience would suggest that the number of passes required could be between 30 and 50;

The existing filling materials may require some sorting by removal of oversize or unsuitable material to be considered for use as an “engineered” filling; then,

Filling should be placed in 300 mm thick layers with each layer compacted to 98% standard maximum dry density up to depths of 500 mm below the proposed subgrade level and to 100% standard maximum dry density (SMDD) in the upper 500 mm of filling. The moisture content during filling should be controlled so that it is within ±2% of optimum.

11.3 New Filling

For the construction of engineered filling platforms, or pavements, the following site preparation and earthworks measures are recommended for new filling on natural ground:

Any unsuitable material should be removed including grass roots, vegetation and tree roots, together with any existing, uncontrolled filling or other deleterious material. If any other material is substantially root affected, the material should also be removed.

Following stripping, the exposed surface should be tyned and moisture conditioned to approximately optimum moisture content then proof rolled using a smooth drum roller of at least 10 tonnes deadweight.

Proof rolling of exposed subgrade and stripped areas should be observed by an experienced geotechnical professional to detect excessively loose or spongy areas which may require rectification. Any soft or spongy areas should be excavated a further 600 mm depth and backfilled with clean filling placed in compacted layers to 98% of SMDD and within 2% of the SOMC. The re-instated surface should again be subject to proof rolling to assess the adequacy of the prepared surface.

Page 17: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 10 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Materials used for replacing soft areas or site re-grading may comprise either the site soils other than topsoil or unsuitable material (e.g. contaminated materials, wet soil, materials with oversize inclusions or organics), or materials imported specifically for the purpose. If imported materials are used, preference should be given to select readily compactable, well-graded granular material such as crushed sandstone or crushed recycled concrete. If clay filling is used, then the reactivity of the filling should be equal or less than the reactivity of the natural soils. Filling should be placed in layers not more than 300 mm loose layer thickness and compact to at least 98% of SMDD generally, and to at least 100% SMDD within 0.3 m of pavement subgrade surfaces. Moisture contents of the fill material should be maintained within 2% of the SOMC. If smaller compaction plant (8 tonnes or less) needs to be used due to space restrictions, a maximum loose layer thickness of 200 mm should be adopted.

For new filling on existing filing, the existing filling should be treated as discussed in Section 11.2 before placing and compacting the filling as given above.

11.4 Working Platforms

Once exposed, the silty clay and filling on the site may be susceptible to loss of strength if the moisture content increases (e.g. following prolonged rain events, or if water is permitted to pond on the clay surface). In the event of rain, consideration could be given to the provision of a nominal working platform of 200 mm thickness of crushed rock or concrete, to improve trafficability of the site.

A more substantial working platform may be required for the operation of heavy plant on the exposed site soils. The specific requirements will depend on the particular loading applied by the plant and subgrade conditions at the time of loading.

11.5 Excavation Conditions

It is expected that excavation for basements or other needs will entail cutting through 1 to 3 m of overburden overlying extremely low to medium strength shales and siltstone grading into high strength sandstone. Removal of overburden soils and highly weathered rock should be readily accomplished with an excavator.

The Mittagong Formation tends to comprise extremely low strength and medium strength, fractured siltstone and shales while most of the Hawkesbury Sandstone is generally medium to high strength, slightly fractured to unbroken sandstone. Heavy duty equipment, such as large dozers with a ripper, is expected to be required for excavation into rock especially if the excavation is in Hawkesbury Sandstone. For detailed excavation, the use of excavator mounted hammers and rock saws will be required to excavate the medium and high strength sandstone.

Avoidance of overbreak along lines of intended excavation can prove difficult in medium and high strength sandstone. Experience has shown that the use of excavator mounted saws or milling heads can often successfully overcome overbreak problems. Regular inspections of the excavation works by an experienced engineering geologist/geotechnical engineer are suggested to check for potential unstable rock wedges.

Page 18: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 11 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Noise and vibration will be generated by excavation work on the site. Care will be required when excavating close to the existing buildings on adjacent properties. There are residential buildings adjacent to the OSL site and office buildings adjacent to the Station Site South portion of the Station Site North. There is debate as to the maximum amount of vibration that buildings can accommodate without signs of distress. The level of acceptable vibration is dependent on various factors including the type of building structure (e.g. reinforced concrete, brick, etc.), its structural condition, the frequency range of vibrations produced by the construction equipment, the natural frequency of the building and the vibration transmitting medium.

It is also noted that humans are very sensitive to vibrations and consequently will be disturbed by vibration levels which are considered relatively insignificant for buildings. Taking these factors into account, it is suggested that a maximum vibration of 5 mm/s at the foundation level of the adjacent buildings be adopted. From previous monitoring in similar conditions, a Krupp 600 hammer or equivalent should be used no closer than 3 m to 5 m from the foundations and a Krupp 950 hammer no closer than 15 m from the foundations. DP recommends that vibration monitors be installed during bulk and detailed excavation when removing rock close to adjacent buildings.

Specific vibration monitoring is expected to be required for construction activities in vicinity of the Epping to Chatswood Rail Line (ECRL) which cross underneath the Station Site South and M2 site. The ECRL is addressed further in Section 11.15.

11.6 Waste Classification

NSW EPA guidelines state that all material to be disposed off site should be the subject of a Waste Classification Assessment. This is the subject of a separate report.

11.7 Excavated Material Disposal and Re-use

Care should be taken to keep separate the filling, topsoil material and natural soils and rock during excavation, as these materials are expected to have different requirements with respect to disposal and/or re-use.

From a geotechnical perspective, the following comments are provided with respect to reuse of materials on site:

The natural topsoil materials (where present) would be unsuitable for reuse as engineered filling, but could potentially be used in landscaping.

The filling, less any organic matter or oversized particles (i.e. greater than 150 mm), is generally considered suitable for reuse as engineered filling. Some sorting may be required to remove any unsuitable or oversized material.

The natural material, which is clay and rock, on the site is likely to generally be suitable for reuse from a geotechnical point of view. However, any organic matter encountered in the natural material should also be removed. Some moisture conditioning of the material may be required.

Page 19: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 12 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Excavated rock may have to be broken down to provide a well graded material with maximum size of about 150 mm for re-use as filling. It may be difficult to break down the high and very high strength sandstone.

Reference should be made to NRSPP Phase 1 and Limited Phase 2 Contamination Investigation Reports (reference ADP–1207–CON–4003 and ADP-1207-CON-4022 respectively) with regard to re-use of the filling from a contamination viewpoint.

11.8 Excavation Batters

Excavations may be temporarily battered for the construction of basement retaining walls. The maximum short and long term batter slopes for the materials encountered in the boreholes are given in Table 6 for batter heights of up to 2 m, and where surcharges are not present at the batter crest.

Table 6: Maximum Safe Batter Slopes

MaterialRetaining Wall Design Parameters (H:V)

Short term temporary Long term permanent

Uncontrolled filling and firm silty clay 1.5:1 2.5:1

Stiff and hard silty clay 1:1 2.0:1

Extremely to low strength rock 0.75:1 1:1

Medium to very high strength rock vertical 0.75:1

Flatter slopes than those above may be required to allow for maintenance. Provision for maintenance and protective measures may be required for the protection of long-term batters, such as pinned shotcrete protection against erosion or weathering.

All batters should be subject to geotechnical inspection for every 1.5 m of vertical excavation, to confirm the adequacy of the slopes indicated above.

11.9 Excavation Support

Where insufficient space is available for temporary batters, excavation support will be required for the overburden and extremely low to low strength rock. Excavation support may also be preferred to reduce volumes of material excavation and/or disposal.

Appropriate shoring may comprise bored soldier pile walls with shotcrete panels. Shoring piles, which would typically be spaced approximately 2.0 m apart, may be used to carry vertical structural loads and should be socketed below the bulk excavation level. Excavation should proceed in drops of no greater than 1.5 m before infill panels are formed. Closer pile spacing’s would be appropriate where existing foundations or other high surcharges are located behind the wall.

For relatively low retaining walls, say up to 3 m high, where lateral movement is not a concern, cantilever walls may be appropriate.

Page 20: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 13 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Where the retaining walls are designed as cantilevered or singly propped retaining walls with a level retained surface, preliminary wall design may be based on the following triangular earth pressure distribution, and the parameters given in Table 7.

hz = K . z .

Where, hz is the horizontal pressure at depth z (kPa)

is the bulk unit weight of soil or rock (kN/m3); and,

K is the earth pressure coefficient

Table 7: Parameters for Cantilevered or Singly Propped Retaining Wall Design

Soil Type Unit Weight(kN/m3)

Active Earth Pressure Coefficient (Ka)

Temporary Permanent

Existing filling 20 0.3 0.4

Natural stiff to very stiff clay 20 0.25 0.3

Engineered filling 20 0.25 0.3

Extremely to Low Strength rock 22 0.2 0.25

Medium to Very High Strength rock 22 0 0

Where the lateral movement of the wall needs to be limited, an “at rest” earth pressure coefficient 50% greater than the active earth pressure may be adopted. It should be noted, however, that it is not possible to totally eliminate lateral movement towards an excavation. Should existing foundations be present behind the wall, a cantilevered wall design may not be appropriate. Additional allowance should be given to hydrostatic loads and surcharge loading such as sloping ground, construction traffic and adjacent foundations. Hydrostatic pressures may be ignored if allowance is made for the permanent drainage of any perched groundwater flow or seepage from behind the proposed building and retaining walls.

Where soil is backfilled immediately behind retaining walls, free-draining, granular material should be used and suitable drainage provided. Compaction of the soils should be undertaken using hand-operated equipment only.

Where reliance on passive resistance is required, the ultimate passive pressure considered appropriate for design in at least very stiff to hard clay soils is 100 kPa (or passive coefficient, Kp, of 2) or 1000 kPa in low strength rock. This would only be achieved following significant movement of the retaining wall, and hence the value should be factored down appropriately so as to limit movement.

11.10 Groundwater

Groundwater levels on the site were recorded at relatively deep levels within the rock during previous investigations. It is noted, however, that groundwater levels would be expected to vary seasonally and with climatic influences, and that perched groundwater levels may occur due to rainfall events.

Page 21: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 14 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Should excavations intercept the perched groundwater table, then some groundwater inflows could be expected. Estimates of inflow are difficult to assess and a better assessment could be made at the excavation stage. Allowance should be made for possible buoyant forces that may act upon the basements, unless drainage of seepage or groundwater is provided.

Only minor, periodic inflows are expected into any basement excavation, and it is expected that such inflows could be readily managed in the short and long term by the use of a normal “sump-and-pump” drainage system.

11.11 Foundations

11.11.1 Site Classification

It should be noted that site classification in accordance with AS2870 – 2011 Residential Slabs and Footings would generally only be applicable to buildings supported on shallow foundations at, or near present ground surface levels (i.e. with no basements) and if they are similar to houses in size, loading and superstructure flexibility. Notwithstanding this, site classification provides a useful indication of the potential for shrinkage and swelling of the site soils, although it is not suggested that the standard footing designs presented in AS2870 be adopted for this development.

Given the depth of filling on the M2 and Station Sites, and the presence of trees on the OSL and RMS sites, a ‘Class P’ classification would generally apply to the site in its present condition.

Additional surface movement due to trees (yt) should be expected especially on the OSL and RMS sites. The influence of trees on surface movements would be expected to continue after removal of the trees, until seasonal moisture changes result in climate-controlled moisture contents within the soil. This could take many years.

Further assessment would be required should an alternative site classification be required. It is noted that the natural clays on site are considered to be moderately to highly reactive to changes in moisture content.

11.11.2 Design

It is recommended that all new foundations be taken down to bear on natural materials to reduce the risk of differential movement between footings supported on materials of different strengths/stiffness.

Recommended maximum ultimate and allowable pressures and modulus values for the foundation materials encountered in the field investigations at the site are presented in Table 8.

Page 22: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 15 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Table 8: Recommended Parameters for Foundation Design

Material

End Bearing Pressure (kPa)

Shaft adhesion * (kPa) Field Elastic

Modulus, E (MPa) Allowable Ultimate Allowable Ultimate

Controlled filling 100 250 15

Stiff silty clay 150 350 30

Extremely low to very low strength shale 700 3,000 40 75 50

Low strength siltstone and Shale 1,000 3,000 100 350 200

Medium strength siltstone and Shale 3,500 10,000 350 600 400

High Strength Sandstone 6,000 40,000 600 1,500 1,000

* For pile foundations in compression only; assumes adequately roughened pile sockets and a minimum pile depth of 1.5 times the pile diameter; reduce by 50% to obtain values for design against uplift.

The settlement of foundations proportioned on the basis of the above allowable parameters would be expected not to exceed 1% of the footing width/diameter.

Differential movement should be expected between structures founded partly on rock, and partly on controlled filling or on natural soils. Allowance should be made for suitable articulation between structural elements founded on different strata.

Where high level footings or pile shafts are above an imaginary line extending upwards at an angle of 45° from the base of adjacent excavations, such as the M2, reduction of the design bearing pressure and shaft adhesion may be appropriate. Specific advice should be sought if this situation occurs.

11.11.3 Construction

All foundation excavations should be clean and free of loose debris with pile sockets free of smear and adequately roughened immediately prior to concrete placement. Some softening of the rock may occur after exposure, particularly in wet weather. Any softened or loose material within the excavation or socket length would need to be removed. Any surface water or groundwater inflow into footing excavations should be removed prior to pouring of concrete.

In situations where pile foundations are considered, suitable pile types include conventional bored piers or Continuous Flight Auger (CFA) piling.

If bored piles are used, temporary casing may be required to prevent the collapse of materials, especially the filling, into the pile hole. Should groundwater infiltration occur into the pile excavation, then the water would need to be removed from the excavation prior to pouring of concrete.

Page 23: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 16 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

As CFA piles are a ‘blind’ piling technique (and hence not suited to geotechnical inspection), the piles will need to be certified by the piling contractor to confirm that the piles have reached a suitable depth, and that the material encountered is consistent with the design assumptions. The selected piling rig should also be able to drill to the required depths. For example, in the case of deep piles, the piling rig must be capable of drilling through high and very high strength sandstone.

11.12 Soil Aggressivity

Based on the results from the chemical laboratory testing of soil and groundwater samples collected on the site, and with reference to Table 6.4.2 (A) & (C) and 6.5.2 (A) & (C) in AS2159-2009, the exposure classification for piles (and other structural elements such as pad footings, etc) falls into the non-aggressive or mild exposure classification for steel and concrete elements.

The site is located outside of areas of known acid sulphate soils, and no signs of concern for acid sulphate soils were identified during the investigation. Therefore, acid sulphate soils are not anticipated on the site.

11.13 Soil Erodibility

Filling and Silty Clay layers may be susceptible to erosion during construction. During construction erosion control measures should be implemented. Design and implementation of control measures should comply with the NSW Guideline Soils and Construction: Managing Urban Stormwater, Landcom, 2004. For the purposes of preliminary design of control measures, soils are expected to fall within the Type C or Type F classification (as described in the aforementioned guideline).

11.14 Pavements

The design of the pavements will depend on the CBR of the subgrade material and the final levels. At present, there is a significant amount of variable filling on the M2 and the Station sites and therefore the CBR of the material is expected to be variable.

CBR testing on filling samples from the M2 site produced CBR results of 5% and 12% while CBR tests on the Station Site North from another investigation had results of 3%, 5% and 7%.

Where imported fill is used to raise the existing site levels, the design CBR value will depend on the type of imported material. Assessment of any imported materials would require further inspection and laboratory testing to confirm the appropriate CBR value for design purposes. It would be normal practice to only import material with a minimum CBR value of 5%, where it is to be used to form pavement subgrades.

Where pavement levels are significantly lowered, hard clay or rock could be exposed as subgrade.

When pavement levels are known, the pavement design will have to be reviewed. In the meantime, a provisional design CBR of 5% based on an assessment of the existing material on the site could be used for the concept design of the pavements only.

Page 24: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 17 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

The design CBR value will depend on the provision of adequate surface and subsoil drainage to maintain the subgrade as close to OMC as possible. Subsoil drainage should be installed to not less than 500 mm depth below subgrade level adjacent to pavement areas and to any lawns or garden areas, where the ingress of water beneath the neighbouring pavement subgrade may be possible. Preparation of subgrade surfaces should be such that adequate cross-falls for surface drainage purposes are achievable across the final pavement.

11.15 Epping to Chatswood Railway Line (ECRL)

The presence of the ECRL tunnel and North Ryde Station under the site will provide restrictions on the development within the zone of influence of the tunnel and station. Details are contained in the document “ECRL Underground Infrastructure Protection Guidelines (UIPG), Report No. 20007300 / PO-4532”, by Transport Infrastructure Development Corporation (now TfNSW), dated May 2009. Reference is also made to the “Development sites Report on Assessment of Impacts on Epping to Chatswood Rail Line”, prepared by Parsons Brinckerhoff Australia Pty Limited, dated August 2008.

The Guidelines require that the potential impact of a proposed building or structure in the vicinity of ECRL be assessed in terms of potential effects on stress distribution, deformation and groundwater movements. The Guidelines also suggest that designers of proposed developments carry out an assessment of the effect of the ECRL infrastructure on their structure. All potential effects such as vibrations, long term creep movements, groundwater table variations and stress imposed by new buildings need to be considered.

The Guidelines define the “support zone” for tunnels as 10 m vertically above and 5 m vertically below or horizontally from the finished internal surfaces of the running tunnels. It is slightly different for stations where the support zone is 15 m vertically above and 5 m vertically below and 8 m horizontally from the finished internal surfaces

The “zone of influence” for the tunnels and stations is defined as the area vertically above the structure to the existing surface level. The tunnel influence zone is bounded by a line extending outwards at a slope of 1V:1H from the edge of the tunnel support zone at the lowest level of the tunnel for a horizontal distance of 20 m.

The ECRL Protection Guideline documents define a 1st Reserve and a 2nd Reserve zone. The 1st

Reserve aligns with the ECRL “Support Zone”. The 2nd Reserve aligns with the ECRL “Influence Zone”. Development within these zones shall consider the protection guidelines and relevant requirements.

Proposed developments should induce negligible or allowable stress and strain changes around the tunnel and station infrastructure. Stress changes of less than 10% are generally considered acceptable.

The lateral movements of excavated rock faces due to stress relief must be considered and their effects on the tunnels and station.

There is also a recommendation that any basement within 14 m of the tunnels or loads associated with the development which are non-uniform be analysed for displacements and stresses at the tunnel

Page 25: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 18 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

lining. Point loads, eccentric loads and concentrated loads should be avoided above tunnels and stations.

The guidelines recommend that a monitoring program is implemented during construction to measure any movements for assessment. The movements include: surface settlement, lateral movement within excavations and internal ground movements including lateral bedding plane shear and bedding plane dilation.

Some of these guidelines include:

No excavation within the support zone;

No shallow footings within the support zone;

Limitations on development in the vicinity of the tunnel;

Insignificant construction effects, e.g. vibrations, on the tunnel;

Detailed assessments of the development on the tunnel.

The ECRL will potentially affect the type of developments on the M2 and Station Sites. It is understood that the Precinct planning and Indicative Layout Plan (ILP) has been developed so as to avoid impacts on the ECRL.

It is expected that monitoring will be required for any development near the ECRL and could involve, but not be limited to:

Precise levelling and surveying;

Installation of inclinometers and regular measurements;

Vibration monitoring; and Site inspections.

12. M2 Site

12.1 Description

The M2 site, which is owned by TfNSW, is bounded by the M2 to the east, Delhi Road to the south, Epping Road to the south-west and low rise commercial/industrial buildings to the north-west.

The area is an irregular shaped land parcel covering approximately 9.5 ha and is some 300 m long and about 90 m wide. Site levels slope down to the north with a difference in level of 28 m over about 300 m, or an average slope of about 5o.

At the time of the investigation, about 70% of the southern part of the site was being utilised by Leighton Contractors as a works compound for the M2 Upgrade project. There are site sheds and parking areas at the southern end and stockpiles of mainly excavated material occupying the centre of the site. Refer to Photos 1 and 2 in Appendix F. A large concrete lined water retention pond is located at the lower levels of the worked area.

Page 26: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 19 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Bushland occupies the northern part of the site. Porters Creek crosses the site at the northern end within the bushland.

The Epping to Chatswood railway tunnel passes under the site at the southern end and it is understood that the site was previously used as a works site for the construction of the tunnel. Drawings for the project indicate that there was a temporary shaft and tunnel incline to the rail tunnel, which would have been backfilled after the works were completed.

Due to the previous site uses, the site has been subjected to significant changes over the years.

The site is shown on Drawing 4 in Appendix B.

12.2 Field Work Results

Boreholes 1 to 7 were drilled on the M2 site and their locations are shown on Drawing 4 in Appendix B. Details of the results of boreholes and in situ testing are given in the borehole logs in Appendix C. The subsurface conditions may be broadly summarised as follows:

FILLING: gravelly sandy clay filling to depths of between 1.1 m and 3.0 m; underlain by,

SILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4 and 6 only; underlain by,

BEDROCK: extremely low to low strength rock at depths ranging from 1.1 m to 3.0 m depth and increasing in strength with depth.

In all the cored boreholes, the recovered rock was generally shale, siltstone and fine grained sandstone near the rock surface indicating that these rocks belongs to Mittagong Formation. With depth, the rock changes to Hawkesbury Sandstone which tendered to be generally high strength rock.

No free groundwater was observed whilst augering at any borehole location.

The exception to the above will occur in the area of the tunnel decline and the shaft built for the tunnel boring machine.

12.3 Other Investigations

The geotechnical reports prepared for the railway ECRL included two boreholes (Boreholes CB30 and CB31) drilled on the site. The results are consistent with the current findings with some filling over silty or sandy clay over rock. Both boreholes had either Mittagong Formation or Ashfield Shale over medium grained Hawkesbury Sandstone which was generally being high strength rock. The boreholes are included in Appendix E.

From groundwater observations made during the geotechnical investigation for the ECRL, the groundwater table was measured at RL 38.66 m to RL 39.03 m in Borehole CB31 between February 2001 and October 2001.

Page 27: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 20 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

12.4 Geotechnical Model

Based on the results of the investigation and other geotechnical investigation reports, the interpreted geotechnical model is provided in Table 9.

Table 9: M2 Geotechnical Model

Unit Material Description

1 Filling Deep filling was encountered in the majority of the borehole locations across the M2 site (Boreholes 1 to 7) to depths of 1.0 m to 3.0 m.

2 Silty Clay Hard silty clay identified at Boreholes 4, 6 and CB31 only, to depths of 1.9 m and 2.2 m (up to 1.9 m thick).

3

Shale,Siltstone

andSandstone

(MittagongFormation)

Extremely low to very low strength shale and siltstone to depths of 3.0 m to 3.7 m was encountered in Boreholes 6, 7 and CB31.

Low to medium strength siltstone to depths of 5.1 m to 6.0 m in Boreholes 6 and 7 only.

Extremely low to low strength, fine grained sandstone to depths of 2.1 m to 4.25 m.

4Sandstone

(Hawkesbury Sandstone)

At cored locations - medium to high strength sandstone, moderately to slightly fractured to unbroken with depth, was proven to depths of 9.55 m to 41 m.

Some very low strength bands were encountered at varies depths.

An interpreted cross-section is included in Drawing 5 in Appendix D, indicating the above geotechnical profile as well as showing the approximate location of the ECRL tunnel. A plan of the approximate locations of the tunnel, shaft and decline is given on Drawing 6.

In the absence of specific information on compaction, the existing site filling must be assumed to be uncontrolled even though it has been used as a works compound and vehicles have travelled over the site and areas have been subjected to preloading by stockpiles. It is, however, understood that the backfilling of the shaft was done under controlled conditions with results available from the contractor.

The groundwater table was measured at RL 39 m in 2001 (about 20 m below the surface).

12.5 Comments

12.5.1 ECRL

The ECRL is located under part of the site. There is also reference in historical documents to a decline and shaft, which were large open excavations during the construction of the ECRL to facilitate the entry of equipment. Refer to Drawing 6 for the extent of ECRL, decline and shaft. It has been reported that the decline had rock bolts installed as temporary support when it was an open excavation and the excavation has been backfilled with a concrete plug and filling.

Page 28: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 21 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Any surface development within the zone of influence of the tunnel will have to consider the effects on the tunnel.

For buildings over the backfilled decline, special attention will be required on the foundations so that they are not affected by the decline.

12.5.2 Site Preparation

Before the site is handed back to TfNSW, it is understood that Leighton Contractors will clear the works compound site of site sheds, stockpiles, etc.

In addition to the general comments given above, site preparations on the M2 site are expected to include some bushland clearing and filling a retention pond.

In clearing the bushland, it is expected to create abnormal moisture conditions in the remaining clays. The moisture condition should be allowed to stabilise or otherwise moisture conditioned prior to construction works on the clays.

The existing retention pond is concrete lined above the water line and, for discussion purposes, is assumed to be fully lined. It is understood that the detention pond will be removed and the site remediated before the site is handed back to TfNSW. Any remediation works should be carried out using good engineering practice. The concrete lining should be removed; any soft or moisture effected material surrounding the pond should also be removed prior to any earthworks or development. Filling should be carried out under Level 1 supervision in accordance with AS 3798-2008 and a Level 1 report prepared.

12.5.3 Foundations

With rock found to be generally close to the surface in the investigation area, it is suggested that structures are founded on rock. In the case of buildings with no basements, bored piers to rock are appropriate. For buildings with basements, rock is expected to be exposed in the bulk excavation and therefore shallow footings may be appropriate.

For buildings and structures within the zone of the ECRL tunnel, foundations may have to be piles founded below the zone of influence of the tunnel unless it can be shown that the foundations do not adversely affect the tunnel. For piles founded below the zone of influence of the tunnel, they would be expected to be relatively deep, possibly of the order of 30 m and therefore drilled through high and possibly, very high strength sandstone. Piles should be debonded through the zone of influence to mitigate the effects of skin friction.

A similar situation exists for structures over the decline. Unless it can be established that the decline was properly backfilled and is suitable to support structures above it, it will be prudent to allow for piled footings founded below the influence of the decline.

End bearing pressures for preliminary design of foundations are given in Section 11.11.2 above. It is expected that deep piles will be founded in high strength sandstone with bearing pressures of the order of 6 000 kPa.

Page 29: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 22 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

13. Station Site North

13.1 Description

The Station Site North is bounded by Delhi Road to the north, the M2 to the west, Station Site South site to the south, and a right of way and existing commercial buildings to the east. The area is irregularly shaped with major dimensions of approximately 200 m by 70 m.

The overall site slopes down to the south with a difference in level of about 8 m However, original surface levels have been changed to suit the previous developments on the site and there is a vegetated cover retaining wall about 4 m to 6 m high along the Delhi Road boundary.

The northern portion of the site has the North Ryde railway station and associated vertical shaft on the Delhi Road frontage. On a lower level, the slightly sloping area behind the station is currently used as a construction site office by Leightons for work on M2 Upgrade Project. Temporary site sheds and car parking areas occupy the site. See Photos 3 and 4 in Appendix F.

The ECRL tunnel passes under Delhi Road with part of the easement (Reserve Zones) encroaching on the site. In addition, the station and other related infrastructure encroaches onto the site at the northern end.

The site is shown on Drawing 7 in Appendix B.

13.2 ECRL Investigations

Previous geotechnical investigations for the North Ryde Railway Station site encountered a relatively thin layer of filling and clay over shale or siltstone over sandstone. High strength sandstone was encountered in Boreholes TC1, TC2 and TC3 below RL 54 m to RL 48 m. During previous investigations conducted in the area, a fault was intersected near the contact between the Mittagong Formation and the Hawkesbury Sandstone at about RL 50 m in Borehole SH100. A narrow dyke, interpreted as striking south-easterly, has been previously describing just south of the North Ryde station.

Groundwater measures for the ECRL near the station found that the groundwater level varied from RL 53.2 m in February 2001 to RL 46.5 m in October 2001 in Borehole CB32.

13.3 Geotechnical Model

Based on the results of the ECRL investigation the interpreted geotechnical model is provided in Table 10.

Page 30: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 23 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Table 10: Station Site North Geotechnical Model

Unit Material Description

1 Filling Shallow filling to depths of 0.15 m to 0.2 m.

2 Shaly Clay / Clayey Shale

Hard shaly clay or clayey shale was encountered to depths of 2.0 m to 6.5 m.

3

Shale, Siltstone and Sandstone

(MittagongFormation)

Extremely low to high strength shale, siltstone and sandstone to depths of 10.8 m to 13.6 m.

4Sandstone

(Hawkesbury Sandstone)

Medium to high strength, fine and medium grained sandstone below approximately RL 50 m was proven to depths of 40.05 m to 45 m with some carbonaceous silty laminate

and siltstone bands at various depths.

Interpreted cross-sections are included in Drawings 9 and 10 in Appendix B, indicating the above geotechnical profile. It is noted that some of the Mittagong Formation is described as high strength, fine grained sandstone and the layer tends to be thicker than encountered on the M2 site.

In the absence of specific information on compaction, the existing site filling must be assumed to be uncontrolled.

Groundwater is assumed to vary across the site from about RL 55 m to RL 46 m at the northern end.

13.4 Comments

13.4.1 ECRL

Development within the majority of the site will located over the zone of influence of the ECRL and North Ryde Station and the effects of the development on the tunnel and station will have to be considered by the future developer.

13.4.2 Site Preparation

Previous developments on the site have altered the site profile. There are significant areas of cut and fill which were constructed to provide benched building platforms. A large part of the site is probably in cut.

The site sheds will be removed by Leighton Contractors before the site is handed back to TfNSW leaving a relatively clean area and possibly some pavements.

Page 31: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 24 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

13.4.3 Foundations

Rock is generally close to the surface in the area investigation. Accordingly it is suggested that structures are founded on rock. In the case of buildings with no basements, shallow footings or bored piers are appropriate. For buildings with basements, rock is expected to be exposed in the bulk excavation and therefore shallow footings may be appropriate.

For buildings and structures within the zone of the ECRL tunnel and station, foundations may have to be piles founded below the zone of influence of the tunnel and station unless it can be shown that the foundations do not adversely affect the tunnel. For piles founded below the zone of influence of the tunnel, they would be expected to be relatively deep and therefore drilled through high and possibly, very high strength sandstone. Piles should be debonded through the zone of influence to mitigate the effects of skin friction.

End bearing pressures for preliminary design of foundations are given in Section 11.11.2 above. It is expected that deep piles will be founded in high strength sandstone with an allowable bearing pressure of the order of 6 000 kPa.

14. Station Site South

14.1 Description

The Station Site South is bounded by Station Site North to the north, the M2 to the south-west and commercial building to the south-east. The area is roughly triangular with a handle and covers approximately 1.2 ha.

The overall site slopes down to the south with a difference in level of approximately 9 m over some 140 m or an average slope of less than 4o. However, original surface levels have been changed to suit the previous developments on the site.

The site is currently vacant. It has had a number of uses in the past. Currently, there is a one vacant workshop type building on the eastern boundary and pavement areas, generally around the boundaries. In other areas, vegetation has been allowed to grow on the old building platforms and there are some stockpiles of material. See Photo 5 and 6 in Appendix F.

14.2 Field Work Results

Boreholes 10 and 11 were drilled on the Station Site South and their locations are shown on Drawing 8 in Appendix B. Details of the results of boreholes and in situ testing are given in the borehole logs in Appendix C. The subsurface conditions may be broadly summarised as follows:

FILLING: gravelly clay filling to depths of between 1.1 m and 1.3 m; underlain by,

CLAY AND stiff to very stiff, red brown clay overlying hard shaly clay, to a depth of 4.8 m in SHALY CLAY: Borehole 10 only; underlain by,

Page 32: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 25 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

BEDROCK: extremely low to low strength sandstone at depths ranging from 1.1 m to 4.8 m depth.

No free groundwater was observed whilst augering at any borehole location.

14.3 Other Investigations

A previous geotechnical investigation by Douglas Partners on the Station Site South portion of the site encountered a subsurface profile of filling with minor residual clays underlain by Hawkesbury Sandstone. A deeply weathered zone, consisting of residual clays and extremely weathered shale, (which was exposed during construction of the M2 retaining wall) extends to the north-north west across the site. The recovered cores indicate a significant variation in weathering profile with low to medium strength and better rock as shallow as 1.5 m depth (RL 49.6 m) and up to 5.7 m depth (RL 50.6 m) grading into moderately weathered, slightly weathered and fresh sandstone. High strength sandstone was encountered at levels ranging from RL 43.6 m to RL 50.3 m. No groundwater was encountered during augering.

14.4 Geotechnical Model

Based on the results of the investigation and other geotechnical reports, the interpreted geotechnical model is provided in Table 11.

Table 11: Station Site South Site Geotechnical Model

Unit Material Description

1 Filling Deep filling was encountered in the Boreholes 10 and 11

across the Station Site North to depths of 1.1 m to 1.3 m.

2 Clay At Borehole 10 location, stiff to very stiff clay and shaly clay with some ironstone gravel to a depth of 4.8 m.

3

Shale, Siltstone and Sandstone

(MittagongFormation)

Extremely low to high strength shale, siltstone and sandstone at depths of 1.1 m to 4.8 m.

An interpreted cross-section is included in Drawing 10 in Appendix B, indicating the above geotechnical profile. It is noted that some of the Mittagong Formation is described as high strength, fine grained sandstone and the layer tends to be thicker than encountered on the M2 site.

In the absence of specific information on compaction, the existing site filling must be assumed to be uncontrolled.

Page 33: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 26 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

No groundwater was encountered during augering in the current and past investigations, but it was expected that the groundwater table was drawn down by the adjacent M2 motorway along the southern boundary whose levels vary from about RL 48 m to RL 37 m.

14.5 Comments

14.5.1 Site Preparation

Previous developments on the site have altered the site profile. There are significant areas of cut and fill which were constructed to provide benched building platforms. There are some deep filled areas on the site. A significant amount of earthworks may be required on the site to prepare it for building works.

14.5.2 Foundations

Rock is generally close to the surface in the area investigation. It is therefore suggested that structures are founded on rock. In the case of buildings with no basements, shallow footings or bored piers are appropriate. For buildings with basements, rock is expected to be exposed in the bulk excavation and therefore shallow footings may be appropriate.

End bearing pressures for preliminary design of foundations are given in Section 11.11.2 above. It is expected that deep piles will be founded in high strength sandstone with a safe bearing pressure of the order of 6 000 kPa.

15. Roads and Maritime Services (RMS) Site

15.1 Description

The RMS site is situated within the area bounded by Delhi Road to the north, Epping Road to the south-west and the M2 to the east. It forms an irregular shape covering 0.2 ha and is occupied by the three residential buildings on the southern portion as well as a small amount of bushland on the northern portion. See Photo 7 in Appendix F.

Site levels generally slope down to the south with a difference in level of about 8 m over approximately 120 m, or an average slope of about 3o. The residential properties generally slope down from Epping Road to the building line and then rise again so that the residential buildings are in a small gully.

15.2 Field Work Results

It was proposed to drill the borehole with a truck mounted rig in the narrow driveway. However, the presence of a buried service in the middle of the drive meant that the location of the borehole had to be moved which was not accessible by the truck. Therefore the borehole was drilled using a hand auger.

Page 34: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 27 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

Borehole 9 was drilled on the RMS site and its location is shown on Drawing 11 in Appendix B. Details of the results of borehole and in situ testing are given in the borehole log in Appendix C. The subsurface conditions may be broadly summarised as follows:

FILLING: gravelly sandy clay filling to 0.9 m depth (backfilling around the buried service conduit); underlain by,

CLAY: firm to stiff, grey brown, slightly sandy clay, to 1.75 m depth where refusal to the hand auger occurred.

No free groundwater was observed whilst augering.

Photo 8 in Appendix F shows the cutting at the rear of the RMS site. Medium to high strength sandstone can be seen in the photo. The sandstone is expected to lie beneath the RMS site.

15.3 Comments

15.3.1 Site Preparation

The site is currently occupied by three residential properties. Demolition of the houses, possibly removal of some vegetation, will be required. Earthworks will be required to prepare the site for construction.

There is not expected to be a significant amount of filling on the RMS site.

15.3.2 Foundations

With rock found to be generally close to the surface in the area investigated, it is suggested that structures are founded on rock. In the case of buildings with no basements, bored piers are appropriate. For buildings with basements, rock is expected to be exposed in the bulk excavation and therefore shallow footings may be appropriate.

End bearing pressures for preliminary design of foundations are given in Section 11.11.2 above. For preliminary purposes, assume that the underlying sandstone is medium strength. Higher bearing pressures are possible following a detailed geotechnical investigation.

16. OSL Site

The OSL site, which is owned by Office of Strategic Lands (OSL) is bounded by Epping Road to the north-east, parkland to the south and residential properties to the west.

The area is an irregular shaped land parcel of 1.3 ha and is some 170 m long and about 120 m wide. Site levels slope down to the south with a difference in level of about 5 m over about 170 m, or an average slope of about 2o.

Page 35: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 28 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

At the time of the investigation, the site was mainly occupied by tennis courts with parking areas on the northern and western sides. In order to provide level tennis courts, there had been some excavation into the gentle slope. The parking areas had some mature trees growing across the site especially along the boundaries. See Photos 9 and 10 in Appendix F. A double storey, brick building at the south-eastern end of the site services as an office and club house for the courts.

16.1 Field Work Results

Borehole 8 was drilled on the OSL site and its location is shown on Drawing 12 in Appendix B. Details of the results of borehole and in situ testing are given in the borehole log in Appendix C. The subsurface conditions may be broadly summarised as follows:

FILLING: gravelly sandy clay filling to 0.4 m depth; underlain by,

CLAY: firm to stiff clay, to 1.1 m depth; underlain by,

BEDROCK: extremely low to low strength shale and siltstone becoming high strength sandstone at 5.1 m depth.

The recovered rock was Mittagong Formation comprising shale and siltstone near the rock surface which changes to Hawkesbury Sandstone at about 5 m depth.

No free groundwater was observed whilst augering at any borehole location.

16.2 Comments

16.2.1 Site Preparation

The site is currently occupied by tennis courts and parking areas with some bush. The current development on the site has resulted in split levels across the site. Some earthworks will be required to prepare the site for development.

There does not appear to be a significant amount of existing filling on the site.

There are residential buildings near the site and therefore construction noise and vibrations will have to be considered.

16.2.2 Foundations

With rock found to be generally close to the surface in the area investigated, it is suggested that structures are founded on rock. In the case of buildings with no basements, shallow footings or short bored piers are considered suitable. For buildings with basements, rock is expected to be exposed in the bulk excavation and therefore shallow footings may be appropriate.

End bearing pressures for the preliminary design of foundations are given in Section 11.11.2 above.

Page 36: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 29 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

17. The Pedestrian Bridge

A pedestrian bridge is proposed over Delhi Road spanning from the M2 Site to the RMS site, with an ultimate second span to extend the bridge from the RMS site to the Station Site North. Exact foundation details are currently unknown as the bridge design is in development, however, it is assumed that the main geotechnical consideration will be foundations for the superstructure with relatively high loadings at bridge pylons. In support of this, preliminary comments are provided below.

17.1 Comments

In the south eastern corner of the M2 site, weathered rock is currently at about 1.0 m depth and high strength rock at about 7 m depth. Immediately across Delhi Road in the RMS site, the ground conditions appear to be similar based on the profile exposed in the M2 cutting. The adjacent cutting on the M2 is shown as about 10 m below Delhi Road on the survey plan and the bottom 2 m or so is exposed medium or high strength sandstone.

Borehole TC3 on the north-western corner of the Station Site North encountered clayey shale at 0.6 m depth, low strength shale at about 3 m depth and medium or high strength siltstone and sandstone from about 7 m depth.

It is suggested that the foundations of the bridge are founded in rock. For the anticipated high loadings, bored piles founded in medium or high strength rock, which is expected at about 7 m depth (approximately RL 54 m) on the M2 site; about 8 m below the level of Delhi Road (approximately RL 50 m) on the RMS site; and approximately RL 52 m on the Station Site North, would be appropriate.

On the Station Site North, the foundations of the bridge may come within the zone of influence of the ECRL, especially the western ventilation shaft building, and special consideration must be given to the foundations.

End bearing pressures for preliminary design of foundations are given in Section 11.11.2 above.

18. Further Investigation

The geotechnical investigation carried out is preliminary in nature for the preliminary design of the NRSPP only. For detailed design purposes, further geotechnical investigation(s) appropriate for the proposed development should be carried out.

For the Stage 1 Works, detailed CBR testing of the subgrade will be required for pavement design as the subgrade materials vary across the sites. Detailed investigation of the pedestrian bridge founding and anchor points will be required. Subject to the final siting of the pedestrian bridge, detailed analysis of impacts on the ECRL and stability of the M2 cutting may be required.

For development of building lots, investigations for building with basements should involve cored bores taken to at least 3 m below basement level. Cored bores should also be drilled at the bridge

Page 37: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 30 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

foundation locations to determine the founding levels of the footings. The cored boreholes from the current and previous investigations have encountered medium to very high strength rock. As this investigation is only a preliminary investigation, lower bound bearing pressures have been provided for preliminary design purposes. With project specific additional investigations, it is possible that the end bearing pressures and shaft adhesion given above in Table 8 may be increased.

Further investigation and assessment of impacts on the ECRL from temporary and permanent works should be undertaken in accordance with the ECRL Protection Guidelines and Railcorp requirements.

19. Sustainability

A Sustainability Strategy has been developed for the NRSPP to provide a framework of targets, commitments, and potential actions to address sustainable design opportunities within the project. Targets and commitments are mandatory, whereas potential actions should be considered and implemented where feasible.

Targets and commitments relevant to geotechnical activities and considerations are provided in Table 11.

Table 11: Sustainability

Item Details Response

MW2 100% of usable spoil to be beneficially reused

Insitu soils deemed suitable for reuse will be used in filling. Ideally usable spoil will be used on site, alternatively on adjacent Precinct

sites, or other project sites.

MW19 Work with other TfNSW or Government agencies’

projects to import and/or reuse clean spoil as required

To be addressed in pre-construction stages to identify opportunities.

MW20 Reuse crushed masonry from on and/or off site sources as

road base

Use of recycled materials will be promoted and allowed for in construction specifications. Recycled roadbase material will need to meet IPWEA (NSW) Specification for Supply of Recycled Material,

2010.

20. Limitations

Douglas Partners (DP) has prepared this report for a project at North Ryde Station precinct project. The report is provided for the exclusive use of TfNSW for this project only and for the purpose(s) described in the report. It should not be used for other projects or by a third party. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents.

The results provided in the report are indicative of the sub-surface conditions only at the specific sampling or testing locations, and then only to the depths investigated and at the time the work was

Page 38: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Page 31 of 31

Report on Preliminary Geotechnical Investigation Project 72518.00 North Ryde Station Precinct Project November 2012

carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of man-made changes. Such changes may occur after DP's field testing has been completed.

DP's advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be limited by undetected variations in ground conditions between sampling locations. The advice may also be limited by budget constraints imposed by others or by site accessibility.

This report must be read in conjunction with all of the attached notes and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion given in this report.

Douglas Partners Pty Ltd

Page 39: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Appendix A

About this Report

Page 40: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports.

DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely.

Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited.

Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile.

Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations.

Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

A localised, perched water table may lead to an erroneous indication of the true water table;

Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table.

Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work.

Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

Changes in policy or interpretations of policy by statutory authorities; or

The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 41: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event.

Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge.

Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 42: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Appendix B

Drawings

Page 43: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

1

3

5

4

6 7

89

10

SH101

CB31

CB32TC1TC2

TC3SH100

44864-5 44864-6

44864-7

44864-3

44864-4

44864-2 44864-8

44864-1

CB30

TC22 TC21

TC23

P:\72

51

8.0

0N

OR

TH

RY

DE

,M

2P

recin

ctG

SY

\Dra

win

gs\7

251

8_

1.d

wg,5

/11/2

012

8:5

3:1

3A

M

72518.00

1

1DRAWING No:

PROJECT No:

REVISION:

20.10.2011CLIENT: DATE:

Site Location PlanNorth Ryde Station Precinct

Transport for NSW

OSLSite

(OSL)RMSSite

(RMS)

Station SiteNorth

Station SiteSouth

M2 Site(TCA)

Macquarie ParkCemetery

Delhi Road

M2

Epping Road

Waterloo RoadW

icks Roa

d

LegendN

Borehole location(Douglas Partners)

Borehole location(previous investigation)

Contour level (5m)

1

SH100

Contour level (0.5m)

Page 44: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

P:\72

51

8.0

0N

OR

TH

RY

DE

,M

2P

recin

ctG

SY

\Dra

win

gs\7

251

8_

2.d

wg,5

/11/2

012

8:5

4:1

3A

M

72518.00

1

2DRAWING No:

PROJECT No:

REVISION:

20.10.2011CLIENT: DATE:

Regional GeologyNorth Ryde Station Precinct

Transport for NSW

OSLSite

(OSL)RMSSite

(RMS)

Station SiteNorth

Station SiteSouth

M2 Site(TCA) Macquarie Park

Cemetery

Delhi Road

M2

Epping Road

Waterloo RoadW

icks Roa

d

Ashfield Shale

Hawkesbury Sandstone

LegendN

0 50 100 200

1:5000 @ A3

300 400 500m150

Page 45: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

P:\72

51

8.0

0N

OR

TH

RY

DE

,M

2P

recin

ctG

SY

\Dra

win

gs\7

251

8_

3.d

wg,5

/11/2

012

8:5

4:5

1A

M

72518.00

1

3DRAWING No:

PROJECT No:

REVISION:

20.10.2011CLIENT: DATE:

Regional SoilNorth Ryde Station Precinct

Transport for NSW

OSLSite

(OSL)RMSSite

(RMS)

Station SiteNorth

Station SiteSouth

M2 Site(TCA) Macquarie Park

Cemetery

Delhi Road

M2

Epping Road

Waterloo RoadW

icks Roa

d

Legend

Disturbed terrain

Glenorie

Lucas Heights

Hawkesbury

N

0 50 100 200

1:5000 @ A3

300 400 500m150

Page 46: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

1

3

5

4

67

CB31

CB30

72518.00

1

4DRAWING No:

PROJECT No:

REVISION:

20.10.2011CLIENT: DATE:

M2 Site Borehole Location PlanNorth Ryde Station Precinct

Transport for NSW

N

200 300m10080604020100 150

1:3000 @ A3

Legend

Borehole location(Douglas Partners)

Borehole location(previous investigation)

BH1

SH100

5 A

5 A

P:\72

51

8.0

0N

OR

TH

RY

DE

,M

2P

recin

ctG

SY

\Dra

win

gs\7

251

8_

4.d

wg,5

/11/2

012

8:5

7:2

4A

M

Page 47: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

Tops

oil

San

dsto

ne fi

ne g

rain

ed

Sha

le

Silt

ston

e

Silt

y C

lay

San

dsto

ne c

oars

egr

aine

d

Filli

ng

Bas

ecou

rse

Cor

e Lo

ss

LEG

EN

DD

ISTA

NC

E A

LON

G P

RO

FILE

(m)

RO

CK

STR

EN

GTH

SO

IL C

ON

SIS

TEN

CY

TES

TS /

OTH

ER

EL

Ext

rem

ely

Low

Ver

y Lo

w

Med

ium

Hig

hV

ery

Hig

h

Low

VL

L M H VH

hvst

stfsvsve

ry s

oft

soft

firm

stiff

very

stif

fha

rd

vlve

ry lo

ose

loos

el m

dm

ediu

m d

ense

dens

ed

very

den

sevd

Sta

ndar

d pe

netra

tion

test

val

ueW

ater

leve

lN

300

200

100

0

253035404550556060 55 50 45 40 35 30 25

700

600

500

400

NO

TE: S

umm

ary

logs

onl

y. S

houl

d be

read

in c

onju

nctio

n w

ith d

etai

led

logs

.

Bot

tom

Dep

th2.

2 m

Offs

et 5

.0m

1

Bot

tom

Dep

th10

.45

m

2O

ffset

6.5

m N =

13

Roc

k S

treng

th EHVHHMLVLEL

Bot

tom

Dep

th10

.19

m

Offs

et 2

9.0m

4O

ffset

8.2

mC

B31

Roc

k S

treng

th

EHVHHMLVLEL

Bot

tom

Dep

th41

m

Roc

k S

treng

th EHVHHMLVLEL

7O

ffset

4.3

m

Bot

tom

Dep

th9.

55 m

ELEVATION (AHD)

A'

A

refu

sal

Gro

und

prof

ile

DR

AW

ING

No:

PR

OJE

CT

No:

RE

VIS

ION

:

CLI

EN

T:

DR

AW

N B

Y:

SC

ALE

:D

ATE

:

OFF

ICE

:

TITL

E:

Tran

spor

t for

NS

W

Syd

ney

As

show

n

JCP

7.11

.201

1

7251

8

5 1

Cro

ss-S

ectio

n A

M2

Site

Nor

th R

yde

Stat

ion

Prec

inct

Sca

le 1

:200

0 (H

) 1:2

00 (V

) @A

3

App

roxi

mat

e su

ppor

tzo

ne o

f EC

RL

Page 48: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

1

3

5

4

67

CB30

CB31

72518.00

1

6DRAWING No:

PROJECT No:

REVISION:

20.10.2011CLIENT: DATE:

Approximate Location of ECRL,Shaft and DeclineM2 SiteNorth Ryde Station Precinct

Transport for NSW

N

200 300m10080604020100 150

1:3000 @ A3

Legend

Borehole location(Douglas Partners)

Borehole location(previous investigation)

1

SH100

Tunnel alignment

Decline

Shaft

P:\72

51

8.0

0N

OR

TH

RY

DE

,M

2P

recin

ctG

SY

\Dra

win

gs\7

251

8_

6.d

wg,5

/11/2

012

8:5

8:3

9A

M

Page 49: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

SH101

SH103

CB32

TC1

TC2

TC3 SH100

44864-644864-5

44864-7

44864-3

44864-244864-8

44864-1

44864-4

10

11

TC23

TC22

TC21

P:\72

51

8.0

0N

OR

TH

RY

DE

,M

2P

recin

ctG

SY

\Dra

win

gs\7

251

8_

7.d

wg,5

/11/2

012

8:5

9:0

5A

M

72518.00

1

7DRAWING No:

PROJECT No:

REVISION:

20.10.2011CLIENT: DATE:

Borehole Location PlanStation Site NorthNorth Ryde Station Precinct

Transport for NSW

N

Station Site North

0 2 4 6 8 10

1:200 @ A3

20m151 3

LegendBorehole location(Douglas Partners)

Borehole location(previous investigation)

1

SH100

9B

9B

BC Section location

Page 50: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

SH101

SH103

CB32

TC1

TC2

TC3 SH100

44864-644864-5

44864-7

44864-3

44864-244864-8

44864-1

44864-4

10

TC23

TC22

TC21

11

P:\72

51

8.0

0N

OR

TH

RY

DE

,M

2P

recin

ctG

SY

\Dra

win

gs\7

251

8_

8.d

wg,5

/11/2

012

8:5

9:3

2A

M

72518.00

1

8DRAWING No:

PROJECT No:

REVISION:

20.10.2011CLIENT: DATE:

Borehole Location PlanStation Site SouthNorth Ryde Station Precinct

Transport for NSW

N

Station Site South

0 2 4 6 8 10

1:200 @ A3

20m151 3

LegendBorehole location(Douglas Partners)

Borehole location(previous investigation)

1

SH100

9 C

9 C

BC Section location

Page 51: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

050

100

150

200

250

300

350

1015202530354045505555 50 45 40 35 30 25 20 15 10

ELEVATION (AHD)

DIS

TAN

CE

ALO

NG

PR

OFI

LE (m

)

NO

TE: S

umm

ary

logs

onl

y. S

houl

d be

read

in c

onju

nctio

n w

ith d

etai

led

logs

.

LEG

EN

D

Cor

e Lo

ss

Asp

halti

c C

oncr

ete

Filli

ng

San

dsto

ne c

oars

e gr

aine

dS

ilt

Sha

ly C

lay

Sha

le

San

dsto

ne fi

ne g

rain

edS

iltst

one

Gro

und

prof

ile

RO

CK

STR

EN

GTH

SO

IL C

ON

SIS

TEN

CY

TES

TS /

OTH

ER

EL

Ext

rem

ely

Low

Ver

y Lo

w

Med

ium

Hig

hV

ery

Hig

h

Low

VL

L M H VH

hvst

stfsvsve

ry s

oft

soft

firm

stiff

very

stif

fha

rd

vlve

ry lo

ose

loos

el m

dm

ediu

m d

ense

dens

ed

very

den

sevd

Sta

ndar

d pe

netra

tion

test

val

ueW

ater

leve

lN

B'

B

Bot

tom

Dep

th45

m

Bot

tom

Dep

th42

m

Bot

tom

Dep

th40

.1 m

TC3

Offs

et -

0.3m

Offs

et -

3.5m

TC2

TC1

Offs

et -

0.2m

5657

5657

DR

AW

ING

No:

PR

OJE

CT

No:

RE

VIS

ION

:

CLI

EN

T:

DR

AW

N B

Y:

SC

ALE

:D

ATE

:

OFF

ICE

:

TITL

E:

Tran

spor

t for

NS

W

Syd

ney

As

show

n

JCP

7.11

.201

1

7251

8

9 1

Cro

ss-S

ectio

n B

Stat

ion

Site

Nor

thN

orth

Ryd

e St

atio

n Pr

ecin

ct

Sca

le 1

:100

0 (H

) 1:3

00 (V

) @A

3

Page 52: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

RO

CK

STR

EN

GTH

SO

IL C

ON

SIS

TEN

CY

TES

TS /

OTH

ER

EL

Ext

rem

ely

Low

Ver

y Lo

w

Med

ium

Hig

hV

ery

Hig

h

Low

VL

L M H VH

hvst

stfsvsve

ry s

oft

soft

firm

stiff

very

stif

fha

rd

vlve

ry lo

ose

loos

el m

dm

ediu

m d

ense

dens

ed

very

den

sevd

Sta

ndar

d pe

netra

tion

test

val

ueW

ater

leve

lN

Silt

y C

lay

San

dsto

ne fi

ne g

rain

ed

Sha

le

Sha

ly C

lay

Silt

ston

eS

ands

tone

coa

rse

grai

ned

Roa

dbas

e

Lam

inite

Filli

ngC

ore

Loss

Asp

halti

c C

oncr

ete

Cla

y

Con

cret

e

DIS

TAN

CE

ALO

NG

PR

OFI

LE (m

)

ELEVATION (AHD)

NO

TE: S

umm

ary

logs

onl

y. S

houl

d be

read

in c

onju

nctio

n w

ith d

etai

led

logs

.10152025303540455055

050

100

150

200

250

300

350

10152025303540455055

Bot

tom

Dep

th45

m

Bot

tom

Dep

th4.

9 m

Bot

tom

Dep

th8.

75 m

Bot

tom

Dep

th8.

1 m

Bot

tom

Dep

th8

m

Roc

k S

treng

th EHVHHMLVLEL

Roc

k S

treng

th EHVHHMLVLEL

Roc

k S

treng

th EHVHHMLVLEL

TC3

Offs

et 1

.3m

10O

ffset

- 12

.4m

4486

4-6

Offs

et -

9.4m

4486

4-7

Offs

et -

4.5m

4486

4-8

Offs

et -

1.4m

N =

23

N =

32

refu

sal

N =

29

N =

14

N =

11

N =

6

refu

sal

C'

C

Gro

und

prof

ile

LEG

EN

D

5656

5757

DR

AW

ING

No:

PR

OJE

CT

No:

RE

VIS

ION

:

CLI

EN

T:

DR

AW

N B

Y:

SC

ALE

:D

ATE

:

OFF

ICE

:

TITL

E:

Tran

spor

t for

NS

W

Syd

ney

As

show

n

JCP

7.11

.201

1

7251

8

10 1

Cro

ss-S

ectio

n C

Stat

ion

Site

sN

orth

Ryd

e St

atio

n Pr

ecin

ct

Sca

le 1

:100

0 (H

) 1:3

00 (V

) @A

3

Page 53: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

9

P:\72

51

8.0

0N

OR

TH

RY

DE

,M

2P

recin

ctG

SY

\Dra

win

gs\7

251

8_

11

.dw

g,5/1

1/2

012

9:0

0:4

3A

M

72518.00

1

11DRAWING No:

PROJECT No:

REVISION:

20.10.2011CLIENT: DATE:

Borehole Location PlanRMS SiteNorth Ryde Station Precinct

Transport for NSW

N

0 5 10 20

1:500 @ A3

30 40 50m15

Legend

Borehole location(Douglas Partners)

1

Page 54: 72518 North Ryde Preliminary Report Final · xSILTY CLAY: firm to hard, light grey and red, high plasticity; silty clay, to depths of 1.9 m to 2.2 m in Boreholes 4, 6, 9 and 10 only;

8

P:\72

51

8.0

0N

OR

TH

RY

DE

,M

2P

recin

ctG

SY

\Dra

win

gs\7

251

8_

12

.dw

g,5/1

1/2

012

9:0

1:0

2A

M

72518.00

1

12DRAWING No:

PROJECT No:

REVISION:

20.10.2011CLIENT: DATE:

Borehole Location PlanOSL SiteNorth Ryde Station Precinct

Transport for NSW

N

0 10 20 30 40 50

1:1000 @ A3

100m75

Legend

Borehole location(Douglas Partners)

1