7-Year Statement (2014-2020) Page 50 Desalination Capacity Requirement – Musandam OPWP has not been provided water demand projections for the Musandam Governorate, but has been requested by PAEW to procure an IWP with capacity of about 13,000 m3/d (3 MIGD) to provide water to Khasab City. 3.4 PROCUREMENT ACTIVITIES OPWP expects to procure both power generation and desalinated water facilities for operation in Ad Duqm and the Musandam Governorate in the near future. These projects include the following: Musandam IPP, with net firm capacity of 100 MW utilizing dual fuel engines. The IPP will be owned by a consortium led by Oman Oil Company, and operated under a PPA with OPWP for supply to RAECO. The EPC tender is expected to be issued in the first quarter of 2014, with anticipated COD in the fourth quarter of 2016. Khasab IWP, with capacity in the range of 13,000 m 3 /d (3 MIGD) using RO technology, for supply to PAEW. The tender is expected to be issued in the third quarter of 2014, with anticipated COD in the fourth quarter of 2015. Duqm IWP, with capacity in the range of 30,000 m 3 /d (6 MIGD) using RO technology, for supply to PAEW. The tender is expected to be issued in the fourth quarter of 2014, with anticipated COD in the fourth quarter of 2017. In addition to these procurement actions, OPWP expects to finalize plans for a potential Duqm IPP during 2014, for COD in about 2018. The installed capacity is expected to be in the range of 300 MW to 400 MW, but this specification is pending the outcome of OPWP’s ongoing Ad Duqm study.

7 Years Statement 2014-2020 54

Embed Size (px)

DESCRIPTION

OPWP 2020 54

Citation preview

  • 7-Year Statement (2014-2020) Page 50

    Desalination Capacity Requirement Musandam

    OPWP has not been provided water demand projections for the Musandam Governorate, but has been

    requested by PAEW to procure an IWP with capacity of about 13,000 m3/d (3 MIGD) to provide water to

    Khasab City.

    3.4 PROCUREMENT ACTIVITIES

    OPWP expects to procure both power generation and desalinated water facilities for operation in Ad Duqm

    and the Musandam Governorate in the near future. These projects include the following:

    Musandam IPP, with net firm capacity of 100 MW utilizing dual fuel engines. The IPP will be owned by

    a consortium led by Oman Oil Company, and operated under a PPA with OPWP for supply to RAECO.

    The EPC tender is expected to be issued in the first quarter of 2014, with anticipated COD in the

    fourth quarter of 2016.

    Khasab IWP, with capacity in the range of 13,000 m3/d (3 MIGD) using RO technology, for supply to

    PAEW. The tender is expected to be issued in the third quarter of 2014, with anticipated COD in the

    fourth quarter of 2015.

    Duqm IWP, with capacity in the range of 30,000 m3/d (6 MIGD) using RO technology, for supply to

    PAEW. The tender is expected to be issued in the fourth quarter of 2014, with anticipated COD in the

    fourth quarter of 2017.

    In addition to these procurement actions, OPWP expects to finalize plans for a potential Duqm IPP during

    2014, for COD in about 2018. The installed capacity is expected to be in the range of 300 MW to 400 MW, but

    this specification is pending the outcome of OPWPs ongoing Ad Duqm study.