BPMS QUALITY DOCUMENT Process No.: 7.2 Ver.3 Department: Training Date of Issue: November 3, 2006 Covers newly hired trainers I. OBJECTIVE II. SCOPE To provide guidelines for the orientation and induction of new trainers Page No.: 1 of 6 Compiled and Controlled by: Approved by: Benel Pilar Strategic Quality – Manager Arvy Villamarzo Process Owner – Training Head Printed copies will only be valid if signed by the Process Owner and Manager - Strategic Quality

7.02 Procedure for Orientation and Induction of New Trainers v3

Embed Size (px)

DESCRIPTION

procedure for OR & IND new trainers

Citation preview

Page 1: 7.02 Procedure for Orientation and Induction of New Trainers v3

BPMSQUALITYDOCUMENT Process No.: 7.2 Ver.3

Department: Training Date of Issue: November 3, 2006

Covers newly hired trainers

I. OBJECTIVE

II. SCOPE

• To provide guidelines for the orientation and induction of new trainers

Page No.: 1 of 6

Compiled and Controlled by: Approved by:

Benel Pilar

Strategic Quality – Manager

Arvy Villamarzo

Process Owner – Training Head

Printed copies will only be valid if signed by the Process Owner and Manager - Strategic Quality

Page 2: 7.02 Procedure for Orientation and Induction of New Trainers v3

BPMSQUALITYDOCUMENT Process No.: 7.2 Ver.3

Department: Training Date of Issue: November 3, 2006

Compiled and Controlled by: Approved by:

III. FLOW CHART

Page No.: 2 of 6

•Signed PBC and

uploaded to People

Soft

•Trainer Expectations

•Corporate Goals

•Trainees

•Other Departments

•New Trainer

•HR

•Recruitment

•Training Manager

Flowchart

No. of New Trainers

New Trainer meets Training Manager

New Trainer joins team

Training Manager

explains PBC

New Trainer signs

PBC and uploads

to People Soft

Benel Pilar

Strategic Quality – Manager

Arvy Villamarzo

Process Owner – Training Head

Printed copies will only be valid if signed by the Process Owner and Manager - Strategic Quality

Page 3: 7.02 Procedure for Orientation and Induction of New Trainers v3

BPMSQUALITYDOCUMENT Process No.: 7.2 Ver.3

Department: Training Date of Issue: November 3, 2006

FLOWCHART

Page No.: 3 of 6

1. HR hires a new

trainer

3. TC coordinates

with HR and IT for

HRID and network

connectivity

2. DGM updates

org chart

4. Training

Manager prepares

the PBC sheet

KCP

6. New trainer signs hard copy of

PBC and uploads soft copy into

PeopleSoft

8. TM introduces

the new trainer to

the team

Certification

of VA Trainer

5. TM explains

PBC and other

goals

7. TC forwards

signed copies of

PBC to HRD

Printed copies will only be valid if signed by the Process Owner and Manager - Strategic Quality

Page 4: 7.02 Procedure for Orientation and Induction of New Trainers v3

BPMSQUALITYDOCUMENT Process No.: 7.2 Ver.3

Department: Training Date of Issue: November 3, 2006

5. Training Manager explains PBC to new trainer

Who: TM or Head of Training

What: Discussion of PBC

When: First day of work

Why: For new trainers complete understanding of the PBC

How: One to one discussion of PBC

6. New trainer signs PBC and uploads to People Soft

Who: New trainer

What: Signs PBC and upload to People Soft

When: After the discussion with TM

Why: For reference and documentation

How: Signs hard copies and access to People Soft for PBC

upload

7. Training Coordinator forwards signed PBC to HR

Who: Training Coordinator

What: Submission of PBC to HR

When: After new trainer signs PBC

Why: For reference and documentation

How: HR receives signed PBC copies

8. Training Manager introduces new trainer to the team

Who: Training Manager

What: Introduction of new trainer to the team

When: New trainer’s first day

Why: To welcome the new trainer

How: Introduces to team

1. HR hires a new trainer

Who: Human Resource Department

What: New VA Trainer

When: If there is an open slot for new trainers

Why: Attrition replacement or to meet increase in manpower

needs

How: Conduct interview with CRT and Training

2. DGM - Training updates Org Chart

Who: DGM - Training

What: Updates Org Chart

When: When HR informs Training start date of new trainer

Why: To revise previous org chart

How: By adding new trainer on list

3. Training Coordinator coordinates with HR for HRID and IT

for network connectivity

Who: Training Coordinator

What: Process HRID and provide network access

When: Upon hiring of new trainers

Why: For preparation of company ID / PC and phone set up

4. Preparation of new trainer’s PBC

Who: Training Manager

What: Prepares PBC of new trainer

When: Upon hiring of new trainer

Why: For discussion and orientation with new trainer

How: By basing new trainer’s PBC on PBC of superior

IV. NARRATIVE

Page No.: 4 of 6

Printed copies will only be valid if signed by the Process Owner and Manager - Strategic Quality

Page 5: 7.02 Procedure for Orientation and Induction of New Trainers v3

BPMSQUALITYDOCUMENT Process No.: 7.2 Ver.3

Department: Training Date of Issue: November 3, 2006

New trainer signs the PBC and uploads to People SoftOrientation and Induction of New Trainers

KCPProcess

V. KEY CONTROL POINTS

Page No.: 5 of 6

VI. SOD MATRIX

xDGM - Training

xxTC

xNew Trainer

xxxTraining Manager

xHRD

87654321

Orientation and Induction of New Trainers

Printed copies will only be valid if signed by the Process Owner and Manager - Strategic Quality

Page 6: 7.02 Procedure for Orientation and Induction of New Trainers v3

BPMSQUALITYDOCUMENT Process No.: 7.2 Ver.3

Department: Training Date of Issue: November 3, 2006

VII. LIST OF ARTIFACTS / RECORDS

Date of Issue:

VIII. SUMMARY OF CHANGES

Page No.: 6 of 6

1. Signed PBC

2. PBC uploaded in People Soft

Arvy VillamarzoAddition of process

objective, scope,

process narrative,

identification of key

control points, SOD

matrix, artifacts/records

and summary of

changes

2/2/20062

Arvy VillamarzoVictor ManlansingChanged process

flowchart, narrative,

KCP, SOD matrix &

records

11/03/20063

Date Approved Approved byReviewed byNature of Change Version Date Version

Printed copies will only be valid if signed by the Process Owner and Manager - Strategic Quality